CN212772366U - Pile foundation concrete pouring device for road and bridge construction - Google Patents

Pile foundation concrete pouring device for road and bridge construction Download PDF

Info

Publication number
CN212772366U
CN212772366U CN202021526060.4U CN202021526060U CN212772366U CN 212772366 U CN212772366 U CN 212772366U CN 202021526060 U CN202021526060 U CN 202021526060U CN 212772366 U CN212772366 U CN 212772366U
Authority
CN
China
Prior art keywords
pile foundation
road
material box
bridge construction
connecting shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021526060.4U
Other languages
Chinese (zh)
Inventor
谢勇波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021526060.4U priority Critical patent/CN212772366U/en
Application granted granted Critical
Publication of CN212772366U publication Critical patent/CN212772366U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pile foundation concreting device is used in road bridge construction, including material case, electric appliance cabinet and workstation, material case one side is provided with the electric appliance cabinet, electric appliance cabinet one side is provided with operating panel, operating panel one side is provided with the display screen. Has the advantages that: the utility model discloses a set up the workstation, supporting leg and hydraulic stem, can drive material case vertical rising, through the fixed of workstation, avoid at the in-process that rises, the material case produces and rocks, thereby can avoid the concrete to spill in the pile foundation periphery, keep operational environment's clean and tidy, avoid the wasting of resources, through setting up the mounting panel, infrared distance measurement inductor, operating panel and display screen, can record the surplus height in the pile foundation through infrared distance measurement inductor, and will record data and show through the display screen display, the staff of being convenient for accurately holds surplus and fills the height, convenient construction.

Description

Pile foundation concrete pouring device for road and bridge construction
Technical Field
The utility model relates to a pile foundation concreting device field, concretely relates to pile foundation concreting device is used in road bridge construction.
Background
In civil engineering construction, pouring simply means pouring prepared concrete into an assembled formwork, and for higher buildings or deeper pile lengths, the pouring is generally carried out by pumping pouring, and a grouting pipe is generally required for conveying the concrete.
The in-process that current cast-in-place concrete device is filling the road bridge pile foundation, when the pile foundation is about to be filled up to the concrete, need use outside hoisting equipment to hoist the material case, the lifting height, at the promotion in-process, the material case produces easily and rocks, lead to the concrete to spill in the pile foundation periphery, not only can influence the construction environment, and resource-wasting, and because current cast-in-place concrete device is filling the in-process to the road bridge pile foundation, the staff need observe in order to judge the residual height to the pile foundation many times, because the light line is darker in the pile foundation, lead to the staff can't accurately judge the residual height, cause the inconvenient construction, consequently, need a road bridge construction to solve current problem with pile foundation cast-in-place concrete device.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art not enough, the pile foundation cast-in-place concrete device for road and bridge construction is provided at present, the in-process that current cast-in-place concrete device is filling the road and bridge pile foundation has been solved, when the pile foundation is about to be filled up to the concrete, need use outside hoisting equipment to hoist the material case, the lifting height, in the promotion process, the material case produces easily and rocks, lead to the concrete to spill in the pile foundation periphery, not only can influence the construction environment, and resource still is wasted, and because current cast-in-place concrete device is in-process filling the road and bridge pile foundation, the staff need observe to judge the residual height to the pile foundation many times, because the light is darker in the pile foundation, lead to the staff can't accurately judge the residual height, cause the inconvenient problem of construction.
(II) technical scheme
The utility model discloses a following technical scheme realizes: the utility model provides a pile foundation concreting device for road and bridge construction, including material case, electric appliance cabinet and workstation, material case one side is provided with the electric appliance cabinet, electric appliance cabinet one side is provided with operating panel, operating panel one side is provided with the display screen, be provided with the motor in the electric appliance cabinet, be provided with the connecting axle in the material case, the connecting axle middle part is provided with the stirring leaf, connecting axle one end is provided with the fixing base, a material case lateral wall below is provided with the mounting panel, the mounting panel below is provided with infrared distance measuring inductor, material bottom of the case portion is provided with the gate, material case peripheral lateral wall is provided with the workstation, workstation below four corners department is provided with the supporting leg, the supporting leg below is provided with the hydraulic stem, the hydraulic stem below is provided with the universal wheel.
Furthermore, the motor output shaft is connected with the connecting shaft key, and the connecting shaft is rotatably connected with the fixed seat.
By adopting the technical scheme, the motor can drive the connecting shaft to rotate.
Furthermore, the infrared distance measuring sensor is electrically connected with the operation panel, and the infrared distance measuring sensor is electrically connected with the display screen.
Through adopting above-mentioned technical scheme, can pass through the infrared distance measuring inductor precision records remaining height in the pile foundation, the construction of being convenient for.
Furthermore, the infrared distance measuring sensor is electrically connected with the operation panel, and the infrared distance measuring sensor is electrically connected with the display screen.
By adopting the technical scheme, the data measured by the infrared distance measuring sensor can be displayed through the display screen.
Furthermore, the supporting legs are welded with the workbench, and the hydraulic rods are connected with the supporting legs through bolts.
Through adopting above-mentioned technical scheme, can pass through the hydraulic stem drives the workstation goes up and down, and then drives the material case goes up and down.
Further, the stirring blade is connected with the connecting shaft through a bolt.
By adopting the technical scheme, the concrete can be stirred by the stirring blades driven by the connecting shaft.
(III) advantageous effects
Compared with the prior art, the utility model, following beneficial effect has:
1. for solving present current cast-in-place concrete device and carrying out the in-process that fills to the road bridge pile foundation, when the concrete is about to fill up the pile foundation, need use outside hoisting equipment to hoist the material case, promote the height, at the promotion in-process, the material case produces easily and rocks, leads to the concrete to spill in the pile foundation periphery, not only can influence the construction environment, but also the problem of extravagant resource, the utility model discloses a set up workstation, supporting leg and hydraulic stem, can drive material case vertical lift, through the fixed of workstation, avoid at the in-process that rises, the material case produces and rocks to can avoid the concrete to spill in the pile foundation periphery, keep operational environment's clean and tidy, avoid the wasting of resources.
2. For solving at present because current cast-in-place concrete device is carrying out the in-process of pouring to the road bridge stake base, the staff need observe in order to judge the surplus height to the pile foundation many times, because the light is darker in the pile foundation, leads to the staff can't the accuracy to judge the surplus height, causes the inconvenient problem of construction, the utility model discloses a set up mounting panel, infrared distance measuring inductor, operating panel and display screen, can record the surplus height in the pile foundation through infrared distance measuring inductor to will record data and show through the display screen display, the staff of being convenient for accurately holds the surplus height of pouring, convenient construction.
Drawings
Fig. 1 is a main sectional view of a pile foundation concrete pouring device for road and bridge construction according to the present invention;
fig. 2 is the utility model relates to a road bridge construction is with pile foundation cast in place concrete device's right side view.
Fig. 3 is a top view of the device for pouring concrete into a pile foundation for road and bridge construction according to the present invention;
the reference numerals are explained below:
1. a material box; 2. an electric appliance cabinet; 3. an operation panel; 4. a display screen; 5. a motor; 6. a connecting shaft; 7. stirring blades; 8. a fixed seat; 9. mounting a plate; 10. an infrared ranging sensor; 11. a gate; 12. a work table; 13. supporting legs; 14. a hydraulic lever; 15. a universal wheel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1-3, the pile foundation concrete pouring device for road and bridge construction in this embodiment includes a material box 1, an electrical cabinet 2 and a workbench 12, the electrical cabinet 2 is disposed on one side of the material box 1, the electrical cabinet 2 can be installed with a motor 5 to prevent the motor 5 from being damaged by external force, the electrical cabinet 2 is disposed on one side with an operation panel 3, the operation panel 3 can turn on the motor 5 and an infrared distance measurement sensor 10, the operation panel 3 is disposed on one side with a display screen 4, the display screen 4 can display data measured by the infrared distance measurement sensor 10, the electrical cabinet 2 is disposed with the motor 5, the motor 5 can drive a connecting shaft 6 to rotate, the material box 1 is disposed with a connecting shaft 6, the connecting shaft 6 can drive a stirring blade 7 to rotate through the motor 5, the middle part of the connecting shaft 6 is disposed with a stirring blade 7, the stirring blade 7 can stir concrete in, one end of the connecting shaft 6 is provided with a fixed seat 8, the fixed seat 8 can be provided with the connecting shaft 6, a mounting plate 9 is arranged below one side wall of the material box 1, an infrared distance measuring sensor 10 is arranged below the mounting plate 9, the mounting plate 9 can be provided with the infrared distance measuring sensor 10, the residual height in the pile foundation can be measured by an infrared distance measuring sensor 10, a gate 11 is arranged at the bottom of a material box 1, the gate 11 can seal the material box 1, a workbench 12 is arranged on the peripheral side wall of the material box 1, the workbench 12 can support the material box 1, supporting legs 13 are arranged at four corners below the workbench 12, the supporting legs 13 can support the workbench 12, hydraulic rods 14 are arranged below the supporting legs 13, the hydraulic rods 14 can drive the workbench 12 to vertically lift, and then can make material case 1 vertical lift, be provided with universal wheel 15 below hydraulic stem 14, universal wheel 15 makes things convenient for workstation 12 to remove.
As shown in fig. 1-3, in this embodiment, the output shaft of the motor 5 is connected to the connecting shaft 6, the connecting shaft 6 is rotatably connected to the fixing base 8, the infrared distance measuring sensor 10 is electrically connected to the operation panel 3, and the infrared distance measuring sensor 10 is electrically connected to the display screen 4.
As shown in fig. 1 to 3, in the present embodiment, the infrared distance measuring sensor 10 is electrically connected to the operation panel 3, the infrared distance measuring sensor 10 is electrically connected to the display screen 4, the support leg 13 is welded to the table 12, the hydraulic rod 14 is bolted to the support leg 13, and the stirring blade 7 is bolted to the connecting shaft 6.
The specific implementation process of this embodiment is as follows: when the device is used, the workbench 12 is pushed to move to a designated working place through the universal wheel 15 below the workbench 12, then the material box 1 is placed on the workbench 12 through external hoisting equipment, the gate 11 is opened, the workbench 12 and the material box 1 are lowered to the pile foundation through the hydraulic rod 14, then concrete in the pump truck is poured into the material box 1, the motor 5 in the electric appliance cabinet 2 is opened through the operation panel 3, the motor 5 drives the connecting shaft 6 and the stirring blades 7 to stir the concrete, the stirred concrete is discharged into the pile foundation through the bottom of the material box 1, during the discharging process, the residual filling height in the concrete can be measured through the infrared distance measuring sensor 10 on the pile foundation on the mounting plate 9 at the bottom of the material box 1, the measured data is displayed through the display screen 4, and a worker can conveniently and accurately grasp the residual filling height, convenient construction, then when pouring into pile foundation mouth department, make workstation 12 and material case 1 rise perpendicularly through hydraulic stem 14, through the fixed of workstation 12, can avoid at the in-process that rises, material case 1 produces and rocks to can avoid the concrete unrestrained peripheral at the pile foundation, keep operational environment's clean and tidy, avoid the wasting of resources.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and are not intended to limit the spirit and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by the technical solution of the present invention by those skilled in the art should fall into the protection scope of the present invention, and the technical contents claimed by the present invention have been fully recorded in the claims.

Claims (6)

1. The utility model provides a pile foundation concreting device for road bridge construction which characterized in that: the device comprises a material box (1), an electric appliance cabinet (2) and a workbench (12), wherein the electric appliance cabinet (2) is arranged on one side of the material box (1), an operation panel (3) is arranged on one side of the electric appliance cabinet (2), a display screen (4) is arranged on one side of the operation panel (3), a motor (5) is arranged in the electric appliance cabinet (2), a connecting shaft (6) is arranged in the material box (1), a stirring blade (7) is arranged in the middle of the connecting shaft (6), a fixing seat (8) is arranged at one end of the connecting shaft (6), a mounting plate (9) is arranged below one side wall of the material box (1), an infrared distance measuring inductor (10) is arranged below the mounting plate (9), a gate (11) is arranged at the bottom of the material box (1), the workbench (12) is arranged on the peripheral side wall of the material box (1), and supporting legs (13) are arranged, a hydraulic rod (14) is arranged below the supporting leg (13), and a universal wheel (15) is arranged below the hydraulic rod (14).
2. The device for pouring concrete into a pile foundation for road and bridge construction according to claim 1, wherein: the output shaft of the motor (5) is connected with the connecting shaft (6) in a key mode, and the connecting shaft (6) is rotatably connected with the fixed seat (8).
3. The device for pouring concrete into a pile foundation for road and bridge construction according to claim 1, wherein: the infrared distance measurement sensor (10) is electrically connected with the operation panel (3), and the infrared distance measurement sensor (10) is electrically connected with the display screen (4).
4. The device for pouring concrete into a pile foundation for road and bridge construction according to claim 1, wherein: one side of the gate (11) is hinged with the material box (1), and the other side of the gate (11) is connected with the material box (1) in a buckling mode.
5. The device for pouring concrete into a pile foundation for road and bridge construction according to claim 1, wherein: the supporting legs (13) are welded with the workbench (12), and the hydraulic rods (14) are connected with the supporting legs (13) through bolts.
6. The device for pouring concrete into a pile foundation for road and bridge construction according to claim 1, wherein: the stirring blades (7) are connected with the connecting shaft (6) through bolts.
CN202021526060.4U 2020-07-29 2020-07-29 Pile foundation concrete pouring device for road and bridge construction Expired - Fee Related CN212772366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021526060.4U CN212772366U (en) 2020-07-29 2020-07-29 Pile foundation concrete pouring device for road and bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021526060.4U CN212772366U (en) 2020-07-29 2020-07-29 Pile foundation concrete pouring device for road and bridge construction

Publications (1)

Publication Number Publication Date
CN212772366U true CN212772366U (en) 2021-03-23

Family

ID=75038216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021526060.4U Expired - Fee Related CN212772366U (en) 2020-07-29 2020-07-29 Pile foundation concrete pouring device for road and bridge construction

Country Status (1)

Country Link
CN (1) CN212772366U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116149283A (en) * 2023-04-18 2023-05-23 深圳市盛邦通信有限公司 Material management control method, system, storage medium and intelligent terminal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116149283A (en) * 2023-04-18 2023-05-23 深圳市盛邦通信有限公司 Material management control method, system, storage medium and intelligent terminal
CN116149283B (en) * 2023-04-18 2023-07-25 心诺安(深圳)信息科技有限公司 Material management control method, system, storage medium and intelligent terminal

Similar Documents

Publication Publication Date Title
CN212772366U (en) Pile foundation concrete pouring device for road and bridge construction
CN211597761U (en) Concrete placement device based on bim
CN107866173A (en) Integration apparatus is collected in a kind of industrial chemicals stirring
CN213121509U (en) Concrete slump testing arrangement is used in hydraulic engineering construction
CN211078411U (en) Pipeline surveys auxiliary assembly
JP3413374B2 (en) In-situ pile tester
CN217973939U (en) Even filler device of ground for town road construction
CN210597280U (en) Cast-in-situ anti-floating protective plate for hole digging pile
CN211690343U (en) Bridge foundation pile filling device
CN113252878A (en) Device and method for testing stability of slurry groove under load action
CN218774637U (en) Liftable mixer
CN215247032U (en) Material supplementing device for cement product production
CN205935651U (en) Mold stripping is restoreed to floor hole for hoist
CN219490962U (en) Cement paste supply construction device for mixing pile
CN218121333U (en) Barrel testing device
CN216836865U (en) Lifting device for stably lifting road and bridge
CN214693076U (en) Civil engineering safety construction pushes away ladder with pay-off
CN217751925U (en) Canned type is wall template for concrete placement
CN219451568U (en) Perpendicularity control device used for supporting column-pile double-column construction
CN214786053U (en) Shear force wall PVC wears muscle box installation device
CN214583249U (en) Land measuring device for urban and rural planning and development
CN215448864U (en) Testing arrangement is used in building material manufacturing
CN214939100U (en) Leveling device is restoreed to road well lid
CN215276813U (en) Clean type dosing unit
CN217169113U (en) Exempt from basis batching station of just moving

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

CF01 Termination of patent right due to non-payment of annual fee