CN212740586U - Handling device is used in hydraulic engineering pile foundation construction - Google Patents

Handling device is used in hydraulic engineering pile foundation construction Download PDF

Info

Publication number
CN212740586U
CN212740586U CN202021027730.8U CN202021027730U CN212740586U CN 212740586 U CN212740586 U CN 212740586U CN 202021027730 U CN202021027730 U CN 202021027730U CN 212740586 U CN212740586 U CN 212740586U
Authority
CN
China
Prior art keywords
pile foundation
hydraulic engineering
support plate
fixedly mounted
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021027730.8U
Other languages
Chinese (zh)
Inventor
王瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tibet Fengyuan Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021027730.8U priority Critical patent/CN212740586U/en
Application granted granted Critical
Publication of CN212740586U publication Critical patent/CN212740586U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering, in particular to a transporting device for hydraulic engineering pile foundation construction, which comprises two portal frames, wherein the number of the portal frames is two, universal wheels are fixedly arranged on the left side and the right side of the bottom end of the portal frame, baffle plates are commonly arranged on the left side and the right side of the opposite surface of the two portal frames, chutes are vertically arranged in the middle parts of the inner walls on the left side and the right side of the portal frames, slide blocks are movably arranged in the chutes, and a beam is commonly arranged between every two opposite slide blocks. Time and labor saving and is worth popularizing and using.

Description

Handling device is used in hydraulic engineering pile foundation construction
Technical Field
The utility model relates to a hydraulic engineering technical field especially relates to a handling device is used in hydraulic engineering pile foundation construction.
Background
Hydraulic engineering is a general term for various engineering constructions built for controlling, utilizing and protecting water resources and environments on the earth surface and underground. Need be used the pile foundation in hydraulic engineering construction operation, need to transport the pile foundation that is prefabricated to construction department and construct, consequently need use handling device, current handling device need be carried the pile foundation by the workman when using on handling device, this process is wasted time and energy comparatively dangerous, and stable inadequately to the fixed of pile foundation, also comparatively hard and dangerous when uninstalling the pile foundation, for this reason we propose a handling device for hydraulic engineering pile foundation construction and solve this type of problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the handling device is used in hydraulic engineering pile foundation construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the carrying device for the hydraulic engineering pile foundation construction comprises two portal frames, universal wheels are fixedly mounted on the left side and the right side of the bottom end of each portal frame, baffles are commonly mounted on the left side and the right side of the opposite surfaces of the two portal frames, sliding grooves are vertically formed in the middle of the inner walls of the left side and the right side of each portal frame, sliding blocks are movably mounted in the sliding grooves, a cross beam is commonly mounted between every two opposite sliding blocks, connecting rods are fixedly mounted on the left side and the right side of the bottom end of the cross beam, mounting frames are commonly and fixedly mounted at the bottom ends of the two connecting rods, a support plate is commonly and fixedly mounted between the two mounting frames, moving grooves are transversely formed in the front side and the rear side of the top end of the support plate, threaded rods are transversely and movably mounted in the moving grooves through a pair of bearings, moving blocks, a clamping plate is fixedly arranged above the moving block, the right end of the threaded rod penetrates through the moving groove and extends to the outside of the support plate, a belt pulley is fixedly arranged, the two belt pulleys are connected through a belt, a servo motor is fixedly arranged in front of the left side of the support plate through a motor shell, the left end of the threaded rod positioned on the front side penetrates through the moving groove and extends to the outside of the support plate and is fixedly connected with an output shaft of the servo motor, a top plate is fixedly arranged at the top of the opposite sides of the two door frames together, a winding drum frame is fixedly arranged in the middle of the top end of the top plate, a winding drum is movably arranged in the winding drum frame, a first cable is wound on the surface of the winding drum, a lifting motor is fixedly arranged at the top end of the top plate and on the left side of the winding drum frame, the output shaft of the lifting motor, the equal fixed mounting in the left and right sides on the top of crossbeam has the fixed block, the top fixed mounting of fixed block has the second hawser, four the equal fixed connection in the outside of fixed knot in top of second hawser.
Preferably, the inside slant equidistance movable mounting of mounting bracket has first bull stick, the mounting groove has been seted up at the top middle part of support plate, the inside of mounting groove is by preceding equidistance movable mounting after to have the second bull stick.
Preferably, the inner side of the clamping plate is arc-shaped and is provided with an anti-skidding rubber pad.
Preferably, the left side and the right side of the threaded rod are provided with threads in opposite directions.
Preferably, two the upper portion of the left and right sides of the relative one side of portal all is equipped with the set-square, the top of set-square and the bottom fixed connection of roof.
Preferably, the left side and the right side of the back of the door frame positioned at the rear side are both provided with handles.
The utility model provides a pair of handling device is used in hydraulic engineering pile foundation construction, beneficial effect lies in: when the pile foundation conveying device is used, the lifting motor is started to enable the output shaft of the lifting motor to rotate in the forward direction to drive the winding drum to rotate so as to discharge the first cable rope, the first cable rope drives the fixing buckle to descend so as to drive the four second cable ropes to descend, the descending of the pair of cross beams is further realized, the descending process of the cross beams can be more stable through the matching of the sliding block and the sliding groove, the cross beams drive the connecting rods to descend so as to drive the support plate to descend to the ground, the pile foundation can be conveniently placed on the support plate by a worker through descending of the support plate so as to be placed on the conveying device without lifting the pile foundation, the danger of conveying work is greatly reduced, the pile foundation is convenient to push the pile foundation to the top end of the support plate through the matching of the first rotating rod and the second rotating rod through the first rotating rod, the servo motor is started to enable the output shaft of the lifting motor to drive the connected threaded rod to rotate, the two threaded rods rotate simultaneously, the threaded rods drive a pair of connected moving blocks to move close to each other in the moving grooves along the surfaces of the moving blocks so as to drive a pair of clamping plates to move close to each other to clamp the pile foundation, the space between the clamping plates can be adjusted to stably clamp and fix the pile foundations of different sizes, the lifting motor is started to enable the output shaft of the lifting motor to rotate reversely to drive the winding drum to rotate to wind the first cable rope, the first cable rope drives the fixing buckle to ascend so as to realize the ascending of the lower support plate, the fixed pile foundation is ascended, after the pile foundation is ascended to a certain height, the carrying device is moved by matching a handle with the universal wheel, so that the pile foundation is carried, when the pile foundation arrives at a specified place, the support plate is placed on the ground, the servo motor is started to enable the output shaft of the servo motor to rotate reversely to, the pile foundation is convenient to lift off by matching with the first rotating rod and the second rotating rod.
The utility model discloses simple structure, it is easy and simple to handle, can all carry out stable fixed to not unidimensional pile foundation, strong adaptability can place the pile foundation to ground with the highly decline of support plate, and the first bull stick of cooperation and second bull stick make can relax on the support plate, greatly reduced remove the pile foundation to the danger of handling device in-process, and cooperate the uninstallation of pile foundation that first bull stick and second bull stick can be light, labour saving and time saving is worth promoting and using.
Drawings
Fig. 1 is a schematic structural view of a carrying device for hydraulic engineering pile foundation construction provided by the utility model;
fig. 2 is a schematic front view of a carrying device for hydraulic engineering pile foundation construction provided by the utility model;
fig. 3 is a schematic view of a right-side sectional structure of the carrying device for hydraulic engineering pile foundation construction provided by the utility model;
fig. 4 is a schematic view of a top view structure of the carrier plate according to the present invention.
In the figure: the device comprises a door frame 1, a universal wheel 2, a baffle 3, a sliding groove 4, a sliding block 5, a cross beam 6, a connecting rod 7, a mounting frame 8, a support plate 9, a moving groove 10, a threaded rod 11, a moving block 12, a clamping plate 13, a belt pulley 14, a belt 15, a servo motor 16, a top plate 17, a winding drum frame 18, a winding drum 19, a first cable 20, a lifting motor 21, a fixing buckle 22, a fixing block 23, a second cable 24, a first rotating rod 25, a mounting groove 26, a second rotating rod 27, a handle 28 and a triangular plate 29.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a handling device is used in hydraulic engineering pile foundation construction, includes portal 1, and portal 1 number is two, and the equal fixed mounting in both sides has universal wheel 2 about portal 1 bottom, and the left and right sides that is located the back of portal 1 of rear side all is equipped with handle 28, is convenient for promote handling device cooperation universal wheel 2 through handle 28 and removes.
Baffle 3 is all installed jointly to the left and right sides of the relative one side of two portal 1, spout 4 has all vertically been seted up at the middle part of the left and right sides inner wall of portal 1, movable mounting has slider 5 in the spout 4, all install crossbeam 6 between per two relative sliders 5 jointly, the equal fixed mounting in left and right sides of the bottom of crossbeam 6 has connecting rod 7, the common fixed mounting in bottom of two connecting rod 7 has mounting bracket 8, common fixed mounting has support plate 9 between two mounting bracket 8, mounting bracket 8's inside slant equidistance movable mounting has first bull stick 25, mounting groove 26 has been seted up at the top middle part of support plate 9, the inside of mounting groove 26 is by preceding to back equidistance movable mounting have second bull stick 27, when carrying the pile foundation on support plate 9 in needs, be convenient for remove the device to support plate 9 top through first bull stick 25 that can roll and second bull.
The moving groove 10 has all transversely been seted up to both sides around the support plate 9 top, has threaded rod 11 through the horizontal movable mounting of a pair of bearing in the moving groove 10, threaded rod 11's the equal threaded sleeve in both sides have with moving block 12 of moving groove 10 assorted, and threaded rod 11's the left and right sides is equipped with opposite direction's screw, can drive a pair of moving block 12 along its surface and be close to each other or the motion of keeping away from each other in moving groove 10 when threaded rod 11 rotates.
The top fixed mounting of movable block 12 has splint 13, and the inboard of splint 13 is the arc and is equipped with anti-skidding rubber pad, and the arc design is convenient for carry out the centre gripping to columniform pile foundation, and the anti-skidding rubber pad has increased splint 13 and pile foundation contact surface's frictional force and has made more stable fixed to the pile foundation.
The right-hand member of threaded rod 11 passes the outside fixed mounting that the shifting chute 10 extends to support plate 9 and has belt pulley 14, connect through belt 15 between two belt pulleys 14, there is servo motor 16 left side the place ahead of support plate 9 through motor casing fixed mounting, the left end of the threaded rod 11 that is located the front side passes the outside that the shifting chute 10 extends to support plate 9 and servo motor 16's output shaft fixed connection, the common fixed mounting in top of the relative one side of two gantries 1 has roof 17, the upper portion of the left and right sides of the relative one side of two gantries 1 all is equipped with set-square 29, the top of set-square 29 and the bottom fixed connection of roof 17, set-square 29 can provide the holding power to roof 17, thereby make roof 17 can be more stable.
Top middle part fixed mounting of roof 17 has a reel frame 18, the inside movable mounting of reel frame 18 has reel 19, 19 surface rolling of reel has first hawser 20, the top of roof 17 and the left side fixed mounting who is located reel frame 18 have lifting motor 21, lifting motor 21's output shaft and reel 19's left end fixed connection, roof 17 is passed to first hawser 20's bottom and is extended to its below fixed mounting and have a set buckle 22, the equal fixed mounting in the left and right sides on the top of crossbeam 6 has fixed block 23, the top fixed mounting of fixed block 23 has second hawser 24, the equal fixed connection in the outside of fixed buckle 22 in the top of four second hawsers 24.
The working principle is as follows: when the device is used, the lifting motor 21 is started to enable the output shaft of the lifting motor to rotate in the forward rotation mode to drive the winding drum 19 to rotate so as to discharge the first cable 20, the first cable 20 drives the fixing buckle 22 to descend so as to drive the four second cables 24 to descend, and further realize the descending of the pair of cross beams 6, the descending process of the cross beams 6 can be more stable through the matching of the sliding block 5 and the sliding groove 4, the cross beams 6 drive the connecting rods 7 to descend so as to drive the support plate 9 to descend, the support plate 9 descends to the ground, the descending of the support plate 9 is convenient for workers to place a pile foundation on the support plate 9, the pile foundation can be placed on a carrying device without lifting the pile foundation, the danger of carrying work is greatly reduced, the pile foundation is convenient to push the pile foundation to the top end of the support plate 9 through the matching of the first rotating rod 25 and the second rotating rod 27, the servo motor 16 is started to enable the output, the belt pulley 14 at the front side drives the belt pulley 14 at the rear side to rotate through the belt 15 so as to drive the threaded rod 11 at the rear side to rotate, the two threaded rods 11 rotate simultaneously, the threaded rod 11 drives the pair of moving blocks 12 connected with each other to move along the surfaces of the moving blocks in the moving groove 10 so as to drive the pair of clamping plates 13 to move close to each other to clamp the pile foundation, the distance between the clamping plates 13 can be adjusted to stably clamp and fix the pile foundations of different sizes, the lifting motor 21 is started to drive the output shaft of the lifting motor to rotate to drive the winding drum 19 to rotate to wind the first cable 20, the first cable 20 drives the fixing buckle 22 to ascend so as to lift the lower support plate 9, the fixed pile foundation is lifted, after the pile foundation is lifted to a certain height, the carrying device is moved through the handle 28 in cooperation with the universal wheel 2, so as to carry the pile foundation, when a, and meanwhile, the support plate 9 is placed on the ground, the servo motor 16 is started to enable the output shaft of the servo motor to rotate reversely, so that the clamping plates 13 are separated from each other to move, the fixation of the pile foundation is cancelled, and the pile foundation is convenient to dismount by matching with the first rotating rod 25 and the second rotating rod 27.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The carrying device for hydraulic engineering pile foundation construction comprises two gantries (1) and is characterized in that the number of the gantries (1) is two, universal wheels (2) are fixedly mounted on the left side and the right side of the bottom of the gantry (1), a baffle (3) is mounted on the left side and the right side of the opposite side of the two gantries (1) together, sliding grooves (4) are vertically formed in the middle of the inner wall of the left side and the right side of the gantry (1), sliding blocks (5) are movably mounted in the sliding grooves (4), a cross beam (6) is mounted between every two opposite sliding blocks (5) together, connecting rods (7) are fixedly mounted on the left side and the right side of the bottom of the cross beam (6) together, a support plate (8) is fixedly mounted at the bottom of the two connecting rods (7) together, a support plate (9) is fixedly mounted between the two support frames (8) together, and moving grooves (10) are, a threaded rod (11) is transversely and movably mounted in the moving groove (10) through a pair of bearings, moving blocks (12) matched with the moving groove (10) are sleeved on the left side and the right side of the threaded rod (11) in a threaded mode, a clamping plate (13) is fixedly mounted above the moving blocks (12), belt pulleys (14) are fixedly mounted at the right end of the threaded rod (11) penetrating through the moving groove (10) and extending to the outer portion of the support plate (9), the two belt pulleys (14) are connected through a belt (15), a servo motor (16) is fixedly mounted in front of the left side of the support plate (9) through a motor shell, the left end of the threaded rod (11) located on the front side penetrates through the moving groove (10) and extends to the outer portion of the support plate (9) and is fixedly connected with an output shaft of the servo motor (16), and a top plate (17) is fixedly mounted, the utility model discloses a winding drum, including roof (17), reel frame (18), the inside movable mounting of reel frame (18) has reel (19), reel (19) surface rolling has first hawser (20), the top of roof (17) and the left side fixed mounting who is located reel frame (18) have hoisting motor (21), the output shaft of hoisting motor (21) and the left end fixed connection of reel (19), the bottom of first hawser (20) is passed roof (17) and is extended to its below fixed mounting and have fixed knot (22), the equal fixed mounting in the left and right sides on the top of crossbeam (6) has fixed block (23), the top fixed mounting of fixed block (23) has second hawser (24), four the equal fixed connection in the outside of fixed knot (22) in the top of second hawser (24).
2. The carrying device for the construction of the hydraulic engineering pile foundation as claimed in claim 1, wherein the inside slant equidistance movable mounting of the mounting bracket (8) has a first rotating rod (25), a mounting groove (26) is opened in the middle of the top end of the support plate (9), and the inside of the mounting groove (26) is provided with a second rotating rod (27) by the forward and backward equidistance movable mounting.
3. The carrying device for the construction of the hydraulic engineering pile foundation as claimed in claim 1, wherein the inner side of the clamping plate (13) is arc-shaped and provided with an anti-slip rubber pad.
4. The carrying device for the construction of the hydraulic engineering pile foundation is characterized in that the left side and the right side of the threaded rod (11) are provided with threads in opposite directions.
5. The carrying device for the hydraulic engineering pile foundation construction as claimed in claim 1, wherein triangular plates (29) are arranged on the upper portions of the left side and the right side of the opposite surface of the two portal frames (1), and the top ends of the triangular plates (29) are fixedly connected with the bottom end of the top plate (17).
6. The carrying device for the construction of the hydraulic engineering pile foundation is characterized in that handles (28) are arranged on the left side and the right side of the back face of the portal frame (1) on the rear side.
CN202021027730.8U 2020-06-08 2020-06-08 Handling device is used in hydraulic engineering pile foundation construction Expired - Fee Related CN212740586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021027730.8U CN212740586U (en) 2020-06-08 2020-06-08 Handling device is used in hydraulic engineering pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021027730.8U CN212740586U (en) 2020-06-08 2020-06-08 Handling device is used in hydraulic engineering pile foundation construction

Publications (1)

Publication Number Publication Date
CN212740586U true CN212740586U (en) 2021-03-19

Family

ID=75008705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021027730.8U Expired - Fee Related CN212740586U (en) 2020-06-08 2020-06-08 Handling device is used in hydraulic engineering pile foundation construction

Country Status (1)

Country Link
CN (1) CN212740586U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113911971A (en) * 2021-10-29 2022-01-11 广东电网有限责任公司东莞供电局 Cable shaft carrying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113911971A (en) * 2021-10-29 2022-01-11 广东电网有限责任公司东莞供电局 Cable shaft carrying device
CN113911971B (en) * 2021-10-29 2024-02-13 广东电网有限责任公司东莞供电局 Cable spool handling device

Similar Documents

Publication Publication Date Title
CN203796297U (en) Temporary supporting device of driving working face
CN211141352U (en) Combined type track dismantling device used in shield construction method
CN211314243U (en) Integrated construction trolley for hanging cloth in tunnel
CN215859952U (en) Stable and efficient aerial ladder
CN212740586U (en) Handling device is used in hydraulic engineering pile foundation construction
CN113321131A (en) Lifting equipment used during subway construction
CN213174702U (en) Liftable support for construction engineering construction
CN212050438U (en) High-speed railway tunnel engineering excavation construction rack
CN210682174U (en) Movable belt hoisting device
CN115045271B (en) Pile foundation steel pile casing positioning construction process based on pile foundation steel pile casing transportation construction trolley
CN215854751U (en) Interior decoration material conveying device
CN212743327U (en) Lifting platform for floating dock maintenance
CN210915080U (en) Rope arranging device for mining winch
CN214359835U (en) Steel member turning device
CN213894966U (en) Hoisting accessory is used in building engineering construction
CN209786559U (en) On-spot interim power consumption block terminal support
CN210454580U (en) Toolbox transports deflector structure
CN209908537U (en) A handling device for tunnel lining cutting platform truck rail
CN217839743U (en) Movable construction cage for bridge anti-collision wall
CN220096415U (en) Handling device for mineral water processing
KR100841820B1 (en) Painting work table for deck part of trunk of lng vessel
CN111689379A (en) Transportation device for electric power engineering technical planning
CN211998537U (en) MG type double-beam door type lifting device
CN217322946U (en) Civil engineering material lifting device
CN214114232U (en) Stacking device for transportation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220630

Address after: 4 / F, Fengyuan Hotel, 119 Beijing West Road, Chengxi District, Lhasa, Tibet Autonomous Region, 850000

Patentee after: Tibet Fengyuan Construction Engineering Co.,Ltd.

Address before: 233600 Xiaowangzhuang village, Zhengmiao administrative village, Shuangmiao Town, Woyang County, Bozhou City, Anhui Province

Patentee before: Wang Rui

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210319