CN212802484U - Building site is with interim passageway frame - Google Patents
Building site is with interim passageway frame Download PDFInfo
- Publication number
- CN212802484U CN212802484U CN202021146459.XU CN202021146459U CN212802484U CN 212802484 U CN212802484 U CN 212802484U CN 202021146459 U CN202021146459 U CN 202021146459U CN 212802484 U CN212802484 U CN 212802484U
- Authority
- CN
- China
- Prior art keywords
- plate
- groove
- aisle
- recess
- lateral wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a building site is with interim passageway frame, including first crossing the guidance tape, first one side of crossing the guidance tape is provided with the second and crosses the guidance tape, first both sides outer wall of crossing the guidance tape and second has all seted up first recess, the second recess has been seted up to one side lateral wall of first recess, sliding connection has the movable plate between the both sides lateral wall of second recess, reset spring fixed with second recess lateral wall is installed to one side lateral wall of movable plate, one side lateral wall that reset spring was kept away from to the movable plate is fixed with the screens board, and inside one side lateral wall that the movable plate was kept away from to the screens board extended to first recess, first lateral wall of crossing the guidance tape and second was fixed with the connecting plate, and the connecting plate sets up with first recess joint respectively. The utility model discloses can carry out the high-speed joint to the passageway board between adjacent fixed, avoid appearing piling up the condition between a plurality of passageway boards, improve the stability of using, also can increase or reduce the length in passageway simultaneously, improve the convenience.
Description
Technical Field
The utility model relates to a building site technical field especially relates to a building site is with interim passageway frame.
Background
When an existing building site is built, one layer of temporary aisle frame is often paved on the ground, the traditional aisle frame is often single in form, the aisle plates between adjacent aisle frames are not connected and fixed, after certain times of walking, the aisle plates are stacked easily to generate gaps, follow-up use is influenced, meanwhile, the aisle frame is not stable enough, and therefore the temporary aisle frame for the building site is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the temporary aisle frame for building site who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building site is with interim passageway frame, includes first crossing the guidance tape, first one side of crossing the guidance tape is provided with the second and crosses the guidance tape, and first recess has all been seted up to the first both sides outer wall of crossing the guidance tape and second, and the second recess has been seted up to one side lateral wall of first recess, and sliding connection has the movable plate between the both sides lateral wall of second recess, and reset spring fixed with second recess lateral wall is installed to one side lateral wall of movable plate, one side lateral wall that reset spring was kept away from to the movable plate is fixed with the screens board, and inside one side lateral wall that the movable plate was kept away from to the screens board extended to first recess, first lateral wall of crossing the guidance tape and second was fixed with the connecting plate, and the connecting plate sets up with first recess joint respectively.
Preferably, the top side walls of the first track passing plate and the second track passing plate are provided with third grooves, pull plates are arranged inside the third grooves, pull wires are fixed on the side walls of the bottoms of the pull plates, and one ends, far away from the pull plates, of the pull wires extend into the second grooves and are fixed with the side walls of the moving plate.
Preferably, a pull groove is formed in the side wall of the pull plate, which is far away from the pull line.
Preferably, a clamping groove is formed in the side wall of one side of the connecting plate, and the clamping groove and the clamping plate are clamped.
Preferably, one end of the clamping plate, which is far away from the moving plate, extends to the inside of the first groove and is of an arc-shaped structure.
Compared with the prior art, the beneficial effects of the utility model are that:
the second channel passing plate is arranged on one side of the first channel passing plate, the first grooves are formed in the outer walls of the two sides of the first channel passing plate and the second channel passing plate, the second grooves are formed in the side wall of one side of each first groove, the moving plate is connected between the side walls of the two sides of each second groove in a sliding mode, the reset spring fixed to the side wall of one side of the moving plate is installed on the side wall of one side of the moving plate, the clamping plate is fixed to the side wall of one side, away from the reset spring, of the moving plate, the side wall of one side, away from the moving plate, of the clamping plate extends into the first grooves, the connecting plates are fixed to the outer side walls of the first channel passing plate and the second channel passing plate and are respectively clamped with the first grooves, the channel plates between adjacent channel plates can be quickly connected and fixed, the stacking condition among the channel plates is avoided, the use stability is improved, the convenience is improved.
Drawings
Fig. 1 is the utility model provides a structure plan view of temporary aisle frame for building site.
Fig. 2 is the utility model provides a part A of temporary aisle frame enlarges the schematic structure for building site.
Fig. 3 is the utility model provides a first passageway plate structure side view of building site is with interim passageway frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a temporary aisle frame for construction site includes first crossing guidance tape 1, first crossing guidance tape 1's one side is provided with the second and crosses guidance tape 2, first crossing guidance tape 1 and second cross guidance tape 2's both sides outer wall and all seted up first recess 4, second recess 5 has been seted up to one side lateral wall of first recess 4, sliding connection has movable plate 6 between the both sides lateral wall of second recess 5, and reset spring 8 fixed with second recess 5 lateral wall is installed to one side lateral wall of movable plate 6, one side lateral wall that reset spring 8 was kept away from to movable plate 6 is fixed with screens board 7, and one side lateral wall that movable plate 6 was kept away from to screens board 7 extends to inside first recess 4, first crossing guidance tape 1 and second cross guidance tape 2's lateral wall and be fixed with connecting plate 14, and connecting plate 14 sets up with first recess 4 joint respectively.
The top side wall of the first track passing plate 1 and the top side wall of the second track passing plate 2 are provided with third grooves 10, pull plates 11 are arranged inside the third grooves 10, pull wires 13 are fixed on the bottom side walls of the pull plates 11, and one ends, far away from the pull plates 11, of the pull wires 13 extend to the inside of the second grooves 5 and are fixed with the side walls of the moving plate 6.
The pull plate 11 is kept away from one side lateral wall of acting as go-between 13 and has been seted up pull groove 12, screens groove 15 has been seted up to one side lateral wall of connecting plate 14, and the joint sets up between screens groove 15 and the screens board 7, the one end that the movable plate 6 was kept away from to screens board 7 extends to inside being the arc structure of first recess 4.
The working principle is as follows: when the first track passing plate 1 and the second track passing plate 2 are connected, the second track passing plate 2 is moved, the second track passing plate 2 drives the connecting plate 14 to enter the first groove 4 formed in the side wall of the first track passing plate 1, the connecting plate 14 extrudes the arc-shaped surface of the clamping plate 7 when entering the first groove 4, the clamping plate 7 drives the moving plate 6 to extrude the reset spring 8, the clamping plate 7 enters the second groove 5 until the connecting plate 14 completely enters the first groove 4, under the elastic force of the reset spring 8, the clamping plate 7 and the clamping groove 15 formed in the side wall of the connecting plate 14 are clamped and arranged, and installation is completed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. A temporary aisle frame for a building site comprises a first aisle passing plate (1) and is characterized in that a second aisle passing plate (2) is arranged on one side of the first aisle passing plate (1), first grooves (4) are formed in outer walls of two sides of the first aisle passing plate (1) and the second aisle passing plate (2), a second groove (5) is formed in a side wall of one side of each first groove (4), a moving plate (6) is connected between the side walls of the two sides of each second groove (5) in a sliding mode, a reset spring (8) fixed with the side wall of the second groove (5) is installed on the side wall of one side of the moving plate (6), a clamping plate (7) is fixed on the side wall of one side, far away from the reset spring (8), of the clamping plate (7) and far away from the moving plate (6) and extends into the first groove (4), and connecting plates (14) are fixed on outer side walls of the first aisle passing plate (1) and the second aisle passing plate (2), and the connecting plates (14) are respectively clamped with the first grooves (4).
2. The temporary aisle rack for the construction site as claimed in claim 1, wherein a third groove (10) is formed in the top side wall of the first aisle board (1) and the second aisle board (2), a pulling plate (11) is arranged inside the third groove (10), a pulling wire (13) is fixed to the bottom side wall of the pulling plate (11), and one end, far away from the pulling plate (11), of the pulling wire (13) extends into the second groove (5) and is fixed to the side wall of the moving plate (6).
3. A temporary aisle frame for a construction site according to claim 2, wherein a side wall of the pulling plate (11) far away from the pulling line (13) is provided with a pulling groove (12).
4. The temporary aisle rack for the construction site as claimed in claim 1, wherein a clamping groove (15) is formed in one side wall of the connecting plate (14), and the clamping groove (15) and the clamping plate (7) are clamped.
5. A temporary aisle rack for a construction site according to claim 1, wherein one end, far away from the moving plate (6), of the clamping plate (7) extends to the inside of the first groove (4) to form an arc-shaped structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021146459.XU CN212802484U (en) | 2020-06-18 | 2020-06-18 | Building site is with interim passageway frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021146459.XU CN212802484U (en) | 2020-06-18 | 2020-06-18 | Building site is with interim passageway frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212802484U true CN212802484U (en) | 2021-03-26 |
Family
ID=75097370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021146459.XU Active CN212802484U (en) | 2020-06-18 | 2020-06-18 | Building site is with interim passageway frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212802484U (en) |
-
2020
- 2020-06-18 CN CN202021146459.XU patent/CN212802484U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209211886U (en) | A kind of gang form of Fast Installation | |
CN212802484U (en) | Building site is with interim passageway frame | |
CN207453256U (en) | A kind of modularization prefabricated panel | |
CN217028011U (en) | Climb a passageway plate turnover | |
CN218216464U (en) | Overpass type routing bridge frame capable of avoiding mutual crossing and lamination of cables | |
CN213173570U (en) | Hydraulic engineering slope bearing structure | |
CN215760640U (en) | Short-limb shear wall frame structure for adding floor to existing building | |
CN109594729B (en) | Assembled double-division stair | |
CN215406523U (en) | Assembled steel structure house frame | |
CN211200397U (en) | Hydraulic engineering foundation pit protection structure | |
CN210737388U (en) | Novel template support frame is used in public road bridge roof beam construction | |
CN213682788U (en) | Building block for civil construction | |
CN218175683U (en) | Anti-collision isolation pier and anti-collision isolation flower box | |
CN207295760U (en) | Precast concrete vertical retaining wall structure | |
CN216194027U (en) | Combined type shaped standard pattern bridge deck on Bailey beam | |
CN211816024U (en) | Box bank revetment structure of relief (sculpture) of socket joint assembled | |
CN213926785U (en) | A anti-bank of precast concrete for coincide floor construction | |
CN218176230U (en) | Prefabricated wallboard of concatenation formula | |
CN209293391U (en) | Building external climbing type CONSTRUCTION OPERATIONS platform | |
CN213449001U (en) | Steel structure frame for wall | |
CN218060252U (en) | Geogrid convenient to it is fixed | |
CN214883007U (en) | Arch frame connecting device convenient to install connecting rib | |
CN214883053U (en) | Bridge carbon fiber cloth lays and rolls fortune device | |
CN213653368U (en) | Novel ecological environment-friendly multifunctional hollow building block | |
CN218374759U (en) | Ancient building heavy grade roofing tile fixed knot constructs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |