CN212775801U - Cold and hot water tap main part foundry goods structure - Google Patents

Cold and hot water tap main part foundry goods structure Download PDF

Info

Publication number
CN212775801U
CN212775801U CN202021527559.7U CN202021527559U CN212775801U CN 212775801 U CN212775801 U CN 212775801U CN 202021527559 U CN202021527559 U CN 202021527559U CN 212775801 U CN212775801 U CN 212775801U
Authority
CN
China
Prior art keywords
trunk line
main part
foundry goods
cold
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021527559.7U
Other languages
Chinese (zh)
Inventor
辛惠轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Kelida Industrial Co ltd
Original Assignee
Shenzhen Kelida Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Kelida Industrial Co ltd filed Critical Shenzhen Kelida Industrial Co ltd
Priority to CN202021527559.7U priority Critical patent/CN212775801U/en
Application granted granted Critical
Publication of CN212775801U publication Critical patent/CN212775801U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

The utility model discloses a cold and hot water tap main part foundry goods structure, main part foundry goods set up to a tube structure, including the trunk line, the symmetry install in two pairs of pipelines of trunk line both sides, the trunk line side be equipped with respectively with two the connection port of vice pipe connection, connection port is equipped with an annular boss, vice pipeline be equipped with the annular groove of annular boss joint, annular boss side still is equipped with an at least location boss, the annular groove side seted up with the location recess of the corresponding adaptation of location boss, the trunk line with the concatenation department welded fastening of vice pipeline. The utility model discloses technical scheme improves tap main part foundry goods processing technology, improves production efficiency, reduction in production cost.

Description

Cold and hot water tap main part foundry goods structure
Technical Field
The utility model relates to an investment casting technical field, in particular to cold and hot water tap main part foundry goods structure.
Background
The main body of the cold and hot water faucet is a main accessory of the faucet, and needs to be produced in large batch, in order to control the manufacturing cost, the blank can only be formed by precision investment casting, the product is a cavity component, the structure is complex, the tortuous communicating pore diameters of the flow passages are different, and the integral forming of the casting has the following defects, firstly, the casting is too difficult, and the quality of the processes of shell making, sand removal and the like are difficult to ensure; secondly, the mold can not be opened, the loose core can not be taken out, and only an integral water-soluble core can be adopted, so that the cost is too high; thirdly, the cost is too high to be suitable for production.
Accordingly, the prior art is deficient and needs improvement.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a hot and cold water tap main part foundry goods structure, aim at improving tap main part foundry goods processing technology, improve production efficiency, reduction in production cost.
For realizing the above-mentioned purpose, the utility model provides a cold and hot water tap main part foundry goods structure, the main part foundry goods sets up to a tube structure, including the trunk line, the symmetry install in two pair pipelines of trunk line both sides, the trunk line side be equipped with respectively with two the connection port that vice pipeline connects, connection port is equipped with an annular boss, vice pipeline be equipped with the annular groove of annular boss joint, annular boss side still is equipped with at least a location boss, the annular groove side seted up with the location boss corresponds the positioning groove of adaptation, the trunk line with the concatenation department welded fastening of vice pipeline.
Preferably, the main pipeline with spot welding connects between the auxiliary pipeline, just the main pipeline with the gap build-up welding between the auxiliary pipeline connects.
Preferably, the weld penetration between the primary pipe and the secondary pipe is greater than 2 mm.
Preferably, the main pipeline is a straight pipe structure, and the two auxiliary pipelines are both 90-degree elbow pipe structures.
Preferably, the main pipe and the secondary pipe are both provided in a structure made of a 304 stainless steel material.
Preferably, the main pipe and the auxiliary pipe are both provided with a thread structure connected with the outside.
Compared with the prior art, the beneficial effects of the utility model are that: the processing technology of the faucet main body casting is improved, the faucet main body casting is split into three pieces, the three split castings are cast respectively, and finally the three castings are welded, so that the technology is simplified, the production efficiency of the castings is improved, the production cost is reduced, the product quality is stable, the yield reaches more than 99%, and the market demand is met.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the faucet main body casting of the present invention;
FIG. 2 is a schematic view of the main pipeline structure of the present invention;
FIG. 3 is a schematic view of the structure of the auxiliary pipeline of the present invention;
the objects, features and advantages of the present invention will be further described with reference to the accompanying drawings.
Detailed Description
The hot and cold water tap main body casting structure that this embodiment provided, refer to fig. 1 to fig. 3, and the main body casting sets up to a tube structure, including trunk line 1, the symmetry install in two auxiliary pipe 2 of trunk line 1 both sides, trunk line 1 side be equipped with respectively with two the connection port 11 that auxiliary pipe 2 is connected, connection port 11 is equipped with an annular boss 12, auxiliary pipe 2 be equipped with the annular groove 21 of annular boss 12 joint, annular boss 12 side still is equipped with an at least location boss 13, annular groove 21 side seted up with the location recess 22 of the corresponding adaptation of location boss 13, trunk line 1 with auxiliary pipe 2's concatenation department welded fastening.
It should be noted that, in this embodiment, the process for manufacturing the faucet main body casting is improved, the castings are separately cast, then the split castings are welded together by argon arc welding, then the welding seams are ground, the casting welding parts are shaped, the castings are machined, the surface of the castings is polished, and finally the manufacturing is completed by a closed water pressure test.
Specifically, according to the product requirements and the requirements of an investment precision casting process, a casting is divided into a main pipeline 1 and two auxiliary pipelines 2, the main pipeline 1 and the auxiliary pipelines 2 are clamped and connected through an annular boss 12 and an annular groove 21, and are positioned through a positioning boss 13 and a positioning groove 22, so that mould staggering is prevented, wherein in the embodiment, the positioning groove 22 and the positioning boss 13 are arranged into a group and are arranged into a rectangular structure; therefore, a complex main casting is changed into three relatively simple castings which are respectively cast, the production process of the castings is simple, and the quality is easy to guarantee. Furthermore, in the embodiment, the two secondary pipelines 2 have the same structure and are symmetrically arranged on two sides of the main pipeline 1, so that two sets of dies are only needed to be opened for the die, and the dies respectively correspond to the main pipeline 1 and the two secondary pipelines 2, after three castings are processed, the three castings are placed in a welding forming die, firstly, the two sides are respectively fixed by spot welding, then, welding wires (made of the same material as the castings) are added for overlaying welding connection gaps, and the fusion depth is ensured to be more than 2mm and cannot be weakened; after the welding is finished, the welding seam is polished to be flat and smooth by an abrasive belt machine so as to be conveniently placed into a machining fixture, and the threaded structure is machined to be connected with an external pipeline, a water tap and the like. And then carrying out surface polishing treatment, and sealing the casting to carry out a hydrostatic test, so that the water leakage is avoided.
Further, the structure of main pipeline 1 and auxiliary pipeline 2 can change according to actual demand, in this embodiment, main pipeline 1 sets up to a straight tube structure, two auxiliary pipeline 2 all sets up to 90 degrees bent pipe structures.
Further, the main pipeline 1 and the auxiliary pipeline 2 are both of a structure made of 304 stainless steel materials, and the service life of the whole casting is prolonged.
The above is only the preferred embodiment of the present invention, and not the scope of the present invention, all the equivalent structures or equivalent flow changes made by the contents of the specification and the drawings or the direct or indirect application in other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a cold and hot water tap main part foundry goods structure, its characterized in that, the main part foundry goods sets up to a tube structure, including the trunk line, the symmetry install in two pair pipelines of trunk line both sides, the trunk line side be equipped with respectively with two the connection port that vice pipeline is connected, connection port is equipped with an annular boss, vice pipeline be equipped with the annular groove of annular boss joint, annular boss side still is equipped with an at least location boss, the annular groove side seted up with the location boss corresponds the positioning groove of adaptation, the trunk line with the concatenation department welded fastening of vice pipeline.
2. A cast hot and cold water faucet body construction as claimed in claim 1, wherein said primary conduit and said secondary conduit are spot welded and wherein a gap between said primary conduit and said secondary conduit is weld welded.
3. A hot and cold faucet body casting construction as claimed in claim 2, wherein the weld penetration between said primary and secondary conduits is greater than 2 mm.
4. The casting structure of a hot and cold water faucet main body according to any one of claims 1 to 3, wherein the main pipe is provided in a straight pipe structure, and both the auxiliary pipes are provided in a 90-degree bent pipe structure.
5. A cast hot and cold water faucet body structure as defined in any one of claims 1 to 3, wherein said main duct and said sub duct are each provided in a structure made of a 304 stainless steel material.
6. A hot and cold water faucet body casting construction as claimed in claim 5, wherein the primary and secondary conduits are each provided with a threaded formation for connection to the outside.
CN202021527559.7U 2020-07-28 2020-07-28 Cold and hot water tap main part foundry goods structure Active CN212775801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021527559.7U CN212775801U (en) 2020-07-28 2020-07-28 Cold and hot water tap main part foundry goods structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021527559.7U CN212775801U (en) 2020-07-28 2020-07-28 Cold and hot water tap main part foundry goods structure

Publications (1)

Publication Number Publication Date
CN212775801U true CN212775801U (en) 2021-03-23

Family

ID=75038384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021527559.7U Active CN212775801U (en) 2020-07-28 2020-07-28 Cold and hot water tap main part foundry goods structure

Country Status (1)

Country Link
CN (1) CN212775801U (en)

Similar Documents

Publication Publication Date Title
CN102554573B (en) Manufacturing method for tubeless multi-piece wheel used for off-road automobile
CN105666027B (en) A kind of robot modularized welding production method of cooling water drainage
CN102266876A (en) Forming process and mould of seamless fork-shaped pipe
CN104858536A (en) Method for producing large-diameter thick-wall longitudinal submerged arc welded pipe
CN101344181A (en) Water tap valve body and its process technique
CN212775801U (en) Cold and hot water tap main part foundry goods structure
CN101745725B (en) Electromagnetic direct-drive high-speed three-wire magnetic-field compound flux copper-gasket submerged arc welding device and method thereof
CN103624490B (en) A kind of processing method of bimetal composite single-weld-seam bend
CN101234464A (en) Ball valve core hydraulic expansion method
CN113523733A (en) Production process of stainless steel water meter shell
CN100519056C (en) Centrifugal concrete pile die production process
CN208252440U (en) A kind of diffuser blank with welded large-scale vertical pump
US3374522A (en) Method of making diaphragm valve bodies
CN108581390A (en) A kind of ring flange method for turning
CN206943657U (en) A kind of metal three-way pipe of hot extrusion molding
CN201133505Y (en) Integral forging type valve body
CN201316919Y (en) Tee chamfer angle mould
CN213103822U (en) Cold-drawing forming die for arc-shaped pipe
CN102513796B (en) Machining process for inner conductor of ferrite stub
CN113492295A (en) Shaping process of steel pipe with unequal wall thickness
CN204533591U (en) The stainless steel valve seat of integrally casting on modulating valve valve body
CN210566912U (en) Butt welding eccentric reducing elbow used at industrial pipeline turning position and production device thereof
CN204867300U (en) Psammitolite and make core box of this psammitolite
CN107866642A (en) A kind of manufacture method of stainless steel faucet
CN210966856U (en) Lost foam male die for producing composite material machine tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant