CN212797828U - A soil sample case of saving for geotechnical engineering exploration - Google Patents

A soil sample case of saving for geotechnical engineering exploration Download PDF

Info

Publication number
CN212797828U
CN212797828U CN202021404810.0U CN202021404810U CN212797828U CN 212797828 U CN212797828 U CN 212797828U CN 202021404810 U CN202021404810 U CN 202021404810U CN 212797828 U CN212797828 U CN 212797828U
Authority
CN
China
Prior art keywords
fixing groove
fixed slot
soil sample
box
geotechnical engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021404810.0U
Other languages
Chinese (zh)
Inventor
郑庆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xinxing Lianjian Survey And Design Institute Co ltd
Original Assignee
Beijing Xinxing Lianjian Survey And Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xinxing Lianjian Survey And Design Institute Co ltd filed Critical Beijing Xinxing Lianjian Survey And Design Institute Co ltd
Priority to CN202021404810.0U priority Critical patent/CN212797828U/en
Application granted granted Critical
Publication of CN212797828U publication Critical patent/CN212797828U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a soil sample case of depositing for geotechnical engineering exploration, including box, fixed slot one and apron one, be provided with in the box fixed slot one, peg graft on the fixed slot one and have apron one, fixed slot one side is provided with fixed slot two, peg graft on the two fixed slot upper ends and have apron two, two one sides of fixed slot are provided with fixed slot three, peg graft on the three upper ends of fixed slot and have apron three, fixed slot one fixed slot two and three equal shaping in the box of fixed slot. Has the advantages that: the utility model discloses a set up fixed slot one, fixed slot two, fixed slot three, apron one, apron two, apron three, can make the soil sample save the incasement and have a plurality of different accommodation spaces to satisfy the sample demand of different samples, improve device's practicality.

Description

A soil sample case of saving for geotechnical engineering exploration
Technical Field
The utility model relates to a geotechnical engineering technical field, concretely relates to a soil sample case of saving for geotechnical engineering exploration.
Background
The geotechnical engineering investigation refers to finding out, analyzing and evaluating geological and environmental characteristics and geotechnical engineering conditions of a construction site according to requirements of construction engineering, and compiling activities of investigation files, wherein the geotechnical engineering investigation mainly comprises the following contents: engineering geological investigation and surveying and mapping, exploration, soil sample sampling, in-situ testing, indoor testing, on-site inspection and detection, finally, qualitative or quantitative analysis and evaluation are carried out on site engineering geological conditions according to the methods or all the methods, achievement report files required by meeting different stages are compiled, the method mainly refers to the exploration of industrial and civil building engineering, and the main bodies of exploration objects mainly comprise house buildings, industrial plants, school buildings, hospital buildings, municipal engineering, pipelines and overhead lines, bank engineering, slope engineering, foundation pit engineering, foundation treatment and the like.
And after gathering required ground sample outdoor, need take back the laboratory at soil sample storage incasement with soil sample dress, so that detect soil sample, but the accommodation space specification of current soil sample storage case is the same, and the volume of ground sample is not of uniform size, and also can require to get the sample of different volume because the difference of detection project, make storage case storage save inconvenient, the practicality is lower, current soil sample storage case is at the removal in-process in addition, soil sample rocks greatly, destroy the structure of soil easily, disturb the test data of soil.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the defects of the prior art, the soil sample storage box for geotechnical engineering exploration is provided, the problems that the existing soil sample storage box is the same in accommodating space specification, the volume of geotechnical samples is different in size, different amounts of samples are required to be taken due to different detection items, the storage box is inconvenient to store and store, and the practicability is low are solved.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a soil sample case of saving for geotechnical engineering exploration, including box, fixed slot one and apron one, be provided with in the box fixed slot one, a fixed slot upper end is pegged graft and is had apron one, fixed slot one side is provided with fixed slot two, two upper ends of fixed slot are pegged graft and are had apron two, two one sides of fixed slot are provided with fixed slot three, three upper ends of fixed slot are pegged graft and are had apron three, fixed slot one fixed slot two and three equal shaping in the box of fixed slot.
Furthermore, the bottoms of the first fixing groove, the second fixing groove and the third fixing groove can be connected with springs through bolts, sliding blocks are inserted into the upper ends of the springs, and heat preservation layers are bonded on the inner walls of the first fixing groove, the second fixing groove and the third fixing groove.
Through adopting above-mentioned technical scheme, can make the soil sample deposit the incasement and have a plurality of different accommodation spaces to satisfy the sample demand of different samples, the practicality is good, when depositing the sample cup, through the spring provides elasticity, promotes slider extrusion sample cup guarantees that the sample cup is placed compactly, when taking out, can also pop out the sample cup simultaneously, conveniently takes, increases the practicality of device, the heat preservation can carry out heat preservation to the sample cup, and the influence of reduced temperature to the sample.
Furthermore, a cavity is formed in one side of the three fixing grooves and is formed in the box body.
Through adopting above-mentioned technical scheme, be convenient for place the sampling tool, conveniently take a sample, improve the practicality of device.
Furthermore, the bottom end of the box body is connected with a supporting pad through a bolt, and the upper end of the box body is connected with a box cover through a hinge.
By adopting the technical scheme, the supporting pad provides stable support for the box body, and the box cover protects the box body.
Furthermore, the upper end of the box cover is connected with a lifting handle through a bolt, and the box cover and the box body are connected with a lock catch through a bolt.
By adopting the technical scheme, the box cover can be fixedly locked on the box body through the lock catch, and the portability of the device can be improved through the lifting handle.
Furthermore, an elastic pad is bonded on the inner wall of the box cover.
By adopting the technical scheme, the protection effect of the box body can be improved.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. in order to solve the problems that the existing soil sample storage box has the same specification of the accommodating space, the volume of rock soil samples is different, and different amounts of samples can be required to be taken due to different detection items, so that the storage box is inconvenient to store and store, and the practicability is lower, the utility model discloses a plurality of different accommodating spaces can be formed in the soil sample storage box by arranging a first fixed groove, a second fixed groove, a third fixed groove, a first cover plate, a second cover plate and a third cover plate, thereby meeting the sampling requirements of different samples and improving the practicability of the device;
2. for solving current soil sample case of keeping, the soil sample rocks great, destroys the structure of soil easily, disturbs the problem of the test data of soil, the utility model discloses a set up slider, spring, can provide elasticity through the spring, extrude the sample cup, guarantee that the sample cup is placed compactly, when taking out, can also pop out the sample cup simultaneously, conveniently take, increase the practicality of device.
Drawings
Fig. 1 is a schematic structural diagram of a soil sample storage box for geotechnical engineering exploration according to the present invention;
FIG. 2 is a top view of a housing in a soil sample storage box for geotechnical engineering exploration according to the present invention;
figure 3 is a left side view of a soil sample storage box for geotechnical engineering exploration of the utility model.
The reference numerals are explained below:
1. a handle; 2. a box cover; 3. a first cover plate; 4. a second cover plate; 5. a first fixing groove; 6. a slider; 7. a spring; 8. a heat-insulating layer; 9. a support pad; 10. a cavity; 11. locking; 12. an elastic pad; 13. a box body; 14. a second fixing groove; 15. fixing grooves III; 16. and a third cover plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1 to 3, a soil sample storage box for geotechnical engineering exploration in this embodiment includes a box body 13, a first fixing groove 5 and a first cover plate 3, the box body 13 is provided with the first fixing groove 5, the first cover plate 3 is inserted into the upper end of the first fixing groove 5, the first cover plate 3 can fix a sampling cup placed in the first fixing groove 5, one side of the first fixing groove 5 is provided with a second fixing groove 14, the upper end of the second fixing groove 14 is inserted with a second cover plate 4, the second cover plate 4 can fix a sampling cup placed in the second fixing groove 14, one side of the second fixing groove 14 is provided with a third fixing groove 15, the upper end of the third fixing groove 15 is inserted with a third cover plate 16, the third cover plate 16 can fix a sampling cup placed in the third fixing groove 15, the first fixing groove 5, the second fixing groove 14 and the third fixing groove 15 are formed in the box body 13, so that a plurality of different accommodating spaces can, therefore, the sampling requirements of different samples are met, the practicability is good, the bottoms in the first fixing groove 5, the second fixing groove 14 and the third fixing groove 15 can be connected with the spring 7 through bolts, the upper end of the spring 7 is connected with the sliding block 6 in an inserting mode, when the sampling cup is stored, the spring 7 can provide elastic force to push the sliding block 6 to extrude the sampling cup, the compact placement of the sampling cup is guaranteed, meanwhile, the sampling cup can be popped out when the sampling cup is taken out, the sampling cup is convenient to take and use, the heat preservation layer 8 is bonded on the inner walls of the first fixing groove 5, the second fixing groove 14 and the third fixing groove 15, the heat preservation layer 8 can carry out heat preservation treatment on the sampling cup, the influence of temperature on the samples is reduced, the bottom end of the box body 13 is connected with the supporting pad 9 through bolts, the upper end of the box body 13 is connected, the protective effect of the case 13 can be improved.
As shown in fig. 1 and 2, in this embodiment, a cavity 10 is formed in one side of the third fixing groove 15, the cavity 10 is formed in the box body 13, and a sampling tool can be conveniently placed through the cavity 10, so that sampling is convenient, and the practicability of the device is improved.
As shown in fig. 1 and fig. 3, in this embodiment, a handle 1 is connected to the upper end of the case cover 2 through a bolt, a lock 11 is connected between the case cover 2 and the case body 13 through a bolt, the case cover 2 can be fixed and locked on the case body 13 through the lock 11, and the portability of the device can be improved through the handle 1.
The specific implementation process of this embodiment is as follows: during the use, can take out sampling tool from cavity 10, improve the practicality of device, and take up sample soil with the sample cup, according to the size of ground sample, can put into corresponding fixed slot one 5 with the sample, fixed slot two 14, fixed slot three 15, when the sample cup is male, can press slider 6 and slide downwards, then cover apron one 3 respectively, apron two 4 and apron three 16, spring 7 can provide elasticity, promote slider 6 extrusion sample cup, thereby guarantee the sample cup and place compactly, the influence of rocking that slows down box 13 produced in handling to the sample cup, ensure that soil sample deposits safety, can carry out heat preservation to the sample cup through heat preservation 8 simultaneously, reduce the influence of temperature, the practicality is good, fix locking case lid 2 on box 13 through hasp 11, can the carrying device removal through handle 1.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (6)

1. The utility model provides a soil sample case of saving for geotechnical engineering exploration which characterized in that: the box body (13), a first fixing groove (5) and a first cover plate (3) are included, the first fixing groove (5) is arranged in the box body (13), the first cover plate (3) is connected to the upper end of the first fixing groove (5) in an inserting mode, a second fixing groove (14) is arranged on one side of the first fixing groove (5), a second cover plate (4) is connected to the upper end of the second fixing groove (14) in an inserting mode, a third fixing groove (15) is arranged on one side of the second fixing groove (14), a third cover plate (16) is connected to the upper end of the third fixing groove (15) in an inserting mode, and the first fixing groove (5), the second fixing groove (14) and the third fixing groove.
2. The soil sample storage box for geotechnical engineering exploration according to claim 1, wherein: the heat-insulation plate is characterized in that the bottoms of the first fixing groove (5), the second fixing groove (14) and the third fixing groove (15) can be connected with springs (7) through bolts, sliding blocks (6) are inserted into the upper ends of the springs (7), and heat-insulation layers (8) are bonded on the inner walls of the first fixing groove (5), the second fixing groove (14) and the third fixing groove (15).
3. The soil sample storage box for geotechnical engineering exploration according to claim 1, wherein: and a cavity (10) is formed in one side of the third fixing groove (15), and the cavity (10) is formed in the box body (13).
4. The soil sample storage box for geotechnical engineering exploration according to claim 1, wherein: the bottom end of the box body (13) is connected with a supporting pad (9) through a bolt, and the upper end of the box body (13) is connected with a box cover (2) through a hinge.
5. The soil sample storage box for geotechnical engineering exploration according to claim 4, wherein: the box cover is characterized in that the upper end of the box cover (2) is connected with a lifting handle (1) through a bolt, and a lock catch (11) is connected between the box cover (2) and the box body (13) through a bolt.
6. The soil sample storage box for geotechnical engineering exploration according to claim 4, wherein: an elastic pad (12) is bonded on the inner wall of the box cover (2).
CN202021404810.0U 2020-07-16 2020-07-16 A soil sample case of saving for geotechnical engineering exploration Active CN212797828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021404810.0U CN212797828U (en) 2020-07-16 2020-07-16 A soil sample case of saving for geotechnical engineering exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021404810.0U CN212797828U (en) 2020-07-16 2020-07-16 A soil sample case of saving for geotechnical engineering exploration

Publications (1)

Publication Number Publication Date
CN212797828U true CN212797828U (en) 2021-03-26

Family

ID=75102837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021404810.0U Active CN212797828U (en) 2020-07-16 2020-07-16 A soil sample case of saving for geotechnical engineering exploration

Country Status (1)

Country Link
CN (1) CN212797828U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113650961A (en) * 2021-07-31 2021-11-16 中建华宸(海南)建设集团有限公司 Rock core sample storage device for exploration for geotechnical engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113650961A (en) * 2021-07-31 2021-11-16 中建华宸(海南)建设集团有限公司 Rock core sample storage device for exploration for geotechnical engineering

Similar Documents

Publication Publication Date Title
Bungum et al. Seismicity and seismotectonics of Norway and nearby continental shelf areas
Beltrami On the relationship between ground temperature histories and meteorological records: a report on the Pomquet station
Oleskevich et al. The updip and downdip limits to great subduction earthquakes: Thermal and structural models of Cascadia, south Alaska, SW Japan, and Chile
Schmoker Volumetric calculation of hydrocarbons generated: Chapter 19: Part IV. Identification and characterization
He et al. Heat flow and thermal maturity modelling in the northern carnarvon basin, north west shelf, Australia
CN108761023A (en) A kind of sea bed gas hydrate core boat-carrying multifunctional analysis laboratory installation
CN107609759B (en) A kind of seabed engineering geology of exploiting ocean natural gas hydrates influences evaluation method
CN212797828U (en) A soil sample case of saving for geotechnical engineering exploration
Sopher et al. Evaluation of the subsurface compressed air energy storage (CAES) potential on Gotland, Sweden
CN102174646B (en) Method for implementing oil-gas exploration and oil-gas reservoir characterization by using living bacteria anomaly and total bacteria anomaly of methylosinus trichosporium as indexes
Pijnenburg et al. Intergranular clay films control inelastic deformation in the Groningen gas reservoir: Evidence from split‐cylinder deformation tests
Stalker et al. Gold (hydrogen) rush: risks and uncertainties in exploring for naturally occurring hydrogen
Markham Response of liquefiable sites in the central business district of Christchurch, New Zealand
Gregersen et al. Earthquake occurrence and seismotectonics in Norway and surrounding areas
Atkins et al. A Morphometric Investigation of Large‐Scale Crustal Shortening on Mars
CN207670930U (en) A kind of soil storage device used for geological prospecting
Beha et al. Thermal history, hydrocarbon generation and migration in the Horn Graben in the Danish North Sea: a 2D basin modelling study
Coates et al. Introduction to the Illinois deep hole project
Liao et al. CPT site characterization for seismic hazards in the New Madrid seismic zone
Soliman Numerical model estimates fracture production increase
Hudson Rasmussen et al. Mapping Variations in Bedrock Weathering With Slope Aspect Under a Sedimentary Ridge‐Valley System Using Near‐Surface Geophysics and Drilling
Yu et al. Characterization of elastic properties of lacustrine shale reservoir using well logging and core analysis
CN208686379U (en) A kind of complete sampler of geological exploration rock specimens
Fischer et al. Hydraulic characterization of a highly anthropized coastal aquifer subject to tidal fluctuations
CN211821422U (en) On-spot exploration device for architectural design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant