CN212787853U - Join in marriage electrical room and synthesize debugging platform - Google Patents

Join in marriage electrical room and synthesize debugging platform Download PDF

Info

Publication number
CN212787853U
CN212787853U CN202021272579.4U CN202021272579U CN212787853U CN 212787853 U CN212787853 U CN 212787853U CN 202021272579 U CN202021272579 U CN 202021272579U CN 212787853 U CN212787853 U CN 212787853U
Authority
CN
China
Prior art keywords
operation box
debugging
plate
box
heat dissipation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021272579.4U
Other languages
Chinese (zh)
Inventor
杨继明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Mingyuan Electric Power Technology Co ltd
Original Assignee
Zhejiang Mingyuan Electric Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Mingyuan Electric Power Technology Co ltd filed Critical Zhejiang Mingyuan Electric Power Technology Co ltd
Priority to CN202021272579.4U priority Critical patent/CN212787853U/en
Application granted granted Critical
Publication of CN212787853U publication Critical patent/CN212787853U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model relates to the technical field of debugging tables, in particular to a comprehensive debugging table for a power distribution room, which comprises a main box body, a working panel, a debugging mechanism and a heat dissipation mechanism, wherein the main box body consists of an operation box and a display box, the display box is fixedly arranged on one side of the top of the operation box, the working panel is fixedly arranged on the top of the operation box and positioned on one side of the display box through bolts, the debugging mechanism comprises a power-on board and three groups of adjusting components, the heat dissipation mechanism comprises a sealing board and two groups of blowing components, the sealing board is arranged on one side of the operation box and fixedly connected with the operation box, the two groups of blowing components are symmetrically arranged inside the operation box, and the two groups of blowing components and the sealing board are fixedly connected, the utility model can start two groups of heat dissipation fans through operating a regulating board, thus the purpose of heat dissipation can be carried, the result is simple, and is safe high-efficient, has improved the comprehensive debugging platform detection efficiency of joining in marriage electrical room.

Description

Join in marriage electrical room and synthesize debugging platform
Technical Field
The utility model relates to a debugging platform technical field, concretely relates to join in marriage electrical room and synthesize debugging platform.
Background
In the adjustment and the experiment of distribution room electrical equipment, can not directly put into operation after the drawing installation finishes, in order to make equipment can be safe, reasonable, normal operation, avoid taking place accident and cause economic loss for the country, avoid taking place the casualties, must debug the work, only after electrical equipment debugs qualifiedly, electrical equipment just can put into operation, work efficiency, quality after its operating mass directly decides electrical equipment and puts into operation, also decides power supply efficiency simultaneously.
At present join in marriage electrical room with debugging platform, the heat that its inside circuit produced can not be timely give out, in case the temperature is too high, probably leads to the inside metallic conductor resistance increase of circuit to cause the debugging to produce the error, and be unfavorable for the maintenance of debugging platform, the debugging platform of partial joining in marriage electrical room is more single, and the debugging of controlling each main road is gone on one by one, therefore it is necessary to design a join in marriage electrical room comprehensive debugging platform.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a join in marriage electrical room and synthesize debugging platform.
To achieve the purpose, the utility model adopts the following technical proposal:
provides a comprehensive debugging table for a power distribution room, which comprises a main box body, a working panel, a debugging mechanism and a heat dissipation mechanism, the main box body consists of an operation box and a display box, the display box is fixedly arranged on one side of the top of the operation box, the working panel is fixedly arranged at the top of the operation box and positioned at one side of the display box through bolts, the debugging mechanism comprises an electric connecting plate and three groups of adjusting components, the electric connecting plate is fixedly arranged at the inclined plane end of the display box through bolts, the three groups of adjusting components are arranged on the working panel in a linear array, and the three groups of adjusting components are fixedly connected with the working panel and the electric connecting plate, the heat dissipation mechanism comprises a sealing plate and two groups of blowing components, the sealing plate is arranged on one side of the operation box and fixedly connected with the operation box, the two groups of blowing assemblies are symmetrically arranged in the operation box, and the two groups of blowing assemblies are fixedly connected with the sealing plate.
Preferably, the inside of the operation box is symmetrically and fixedly provided with two partition plates, the two groups of partition plates divide the inside of the operation box into three built-in cavities, two groups of mounting holes for mounting the blowing assemblies are symmetrically formed in each partition plate, two groups of sealing doors are arranged on one side of the operation box and symmetrically hinged to two sides of the operation box, and pull grooves are formed in the opposite ends of the two groups of sealing doors.
Preferably, three groups regulating assembly is the one-to-one setting with three built-in cavity, every group regulating assembly includes regulating plate, debugging screen, signal line, keysets, outer fishplate bar and PCB panel, the regulating plate set up on work panel and with work panel fixed connection, the debugging screen set up on connecing the electroplax and with connect electroplax fixed connection, the keysets is fixed to be set up in the bottom of display box and communicates three built-in cavity.
Preferably, signal line and PCB panel all set up in the built-in cavity that corresponds, the inside one side that the display box was passed to the one end of signal line with correspond debugging screen fixed connection, the PCB panel is fixed to be set up in the built-in cavity bottom that corresponds adjusting part, the other end of signal line pass the keysets and extend to correspond on the PCB panel and with PCB panel fixed connection, outer fishplate bar is fixed to be set up in sealing door relative control box one side, the outer line of PCB panel passes outer fishplate bar and extends to the control box outside.
Preferably, the symmetry is equipped with two fresh air inlets on the closing plate, every the fresh air inlet is corresponding the setting with every group blast subassembly, every group blast subassembly is including installation shell, radiator fan and two sets of ventilation net, the installation shell passes through bolt fastening and sets up in corresponding the fresh air inlet, radiator fan sets up inside the installation shell and is connected with the installation shell rotation.
Preferably, it is two sets of the ventilation net sets up respectively in the mounting hole of two group's baffles one side to every group ventilation net is fixed connection with corresponding the mounting hole, radiator fan and regulating plate are electric connection.
Preferably, one side of the display box is provided with a plurality of first rectangular heat dissipation holes, one side of the operation box is provided with a ventilation plate, and the ventilation plate is provided with a plurality of second rectangular heat dissipation holes.
Preferably, the bottom of the operation box is provided with four support columns, and the four support columns are pairwise symmetrical and fixedly arranged at four corners of the bottom end of the operation box.
The utility model has the advantages that: the adjusting plate is operated to start a corresponding group of adjusting components, the debugging result is transmitted to the PCB panel, the PCB panel transmits the signal to the signal line, so that the signal line inputs the debugging result to the debugging screen, and then whether the debugging is qualified is judged, in the debugging process, the adjusting plate is operated to open the switches of the cooling fans in the two groups of blowing components, the cooling fans suck external air into adjacent built-in cavities through two air inlet holes on the sealing plate, then the air is introduced into three built-in cavities through a ventilation net in the two groups of partition plates, and finally the air is discharged through second rectangular heat dissipation holes on the ventilation plate, so that the effective air circulation is carried out inside the operation box, and the purpose of heat dissipation is further achieved, the first rectangular heat dissipation holes arranged on one side of the display box are convenient for the exchange between the inside of the display box and the external air through the first rectangular heat dissipation holes, the reading result to the debugging produces the influence, the utility model discloses an operating the regulating plate and starting two sets of radiator fan, can synthesize the debugging platform to joining in marriage the electrical room and carry out radiating purpose, simple as a result, safe high-efficient has improved and has joined in marriage electrical room and synthesized debugging platform detection efficiency.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments of the present invention are briefly described below.
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the internal three-dimensional structure of the present invention;
fig. 4 is a schematic view of a partial three-dimensional structure of the blowing assembly and the adjusting assembly of the present invention;
FIG. 5 is a schematic view of a partial three-dimensional structure of the adjusting assembly of the present invention;
fig. 6 is a schematic view of the cooling fan and the sealing plate according to the present invention;
FIG. 7 is a schematic view of the main box of the present invention;
FIG. 8 is an enlarged schematic view at A of FIG. 7;
in the figure: the device comprises a main box body 1, an operation box 10, a partition plate 100, a mounting hole 1000, a built-in chamber 101, a sealing door 102, a pull groove 1020, a ventilation plate 103, a second rectangular heat dissipation hole 1030, a first rectangular heat dissipation hole 104, a support column 105, a display box 11, a working panel 2, a debugging mechanism 3, a power connection plate 30, an adjusting assembly 31, an adjusting plate 310, a debugging screen 311, a signal wire 312, an adapter plate 313, an external connection plate 314, a PCB panel 315, a heat dissipation mechanism 4, a sealing plate 40, an air inlet hole 400, an air blowing assembly 41, a mounting shell 410, a cooling fan 411 and a ventilation net 412.
Detailed Description
The technical scheme of the invention is further explained by the specific implementation mode in combination with the attached drawings.
Wherein the showings are for the purpose of illustration only and are shown by way of illustration only and not in actual form, and are not to be construed as limiting the present patent; to better illustrate the embodiments of the present invention, some components of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product.
Referring to fig. 1 to 8, the comprehensive debugging platform for a power distribution room comprises a main box body 1, a working panel 2, a debugging mechanism 3 and a heat dissipation mechanism 4, wherein the main box body 1 is composed of an operation box 10 and a display box 11, the display box 11 is fixedly arranged on one side of the top of the operation box 10, the working panel 2 is fixedly arranged on the top of the operation box 10 and is positioned on one side of the display box 11 through bolts, the debugging mechanism 3 comprises an electric connection plate 30 and three sets of adjusting components 31, the electric connection plate 30 is fixedly arranged on the inclined end of the display box 11 through bolts, the three sets of adjusting components 31 are arranged on the working panel 2 in a linear array, the three sets of adjusting components 31 are fixedly connected with the working panel 2 and the electric connection plate 30, the heat dissipation mechanism 4 comprises a sealing plate 40 and two sets of blowing components 41, the sealing plate 40 is arranged on one side of the operation box 10 and is fixedly connected with the operation box, the two groups of the blowing assemblies 41 are symmetrically arranged inside the operation box 10, and the two groups of the blowing assemblies 41 are fixedly connected with the sealing plate 40.
The inside of the operation box 10 is symmetrically and fixedly provided with two partition plates 100, the inside of the operation box 10 is divided into three built-in chambers 101 by the two groups of partition plates 100, each partition plate 100 is symmetrically provided with two groups of mounting holes 1000 for mounting the blowing assemblies 41, one side of the operation box 10 is provided with two groups of sealing doors 102, the two groups of sealing doors 102 are symmetrically hinged to two sides of the operation box 10, the opposite ends of the two groups of sealing doors 102 are respectively provided with a pull groove 1020, the inside of the operation box 10 is divided into three built-in chambers 101 by the two groups of partition plates 100, each chamber corresponds to one group of adjusting assemblies 31, the three built-in chambers 101 are communicated through the mounting holes 1000 on the two groups of partition plates 100, subsequent air circulation is facilitated, and the two groups of sealing doors 102 are arranged to facilitate inspection and.
Three the regulating part 31 is the one-to-one setting with three built-in cavity 101, every group the regulating part 31 includes regulating plate 310, debugging screen 311, signal line 312, adapter plate 313, external board 314 and PCB panel 315, regulating plate 310 set up on working panel 2 and with working panel 2 fixed connection, debugging screen 311 sets up on connecing electroplax 30 and with connect electroplax 30 fixed connection, adapter plate 313 is fixed to be set up in the three built-in cavity 101 of bottom and intercommunication of display box 11, and three regulating part 31 corresponds three built-in cavity 101 and sets up, and three built-in cavity 101 communicates each other through two group baffles 100, and consequently can the multiunit simultaneously detect.
The signal line 312 and the PCB panel 315 are both disposed in the corresponding built-in cavity 101, one end of the signal line 312 passes through one side of the inside of the display box 11 and is fixedly connected with the corresponding debugging screen 311, the PCB panel 315 is fixedly disposed at the bottom of the built-in cavity 101 corresponding to the adjusting component 31, the other end of the signal line 312 passes through the adapter plate 313 and extends to the corresponding PCB panel 315 and is fixedly connected with the PCB panel 315, the external connecting plate 314 is fixedly disposed at one side of the operation box 10 opposite to the sealing door 102, the external connecting line of the PCB panel 315 passes through the external connecting plate 314 and extends to the outside of the operation box 10, during debugging, the adjusting plate 310 is operated to start the corresponding set of adjusting components 31, the debugging result is transmitted to the PCB panel 315, the PCB panel 315 transmits the signal to the signal line 312, so that the signal line 312 inputs the debugging result to the debugging screen 311 to judge whether the signal line is qualified, the setting of, and provides a mounting carrier for each set of PCB panels 315.
Two air inlet holes 400 are symmetrically arranged on the sealing plate 40, each air inlet hole 400 and each group of blowing assemblies 41 are correspondingly arranged, each group of blowing assemblies 41 comprises an installation shell 410, a cooling fan 411 and two groups of ventilation nets 412, the installation shell 410 is fixedly arranged in the corresponding air inlet holes 400 through bolts, the cooling fan 411 is arranged inside the installation shell 410 and is rotatably connected with the installation shell 410, the two groups of installation shells 410 are fixedly arranged in the two air inlet holes 400 on the sealing net, the installation shell 410 provides a rotating carrier for the corresponding cooling fan 411, and the installation holes 1000 arranged on the two groups of partition plates 100 are convenient for the installation of the ventilation nets 412, so that the air circulation purpose is achieved.
Two sets of ventilation net 412 sets up respectively in the mounting hole 1000 of two group's baffles 100 one side to every group ventilation net 412 is fixed connection with corresponding mounting hole 1000, radiator fan 411 is electric connection with regulating plate 310, manipulates regulating plate 310 and starts radiator fan 411, and two sets of radiator fan 411 inhale the outside air of control box 10, through three built-in cavities 101 of group respectively, thereby form the circulation of air, and electric connection easy operation, convenient and fast.
A plurality of first rectangular heat dissipation holes 104 are formed in one side of the display box 11, a ventilation plate 103 is arranged on one side of the operation box 10, a plurality of second rectangular heat dissipation holes 1030 are formed in the ventilation plate 103, when air is sucked in, the air passes through the three groups of built-in cavities 101 respectively, and finally the second rectangular heat dissipation holes 1030 in the ventilation plate 103 are discharged, so that the purpose of air circulation is achieved, the plurality of first rectangular heat dissipation holes 104 are formed in one side of the display box 11, the display box 11 is convenient to exchange with outside air through the first rectangular heat dissipation holes 104, the temperature inside the display box 11 is prevented from being increased, and the debugging reading result is influenced.
The bottom of control box 10 is equipped with four support columns 105, four two bisymmetry and fixed the setting in control box 10 bottom four corners of support column 105, and four support columns 105 are for providing firm support carrier for main tank 1.
The working principle is as follows: the adjusting plate 310 is operated to start the corresponding set of adjusting components 31, the debugging result is transmitted to the PCB panel 315, the PCB panel 315 transmits the signal to the signal line 312, so that the signal line 312 inputs the debugging result to the debugging screen 311, and then the qualification is judged, during the debugging process, the adjusting plate 310 is operated to open the switches of the cooling fans 411 in the two sets of blowing components 41, the cooling fans 411 suck the external air into the adjacent built-in chambers 101 through the two air inlets 400 on the sealing plate 40, then the air is introduced into the three built-in chambers 101 through the ventilation net 412 in the two sets of partition plates 100, and finally the air is discharged through the second rectangular heat dissipation holes 1030 on the ventilation plate 103, so as to effectively circulate the air inside the operation box 10, and further achieve the purpose of heat dissipation, the first rectangular heat dissipation holes 104 arranged on one side of the display box 11 are convenient for the exchange with the external air through the first rectangular heat dissipation holes 104 inside the display, thereby avoiding the temperature inside the display box 11 from increasing and affecting the reading result of debugging.
It should be understood that the above-described embodiments are merely illustrative of the preferred embodiments of the present invention and the technical principles thereof. It will be understood by those skilled in the art that various modifications, equivalents, changes, and the like can be made to the present invention. However, these modifications are within the scope of the present invention as long as they do not depart from the spirit of the present invention. In addition, certain terms used in the specification and claims of the present application are not limiting, but are used merely for convenience of description.

Claims (8)

1. The utility model provides a join in marriage electrical room comprehensive debugging platform, includes main tank body (1), its characterized in that still includes work panel (2), debugging mechanism (3) and heat dissipation mechanism (4), main tank body (1) comprises operation box (10) and display box (11), display box (11) are fixed to be set up in operation box (10) top one side, work panel (2) set up in operation box (10) top and lie in one side of display box (11) through bolt fastening, debugging mechanism (3) are including connecing electroplax (30) and three group adjusting part (31), connect electroplax (30) to set up in the inclined plane end of display box (11) through bolt fastening, three group adjusting part (31) are linear array and set up on work panel (2) to three group adjusting part (31) and work panel (2) and connect electroplax (30) to be fixed connection, the heat dissipation mechanism (4) comprises a sealing plate (40) and two groups of blowing assemblies (41), the sealing plate (40) is arranged on one side of the operation box (10) and fixedly connected with the operation box (10), the two groups of blowing assemblies (41) are symmetrically arranged inside the operation box (10), and the two groups of blowing assemblies (41) are fixedly connected with the sealing plate (40).
2. The comprehensive debugging table for the power distribution room of claim 1, wherein two partition plates (100) are symmetrically and fixedly arranged inside the operation box (10), two sets of partition plates (100) divide the inside of the operation box (10) into three built-in chambers (101), two sets of mounting holes (1000) for mounting the blowing components (41) are symmetrically arranged on each partition plate (100), two sets of sealing doors (102) are arranged on one side of the operation box (10), two sets of sealing doors (102) are symmetrically hinged on two sides of the operation box (10), and pull grooves (1020) are arranged at opposite ends of the two sets of sealing doors (102).
3. The power distribution room comprehensive debugging platform of claim 2, wherein three groups of adjusting components (31) are arranged in one-to-one correspondence with three built-in chambers (101), each group of adjusting components (31) comprises an adjusting plate (310), a debugging screen (311), a signal line (312), an adapter plate (313), an external connecting plate (314) and a PCB panel (315), the adjusting plate (310) is arranged on a working panel (2) and is fixedly connected with the working panel (2), the debugging screen (311) is arranged on a power receiving plate (30) and is fixedly connected with the power receiving plate (30), and the adapter plate (313) is fixedly arranged at the bottom of a display box (11) and is communicated with the three built-in chambers (101).
4. The power distribution room comprehensive debugging platform of claim 3, wherein the signal line (312) and the PCB panel (315) are both disposed in the corresponding built-in cavity (101), one end of the signal line (312) passes through one side of the inside of the display box (11) and is fixedly connected with the corresponding debugging screen (311), the PCB panel (315) is fixedly disposed at the bottom of the built-in cavity (101) of the corresponding adjusting component (31), the other end of the signal line (312) passes through the adapter plate (313) and extends to the corresponding PCB panel (315) and is fixedly connected with the PCB panel (315), the external connecting plate (314) is fixedly disposed at one side of the operation box (10) opposite to the sealing door (102), and the external connecting line of the PCB panel (315) passes through the external connecting plate (314) and extends to the outside of the operation box (10).
5. The comprehensive debugging table for the power distribution room of claim 4, wherein two air inlet holes (400) are symmetrically formed in the sealing plate (40), each air inlet hole (400) is arranged corresponding to each air blowing component (41), each air blowing component (41) comprises a mounting shell (410), a heat dissipation fan (411) and two sets of ventilation nets (412), the mounting shell (410) is fixedly arranged in the corresponding air inlet hole (400) through bolts, and the heat dissipation fan (411) is arranged inside the mounting shell (410) and is rotatably connected with the mounting shell (410).
6. The comprehensive debugging table for the power distribution room of claim 5, wherein two sets of said ventilation nets (412) are respectively disposed in the mounting holes (1000) on one side of two sets of partition plates (100), and each set of ventilation net (412) is fixedly connected to the corresponding mounting hole (1000), and said heat dissipation fan (411) is electrically connected to the adjusting plate (310).
7. The comprehensive debugging table for the power distribution room according to claim 6, wherein a plurality of first rectangular heat dissipation holes (104) are formed in one side of the display box (11), a ventilation board (103) is formed in one side of the operation box (10), and a plurality of second rectangular heat dissipation holes (1030) are formed in the ventilation board (103).
8. The comprehensive debugging table for the power distribution room of claim 7, wherein four supporting columns (105) are arranged at the bottom of the operation box (10), and the four supporting columns (105) are symmetrical in pairs and fixedly arranged at four corners of the bottom end of the operation box (10).
CN202021272579.4U 2020-07-02 2020-07-02 Join in marriage electrical room and synthesize debugging platform Active CN212787853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021272579.4U CN212787853U (en) 2020-07-02 2020-07-02 Join in marriage electrical room and synthesize debugging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021272579.4U CN212787853U (en) 2020-07-02 2020-07-02 Join in marriage electrical room and synthesize debugging platform

Publications (1)

Publication Number Publication Date
CN212787853U true CN212787853U (en) 2021-03-26

Family

ID=75099456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021272579.4U Active CN212787853U (en) 2020-07-02 2020-07-02 Join in marriage electrical room and synthesize debugging platform

Country Status (1)

Country Link
CN (1) CN212787853U (en)

Similar Documents

Publication Publication Date Title
CN202374160U (en) Complete machine structure of inverter
CN212787853U (en) Join in marriage electrical room and synthesize debugging platform
CN114171819A (en) Energy storage cabinet
CN109655694A (en) A kind of more enablings turnover aging testing apparatus that can load power supply automatically
CN212932900U (en) High-temperature aging test equipment for power supply module
CN215832065U (en) Good heat dissipation's outer quick-witted frequency conversion mainboard of air conditioner is with electrical apparatus box
CN204906957U (en) Intellectual detection system equipment is synthesized to train monitoring device host computer
CN211378508U (en) Cabinet for low oxygen system
CN212851626U (en) Electronic information anti-interference device
CN213687520U (en) Flame retardant fabric preheating and drying device
CN108819770A (en) A kind of rush-harvesting and rush-planting non-on-board charger of single open-door
CN201178456Y (en) Ultra-large switching matrix
CN220191211U (en) Compact double-H air-cooled SVG chain link shell
CN208615731U (en) A kind of rush-harvesting and rush-planting non-on-board charger of single open-door
CN220306750U (en) Noise reduction mechanism
CN219779570U (en) Heat dissipation control cabinet
CN210225231U (en) Power module of power electronic transformer
CN218482293U (en) Formation and capacity-separation integrated equipment
CN214175041U (en) Cooling device for computer and cooling mechanism thereof
CN206759318U (en) A kind of frequency converter movement of modular unit
CN217955601U (en) LLC transformer and LLC power
CN219577097U (en) Heat dissipation nature industrial switch
CN216721863U (en) Digital conference system central host with good protection effect
CN204905715U (en) SVG device structure
CN219203273U (en) Air-cooled battery module of energy storage system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant