CN212772308U - Device for preventing upright pile from clamping lattice column by guide pipe in pouring process - Google Patents

Device for preventing upright pile from clamping lattice column by guide pipe in pouring process Download PDF

Info

Publication number
CN212772308U
CN212772308U CN202021479849.9U CN202021479849U CN212772308U CN 212772308 U CN212772308 U CN 212772308U CN 202021479849 U CN202021479849 U CN 202021479849U CN 212772308 U CN212772308 U CN 212772308U
Authority
CN
China
Prior art keywords
lacing
lattice column
pouring
steel bar
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021479849.9U
Other languages
Chinese (zh)
Inventor
胡良海
戴勇
李辉
刘祥
郑树彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202021479849.9U priority Critical patent/CN212772308U/en
Application granted granted Critical
Publication of CN212772308U publication Critical patent/CN212772308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a device for preventing upright post pile from blocking lattice column at filling in-process pipe, including lattice column, lattice column comprises lacing bar and lacing plate, lacing bar is triangle steel, and lacing bar is provided with four groups altogether, lacing bar encloses into the rectangle structure, and is two sets of fixed welding has lacing plate between the lacing bar, and lacing plate is provided with four groups altogether, the equal fixed welding in lacing plate bottom has the direction reinforcing bar. The utility model discloses the stand pile can prevent at the concrete pouring in-process that the phenomenon of pipe card at lattice column bottom from taking place, the pouring time that significantly reduces avoids causing the broken pile phenomenon because of concrete placement discontinuity at the in-process of pouring, will effectively promote the efficiency of pouring and pour the quality to the stand pile, and carry out fast assembly, it is more convenient to use, reduces the volume of lattice column simultaneously, more conveniently transports, and simple manufacture, available reinforcing bar leftover bits preparation, resources are saved.

Description

Device for preventing upright pile from clamping lattice column by guide pipe in pouring process
Technical Field
The utility model relates to a construction equipment technical field specifically is a device that prevents that stand pile from blocking lattice column at the in-process pipe that fills.
Background
The section of the lattice column is generally designed into a biaxial symmetrical or uniaxial symmetrical section by section steel or steel plates, the supporting forms in the building foundation pit are more and more along with the high-speed development of urban construction in China, and a vertical column pile and inner support supporting system is widely applied.
However, the existing device for preventing the conduit of the upright post pile from being clamped in the lattice post during the pouring process has the following disadvantages:
the stand pile is different from traditional bored concrete pile, the stand pile needs to imbed the lattice column at a stake center, consequently when concreting, the pipe festival is easily blocked on the angle steel at lattice column bottom lifting the in-process, greatly increase the filling time, probably cause disconnected stake because of concrete placement discontinuity even, and the device structure that prevents the stand pile at the in-process pipe card lattice column of filling that has now is complicated, the great inconvenience of volume transports, and manufacturing cost is great simultaneously, greatly increased construction cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevent device of stand pile pipe card lattice column in the filling process, with it is different with traditional drilling bored concrete pile to solve above-mentioned background art stand pile, the stand pile need imbed the lattice column at stake center, consequently when concreting, the pipe festival is on the angle steel of lifting the easy card of in-process at the lattice column bottom, the filling time of extension greatly, probably cause disconnected stake because of concrete placement is discontinuous even, and the device structure that prevents the stand pile pipe card lattice column in the filling process that has now is complicated, the great inconvenience of volume is transported, and the while manufacturing cost is great, greatly increased construction cost's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a device for preventing a vertical column pile from being clamped by a guide pipe in a pouring process comprises a lattice column, wherein the lattice column is composed of batten strips and batten plates, the batten strips are made of triangular steel materials and are provided with four groups, the batten strips are enclosed into a rectangular structure, the batten plates are fixedly welded between the two groups of batten strips, the four groups of batten plates are provided, guide steel bars are fixedly welded at the bottoms of the batten plates, the lattice column is composed of the batten strips and the batten plates, the batten strips are made of triangular steel materials and are provided with four groups, the batten strips are enclosed into the rectangular structure, the batten plates are fixedly welded between the two groups of batten strips and are provided with four groups, the structural strength of the lattice column can be effectively improved by welding the batten plates, the lattice column is supported through an inner cavity of the lattice column when the vertical column pile is poured, the lattice column is used as a bending component and is mainly used for a factory building frame column and a single-upright column, the section is generally designed into a double-shaft symmetrical or single-shaft symmetrical section, the batten strip mainly bears axial force, the batten plate mainly resists lateral force, the bending resistance of a reinforced component can be guaranteed under the condition of the same axial resistance, the structural strength of a vertical column pile can be effectively improved, the bottom of the batten plate is connected with a guide steel bar through a clamping groove in a welding mode, the batten plate can be quickly assembled with the guide steel bar in a construction place, the use is more convenient, the volume of a lattice column is reduced, the transportation is more convenient, meanwhile, the guide steel bar is composed of a transverse welding steel bar head and an arc-shaped guide steel bar, the welding precision of the guide steel bar can be effectively improved through the mutual matching of the transverse welding steel bar head and the clamping groove, a circular hoop is fixedly welded at the other end of the arc-shaped guide steel bar, the other end of the arc-shaped guide steel bar can be supported by the circular hoop, the other end of the arc-shaped guide steel bar can form a circular structure, after the vertical column pile is poured, a guide pipe is guided by the guide steel, the guide pipe is lifted from the center of the steel reinforcement cage, the guide pipe cannot be inclined, the problem that the guide pipe is clamped at the bottom of the lattice column in the concrete pouring process of the upright column pile is effectively solved, the pouring time is greatly reduced, the pile breaking phenomenon caused by discontinuous concrete pouring in the pouring process is avoided, and the pouring efficiency and the pouring quality of the upright column pile are effectively improved.
Preferably, the guide steel bar consists of a transverse welding steel bar head and an arc-shaped guide bar, and the transverse welding steel bar head and the arc-shaped guide bar form the guide steel bar.
Preferably, the guide steel bar is circular steel, and the guide steel bar is circular steel, can make the guide steel bar have stronger structural strength.
Preferably, arc direction muscle top one end integrated into one piece has the horizontal welding reinforcing bar head, horizontal welding reinforcing bar head and arc direction muscle all are 90 degrees contained angles, and the arc direction muscle top can conveniently be connected with the batten plate through horizontal welding reinforcing bar head.
Preferably, the other end of the arc-shaped guide rib is fixedly welded with a circular stirrup, and the other end of the arc-shaped guide rib can be supported by the circular stirrup, so that the other end of the arc-shaped guide rib can be supported by the circular stirrup to form a circular structure.
Preferably, the lacing plate bottom has all fixedly seted up the draw-in groove, the direction reinforcing bar top links to each other with the draw-in groove welding through horizontal welding reinforcing bar head, and there is the direction reinforcing bar lacing plate bottom through draw-in groove welded connection, and the lacing plate can be in construction department and the direction reinforcing bar fast assembly, uses more convenient, reduces the volume of lattice column simultaneously, more conveniently transports.
The utility model provides a device for preventing upright post pile from blocking lattice column at the in-process pipe that fills possesses following beneficial effect:
(1) the utility model discloses a circular stirrup can support the arc direction muscle other end, make the arc direction muscle other end enclose into circular structure under the support of circular stirrup, pour the completion back to the stand stake, the pipe is under the in-process of lifting leading of leading through direction reinforcing bar and circular stirrup, make the pipe propose from the steel reinforcement cage positive center, the pipe can not incline, the phenomenon of pipe card at lattice column bottom has effectively been solved the stand stake and has taken place the pipe card at the concrete placement in-process, the filling time that significantly reduces, avoid causing disconnected pile phenomenon because of concrete placement discontinuity in the in-process of pouring, will effectively promote the efficiency of pouring and pour the quality to the stand stake.
(2) The utility model discloses batten plate bottom has the direction reinforcing bar through draw-in groove welded connection, and batten plate can carry out fast assembly in construction department and direction reinforcing bar, uses more convenient, reduces the volume of lattice column simultaneously, more conveniently transports, and simple manufacture, available reinforcing bar leftover bits preparation, resources are saved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the lattice column structure of the present invention;
FIG. 3 is a schematic cross-sectional view of the lattice column of the present invention;
fig. 4 is the utility model discloses a direction rebar structure schematic diagram.
In the figure: 1. a lattice column; 101. lacing strips; 102. a batten plate; 2. a card slot; 3. guiding the reinforcing steel bars; 301. transversely welding the reinforcing steel bar heads; 302. an arc-shaped guide rib; 4. and (5) a circular stirrup.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1-4, the utility model provides a technical scheme: a device for preventing a vertical column pile from being clamped by a guide pipe in a pouring process comprises a lattice column 1, wherein the lattice column 1 is composed of batten strips 101 and batten plates 102, the batten strips 101 are made of triangular steel, four groups of batten strips 101 are arranged on the batten strips 101, the batten strips 101 are enclosed into a rectangular structure, the batten plates 102 are fixedly welded between two groups of batten strips 101, the four groups of batten plates 102 are arranged on the batten plates 102, guide reinforcing steel bars 3 are fixedly welded at the bottoms of the batten plates 102, the lattice column 1 is composed of the batten strips 101 and the batten plates 102, the batten strips 101 are made of triangular steel, the four groups of batten strips 101 are arranged on the batten strips 101, the rectangular structure is enclosed by the batten strips 101, the batten plates 102 are fixedly welded between the two groups of batten strips 101, the four groups of batten plates 102 are welded through the batten plates 102, the structural strength of the lattice column 1 can be effectively improved, the lattice column 1 is supported through an inner cavity of the lattice column 1 when the vertical column pile is poured, and is used as a bending component, the section is generally designed into a biaxial symmetry section or a uniaxial symmetry section by section steel or steel plates, the batten strip 101 mainly bears axial force, the batten plate 102 mainly resists lateral force and can ensure the bending resistance of a reinforcing component under the condition of the same axial resistance, and the structural strength of a column pile can be effectively improved, wherein the bottom of the batten plate 102 is connected with a guide steel bar 3 through a clamping groove 2 in a welding manner, the batten plate 102 can be quickly assembled with the guide steel bar 3 at a construction place, the use is more convenient, the volume of the lattice column 1 is reduced, the transportation is more convenient, meanwhile, the guide steel bar 3 consists of a transverse welding steel bar head 301 and an arc-shaped guide steel bar 302, the welding precision of the guide steel bar 3 can be effectively improved through the mutual matching of the transverse welding steel bar head 301 and the clamping groove 2, the circular stirrup 4 is fixedly welded at the other end of the arc-shaped guide steel bar 302, and the other end of the arc-shaped guide steel bar 302 can be supported through, make the arc direction muscle 302 other end can enclose into circular structure under circular stirrup 4's support, pour the completion back to the stand pile, the pipe is under the in-process of lifting leads of direction reinforcing bar 3 and circular stirrup 4, make the pipe propose from the steel reinforcement cage positive center, the pipe can not incline, effectively solved the stand pile and taken place the phenomenon of pipe card at lattice column bottom at the concrete pouring in-process, the pouring time that significantly reduces, avoid causing the disconnected pile phenomenon because of concrete pouring discontinuity in the in-process of pouring, will effectively promote the efficiency of pouring and the quality of pouring to the stand pile.
The guide steel bar 3 is composed of a transverse welding steel bar head 301 and an arc-shaped guide bar 302, and the transverse welding steel bar head 301 and the arc-shaped guide bar 302 form the guide steel bar 3.
The guide steel bar 3 is round steel, and the guide steel bar 3 is round steel, so that the guide steel bar 3 has stronger structural strength.
Arc direction muscle 302 top one end integrated into one piece has horizontal welding reinforcing bar head 301, horizontal welding reinforcing bar head 301 and arc direction muscle 302 all are 90 degrees contained angles, and arc direction muscle 302 top can conveniently be connected with lacing plate 102 through horizontal welding reinforcing bar head 301.
The arc direction muscle 302 other end all fixed welding have circular stirrup 4, can support the arc direction muscle 302 other end through circular stirrup 4, make the arc direction muscle 302 other end enclose into circular structure under circular stirrup 4's support.
All fixed draw-in groove 2 of having seted up in lacing plate 102 bottom, 3 tops of direction reinforcing bar link to each other with draw-in groove 2 welding through horizontal welding reinforcing bar head 301, and lacing plate 102 bottom has direction reinforcing bar 3 through draw-in groove 2 welded connection, and lacing plate 102 can be in construction department and lead reinforcing bar 3 and carry out fast assembly, uses more convenient, reduces the volume of lattice column 1 simultaneously, more conveniently transports.
It should be noted that, when the device for preventing the upright post pile from being clamped by the guide pipe in the pouring process works, the lattice post 1 is composed of batten strips 101 and batten plates 102, the batten strips 101 are made of triangular steel, four groups of batten strips 101 are arranged, the batten strips 101 enclose a rectangular structure, the batten plates 102 are fixedly welded between the two groups of batten strips 101, the four groups of batten plates 102 are arranged between the two groups of batten strips 101, the batten plates 102 are welded to the batten strips 101 through the batten plates 102, the structural strength of the lattice post 1 can be effectively improved, the inner cavity of the upright post pile is supported through the lattice post 1 when the upright post pile is poured, the lattice post 1 is used as a bending member and is used for a factory building frame post and an independent upright post, the cross section is generally designed into a biaxial symmetrical or uniaxial symmetrical cross section through a section, the batten strips 101 mainly bear axial force, the batten plates 102 mainly resist lateral force, the performance of the bending member can be enhanced under the condition of the same axial resistance, and the structural strength of, wherein the bottom of the batten plate 102 is connected with the guide steel bar 3 through the clamping groove 2 in a welding manner, the batten plate 102 can be rapidly assembled with the guide steel bar 3 at a construction position, the use is more convenient, the volume of the lattice column 1 is reduced, the transportation is more convenient, meanwhile, the guide steel bar 3 consists of a transverse welding steel bar head 301 and an arc-shaped guide steel bar 302, the welding precision of the guide steel bar 3 can be effectively improved through the mutual matching of the transverse welding steel bar head 301 and the clamping groove 2, the circular hoop 4 is fixedly welded at the other end of the arc-shaped guide steel bar 302, the other end of the arc-shaped guide steel bar 302 can be supported by the circular hoop 4 to form a circular structure, after the column pile is poured, the guide pipe is guided by the guide steel bar 3 and the circular hoop 4 in the lifting process, the guide pipe is lifted from the center of the steel cage, and cannot incline, the phenomenon that the upright post pile takes place the pipe card at lattice column bottom in the concrete pouring process is effectively solved, the pouring time that significantly reduces avoids causing the disconnected phenomenon because of concrete pouring is discontinuous at the in-process of pouring, will effectively promote the efficiency of pouring and the quality of pouring to the upright post pile.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a prevent that upright post stake from blocking device of lattice column in the filling process, includes lattice column (1), its characterized in that: lattice column (1) comprises lacing strip (101) and lacing plate (102), lacing strip (101) are triangle steel, and lacing strip (101) are provided with four groups altogether, lacing strip (101) enclose into the rectangle structure, and are two sets of fixed welding has lacing plate (102) between lacing strip (101), and lacing plate (102) are provided with four groups altogether, lacing plate (102) bottom all fixed welding has guide reinforcement (3).
2. The apparatus of claim 1, wherein the conduit is configured to prevent buckling of the post during grouting of the post, the apparatus further comprising: the guide steel bar (3) is composed of a transverse welding steel bar head (301) and an arc-shaped guide steel bar (302).
3. An apparatus for preventing a conduit from jamming against a lattice column during the pouring of a post pile according to claim 2, wherein: the guide steel bars (3) are made of round steel.
4. An apparatus for preventing a conduit from jamming against a lattice column during the pouring of a post pile according to claim 2, wherein: arc direction muscle (302) top one end integrated into one piece has horizontal welding reinforcing bar head (301), horizontal welding reinforcing bar head (301) and arc direction muscle (302) all are 90 degrees contained angles.
5. An apparatus for preventing a conduit from jamming against a lattice column during the pouring of a post pile according to claim 4, wherein: and the other end of the arc-shaped guide rib (302) is fixedly welded with a circular stirrup (4).
6. The apparatus of claim 1, wherein the conduit is configured to prevent buckling of the post during grouting of the post, the apparatus further comprising: the bottom of the batten plate (102) is fixedly provided with a clamping groove (2), and the top of the guide steel bar (3) is connected with the clamping groove (2) in a welding mode through a transverse welding steel bar head (301).
CN202021479849.9U 2020-07-24 2020-07-24 Device for preventing upright pile from clamping lattice column by guide pipe in pouring process Active CN212772308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021479849.9U CN212772308U (en) 2020-07-24 2020-07-24 Device for preventing upright pile from clamping lattice column by guide pipe in pouring process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021479849.9U CN212772308U (en) 2020-07-24 2020-07-24 Device for preventing upright pile from clamping lattice column by guide pipe in pouring process

Publications (1)

Publication Number Publication Date
CN212772308U true CN212772308U (en) 2021-03-23

Family

ID=75039253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021479849.9U Active CN212772308U (en) 2020-07-24 2020-07-24 Device for preventing upright pile from clamping lattice column by guide pipe in pouring process

Country Status (1)

Country Link
CN (1) CN212772308U (en)

Similar Documents

Publication Publication Date Title
CN210658968U (en) Auxiliary fixing framework of frame column node core stirrup cage
CN210659276U (en) Template positioning device for thickness of shear wall and concrete protective layer
CN212772308U (en) Device for preventing upright pile from clamping lattice column by guide pipe in pouring process
CN106049531B (en) High-moisture ultra-soft soil box multicell cast in place frame method for tunnel construction
CN210918296U (en) Square steel pipe sleeve fixing device
CN214995990U (en) Steel reinforced concrete independent beam template tool type supporting assembly
CN212294679U (en) Combined lattice column-concrete precast pile inclined support structure
CN212896859U (en) Beam and wall connecting node of bolt-tube concrete structure
CN210194997U (en) Rear-loading truss laminated plate
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN210368577U (en) Trestle for foundation pit
CN113738102A (en) Template building block for civil engineering and manufacturing method and using method thereof
CN220301317U (en) Zxfoom zxfoom zxfoom zxfoom occlusion device pile guide wall template
CN214657999U (en) Connecting structure for quickly assembling shear wall
CN219343162U (en) High-shear prestressed concrete pile
CN220033602U (en) Paying-off device for three-pile cap
CN221052982U (en) High-strength concrete structure
CN216587704U (en) Constructional column pouring system
CN216475061U (en) Novel composite precast pile supporting construction
CN212866621U (en) Prefabricated welded steel bar net
CN216920354U (en) Foundation pit support system for multi-dimensional support beam and steel stand column in sea reclamation area
CN217204223U (en) Retaining wall unilateral founds mould and supports reinforcement assembly
CN220468861U (en) Hard cutting secant pile guide wall pouring device with different pile diameters
CN214364436U (en) Frame column structure
CN214883613U (en) Prestressed recycled concrete precast pile

Legal Events

Date Code Title Description
GR01 Patent grant