CN212865964U - Safety protection device is used in electricity operation construction - Google Patents

Safety protection device is used in electricity operation construction Download PDF

Info

Publication number
CN212865964U
CN212865964U CN202021257289.2U CN202021257289U CN212865964U CN 212865964 U CN212865964 U CN 212865964U CN 202021257289 U CN202021257289 U CN 202021257289U CN 212865964 U CN212865964 U CN 212865964U
Authority
CN
China
Prior art keywords
side bearer
fixed
construction
loop bar
reinforcing groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021257289.2U
Other languages
Chinese (zh)
Inventor
丁绍江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honghe Mechanical & Electrical Engineering Co ltd
Original Assignee
Honghe Mechanical & Electrical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honghe Mechanical & Electrical Engineering Co ltd filed Critical Honghe Mechanical & Electrical Engineering Co ltd
Priority to CN202021257289.2U priority Critical patent/CN212865964U/en
Application granted granted Critical
Publication of CN212865964U publication Critical patent/CN212865964U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a safety device is used in electricity operation construction, including construction ground, the cable pit has been seted up at construction ground top, the opposition of cable pit internal face is equipped with first side bearer and second side bearer, the top outside of first side bearer and second side bearer is all fixed and is equipped with the installation piece, the fixed collar that is equipped with in installation piece top, wear to be equipped with the dead lever in collar and the installation piece, the fixed drill bit that is equipped with in dead lever bottom. This safety device is used in electricity operation construction is through setting up first side bearer and second side bearer in the cable pit, through the dead lever, the fixed work of first side bearer, second side bearer is realized to collar and installation piece, can carry out stable supporting work between first side bearer and the second side bearer through setting up adjustable loop bar and movable rod, thereby realize preventing the problem of soil collapse to the cable pit, and set up supplementary roller and protective sheath and be used for the supplementary transport work to the cable protection pipe, use manpower sparingly, improve work efficiency.

Description

Safety protection device is used in electricity operation construction
Technical Field
The utility model relates to a pre-buried construction technical field of cable specifically is a safety device is used in electrical operation construction.
Background
Before cable pre-embedding construction, a groove needs to be excavated, enough working space is ensured according to the width of a cable trench, side lines are drawn, the trend elevation of an underground pipeline is ascertained before the cable trench is excavated, a sample hole is excavated and marked, monitoring is carried out at any time during construction and protection is carried out, and the following requirements are met when the groove is excavated (1) the safety of various pipelines and other facilities cannot be influenced; (2) the fire hydrant, the pipeline gate valve, the rainwater inlet, the measuring mark and well covers of various underground pipelines can not be buried, the normal use of the fire hydrant, the pipeline gate valve, the rainwater inlet, the measuring mark and the well covers can not be influenced, the cable protection pipe can be laid only after the bottom of the fire hydrant is trimmed and leveled, and then the fire hydrant, the pipeline gate valve, the rainwater inlet, the measuring mark and the well covers.
Carry out cable again and wear to establish work after carrying cable protection pipe among the prior art in the cable pit, because the pre-buried construction engineering of cable is great, it is comparatively difficult when artifical removes in the cable pit to cable protection pipe to the problem that the construction was hindered to soil collapse appears in the cable pit easily.
The utility model discloses a cable for road construction with protector that has now, application number CN201920975718.0 is through setting up cable shell body, one-level protection mechanism, second grade protection mechanism, cable protection pipe, cable core, rubber protection layer, back up coat, reinforcing mechanism to the realization is fixed the protection to the department of meeting between the cable, but this cable for road construction with protector does not possess the safeguard function to the soil collapse problem in the cable pit, to prior art's not enough, the safety device for electric operation construction of prior art design.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a safety device is used in electrical operation construction to solve the current cable for road construction that has protector that provides among the above-mentioned background art and do not possess the safeguard function's problem to soil collapse problem in the cable pit.
In order to realize the above-mentioned purpose, the utility model provides a following technical scheme, a safety device is used in electrical operation construction, including construction ground, the cable pit has been seted up at construction ground top, the opposition of cable pit internal face is equipped with first side bearer and second side bearer, the top outside of first side bearer and second side bearer is all fixed and is equipped with the installation piece, the fixed collar that is equipped with in installation piece top, wear to be equipped with the dead lever in collar and the installation piece, the fixed drill bit that is equipped with in dead lever bottom, and the fixed construction warning sign that is equipped with in dead lever top, the fixed supplementary roller that is equipped with between first side bearer and the second side bearer bottom, and first reinforcing groove has been seted up to first side bearer inboard, second reinforcing groove has been seted up to second side bearer inboard, first reinforcing inslot activity is equipped with the loop bar, second reinforcing inslot activity is equipped with the movable rod.
Preferably, the surface of the fixing rod is provided with threads, the inner wall surface of the mounting ring is provided with a thread groove meshed with the surface of the fixing rod, and the lower end of the fixing rod sequentially penetrates through the mounting ring and the mounting block to be located in the construction site.
Preferably, the surface of the auxiliary roller is fixedly provided with a protective sleeve, the protective sleeve is in a circular cylinder shape, and the protective sleeve is made of rubber.
Preferably, the first reinforcing groove and the second reinforcing groove are both columnar grooves.
Preferably, the loop bar is cylindricly, and the loop bar is hollow structure, and loop bar one end is open structure, the loop bar other end is contradicted in first reinforcing inslot.
Preferably, the movable rod is cylindric, and the movable rod surface is equipped with the screw thread, loop bar internal face is equipped with the thread groove with the interlock of movable rod surface mutually, and the movable rod keeps away from loop bar one end and contradicts in the second reinforcing inslot.
Compared with the prior art, the beneficial effects of the utility model are that: this safety device is used in electricity operation construction is through setting up first side bearer and second side bearer in the cable pit, through the dead lever, the fixed work of first side bearer, second side bearer is realized to collar and installation piece, can carry out stable supporting work between first side bearer and the second side bearer through setting up adjustable loop bar and movable rod, thereby realize preventing the problem of soil collapse to the cable pit, and set up supplementary roller and protective sheath and be used for the supplementary transport work to the cable protection pipe, use manpower sparingly, improve work efficiency.
Drawings
FIG. 1 is a front sectional view of a safety protection device for electrical work construction of the present invention;
FIG. 2 is a schematic view of the front structure of a safety protection device for electric work construction of the present invention;
fig. 3 is the utility model relates to a safety device for electrical operation construction overlooks the schematic structure.
In the figure: 1. the construction method comprises the following steps of construction ground, 2, a cable trench, 3, a first side frame, 4, a second side frame, 5, an installation block, 6, an installation ring, 7, a fixed rod, 8, a drill bit, 9, a construction warning board, 10, an auxiliary roller, 11, a first reinforcing groove, 12, a second reinforcing groove, 13, a loop bar, 14, a movable rod, 15 and a protective sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a safety protection device for electric operation construction comprises a construction ground 1, a cable trench 2 is arranged at the top of the construction ground 1, a first side frame 3 and a second side frame 4 are oppositely arranged on the inner wall surface of the cable trench 2, installation blocks 5 are fixedly arranged on the outer sides of the tops of the first side frame 3 and the second side frame 4, an installation ring 6 is fixedly arranged at the top of the installation block 5, a fixing rod 7 penetrates through the installation ring 6 and the installation block 5, the surface of the fixing rod 7 is provided with threads, the inner wall surface of the inner ring of the installation ring 6 is provided with thread grooves meshed with the surface of the fixing rod 7, the lower end of the fixing rod 7 sequentially penetrates through the installation ring 6, the installation block 5 is positioned in the construction ground 1, the installation ring 6 and the installation block 5 can be synchronously fixed at the top of the construction ground 1 through the fixing rod 7, so that the fixing work of the first side frame 3 and the second side frame 4 is respectively realized, a drill bit 8, a construction warning board 9 is fixedly arranged at the top of the fixed rod 7, an auxiliary roller 10 is fixedly arranged between the bottoms of the first side frame 3 and the second side frame 4, a protective sleeve 15 is fixedly arranged on the surface of the auxiliary roller 10, the protective sleeve 15 is in a circular cylindrical shape, the protective sleeve 15 is made of rubber, the auxiliary roller 10 can be used for assisting in carrying the cable protection tubes, so that when a plurality of groups of safety protection devices for electric operation construction are arranged, the cable protection tubes are arranged on the plurality of groups of auxiliary rollers 10 in a lap joint mode to facilitate carrying work, the function of saving manpower is realized, the cable protection tubes can be protected during carrying through the protective sleeve 15, a first reinforcing groove 11 is arranged on the inner side of the first side frame 3, a second reinforcing groove 12 is arranged on the inner side of the second side frame 4, the first reinforcing groove 11 and the second reinforcing groove 12 are both columnar grooves, a sleeve rod 13 is movably arranged in the first reinforcing groove 11, a movable rod 14 is movably arranged in the second reinforcing, loop bar 13 is cylindricly, and loop bar 13 is hollow structure, and loop bar 13 one end is open structure, the loop bar 13 other end is contradicted in first reinforcement groove 11, movable rod 14 is cylindricly, and movable rod 14 surface is equipped with the screw thread, loop bar 13 internal face is equipped with the thread groove with the interlock of movable rod 14 surface mutually, and movable rod 14 keeps away from loop bar 13 one end and contradicts in second reinforcement groove 12, accessible thread structure realizes the linkage work of movable rod 14 in loop bar 13 like this, and be convenient for adjust work to movable rod 14 and loop bar 13 through thread structure, thereby contradict in first reinforcement groove 11 through loop bar 13, movable rod 14 contradicts and realizes the reinforcement support work between first side frame 3 and the second side frame 4 in second reinforcement groove 12, and then can effectively prevent the collapse problem of soil in cable pit 2.
The working principle is as follows: when the safety protection device for electric operation construction is used, the safety protection device for electric operation construction is firstly placed in a cable trench 2, the outer sides of a first side frame 3 and a second side frame 4 are respectively contacted with the inner wall surface of the cable trench 2, a fixed rod 6 penetrates through a mounting ring 6 and a mounting block 5 through a thread structure and then is positioned in a construction ground 1, so that the fixing work of the first side frame 3 and the second side frame 4 is realized, a movable rod 14 is connected with a loop bar 13, the loop bar 13 is abutted in a first reinforcing groove 11 and the movable rod 14 is abutted in a second reinforcing groove 12 by adjusting the position of the movable rod 14 in the loop bar 13, the reinforcing and supporting work between the first side frame 3 and the second side frame 4 is realized, a plurality of groups of safety protection devices for electric operation construction are arranged in the cable trench 2, cable protection pipes are erected on a plurality of groups of auxiliary rollers 10, and the moving work of the cable protection pipes is realized, the working process of the safety protection device for the electric operation construction is described above.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a safety device is used in electrical operation construction, includes construction ground (1), cable pit (2) have been seted up at construction ground (1) top, the opposition of cable pit (2) internal face is equipped with first side bearer (3) and second side bearer (4), its characterized in that: the top outside of first side bearer (3) and second side bearer (4) all is fixed and is equipped with installation piece (5), the fixed collar (6) that is equipped with in installation piece (5) top, wear to be equipped with dead lever (7) in collar (6) and installation piece (5), dead lever (7) bottom is fixed and is equipped with drill bit (8), and dead lever (7) top is fixed and is equipped with construction warning sign (9), fixed between first side bearer (3) and second side bearer (4) bottom is equipped with supplementary roller (10), and first reinforcing groove (11) have been seted up to first side bearer (3) inboard, second reinforcing groove (12) have been seted up to second side bearer (4) inboard, first reinforcing groove (11) internalization is equipped with loop bar (13), second reinforcing groove (12) internalization is equipped with movable rod (14).
2. The safety protection device for electric work construction according to claim 1, wherein: the surface of the fixing rod (7) is provided with threads, the inner wall surface of the inner ring of the mounting ring (6) is provided with a thread groove meshed with the surface of the fixing rod (7), and the lower end of the fixing rod (7) sequentially penetrates through the mounting ring (6) and the mounting block (5) to be located in the construction ground (1).
3. The safety protection device for electric work construction according to claim 1, wherein: auxiliary roller (10) fixed surface is equipped with protective sheath (15), protective sheath (15) are the ring cylinder form, and protective sheath (15) are the rubber material.
4. The safety protection device for electric work construction according to claim 1, wherein: the first reinforcing groove (11) and the second reinforcing groove (12) are both columnar grooves.
5. The safety protection device for electric work construction according to claim 1, wherein: loop bar (13) are cylindricly, and loop bar (13) are hollow structure, and loop bar (13) one end is open structure, loop bar (13) other end is contradicted in first reinforcing groove (11).
6. The safety protection device for electric work construction according to claim 5, wherein: the movable rod (14) is cylindrical, threads are arranged on the surface of the movable rod (14), a thread groove meshed with the surface of the movable rod (14) is formed in the inner wall surface of the sleeve rod (13), and one end, far away from the sleeve rod (13), of the movable rod (14) abuts against the second reinforcing groove (12).
CN202021257289.2U 2020-07-02 2020-07-02 Safety protection device is used in electricity operation construction Expired - Fee Related CN212865964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021257289.2U CN212865964U (en) 2020-07-02 2020-07-02 Safety protection device is used in electricity operation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021257289.2U CN212865964U (en) 2020-07-02 2020-07-02 Safety protection device is used in electricity operation construction

Publications (1)

Publication Number Publication Date
CN212865964U true CN212865964U (en) 2021-04-02

Family

ID=75212535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021257289.2U Expired - Fee Related CN212865964U (en) 2020-07-02 2020-07-02 Safety protection device is used in electricity operation construction

Country Status (1)

Country Link
CN (1) CN212865964U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115776086A (en) * 2023-02-13 2023-03-10 成都建工第三建筑工程有限公司 Cable wiring support device suitable for drainage tunnel and utility tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115776086A (en) * 2023-02-13 2023-03-10 成都建工第三建筑工程有限公司 Cable wiring support device suitable for drainage tunnel and utility tunnel

Similar Documents

Publication Publication Date Title
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN102889428B (en) Non-excavation correction method and apparatus of pipeline center line deviation after pipe-jacking construction
CN108316952A (en) Extremely frigid zones tunnel insulation waterproof and water drainage system
CN110715111B (en) Pipe jacking and casing pipe construction method
CN111502682B (en) Trenchless pipe jacking construction device and construction method
CN212865964U (en) Safety protection device is used in electricity operation construction
CN105370315A (en) Drainage construction technology for seasonally-frozen ground tunnel
CN207194008U (en) A kind of underground pipe gallery for municipal integration engineering
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN206396862U (en) A kind of clear and coherent sewage inspection well of the pipe gallery combination of inner and outside
CN205355694U (en) Non - excavation cable push pipe
CN112832864A (en) Electric power tunnel pipe culvert
CN206487410U (en) A kind of drilling mechanism and small-sized pipe laying equipment
CN111851703A (en) Large-diameter pipeline outdoor construction butt joint assembly and construction method
CN111064113A (en) Construction method of building construction embedded pipe
CN220057961U (en) A monitoring facilities that is used for precast pile sinking process to prevent crowding soil
Sinna Application of trenchless construction technology in construction of water supply and drainage in urban road construction
CN112377252B (en) Removable tunnel lateral wall water drainage hole device convenient to mediation
CN212657355U (en) Pipeline installation anti-floating device
CN213508468U (en) Water conservancy grouting device for hollow part of horizontal directional drill collar
CN215071572U (en) Electric power protection tube buckling tube
CN213116339U (en) Wall-penetrating water stop structure for mechanical pipe-jacking circular working well opening
CN208508482U (en) The town road cable of low cost is pre-buried with laying bricks
CN213510622U (en) Push bench for hydraulic engineering
CN214464184U (en) Extrusion type shield device under complex pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210402

CF01 Termination of patent right due to non-payment of annual fee