CN212822332U - Galvanized steel wire pull wire rapid prefabricating platform - Google Patents

Galvanized steel wire pull wire rapid prefabricating platform Download PDF

Info

Publication number
CN212822332U
CN212822332U CN202021719564.8U CN202021719564U CN212822332U CN 212822332 U CN212822332 U CN 212822332U CN 202021719564 U CN202021719564 U CN 202021719564U CN 212822332 U CN212822332 U CN 212822332U
Authority
CN
China
Prior art keywords
galvanized steel
steel wire
wire
rectangular
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021719564.8U
Other languages
Chinese (zh)
Inventor
胡波
李爱国
吴付华
曹雷
梁信源
陈广崧
董涛
宋建新
张立新
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Gudao Oil Extraction Plant
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shengli Oilfield Co Gudao Oil Extraction Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shengli Oilfield Co Gudao Oil Extraction Plant filed Critical China Petroleum and Chemical Corp
Priority to CN202021719564.8U priority Critical patent/CN212822332U/en
Application granted granted Critical
Publication of CN212822332U publication Critical patent/CN212822332U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wire Processing (AREA)

Abstract

A galvanized steel wire drawing line rapid prefabrication platform comprises: the device comprises a support (1), a stay wire bending device (2), a pressing device (3), a tray (4) and a stress application pipe (5); the method is characterized in that: the galvanized steel wire stay wire rapid prefabricating platform is of a rectangular truss structure, a rectangular frame is formed by welding channel steel on the top surface, two corners of the front end are respectively provided with a pressing device (3), the middle of the rear end is provided with a stay wire bending device (2), two corners of the rear end are respectively provided with a straight groove (A), the lower parts of the middle parts of the two sides are respectively provided with an L-shaped groove (B), the lower parts of the two sides are circumferentially provided with rectangular closed loop bottom braces (1-1), and the bottom braces (1-1) are transversely provided with trays (4). The utility model discloses the platform highly integrates, prefabricated galvanized steel wire is acted as go-between and is buckled, compress tightly, the ligature is accomplished at the platform, convenient operation realizes that prefabricated galvanized steel wire is acted as go-between rapid, the security, standardizes, and labour saving and time saving reduces staff intensity of labour, improves the operating efficiency, and prefabricated galvanized steel wire is acted as go-between and is accorded with the standard.

Description

Galvanized steel wire pull wire rapid prefabricating platform
Technical Field
The utility model relates to an electrical engineering technical field particularly is a quick prefabricated platform of galvanized steel wire acting as go-between.
Background
In the operation and maintenance of a power grid, a galvanized steel wire pull wire is an important protection measure of a pole, and the safety of a pole base is powerfully guaranteed. In the daily operation and maintenance, construction transformation and power grid maintenance processes of the power grid, a large number of galvanized steel wire pull wires need to be supplemented and replaced every year. A galvanized steel wire stay wire is divided into an upper handle and a lower handle of the galvanized steel wire stay wire, and the upper handle and the lower handle are connected through an insulator to ensure the insulating function of the galvanized steel wire stay wire. Both ends of the galvanized steel wire stay wire are required to be provided with modeling wedge blocks, and one end of the galvanized steel wire stay wire lower handle is required to be processed. The processing needs 3-4 personnel to operate once, and the specific division of labor is as follows: the fixed galvanized steel wire of the 1 st people acts as go-between, the 2 nd people bends the galvanized steel wire and acts as go-between, the fixed wedge clamp of the 3 rd people, 4 th people's ligature tail-wire, and it is big to need personnel quantity, wastes time and energy, processes 30min consuming time once. Moreover, the galvanized steel wire drawing wire is tough, people are often injured by rebounding in the operation process, and the prefabricated galvanized steel wire drawing wire is a heavy work and has high labor intensity. The above operation has the following potential safety hazards:
firstly, the galvanized steel wire stay wire has large elasticity, and the tail wire is bent and then returns to the end to penetrate into the wire clamp, so that the technical level of workers is required to be high, and the workers are sometimes injured by the galvanized steel wire stay wire in a springing way;
secondly, the wedge-shaped wire clamp is fixed, the galvanized steel wire pull wire is tightened by a tapping wire clamp in a traditional mode to ensure that the wedge is fixed firmly, and the tapping vibration for a long time causes hand pain of workers and is easy to cause injury of the workers;
thirdly, the ligature of tail wire needs to look for an appropriate position, makes things convenient for the ligature, or height or low all influence the ligature effect, causes staff's waist fatigue damage easily moreover.
Through retrieving a utility model patent "bind the line, act as go-between prefabricated operation panel" notice no: CN206957328U, but has the following disadvantages:
firstly, the wiring coiler in this patent looses the strand with steel core aluminum stranded conductor, loosens aluminium wire and steel core wire, then with aluminium core and steel core wire alignment, winding. In this step, a temporary power supply is needed, so that the potential safety hazard of electric leakage and electric shock exists. The binding wire winding machine has a complex structure, a chain and gear structure and potential safety hazards of clamping injuries of operators. The steel-cored aluminum strand needs to be cut off by a grinder, sparks splash, and operators need professional protection. The binding wire winding machine is complex to operate and low in efficiency. The later maintenance cost of the equipment is high.
Secondly, the problem of reserved length of the tail wire after the steel strand is bent is not solved by the hydraulic steel strand bender in the patent, and the problem that the tail wire of each galvanized steel wire is different in length and does not meet the standard exists.
Thirdly, the problem that tail line binding in the last step needs to be additionally and independently finished in the galvanized steel wire stay wire prefabrication process is not solved in the patent.
Disclosure of Invention
The utility model discloses based on the technical problem that the background art exists, the purpose provides a galvanized steel wire acts as go-between quick prefabricated platform, solves current electric wire netting fortune dimension, and the pole galvanized steel wire is acted as go-between construction transformation and electric wire netting maintenance in-process, and the galvanized steel wire is acted as go-between prefabricated galvanized steel wire and is acted as go-between staff intensity of labour big, and work efficiency is low, has the problem of potential safety hazard.
In order to achieve the above purpose, the utility model is realized by the following technical scheme:
the utility model discloses a: the device comprises a bracket, a stay wire bender, a compactor, a tray and a stress application pipe; the method is characterized in that: a galvanized steel wire acts as go-between and prefabricates platform fast is rectangle truss structure, and the top surface is that rectangular frame forms for the channel-section steel welding, respectively is equipped with a collet on two angles of front end, is equipped with the bending ware of acting as go-between in the middle of the rear end, respectively is equipped with a straight flute on two angles of rear end, and the lower part respectively is equipped with "L" type groove in the middle of both sides, and lower part circumference is equipped with rectangle closed loop end brace, is equipped with the tray on the horizontal of end brace.
Preferably, the axis of the stay wire bending device in the galvanized steel wire stay wire rapid prefabrication platform is vertically arranged on the support, the rear end of the bending pressing plate is sleeved on the axis, the lower part of the middle of the bending pressing plate is provided with a bending roller, the front end of the bending pressing plate is sleeved with a force applying pipe, the right side of the axis is provided with a rectangular limiting plate, and the upper part of the right side of the limiting plate is provided with an anti-unhooking device.
Preferably, the bending pressing plate in the galvanized steel wire stay wire rapid prefabricating platform is of a rectangular plate-shaped structure, the left end of the bending pressing plate is provided with a through hole larger than the diameter of a shaft, the middle of the bending pressing plate is provided with a shaft hole of a bending roller, and the right end of the bending pressing plate is provided with a U-shaped opening which is pried upwards.
Preferably, the compactor in the galvanized steel wire stay wire rapid prefabrication platform is of a 'guillotine' structure, the handle is hinged with a rectangular fulcrum through a hinge shaft, the fulcrum is connected with the support, the left side of the bottom of the fulcrum is provided with a rectangular bottom support, a 'C' -shaped long groove is arranged on the bottom support, and a square port is arranged on the handle corresponding to the bottom support.
Preferably, the bottom support in the zinc-coated steel wire stay wire rapid prefabricating platform is rectangular, and a C-shaped long groove is arranged on the bottom support
The utility model discloses following beneficial effect has: the utility model provides a galvanized steel wire acts as go-between quick prefabricated platform highly integrates, and three main step that prefabricated galvanized steel wire acted as go-between is buckled, is compressed tightly, the ligature all can accomplish at the platform, convenient operation, safety, realize that the rapidization, the security, the standardization that prefabricated galvanized steel wire acted as go-between, labour saving and time saving practices thrift manpower and materials, reduces staff intensity of labour, improves the operating efficiency, and prefabricated galvanized steel wire acts as go-between and accords with the standard.
Drawings
FIG. 1 is a schematic view of the side-axis structure of the present invention
Fig. 2 the utility model discloses well acting as go-between bender 2 uses the axle side structure sketch map
FIG. 3 is a schematic view of the side structure of the middle pressing device 3
Fig. 4 the utility model discloses use the side-to-side structure sketch map at straight flute A binding wire
FIG. 5 the utility model discloses use the axle side structure sketch map at "L" type groove B wiring
In the figure, 1, a bracket, 1-1, a bottom support; 2. the device comprises a stay wire bender, 2-1 a bending pressing plate, 2-2 a bending roller, 2-3 a shaft, 2-4 a limiting plate, 2-5 a mousing hook, 3 a compactor, 3-1 a fulcrum, 3-2 a hinge shaft, 3-3 a square port, 3-4 a handle and 3-5 a bottom support; 4. the device comprises a tray, 5 parts of a stress application pipe, 6 parts of a galvanized steel wire pull wire, 7 parts of a wedge-shaped wire clamp, 7-1 parts of a bolt and 7-2 parts of a round-head wedge block; 8. binding wires; A. straight groove, B. "L" type groove, T. "C" type elongated slot.
Detailed Description
The following detailed description and technical contents of the present invention are further described with reference to the accompanying drawings, which, however, are provided for reference and illustration purposes only and are not intended to limit the present invention.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
As shown in fig. 1, the utility model comprises: the device comprises a support 1, a stay wire bender 2, a compactor 3, a tray 4 and a stress application pipe 5; the method is characterized in that: the galvanized steel wire stay wire rapid prefabricating platform is of a rectangular truss structure, a rectangular frame is formed by welding channel steel on the top surface, two pressing devices 3 are respectively arranged on two corners of the front end, a stay wire bending device 2 is arranged in the middle of the rear end, two straight grooves A are respectively arranged on two corners of the rear end, an L-shaped groove B is respectively arranged at the lower parts of the middle parts of two sides, a rectangular closed-loop bottom support 1-1 is circumferentially arranged at the lower part, and a tray 4 is transversely arranged on the bottom support 1-1.
As shown in the figure-2, a shaft 2-3 of the stay wire bender 2 is vertically arranged on a support 1, the rear end of a rectangular bending pressing plate 2-1 is sleeved on the shaft 2-3, a bending roller 2-2 is arranged at the lower part of the middle of the bending pressing plate 2-1, a force applying pipe 5 is sleeved on a U-shaped opening which is pried upwards at the front end of the bending pressing plate 2-1, a rectangular limiting plate 2-4 is arranged on the right side of the shaft 2-3, and an anti-unhooking pipe 2-5 is arranged at the upper part of the right side of the limiting plate 2-4. When the galvanized steel wire stay wire 6 is used, the galvanized steel wire stay wire 6 passes through a gap between the bending roller 2-2 and the shaft 2-3, the head of the galvanized steel wire stay wire 6 is aligned with the long edge of the bracket 1, the bending pressing plate 2-1 is operated to bend the galvanized steel wire stay wire 6 until the galvanized steel wire stay wire 6 reaches the limiting plate 2-4, the anti-unhooking device 2-5 controls the main part of the galvanized steel wire stay wire 6 not to fall off, the tail wire length 450mm of the bent galvanized steel wire stay wire 6 just meets the stay wire prefabrication standard, the bent radian of the galvanized steel wire stay wire 6 is completely attached to the edge of the round-head wedge block 7-2 without a gap, and the stay wire prefabricati.
As shown in the figure-3, the wedge-shaped wire clamp 7 is pressed tightly, the galvanized steel wire stay wire 6 penetrates into the wire clamp after being bent by the stay wire bending device 2, the round-head wedge 7-2 is placed, the galvanized steel wire stay wire 6 on the assembled wedge-shaped wire clamp 7 penetrates through the square port 3-3 of the pressing device 3 from bottom to top, the bent galvanized steel wire stay wire 6 is placed in the C-shaped long groove T of the bottom support 3-5, and the hand-press handle 3-4 is used for clamping the galvanized steel wire stay wire 6 with the round-head wedge 7-2. By utilizing the 'guillotine' structure of the compressor 3, the handle 3-4 is hinged with the fulcrum 3-1 through the hinge shaft 3-2 to form a lever mechanism, and the wedge-shaped wire clamp 7 is compressed in a time-saving and labor-saving manner.
Binding the tail wire, namely, as shown in a figure-4, after a galvanized steel wire pull wire 6 is pressed by a pressing device 3, putting the galvanized steel wire pull wire into a straight groove A of a bracket 1, fastening a bolt 7-1, and manually binding a binding wire 8 on the tail wire of the galvanized steel wire pull wire 6; secondly, as shown in figure-5, the galvanized steel wire pull wire 6 is put in an L-shaped groove B of the bracket 1 to be tensioned, and the tail wire of the galvanized steel wire pull wire 6 is manually bound by a binding wire 8.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A galvanized steel wire drawing line rapid prefabrication platform comprises: the device comprises a support (1), a stay wire bending device (2), a pressing device (3), a tray (4) and a stress application pipe (5); the method is characterized in that: the galvanized steel wire stay wire rapid prefabricating platform is of a rectangular truss structure, a rectangular frame is formed by welding channel steel on the top surface, two front-end corners are respectively provided with a pressing device (3), the middle of the rear end is provided with a stay wire bending device (2), two rear-end corners are respectively provided with a straight groove (A), the lower parts of the middle parts of the two sides are respectively provided with an L-shaped groove (B), the lower parts of the two sides are circumferentially provided with rectangular closed-loop bottom braces (1-1), and the transverse direction of the bottom braces (1-1) is provided with a tray (4).
2. The galvanized steel wire stay wire rapid prefabrication platform as set forth in claim 1, characterized in that: the pull wire bender is characterized in that a shaft (2-3) of the pull wire bender (2) is vertically arranged on the support (1), the rear end of a bending pressing plate (2-1) is sleeved on the shaft (2-3), a bending roller (2-2) is arranged at the lower part of the middle of the bending pressing plate (2-1), a force applying pipe (5) is sleeved at the front end of the bending pressing plate (2-1), a rectangular limiting plate (2-4) is arranged on the right side of the shaft (2-3), and an anti-unhooking device (2-5) is arranged at the upper part of the right side of the limiting plate (2-4).
3. The galvanized steel wire stay wire rapid prefabrication platform as set forth in claim 2, characterized in that: the bending pressing plate (2-1) is of a rectangular plate-shaped structure, the left end of the bending pressing plate is provided with a through hole with the diameter larger than that of the shaft (2-3), the middle of the bending pressing plate is provided with a shaft hole of the bending roller (2-2), and the right end of the bending pressing plate is provided with a U-shaped opening which is prized upwards.
4. The galvanized steel wire stay wire rapid prefabrication platform as set forth in claim 1, characterized in that: the compactor (3) is of a 'guillotine' shaped structure, a handle (3-4) is hinged with a rectangular fulcrum (3-1) through a hinge shaft (3-2), the fulcrum (3-1) is connected with the support (1), a rectangular bottom support (3-5) is arranged on the left side of the bottom of the fulcrum (3-1), a 'C' -shaped long groove (T) is arranged on the bottom support (3-5), and a square port (3-3) is arranged on the handle (3-4) corresponding to the bottom support (3-5).
5. The galvanized steel wire stay wire rapid prefabrication platform as set forth in claim 4, wherein: the bottom supports (3-5) are rectangular, and C-shaped long grooves (T) are arranged on the bottom supports.
CN202021719564.8U 2020-08-18 2020-08-18 Galvanized steel wire pull wire rapid prefabricating platform Expired - Fee Related CN212822332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021719564.8U CN212822332U (en) 2020-08-18 2020-08-18 Galvanized steel wire pull wire rapid prefabricating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021719564.8U CN212822332U (en) 2020-08-18 2020-08-18 Galvanized steel wire pull wire rapid prefabricating platform

Publications (1)

Publication Number Publication Date
CN212822332U true CN212822332U (en) 2021-03-30

Family

ID=75137194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021719564.8U Expired - Fee Related CN212822332U (en) 2020-08-18 2020-08-18 Galvanized steel wire pull wire rapid prefabricating platform

Country Status (1)

Country Link
CN (1) CN212822332U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113996731A (en) * 2021-10-08 2022-02-01 中铁电气化局集团有限公司 Automatic pre-assembly series tool equipment for electrified railway anchor drop pull wire

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113996731A (en) * 2021-10-08 2022-02-01 中铁电气化局集团有限公司 Automatic pre-assembly series tool equipment for electrified railway anchor drop pull wire
CN113996731B (en) * 2021-10-08 2023-09-05 中铁电气化局集团有限公司 Automatic pre-matched series tooling equipment for electrified railway anchor-down stay wire

Similar Documents

Publication Publication Date Title
CN110667909B (en) Binding apparatus for reinforcing bar convenient to remove
CN212822332U (en) Galvanized steel wire pull wire rapid prefabricating platform
CN110328304B (en) Automatic wire stripping and bending device for power industry
CN209918773U (en) Automatic cutting machine for steel bars for building construction
CN110422370B (en) Steel bar binding device
CN203660423U (en) Lifting device for overhead ground wire of power transmission line
CN210614951U (en) Movable steel strand bending and clamping combination tool
CN208981895U (en) A kind of lifting set up for power transmission tower and the combined mechanism that climbs certainly
CN218080151U (en) Reinforcing bar cutting equipment for construction
CN110625030A (en) Movable steel strand bending and clamping combination tool
CN212360651U (en) Steel wire rope crimping device
CN216881478U (en) Intelligent binding apparatus of reinforcing bar for construction
CN211660965U (en) Construction steel bar cutting device
CN210212879U (en) Wire harness bundling and rolling belt device
CN215707349U (en) Auxiliary binding device for steel base plate production
CN113649965A (en) Automatic feeding cutting device for aluminum product machining and construction method
CN215966007U (en) Double-end hoop-bending steel bar processing tool
CN214649212U (en) Reinforcing bar binding apparatus is used in intelligent construction of building
CN212401671U (en) Semi-automatic strapping machine for automobile intercooler core
CN213763845U (en) Reinforcing bar cuts equipment for highway construction
CN216325525U (en) Fixing device for shearing hot-rolled ribbed steel bars
CN217867375U (en) Clamping equipment convenient to draw steel strand wires
CN220659061U (en) Steel bar cutting device for engineering construction site
CN217551322U (en) Clamping device of metal band sawing machine
CN211548399U (en) Steel bar connecting device for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210330

Termination date: 20210818