CN212836589U - Lifting device for building engineering - Google Patents
Lifting device for building engineering Download PDFInfo
- Publication number
- CN212836589U CN212836589U CN202020270150.5U CN202020270150U CN212836589U CN 212836589 U CN212836589 U CN 212836589U CN 202020270150 U CN202020270150 U CN 202020270150U CN 212836589 U CN212836589 U CN 212836589U
- Authority
- CN
- China
- Prior art keywords
- lifting
- placing plate
- groove
- rod
- movably connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to a building engineering technical field just discloses a elevating gear for building engineering, including the transport vechicle, the top of transport vechicle is equipped with places the board, the sliding tray has been seted up to the inside of transport vechicle, the inside swing joint of sliding tray has the sliding block, the top of sliding block runs through the sliding tray and extends to the top of transport vechicle, the upper portion fixed mounting of transport vechicle has the fixed block, the quantity of fixed block is eight, four the lateral surface of fixed block and the bottom fixed connection who places the board, wherein two the bottom of fixed block and the top fixed connection of sliding block. Make the convenient pivoted effect of crane through the activity bull stick of crane below, thereby cooperation hydraulic pressure support equipment advance make the crane can be steady keep flat to the top of placing the board, avoided the crane to lead to very inconvenient of process of transportation because the high restriction of self demand makes can touch the circuit cable and so on the way in the transportation.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a elevating gear for building engineering.
Background
The lifting machinery or device of a platform or semi-enclosed platform for carrying people or goods on a vertical upper and lower passage of a lift is an integral body consisting of the platform and the equipment for operating the platform, a motor, cables and other auxiliary equipment.
The lift for building often can take place the top of lift and can touch the electric wire and cable on the road and so on because the problem of self height at the in-process of transportation, very inconvenient during the transportation because most lifts do not set up the emergence of the equipment of the lift of keeping flat and leading to above problem at present, because the building height of building itself differs sometimes need go up the high of lift once more moreover, does not possess the function of increasing the height once more in the present lift that has.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a lifting device for building engineering possesses the lift of keeping flat when transporting and increases advantages such as lift self height, has solved because inconvenient problem when lift self height transports.
(II) technical scheme
For the purpose of realizing the lift of keeping flat and increasing lift self height when above-mentioned transportation, the utility model provides a following technical scheme: a lifting device for construction engineering comprises a transport vehicle, wherein a placing plate is arranged above the transport vehicle, a sliding groove is formed in the transport vehicle, sliding blocks are movably connected in the sliding groove, the top ends of the sliding blocks penetrate through the sliding groove and extend to the top of the transport vehicle, fixed blocks are fixedly mounted on the upper portion of the transport vehicle, the number of the fixed blocks is eight, the outer side surfaces of the four fixed blocks are fixedly connected with the bottom of the placing plate, the bottoms of the two fixed blocks are fixedly connected with the top of the sliding block, a bearing block is fixedly mounted at the top of the placing plate, a movable rotating rod is movably connected in the bearing block, a lifting frame is movably connected in the bearing block through the movable rotating rod, the outer side surface of the lifting frame is movably connected with the placing plate through a supporting rod, a stretching groove is formed in the placing plate, the inner part of the stretching groove is movably connected with a rotary supporting plate, the top of the rotary supporting plate penetrates through the stretching groove and extends to the outer side face of the placing plate, the top end of the rotary supporting plate is movably connected with hydraulic supporting equipment, the top end of the hydraulic supporting equipment is movably connected with the left side face of the lifting frame, the two lifting frames are symmetrically distributed by taking the axis of the placing plate as a center, and a lifting fixing rod is fixedly installed between the two lifting frames.
Preferably, the lifting fixing rod is internally provided with a lifter groove, and the lifter is fixedly arranged in the lifter groove.
Preferably, a hanging basket is arranged below the lifting fixing rod and is fixedly connected with the output end of the elevator through a steel cable.
Preferably, the hanging basket is internally provided with a deviation-preventing groove, the outer side surface of the supporting rod is fixedly provided with a deviation-preventing rod, and the outer side surface of the deviation-preventing rod is in contact with the inner wall of the deviation-preventing groove.
Preferably, the number of the supporting rods is four, two supporting rods are in one group, and the two groups of supporting rods are symmetrically distributed by taking the axis of the placing plate as a center.
Preferably, the transport vechicle passes through the lifter of fixed block top and places board swing joint, the top fixed mounting of transport vechicle has hydraulic pressure elevating gear, hydraulic pressure elevating gear's top and lifter fixed connection.
(III) advantageous effects
Compared with the prior art, the utility model provides a lifting device for building engineering possesses following beneficial effect:
1. this elevating gear for building engineering makes the convenient pivoted effect of crane through the activity bull stick of crane below, thereby cooperation hydraulic pressure support equipment's receipts make keeping flat to the top of placing the board that the crane can be steady, avoided the crane to make the circuit cable and so on can touch the way in the transportation because the high restriction of self demand, lead to the process inconvenience very of transportation.
2. This elevating gear for building engineering, thereby it drives the removal of fixed block to make the slip of sliding block drive through the extension of the hydraulic pressure elevating gear of transport vechicle top to make the lifter upwards promote to drive the rebound that places the board, the cooperation is carried and is carried the inside lift of dead lever and is driven the drawing of hanging flower basket and has realized the purpose of going up and down, has avoided leading to elevating gear can't reach its tensile height problem because the height of specific building differs.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a side view of the structure of the present invention.
In the figure: 1 transport vechicle, 2 place the board, 3 bracing pieces, 4 bearing plates, 5 activity bull sticks, 6 erectors, 7 tensile groove, 8 hydraulic pressure support equipment, 9 rotatory backup pads, 10 lifter, 11 prevent deviating pole, 12 sliding tray, 13 sliding blocks, 14 hydraulic pressure elevating gear, 15 fixed blocks, 16 hanging flower baskets, 17 carry and draw dead lever, 18 lifts, 19 lift grooves, 20 steel cable ropes, 21 spacing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a lifting device for construction engineering, comprising a transportation vehicle 1, a placing plate 2 is arranged above the transportation vehicle 1, a sliding groove 12 is arranged inside the transportation vehicle 1, a sliding block 13 is movably connected inside the sliding groove 12, a fixed block 15 can move by arranging the sliding block 13 so as to lift the height of the placing plate 2, thereby realizing the height of a lifting frame 6, the top end of the sliding block 13 penetrates through the sliding groove 12 and extends to the top of the transportation vehicle 1, fixed blocks 15 are fixedly arranged on the upper part of the transportation vehicle 1, the number of the fixed blocks 15 is eight, the outer side surfaces of four fixed blocks 15 are fixedly connected with the bottom of the placing plate 2, wherein the bottoms of two fixed blocks 15 are fixedly connected with the top of the sliding block 13, a bearing block 4 is fixedly arranged on the top of the placing plate 2, a movable rotating rod 5 is movably connected inside the bearing block 4, the lifting frame 6 on the outer side surface can rotate, thereby realizing the purpose of the horizontally-placed lifting frame 6, the inside of the bearing block 4 is movably connected with a lifting frame 6 through a movable rotating rod 5, the outer side surface of the lifting frame 6 is movably connected with a placing plate 2 through a support rod 3, the number of the support rods 3 is four, the lifting frame 6 is more stable when being erected by arranging four support rods 3, two support rods 3 are in one group, two groups of support rods 3 are symmetrically distributed by taking the axis of the placing plate 2 as the center, a stretching groove 7 is arranged inside the placing plate 2, the inside of the stretching groove 7 is movably connected with a rotating support plate 9, the top of the rotating support plate 9 penetrates through the stretching groove 7 and extends to the outer side surface of the placing plate 2, the top of the rotating support plate 9 is movably connected with a hydraulic support device 8, the top of the hydraulic support device 8 is movably connected with the left side surface of the lifting frame 6, the number of the lifting, a lifting fixing rod 17 is fixedly arranged between the two lifting frames 6, a lifting groove 19 is arranged inside the lifting fixing rod 17, a lifter 18 is fixedly arranged inside the lifting groove 19, a hanging basket 16 is arranged below the lifting fixing rod 17, an anti-deviation groove is arranged inside the hanging basket 16, an anti-deviation rod 11 is fixedly arranged on the outer side surface of the supporting rod 3, the hanging basket 16 is prevented from shaking during lifting work by arranging the anti-deviation rod 11 to realize more stable lifting, the outer side surface of the anti-deviation rod 11 is contacted with the inner wall of the anti-deviation groove, the hanging basket 16 is fixedly connected with the output end of the lifter 18 through a steel cable 20, the transport vehicle 1 is movably connected with the placing plate 2 through a lifting rod 10 above a fixing block 15, a hydraulic lifting device 14 is fixedly arranged at the top of the transport vehicle 1, and the purpose of supporting the placing plate 2 to lift through the hydraulic lifting device 14 is achieved, the top end of the hydraulic lifting device 14 is fixedly connected with the lifting rod 10.
During operation, make sliding block 13 to hydraulic pressure elevating gear 14's one side removal through hydraulic pressure elevating gear 14's receipts, thereby make the removal of lifter 10 support placing board 2 and realized placing the purpose that board 2 risees, cooperation lift 18 rotates the drawing of driving hanging flower basket 16, thereby realize the purpose of going up and down, cooperate 16 inside anti-deviation poles 11 of hanging flower basket to make the hanging flower basket 16 draw more stable the in-process that rises and avoided going up and down unstable factor again, the top of placing board 2 is provided with hydraulic pressure support device 8 and the setting down of bracing piece 3 realization crane, thereby the problem of because high inconvenient transportation when having solved elevating gear transportation.
In summary, the lifting device for the building engineering has the advantages that the lifting frame 6 is enabled to conveniently rotate through the movable rotating rod 5 below the lifting frame 6, the hydraulic supporting equipment 8 is matched to retract, so that the lifting frame 6 can be stably and horizontally placed above the placing plate 2, and the lifting frame 6 is prevented from contacting with wires and cables on the road in the transportation process due to height limitation of self requirements, and the transportation process is inconvenient; thereby through the extension of the hydraulic pressure elevating gear 14 of transport vechicle 1 top make the slip of sliding block 13 drive the removal of fixed block 15 to make lifter 10 upwards promote the rebound that drives and place board 2, the cooperation is carried and is carried the drawing that the inside lift 18 of dead lever 17 drove hanging flower basket 16 and has realized the purpose of going up and down, has avoided leading to elevating gear can't reach its tensile high problem because the height of specific building differs.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a lifting device for building engineering, includes transport vechicle (1), its characterized in that: the trolley is characterized in that a placing plate (2) is arranged above the trolley (1), a sliding groove (12) is formed in the trolley (1), sliding blocks (13) are movably connected to the inside of the sliding groove (12), the top ends of the sliding blocks (13) penetrate through the sliding groove (12) and extend to the top of the trolley (1), fixed blocks (15) are fixedly mounted on the upper portion of the trolley (1), the number of the fixed blocks (15) is eight, the number of the four fixed blocks (15) is four, the outer side face of each fixed block (15) is fixedly connected with the bottom of the placing plate (2), the bottoms of the two fixed blocks (15) are fixedly connected with the top of the sliding blocks (13), a bearing block (4) is fixedly mounted at the top of the placing plate (2), a movable rotating rod (5) is movably connected to the inside of the bearing block (4), and a lifting frame (6) is movably connected to the inside of the bearing block (4) through, the outer side face of the lifting frame (6) is movably connected with the placing plate (2) through the supporting rod (3), a stretching groove (7) is formed in the placing plate (2), a rotary supporting plate (9) is movably connected to the inside of the stretching groove (7), the top of the rotary supporting plate (9) penetrates through the stretching groove (7) and extends to the outer side face of the placing plate (2), hydraulic supporting equipment (8) is movably connected to the top end of the rotary supporting plate (9), the top end of the hydraulic supporting equipment (8) is movably connected with the left side face of the lifting frame (6), the lifting frame (6) is two in number, the lifting frame (6) is symmetrically distributed by taking the axis of the placing plate (2) as the center, and a lifting fixing rod (17) is fixedly mounted between the lifting frame (6).
2. A lifting device for construction engineering according to claim 1, characterized in that: an elevator groove (19) is formed in the lifting fixing rod (17), and an elevator (18) is fixedly mounted in the elevator groove (19).
3. A lifting device for construction engineering according to claim 2, characterized in that: a hanging basket (16) is arranged below the lifting fixing rod (17), and the hanging basket (16) is fixedly connected with the output end of the lifter (18) through a steel cable rope (20).
4. A lifting device for construction engineering according to claim 3, characterized in that: the anti-deviation groove is formed in the hanging basket (16), the anti-deviation rod (11) is fixedly mounted on the outer side face of the supporting rod (3), and the outer side face of the anti-deviation rod (11) is in contact with the inner wall of the anti-deviation groove.
5. The lifting device for building engineering according to claim 4, characterized in that: the number of the support rods (3) is four, two support rods (3) are in one group, and the two groups of support rods (3) are symmetrically distributed by taking the axis of the placing plate (2) as the center.
6. A lifting device for construction engineering according to claim 1, characterized in that: the transport vehicle (1) is movably connected with the placing plate (2) through a lifting rod (10) above the fixing block (15), a hydraulic lifting device (14) is fixedly mounted at the top of the transport vehicle (1), and the top end of the hydraulic lifting device (14) is fixedly connected with the lifting rod (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020270150.5U CN212836589U (en) | 2020-03-07 | 2020-03-07 | Lifting device for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020270150.5U CN212836589U (en) | 2020-03-07 | 2020-03-07 | Lifting device for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212836589U true CN212836589U (en) | 2021-03-30 |
Family
ID=75112716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020270150.5U Expired - Fee Related CN212836589U (en) | 2020-03-07 | 2020-03-07 | Lifting device for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212836589U (en) |
-
2020
- 2020-03-07 CN CN202020270150.5U patent/CN212836589U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214359854U (en) | Anti-swing device of single-beam crane | |
CN114152828A (en) | Flexible direct current transmission converter valve submodule power overhaul test device and test method | |
CN210313225U (en) | Prefabricated component drawing of patterns hoisting accessory | |
CN212151384U (en) | Lifting equipment suitable for foundation pit operation | |
CN212836589U (en) | Lifting device for building engineering | |
CN211366748U (en) | U-shaped cement tank hoisting mechanism | |
CN218025211U (en) | Hoisting device for civil construction | |
CN212712553U (en) | Lift convenient to transfer | |
CN214935462U (en) | Bridge crane capable of lifting in sectional mode | |
CN213774378U (en) | Assembled building safety construction platform | |
CN214243550U (en) | Assembled hoisting accessory for building | |
CN213865193U (en) | Lifting device for small and medium-sized equipment | |
CN210286537U (en) | Four-point crane for hoisting bin cover of transport ship | |
CN110577088B (en) | Well lid hoisting device and hoisting method thereof | |
CN210559078U (en) | Small-size material lifting machine | |
CN208516720U (en) | A kind of elevator for fixing wheelchair | |
CN112757968A (en) | Lifting type mobile contact net supporting device, mobile contact net and operation method | |
CN215592499U (en) | Building material lifting machine | |
CN217437632U (en) | Material lifting equipment for building construction | |
CN217076759U (en) | Engineering material lifting device | |
CN213387418U (en) | Hoisting platform for steel pipe production equipment maintenance | |
CN218465409U (en) | Lifting device for bricklaying equipment | |
CN214575837U (en) | Prevent material lifting device for building decoration that material falls | |
CN211521433U (en) | Automatic change mechanical hoist | |
CN217703944U (en) | Electric pole centrifugal machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210330 |