CN212809714U - Novel building engineering project management flow show teaching aid - Google Patents
Novel building engineering project management flow show teaching aid Download PDFInfo
- Publication number
- CN212809714U CN212809714U CN202022120781.1U CN202022120781U CN212809714U CN 212809714 U CN212809714 U CN 212809714U CN 202022120781 U CN202022120781 U CN 202022120781U CN 212809714 U CN212809714 U CN 212809714U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- board
- show
- project management
- teaching aid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a novel building engineering project management flow show teaching aid, include first show board, baffle, put thing board, fan, slider, spout, drawer and handle, the top fixedly connected with telescopic link of first show board, the one end fixedly connected with second show board of telescopic link, the top fixedly connected with shielding plate of second show board, the bottom of shielding plate is provided with the light, the fixed surface of second show board is connected with the pivot. The utility model has the advantages of the utility model provides a novel building engineering project management flow show teaching aid, this equipment provides a show storage structure, before the use, the article that operating personnel at first will demonstrate is put into and is put thing board and drawer in, and storage object when having made things convenient for operating personnel to demonstrate, and the telescopic link can make interconnect between first show board and the second show board and strut in addition, makes the area of show enlarge, and the flow is more clear.
Description
Technical Field
The utility model relates to a building engineering display device technical field specifically is a novel building engineering project management flow show teaching aid.
Background
The building engineering refers to the assets formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and structures, wherein the houses refer to engineering buildings for people to live, work, study, production, management, entertainment, article storage and other social activities, the building is different from the buildings, and the structures refer to engineering buildings except the houses, such as enclosing walls, roads, dams, wells, tunnels, water towers, bridges, chimneys and the like.
Modern building engineering project management processes are not perfect, most of the projects are divided on construction sites, the management processes are simple, the management is complex, the project management processes need to be displayed to others in advance when an item is received, and the display needs to be clear, so that a novel building engineering project management process display teaching aid is needed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a novel building engineering project management flow show teaching aid has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel building engineering project management flow show teaching aid, includes first show board, one side fixedly connected with baffle of first show inboard wall, the thing board is put to the bottom fixedly connected with of baffle, the opposite side of first show inboard wall is provided with the fan, the inside fixedly connected with slider of first show board, the top swing joint of slider has the drawer, the spout has been seted up on the surface of drawer, the fixed surface of drawer is connected with the handle, the top fixedly connected with telescopic link of first show board, the one end fixedly connected with second show board of telescopic link, the top fixedly connected with shielding plate of second show board, the bottom fixedly connected with light of shielding plate, the fixed surface of second show board is connected with the pivot.
Optionally, the surface of the rotating shaft is movably connected with an adjusting rod.
Optionally, a reinforcing block is fixedly connected to one side of the second display board.
Optionally, a clamping plate is fixedly connected to the surface of the second display plate.
Optionally, one side of the first display board is fixedly connected with a first support frame, the other side of the first display board is fixedly connected with a protection base, and the top end of the protection base is fixedly connected with a cylinder.
Optionally, the sliding groove and the sliding block are matched with each other.
Optionally, the other side of the second display board is fixedly connected with a second support frame.
(III) advantageous effects
The utility model provides a novel building engineering project management flow show teaching aid possesses following beneficial effect:
the utility model has the advantages of the utility model provides a novel building engineering project management flow show teaching aid, this equipment provides a show storage structure, before the use, the article that operating personnel at first will carry out the show is put into and is put thing board and drawer in, storage article when having made things convenient for the operating personnel demonstration, the handle is stretched and is drawn and take out article, the telescopic link can make interconnect between first show board and the second show board and strut in addition, the area that makes the show enlarges, the flow is more clear.
The utility model has the advantages of the utility model provides a novel building engineering project management flow show teaching aid, this equipment provides a show storage structure, when using this equipment, can place a class in the drum, and the fixture block can block some electronic product, for example dull and stereotyped and cell-phone etc. also can place some newspapers and periodicals and workflow scheme, has simplified project management flow show, has improved the efficiency of whole flow, has strengthened individual cognition to whole flow.
For traditional novel building engineering project management flow show teaching aid, this equipment more can conveniently assist the use according to user's needs, for example, this equipment is provided with the fan, the cleanness of putting the thing board is put in the maintenance that can be fine, and the light is not good when arriving night, and operating personnel passes through the wire and connects the light, and equipment stands and receives wearing and tearing easily for a long time, and the protection base makes equipment receive wearing and tearing to reduce, has embodied the practicality of equipment.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic diagram of a second structural configuration of the present invention;
fig. 3 is a schematic side view of the structure of the present invention.
In the figure: 1. a first display board; 2. a baffle plate; 3. a storage plate; 4. a fan; 5. a slider; 6. a drawer; 7. a chute; 8. a grip; 9. a telescopic rod; 10. a second display board; 11. a shielding plate; 12. an illuminating lamp; 13. a rotating shaft; 14. adjusting a rod; 15. a reinforcing block; 16. clamping a plate; 17. a first support frame; 18. a protective base; 19. a cylinder; 20. a second support frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a novel building engineering project management process display teaching aid comprises a first display board 1, wherein one side of the first display board 1 is fixedly connected with a first supporting frame 17, the other side of the first display board 1 is fixedly connected with a protection base 18, the top end of the protection base 18 is fixedly connected with a cylinder 19, one side of the inner wall of the first display board 1 is fixedly connected with a baffle 2, the bottom end of the baffle 2 is fixedly connected with a storage board 3, the other side of the inner wall of the first display board 1 is provided with a fan 4, the inside of the first display board 1 is fixedly connected with a slide block 5, the top end of the slide block 5 is movably connected with a drawer 6, the surface of the drawer 6 is provided with a chute 7, the chute 7 is matched with the slide block 5, the surface of the drawer 6 is fixedly connected with a handle 8, the top end of the first display board 1 is fixedly connected with a telescopic rod 9, the telescopic rod 9, the control bolt is rotated outwards to enable the upper rod to move downwards or upwards, the lower rod is kept still, when the control bolt is adjusted to be in a proper length, one end of the control bolt is contacted with the outside of the upper rod, one end of the telescopic rod 9 is fixedly connected with a second display board 10, the other side of the second display board 10 is fixedly connected with a second supporting frame 20, the surface of the second display board 10 is fixedly connected with a clamping board 16, one side of the second display board 10 is fixedly connected with a reinforcing block 15, the top end of the second display board 10 is fixedly connected with a shielding board 11, the bottom end of the shielding board 11 is fixedly connected with an illuminating lamp 12, the surface of the second display board 10 is fixedly connected with a rotating shaft 13, the surface of the rotating shaft 13 is movably connected with an adjusting rod 14, before the use, an operator firstly puts objects to be displayed into the object placing board 3 and the drawer 6, and the storage of the operator is convenient for displaying the objects, handle 8 stretches and draws and takes out article, telescopic link 9 can make interconnect and strut between first show board 1 and the second show board 10 in addition, make the area of show enlarge, the flow is more clear, can place a class in the drum 19, fixture block 16 can block some electronic product, for example dull and stereotyped and cell-phone etc., also can place some newspapers and work flow scheme, the show of project management flow has been simplified, the efficiency of whole flow has been improved, individual cognition to whole flow has been strengthened, this equipment is provided with fan 4, the cleanness of thing board is put in the fine maintenance that keeps that can be fine, and the light is not good when arriving night, operating personnel passes through wire connection light 12, equipment stands and receives wearing and tearing too for a long time easily, protection base 18 makes equipment receive wearing and tearing reduction, the practicality of equipment has been embodied.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
To sum up, when the novel teaching aid for demonstrating the construction engineering project management process is used, an operator firstly puts objects to be demonstrated into the object placing plate 3 and the drawer 6, so that the objects are conveniently stored when the operator demonstrates, the handle 8 stretches to take out the objects, in addition, the first display plate 1 and the second display plate 10 can be connected and stretched by the telescopic rod 9, the demonstrated area is enlarged, the process is clearer, pens can be placed in the cylinder 19, the fixture block 16 can clamp some electronic products such as flat plates and mobile phones, and can also place some newspapers and work flow schemes, the project management process demonstration is simplified, the efficiency of the whole process is improved, the cognition of individuals on the whole process is enhanced, the equipment is provided with the fan 4, the cleanness of the object placing plate can be well kept, and the light ray is not good at night, the operating personnel passes through wire connection light 12, and the equipment stands and receives wearing and tearing too for a long time easily, and protection base 18 makes equipment receive wearing and tearing and reduces, has embodied the practicality of equipment.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a novel building engineering project management flow show teaching aid, includes first show board (1), its characterized in that: one side of the inner wall of the first display board (1) is fixedly connected with a baffle (2), the bottom end of the baffle (2) is fixedly connected with an object placing board (3), a fan (4) is arranged on the other side of the inner wall of the first display board (1), a sliding block (5) is fixedly connected inside the first display board (1), the top end of the sliding block (5) is movably connected with a drawer (6), the surface of the drawer (6) is provided with a sliding chute (7), the surface of the drawer (6) is fixedly connected with a handle (8), the top end of the first display board (1) is fixedly connected with a telescopic rod (9), one end of the telescopic rod (9) is fixedly connected with a second display board (10), the top end of the second display board (10) is fixedly connected with a shielding board (11), the bottom of shielding plate (11) is provided with light (12), the fixed surface of second show board (10) is connected with pivot (13).
2. The novel construction engineering project management process display teaching aid of claim 1, wherein: the surface of the rotating shaft (13) is movably connected with an adjusting rod (14).
3. The novel construction engineering project management process display teaching aid of claim 1, wherein: and one side of the second display board (10) is fixedly connected with a reinforcing block (15).
4. The novel construction engineering project management process display teaching aid of claim 1, wherein: the surface of the second display board (10) is fixedly connected with a clamping board (16).
5. The novel construction engineering project management process display teaching aid of claim 1, wherein: one side of the first display board (1) is fixedly connected with a first support frame (17), the other side of the first display board (1) is fixedly connected with a protection base (18), and the top end of the protection base (18) is fixedly connected with a cylinder (19).
6. The novel construction engineering project management process display teaching aid of claim 1, wherein: the sliding groove (7) and the sliding block (5) are matched with each other.
7. The novel construction engineering project management process display teaching aid of claim 1, wherein: the other side of the second display board (10) is fixedly connected with a second support frame (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022120781.1U CN212809714U (en) | 2020-09-24 | 2020-09-24 | Novel building engineering project management flow show teaching aid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022120781.1U CN212809714U (en) | 2020-09-24 | 2020-09-24 | Novel building engineering project management flow show teaching aid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212809714U true CN212809714U (en) | 2021-03-26 |
Family
ID=75091290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022120781.1U Expired - Fee Related CN212809714U (en) | 2020-09-24 | 2020-09-24 | Novel building engineering project management flow show teaching aid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212809714U (en) |
-
2020
- 2020-09-24 CN CN202022120781.1U patent/CN212809714U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206413998U (en) | Table is changed in a kind of Intelligent office meeting | |
CN206249628U (en) | A kind of school information technology device | |
CN212809714U (en) | Novel building engineering project management flow show teaching aid | |
CN207532227U (en) | industrial design display rack | |
CN207587313U (en) | A kind of production management progress display plate | |
CN210643130U (en) | Dress designing platform | |
CN210925402U (en) | Performance stand for manpower resources | |
CN207830921U (en) | A kind of multi-function desktop lcd bracket | |
CN207123972U (en) | A kind of Financial Teaching statistics showing stand | |
CN214796673U (en) | Intelligent party building information publishing column | |
CN206434013U (en) | A kind of desktop copyboard for visual communication specialty | |
CN206726538U (en) | The musical score display device that a kind of music teaching uses | |
CN207100917U (en) | A kind of Mechanical and Electronic Engineering Department religion table | |
CN208444478U (en) | A kind of teaching demonstration device for physics aerology | |
CN218044541U (en) | Space filter display stand convenient to adjust | |
CN212302969U (en) | Portable display device for civil engineering management | |
CN213583018U (en) | Novel communication engineering supervise uses bulletin board | |
CN213659777U (en) | Adjustable multifunctional teaching display analysis device for economics major | |
CN208140696U (en) | A kind of simplicity soil measurement formula instrument | |
CN210722093U (en) | Marketing teaching is with three-dimensional sand table | |
CN205226787U (en) | Ability all around rotation's computer | |
CN212516242U (en) | Display device for economic management teaching | |
CN208969873U (en) | A kind of new tourism management drop loss displaying device | |
CN211673465U (en) | A function table for marketing | |
CN208538448U (en) | A kind of intelligent medical treatment Show board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210326 Termination date: 20210924 |