CN212740631U - Jacking device for building material installation - Google Patents

Jacking device for building material installation Download PDF

Info

Publication number
CN212740631U
CN212740631U CN202020940355.XU CN202020940355U CN212740631U CN 212740631 U CN212740631 U CN 212740631U CN 202020940355 U CN202020940355 U CN 202020940355U CN 212740631 U CN212740631 U CN 212740631U
Authority
CN
China
Prior art keywords
building material
box
jacking device
bottom plate
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020940355.XU
Other languages
Chinese (zh)
Inventor
廖广松
程金平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020940355.XU priority Critical patent/CN212740631U/en
Application granted granted Critical
Publication of CN212740631U publication Critical patent/CN212740631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Braking Arrangements (AREA)

Abstract

The utility model discloses a jacking device is used in building material installation, including bottom plate, L shape link and rotation box, there is electric hydraulic cylinder at the bottom plate top through the bolt fastening, the electric hydraulic cylinder top has the rotation box through the bolt fastening, it has the body to rotate box one end welding, and the inside cover of body is equipped with the pull rod, rotate the inside transmission post of installing through the bearing of box, and the transmission post outside cover is equipped with brake gear, there is L shape link at transmission post top through the bolt fastening, the welding of L shape link bottom has preceding shovel board, the welding of preceding shovel board bottom has the boss. The utility model discloses simple structure, convenient operation can effectively be with building material jacking to take the altitude, has the rotation function simultaneously, can adjust the building material angle, and is easy to assemble, is fit for being extensively promoted and used.

Description

Jacking device for building material installation
Technical Field
The utility model relates to a jacking technical field, in particular to jacking device is used in building material installation.
Background
Building material is the various materials that use in building engineering, building material is various, great building material need use the main equipment to carry, the handling, and some are less, the unable material of carrying of manpower, when the installation, need use the jacking device, lift up it, the jacking is to the take the altitude after, install, current jacking device structure is complicated, convenient operation, and do not have the rotation function, need personnel to promote the jacking device and rotate, adjust, waste time and energy, for this reason, we propose a jacking device for building material installation.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a jacking device is used in building material installation can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a jacking device is used in building material installation, includes bottom plate, L shape link and rotates the box, the bottom plate top has electric hydraulic cylinder through the bolt fastening, the electric hydraulic cylinder top has the rotation box through the bolt fastening, it has the body to rotate box one end welding, and the inside cover of body is equipped with the pull rod, it installs the transmission post through the bearing to rotate box inside, and the cover of transmission post outside is equipped with brake gear, the transmission post top has L shape link through the bolt fastening, L shape link bottom welding has preceding shovel board, preceding shovel board bottom welding has the boss, bottom plate top both ends welding has the pipe box, and the inside cover of pipe box is equipped with fixed awl, the inside mounting groove of bottom plate is installed and is held the electricity box.
Furthermore, the L-shaped connecting frames are located at the top of the rotating box, and reinforcing connecting rods are welded between the L-shaped connecting frames.
Furthermore, the outside cover of pull rod is equipped with compression spring, and pull rod one end is connected with the cardboard through the thread groove, cardboard and compression spring all are located inside the body.
Furthermore, the bottom of the bottom plate is fixed with a universal wheel capable of braking through bolts, and the number of the reinforcing blocks is multiple.
Further, the current output end of the electricity storage box is electrically connected with the current input end of the electric hydraulic cylinder through a power line.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. by arranging the bottom plate, the L-shaped connecting frame and the electric hydraulic cylinder, a person pushes the device to the side of a building material to be installed through the universal wheel capable of braking, the building material to be installed is shoveled by the front shovel plate, the building material is moved to the front shovel plate, the reinforcing blocks are welded at the bottom of the front shovel plate, the strength and the bearing capacity of the front shovel plate can be improved, the front shovel plate is not easy to deform and damage, the person presses down or tramples the fixing cone, the bottom end of the fixing cone is inserted into the ground to fix the bottom plate, the stability of the device during working is improved, the electric hydraulic cylinder is powered by the electric storage box, the electric hydraulic cylinder is opened by the person, the rotating box and the L-shaped connecting frame are pushed upwards during working of the electric hydraulic cylinder, the front shovel plate and the building material at the top of the front shovel plate are moved upwards during moving of the L-shaped connecting frame, the reinforced connecting rod can improve the structural stability of the L-shaped connecting frame, so that the L-shaped connecting frame is not easy to damage.
2. Through setting up brake gear, pull rod and transmission post, when electric hydraulic cylinder promoted building material and rises to preset position, personnel can stimulate the pull rod, make the cardboard of its one end leave brake gear one side, can rotate L shape link and preceding shovel board through the transmission post, building material on the shovel board rotates before the drive, conveniently install it, after personnel loosen the pull rod, compression spring promoted the cardboard removal of pull rod and one end, make the cardboard insert in the brake gear, brake gear and transmission post block after will rotating, fix.
Drawings
Fig. 1 is the utility model relates to a jacking device for building material installation's overall structure schematic diagram.
Fig. 2 is the internal structure schematic diagram of the rotating box of the jacking device for building material installation of the utility model.
Fig. 3 is the utility model relates to a jacking device's for building material installation bottom plate inner structure schematic diagram.
In the figure: 1. a base plate; 2. an L-shaped connecting frame; 3. rotating the cartridge; 4. a front shovel plate; 5. a pipe body; 6. an electric hydraulic cylinder; 7. pipe sleeve; 8. a fixed cone; 9. a pull rod; 10. a drive post; 11. a reinforcing connecting rod; 12. a reinforcing block; 13. the universal wheel can be braked; 14. an electricity storage box; 15. a brake gear; 16. a compression spring; 17. and (4) clamping the board.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, a jacking device is used in building material installation, including bottom plate 1, L shape link 2 and rotation box 3, there is electric hydraulic cylinder 6 at 1 top of bottom plate through the bolt fastening, there is rotation box 3 at 6 tops of electric hydraulic cylinder through the bolt fastening, it has body 5 to rotate 3 one end welding of box, and the inside cover of body 5 is equipped with pull rod 9, it installs transmission post 10 through the bearing to rotate box 3 inside, and the outside cover of transmission post 10 is equipped with brake gear 15, there is L shape link 2 at 10 tops of transmission post through the bolt fastening, 2 bottom welding of L shape link have preceding shovel board 4, preceding shovel board 4 bottom welding has boss 12, 1 top of bottom plate both ends welding has pipe box 7, and the inside cover of pipe box 7 is equipped with fixed awl 8, bottom plate 1 is inside to install the mounting groove through the mounting groove and holds electric box 14.
Wherein, L shape link 2 is located and rotates 3 tops of box, the welding has the reinforcement connecting rod 11 between L shape link 2.
In this embodiment, as shown in fig. 1, the reinforcing connecting rod 11 can improve the structural stability of the L-shaped connecting frame 2, so that it is not easily deformed or damaged.
Wherein, the outside cover of pull rod 9 is equipped with compression spring 16, and pull rod 9 one end is connected with cardboard 17 through the thread groove, cardboard 17 and compression spring 16 all are located inside body 5.
In this embodiment, as shown in fig. 2, the compression spring 16 pushes the pull rod 9 and the catch plate 17 at one end thereof to move, so that the catch plate 17 is inserted into the brake gear 15, and the rotated brake gear 15 and the transmission post 10 are engaged and fixed.
The bottom of the bottom plate 1 is fixed with a brakeable universal wheel 13 through a bolt, and the number of the reinforcing blocks 12 is multiple.
In this embodiment, as shown in fig. 1, the brakable universal wheel 13 facilitates the movement of the device, and the plurality of reinforcing blocks 12 can improve the structural stability and the load-bearing capacity of the front shovel plate 4.
Wherein, the current output end of the electricity storage box 14 is electrically connected with the current input end of the electric hydraulic cylinder 6 through a power cord.
In this embodiment, as shown in fig. 3, the electric storage box 14 supplies power to the electric cylinder 6 so that it can operate normally.
It should be noted that the utility model relates to a jacking device for building material installation, during operation, personnel can brake universal wheel 13 to push the device to the building material side of waiting to install, use preceding shovel board 4 to scoop up the building material of waiting to install, make building material move to preceding shovel board 4, a plurality of boss 12 weld in preceding shovel board 4 bottom, can improve the intensity and the bearing capacity of preceding shovel board 4, make it difficult to deform, damage, personnel push down or trample fixed cone 8, make its bottom insert the underground, fix bottom plate 1, improve the stability of this device during operation, electricity storage box 14 gives electric hydraulic cylinder 6 power supply, personnel open electric hydraulic cylinder 6, electric hydraulic cylinder 6 work is rotated box 3 and L shape link 2 and is upwards moved, the building material of preceding shovel board 4 and top shifts up when L shape link 2 shifts up, shift up to preset position, control electric hydraulic cylinder 6 stop work, the personnel can install building material at the bottom, strengthen connecting rod 11 and can improve the structural stability of L shape link 2, make it not fragile, when electric hydraulic cylinder 6 promoted building material and rise to preset position, personnel can stimulate pull rod 9, make the cardboard 17 of its one end leave brake gear 15 one side, can rotate L shape link 2 and preceding shovel board 4 through transmission post 10, the building material on the shovel board 4 rotates before the drive, conveniently install it, personnel loosen behind the pull rod 9, compression spring 16 promotes the cardboard 17 removal of pull rod 9 and one end, make cardboard 17 insert in brake gear 15, brake gear 15 and transmission post 10 block after will rotating, fix.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a jacking device is used in building material installation, includes bottom plate (1), L shape link (2) and rotates box (3), its characterized in that: an electric hydraulic cylinder (6) is fixed at the top of the bottom plate (1) through a bolt, a rotating box (3) is fixed at the top of the electric hydraulic cylinder (6) through a bolt, a pipe body (5) is welded at one end of the rotating box (3), a pull rod (9) is sleeved in the pipe body (5), a transmission column (10) is installed in the rotating box (3) through a bearing, a brake gear (15) is sleeved on the outer side of the transmission column (10), an L-shaped connecting frame (2) is fixed at the top of the transmission column (10) through a bolt, the bottom end of the L-shaped connecting frame (2) is welded with a front shovel plate (4), the bottom of the front shovel plate (4) is welded with a reinforcing block (12), two ends of the top of the bottom plate (1) are welded with pipe sleeves (7), and the inside cover of pipe box (7) is equipped with fixed awl (8), bottom plate (1) is inside installs storage box (14) through the mounting groove.
2. The jacking device for building material installation of claim 1, wherein: l shape link (2) are located and rotate box (3) top, the welding has between L shape link (2) strengthens connecting rod (11).
3. The jacking device for building material installation of claim 1, wherein: the outer side of the pull rod (9) is sleeved with a compression spring (16), one end of the pull rod (9) is connected with a clamping plate (17) through a threaded groove, and the clamping plate (17) and the compression spring (16) are both located inside the pipe body (5).
4. The jacking device for building material installation of claim 1, wherein: the bottom of the bottom plate (1) is fixed with a brakeable universal wheel (13) through bolts, and the number of the reinforcing blocks (12) is multiple.
5. The jacking device for building material installation of claim 1, wherein: the current output end of the electricity storage box (14) is electrically connected with the current input end of the electric hydraulic cylinder (6) through a power line.
CN202020940355.XU 2020-05-29 2020-05-29 Jacking device for building material installation Expired - Fee Related CN212740631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020940355.XU CN212740631U (en) 2020-05-29 2020-05-29 Jacking device for building material installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020940355.XU CN212740631U (en) 2020-05-29 2020-05-29 Jacking device for building material installation

Publications (1)

Publication Number Publication Date
CN212740631U true CN212740631U (en) 2021-03-19

Family

ID=75005950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020940355.XU Expired - Fee Related CN212740631U (en) 2020-05-29 2020-05-29 Jacking device for building material installation

Country Status (1)

Country Link
CN (1) CN212740631U (en)

Similar Documents

Publication Publication Date Title
CN108590323B (en) Electric wire pole embedding device for electric power construction
CN212740631U (en) Jacking device for building material installation
CN204802470U (en) Feed mechanism behind garbage truck
CN210387313U (en) Rotor disk punching press garbage collection device
CN208070605U (en) Rotary type hook arm lock
CN201296611Y (en) Electric hydraulic crane
CN216072862U (en) Heavy jack translation device for narrow space operation
CN215057194U (en) Distribution drive all-electric drive automatic workover rig
CN204144882U (en) A kind of multi-functional wire barrow
CN211992719U (en) Installation device of street lamp
CN210941900U (en) Tree transportation device for forestry engineering
CN209037594U (en) A kind of hand propelled hydraulic handcart
CN214651436U (en) Full-automatic portable haulage equipment of big musical instrument
CN205968730U (en) Supplementary frock of screwing up of fluid pressure type bolt
CN221396864U (en) Construction hoist
CN205100906U (en) Environmental protection and energy saving type hydraulic drive workover rig
CN221051260U (en) Self-moving cable recycling vehicle
CN220642365U (en) Scaffold matched type transportation carrier
CN220284742U (en) Hydropower station door machine anchoring structure
CN212425231U (en) Winch for building construction
CN210973569U (en) Vertical hoist and mount buckle of reinforcing bar in well
CN211545868U (en) Folding well lid opening device
CN217894978U (en) Movable hoisting device
CN221546999U (en) Net hanging manipulator of anchor rod trolley
CN212221302U (en) Garbage can lifting and overturning equipment with rotary oil cylinder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210319