CN212775950U - Steel structure pipeline bracket for structural engineering - Google Patents

Steel structure pipeline bracket for structural engineering Download PDF

Info

Publication number
CN212775950U
CN212775950U CN202021366204.4U CN202021366204U CN212775950U CN 212775950 U CN212775950 U CN 212775950U CN 202021366204 U CN202021366204 U CN 202021366204U CN 212775950 U CN212775950 U CN 212775950U
Authority
CN
China
Prior art keywords
fixed
sets
rod
fixedly connected
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021366204.4U
Other languages
Chinese (zh)
Inventor
王晓莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021366204.4U priority Critical patent/CN212775950U/en
Application granted granted Critical
Publication of CN212775950U publication Critical patent/CN212775950U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a steel structure pipeline bracket for structural engineering, including cradling piece and pipeline shell, pipeline shell has been placed on the cradling piece top, the cradling piece top is provided with damping device, the first fixed block of the all fixedly connected with in both sides about the cradling piece top, it is two sets of first fixed block all is connected with the telescopic link through the pivot, and is two sets of the all fixed cover of telescopic link outer wall has first spring, and is two sets of the telescopic link top all is connected with the second fixed block through the pivot. The utility model discloses when the pipeline shell receives the foreign object collision, the pipeline shell makes the second fixed block remove through the connecting block, and the second fixed block removes and drives the telescopic link and remove, rotates through driving the connecting rod, and the telescopic link removes and makes the compression of first spring, and the connecting rod removes and makes the second spring tensile to this alleviates the striking of support pole to the pipeline shell, avoids the pipeline shell to break impairedly, makes pipeline shell ability normal use, the security that improves the device.

Description

Steel structure pipeline bracket for structural engineering
Technical Field
The utility model relates to a pipe bracket technical field specifically is a steel construction pipe bracket for structural engineering.
Background
The pipeline bracket can be widely applied to the structural engineering, and the steel structure pipeline bracket for the existing structural engineering basically meets the requirements of people, but still has some problems.
Present structural engineering steel structure pipe bracket when the pipeline receives the foreign object collision, the pipeline strikes with the support easily, leads to the pipeline to break impaired, makes the unable normal use of pipeline, reduces the security of device.
And present steel structure pipe bracket for structural engineering, pipe bracket generally can only support the pipeline of fixed a model, when supporting other model pipelines, need change different pipe bracket, lead to extravagant operating time, reduce work efficiency, reduce the practicality of device simultaneously, therefore an urgent need steel structure pipe bracket for structural engineering solves above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel structure pipeline bracket for structural engineering to solve the traditional steel structure pipeline bracket for structural engineering who proposes in the above-mentioned background art, the pipeline takes place the striking with the support easily when receiving the foreign object collision, and pipeline bracket can only support the problem of the pipeline of fixed model generally.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure pipeline bracket for structural engineering comprises a bracket rod and a pipeline shell, wherein the pipeline shell is placed at the top end of the bracket rod, a damping device is arranged at the top end of the bracket rod and comprises a first fixed block, a telescopic rod, a first spring, a second fixed block, a connecting rod, a fixed plate, a first chute, a first sliding block and a second spring, the first fixed block is fixedly connected to the left side and the right side of the top end of the bracket rod, the telescopic rod is connected to two groups of the first fixed blocks through a rotating shaft, the first spring is fixedly sleeved on the outer wall of the two groups of the telescopic rods, the second fixed block is connected to the top end of the two groups of the telescopic rods through a rotating shaft, the connecting rod is connected to the two groups of the second fixed blocks through a rotating shaft, the first sliding block is fixedly connected to the bottom ends of the two groups of the connecting rods, the first sliding blocks are embedded in, the other ends of the two groups of second springs are fixedly connected to the inner walls of the left end and the right end of the first sliding groove, a fixing plate is fixedly connected to the middle of the top end of the support rod, and the top end of the fixing plate is provided with the first sliding groove.
Preferably, two sets of the second fixed block top is provided with reinforcing apparatus, reinforcing apparatus includes connecting block, second spout and slotted hole, and is two sets of second fixed block top fixedly connected with connecting block, the second spout has been seted up in the middle of the connecting block top, the slotted hole has all been seted up on both sides about the second spout bottom.
Preferably, the inside first mobile device that is provided with of second spout, first mobile device includes second slider and through hole, both sides are all embedded with the second slider about the second spout, and the through hole has all been seted up in the middle of two sets of second sliders.
Preferably, the second moving device is arranged inside the two groups of through holes and comprises a round rod and a push rod, the round rod is inserted into the two groups of through holes in a penetrating mode, the push rod is fixedly connected to the top end of the round rod, and the bottom ends of the round rods are embedded in the groove holes.
Preferably, the pipeline shell outer wall is provided with fixing device, fixing device includes first fixed bolster and second fixed bolster, and is two sets of the relative one side of second slider is the fixedly connected with second fixed bolster, and is two sets of the relative one side of second fixed bolster is laminated with the pipeline shell outer wall mutually, the pipeline shell top is laminated with first fixed bolster mutually, first fixed bolster top fixedly connected with push rod.
Preferably, threaded holes are uniformly formed in the outer wall of the front end of the round rod, and threaded rods are connected to the threaded holes in a threaded mode.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the pipeline shell is collided by a foreign object, the second fixing block is moved through the connecting block, the telescopic rod is driven to move by the movement of the second fixing block, the telescopic rod is driven to rotate, the first spring is compressed by the movement of the telescopic rod, and the second spring is stretched by the movement of the connecting rod, so that the impact of the support rod on the pipeline shell is relieved, the pipeline shell is prevented from being broken and damaged, the pipeline shell can be normally used, and the safety of the device is improved;
2. this steel structure pipeline bracket for structural engineering is provided with the second spout, the second slider, the through hole, the round bar, the push rod, first fixed bolster, the second fixed bolster, screw hole and threaded rod, when needing to support the pipeline shell of fixed different models, through pressing down the push rod with the hand, the push rod removes and drives the round bar and remove inside the through hole, drive first fixed bolster simultaneously and remove, the round bar removes and drives the second slider and remove inside the second spout, the second slider removes and drives the second fixed bolster and remove, when making first fixed bolster and second fixed bolster hug closely the pipeline shell, the reuse hand is twisted into the screw hole with the threaded rod, so that fixed round bar, avoid changing different cradling piece waste time, the work efficiency is improved, the practicality of device is improved simultaneously.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 3 is an enlarged schematic structural view of the utility model at the position B in fig. 1;
fig. 4 is a schematic view of the front view cross-sectional structure of the present invention.
In the figure: 1. a support rod; 210. a first fixed block; 211. a telescopic rod; 212. a first spring; 213. a second fixed block; 214. a connecting rod; 215. a fixing plate; 216. a first chute; 217. a first slider; 218. a second spring; 3. a duct housing; 410. connecting blocks; 411. a second chute; 412. a slot; 413. a second slider; 414. a through hole; 415. a round bar; 416. a push rod; 417. a first fixing pad; 418. a second fixing pad; 419. a threaded hole; 420. a threaded rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a steel structure pipeline bracket for structural engineering comprises a bracket rod 1 and a pipeline shell 3, the pipeline shell 3 is placed at the top end of the bracket rod 1, a damping device is arranged at the top end of the bracket rod 1, the damping device comprises a first fixed block 210, a telescopic rod 211, a first spring 212, a second fixed block 213, a connecting rod 214, a fixed plate 215, a first sliding groove 216, a first sliding block 217 and a second spring 218, the left side and the right side of the top end of the bracket rod 1 are fixedly connected with the first fixed block 210, the two groups of first fixed blocks 210 are both connected with the telescopic rod 211 through rotating shafts, the outer walls of the two groups of telescopic rods 211 are both fixedly sleeved with the first spring 212, the top ends of the two groups of telescopic rods 211 are both connected with the second fixed block 213 through rotating shafts, the two groups of second fixed blocks 213 are both connected with the connecting rod 214 through rotating shafts, the bottom ends of the two, and the width of the first sliding block 217 is equal to the width of the first sliding slot 216, so that when the first sliding block 217 moves in the first sliding slot 216, the device is more stable and the stability of the device is improved, two sets of first sliding blocks 217 are all embedded in the first sliding slot 216, one end of the second spring 218 is fixedly connected to the opposite side of the two sets of first sliding blocks 217, the other end of the two sets of second springs 218 is fixedly connected to the inner walls of the left and right ends of the first sliding slot 216, the fixing plate 215 is fixedly connected to the middle of the top end of the support rod 1, the first sliding slot 216 is formed at the top end of the fixing plate 215, when the pipeline housing 3 is impacted by a foreign object, the pipeline housing 3 moves the second fixing block 213 through the connecting block 410, the second fixing block 213 moves to drive the telescopic rod 211 to move, the telescopic rod 211 is rotated by driving the connecting rod 214 to move to compress the first spring 212, the connecting rod 214, the pipeline shell 3 is prevented from being broken and damaged, so that the pipeline shell 3 can be normally used, and the safety of the device is improved;
the top ends of two groups of second fixed blocks 213 are provided with reinforcing devices, the reinforcing devices comprise connecting blocks 410, second sliding grooves 411 and slotted holes 412, the top ends of the two groups of second fixed blocks 213 are fixedly connected with the connecting blocks 410, the middle of the top end of the connecting blocks 410 is provided with the second sliding grooves 411, the left and right sides of the bottom end of the second sliding grooves 411 are both provided with the slotted holes 412, so that the stability of the device can be improved, the inside of the second sliding grooves 411 is provided with first moving devices, the first moving devices comprise second sliding blocks 413 and through holes 414, the left and right sides of the second sliding grooves 411 are both embedded with the second sliding blocks 413, the middle of the two groups of second sliding blocks 413 is both provided with the through holes 414, so that the movement is simpler and more convenient, the inside of the two groups of through holes 414 is provided with second moving devices, the second moving devices comprise round rods 415 and push rods 416, the two groups of, therefore, the movement is more accurate, a fixing device is arranged on the outer wall of the pipeline shell 3, the fixing device comprises a first fixing pad 417 and a second fixing pad 418, one side of each of two groups of second sliding blocks 413 opposite to each other is fixedly connected with the second fixing pad 418, one side of each of two groups of second fixing pads 418 opposite to each other is attached to the outer wall of the pipeline shell 3, the top end of the pipeline shell 3 is attached to the first fixing pad 417, the top end of the first fixing pad 417 is fixedly connected with a push rod 416, the outer wall of the front end of the round rod 415 is uniformly provided with threaded holes 419, the threaded holes 419 are in threaded connection with a threaded rod 420, the push rod 416 is moved by pressing the push rod 416 with hands to drive the round rod 415 to move in the through hole 414 and simultaneously drive the first fixing pad 417 to move, the round rod 415 moves to drive the second sliding block 413 to move in the second sliding groove 411, the second sliding block 413 moves to drive, and the threaded rod 420 is screwed into the threaded hole 419 by hand so as to fix the round rod 415, thereby avoiding time waste caused by replacing different support rods 1, improving the working efficiency and improving the practicability of the device.
The working principle is as follows: when the pipeline housing 3 receives a foreign object collision, the pipeline housing 3 drives the second fixing block 213 to move through the connecting block 410, the second fixing block 213 drives the telescopic rod 211 to stretch, the telescopic rod 211 stretches and retracts and simultaneously drives the first spring 212 to be compressed and stretched, meanwhile, the second fixing block 213 drives the connecting rod 214 to rotate on the rotating shaft when moving, the connecting rod 214 rotates to drive the first sliding block 217 to move inside the first sliding groove 216, and the first sliding block 217 moves to enable the second spring 218 to be compressed on the inner wall of the fixing plate 215.
When the pipeline shells 3 of different models need to be supported and fixed, the pipeline shell 3 is placed at the top end of the connecting block 410 by hands, the push rod 416 is pushed by hands, the push rod 416 moves to drive the round rod 415 to move inside the through hole 414, meanwhile, the round rod 415 enters the groove hole 412, the round rod 415 moves to drive the second sliding block 413 to move inside the second sliding groove 411, the second sliding block 413 moves to drive the second fixing pad 418 to move, so that the second fixing pad 418 is attached to the surface of the pipeline shell 3, the push rod 416 moves to drive the first fixing pad 417 to move, so that the first fixing pad 417 is attached to the surface of the pipeline shell 3, and the pipeline shell 3 is supported and fixed.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a steel structure pipe bracket for structural engineering, includes cradling piece (1) and pipeline shell (3), its characterized in that have been placed on cradling piece (1) top: the pipeline damping device is arranged at the top end of the support rod (1) and comprises a first fixed block (210), a telescopic rod (211), a first spring (212), a second fixed block (213), a connecting rod (214), a fixed plate (215), a first sliding chute (216), a first sliding block (217) and a second spring (218), the first fixed block (210) is fixedly connected to the left side and the right side of the top end of the support rod (1), the telescopic rods (211) are connected to the two groups of first fixed blocks (210) through rotating shafts, the first springs (212) are fixedly sleeved on the outer walls of the two groups of telescopic rods (211), the second fixed blocks (213) are connected to the top end of the two groups of telescopic rods (211) through rotating shafts, the connecting rods (214) are connected to the two groups of second fixed blocks (213) through rotating shafts, and the first sliding blocks (217) are fixedly connected to the bottom, two sets of first slider (217) all embedded in first spout (216), two sets of first slider (217) all the one end of fixedly connected with second spring (218) on one side mutually back of the body, two sets of both ends inner wall about second spring (218) other end fixed connection in first spout (216), fixedly connected with fixed plate (215) in the middle of cradling piece (1) top, first spout (216) have been seted up on fixed plate (215) top, and two sets of second fixed block (213) top is provided with reinforcing apparatus.
2. The structural steel structural pipe bracket according to claim 1, characterized in that: the reinforcing device comprises a connecting block (410), a second sliding groove (411) and a slotted hole (412), the top end of the second fixing block (213) is fixedly connected with the connecting block (410), the second sliding groove (411) is formed in the middle of the top end of the connecting block (410), the slotted hole (412) is formed in the left side and the right side of the bottom end of the second sliding groove (411), and a first moving device is arranged inside the second sliding groove (411).
3. The structural steel structural pipe bracket according to claim 2, characterized in that: first mobile device includes second slider (413) and through hole (414), both sides are all embedded to have second slider (413) about second spout (411), and are two sets of through hole (414) have all been seted up in the middle of second slider (413), the inside second mobile device that is provided with of two sets of through hole (414).
4. The structural steel structural pipe bracket according to claim 3, characterized in that: the second moving device comprises a round rod (415) and a push rod (416), the two groups of through holes (414) are all inserted with the round rod (415) in a penetrating mode, the top ends of the two groups of round rods (415) are fixedly connected with the push rod (416), the bottom ends of the two groups of round rods (415) are embedded in the groove holes (412), and a fixing device is arranged on the outer wall of the pipeline shell (3).
5. The structural steel structural pipe bracket according to claim 4, characterized in that: fixing device includes first fixed bolster (417) and second fixed bolster (418), and is two sets of the relative one side of second slider (413) is fixedly connected with second fixed bolster (418), and is two sets of the relative one side of second fixed bolster (418) is laminated with pipeline shell (3) outer wall mutually, pipeline shell (3) top is laminated with first fixed bolster (417) mutually, first fixed bolster (417) top fixedly connected with push rod (416).
6. The structural steel structural pipe bracket according to claim 4, characterized in that: threaded holes (419) are uniformly formed in the outer wall of the front end of the round rod (415), and threaded rods (420) are connected to the threaded holes (419) in a threaded mode.
CN202021366204.4U 2020-07-13 2020-07-13 Steel structure pipeline bracket for structural engineering Expired - Fee Related CN212775950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021366204.4U CN212775950U (en) 2020-07-13 2020-07-13 Steel structure pipeline bracket for structural engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021366204.4U CN212775950U (en) 2020-07-13 2020-07-13 Steel structure pipeline bracket for structural engineering

Publications (1)

Publication Number Publication Date
CN212775950U true CN212775950U (en) 2021-03-23

Family

ID=75078524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021366204.4U Expired - Fee Related CN212775950U (en) 2020-07-13 2020-07-13 Steel structure pipeline bracket for structural engineering

Country Status (1)

Country Link
CN (1) CN212775950U (en)

Similar Documents

Publication Publication Date Title
CN111623943B (en) Device for carrying out metal material fatigue test on vibration table
CN103389196B (en) A kind of battery impact test tool
CN212775950U (en) Steel structure pipeline bracket for structural engineering
CN110983936A (en) Buffering formula installing support for electronic cement road surface breaker
CN206740535U (en) A kind of test universal testing machine
CN208527915U (en) A kind of buffer unit of hardware terminal high-speed punch slide block
CN112013077A (en) Industrial display screen with anti-collision mechanism
CN203756853U (en) Rolling machine damper and rolling machine
CN213142894U (en) Truss stand collision avoidance device
CN212947894U (en) A buffer stop for intelligent robot
CN213142895U (en) Anti-collision device for bridge pier
CN212274465U (en) A quick drying equipment for environmental protection field
CN213043500U (en) Three-phase asynchronous motor with shell quick-disassembling structure
CN209625560U (en) A kind of device of physics laboratory's measurement frictional force
CN210434979U (en) Protective structure of movable dust remover
CN209224914U (en) A kind of light-duty new energy commercialization car battery pressing device
CN207758506U (en) A kind of damping wheel group of Intelligent Mobile Robot
CN217617513U (en) Protective bracket device for spring machine
CN211040288U (en) Shock attenuation shell of gear pump
CN215660347U (en) Intelligent robot that shock attenuation protectiveness is good
CN214280604U (en) Power transformation equipment with on-line monitoring and fault diagnosis
CN216382386U (en) Refrigerator shell hand plate model capable of effectively buffering
CN218382181U (en) Concrete block anti-seismic experiment detection device
CN211825381U (en) Electric tension tester
CN211007137U (en) Novel shock insulation damper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323