CN212714767U - Adjustable scaffold for water conservancy construction - Google Patents
Adjustable scaffold for water conservancy construction Download PDFInfo
- Publication number
- CN212714767U CN212714767U CN202020581635.6U CN202020581635U CN212714767U CN 212714767 U CN212714767 U CN 212714767U CN 202020581635 U CN202020581635 U CN 202020581635U CN 212714767 U CN212714767 U CN 212714767U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- rod
- supporting
- welded
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model belongs to the technical field of the scaffold, especially, be an adjustable scaffold for water conservancy construction, including the jib, the tip of jib is provided with first connecting rod, install the hinge between jib and the first connecting rod, the tip of jib and first connecting rod welds respectively on two hinge surfaces of hinge, the lower extreme of first connecting rod is provided with the second connecting rod, the upper end of second connecting rod has the joint pipe through bending integrated into one piece, the lower extreme welding of first connecting rod has the joint board; through the hinge of installation between jib and the first connecting rod, the first connecting rod of being convenient for rotates at the tip of jib, and the jib of being convenient for and first connecting rod erect on the outer wall of water conservancy dam body, and the second connecting rod of hanging connection board and joint union coupling is passed through to first connecting rod below simultaneously, and the joint pipe snap of second connecting rod upper end integrated into one piece is inside first connecting rod lower extreme welded second connecting rod simultaneously, is convenient for prolong the scaffold.
Description
Technical Field
The utility model belongs to the technical field of the scaffold, concretely relates to adjustable is scaffold for water conservancy construction.
Background
The water conservancy construction frame is a platform for supporting workers to set up and is usually used for setting up the outside of a water conservancy dam body and painting or cleaning the outside of the dam body. When the traditional water conservancy construction frame is used, a dam body has a certain inclination angle, the traditional construction frame building method is difficult to use, and meanwhile, the construction frame is paved, so that a large amount of time is consumed during assembly and disassembly.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides an adjustable is scaffold for water conservancy construction has that the scaffold sets up conveniently, and installs and removes and expend time fewly, and sets up the high characteristics of stability.
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for adjustable water conservancy construction comprises a hanging rod, wherein a first connecting rod is arranged at the end part of the hanging rod, a hinge is arranged between the hanging rod and the first connecting rod, the end parts of the hanging rod and the first connecting rod are respectively welded on the surfaces of two hinges of the hinge, a second connecting rod is arranged at the lower end of the first connecting rod, a clamping pipe is integrally formed at the upper end of the second connecting rod through bending, a hanging plate is welded at the lower end of the first connecting rod and clamped inside the hanging plate, supporting plates are arranged on the side surfaces of the first connecting rod and the second connecting rod, positioning assemblies are arranged at the two ends of each supporting plate and comprise a first supporting rod, a limiting clamping plate, a second supporting rod, a third supporting rod, an internal thread sleeve, a screw rod and a positioning sleeve connecting ring, the first supporting rod and the third supporting rod are both welded on the surfaces of the first connecting rod and the second connecting rod, the third supporting rod is welded on the surface of one end of the supporting plate, the limiting clamping plate is welded on the surface of the other end of the supporting plate, the limiting clamping plate is sleeved outside the first supporting rod, the screw rods are screwed at two ends of the internal thread sleeve respectively, the positioning sleeve joint ring is welded at the other end of the third supporting rod, one of the positioning sleeve joint rings welded at the end parts of the screw rods is fixed outside the second supporting rod, and the other positioning sleeve joint ring welded at the end parts of the screw rods is fixed outside the third supporting rod.
As the utility model discloses an adjustable is preferred technical scheme of scaffold for water conservancy construction, the biggest rotation contained angle of jib and first connecting rod is 135 degrees.
As the utility model discloses an adjustable is preferred technical scheme of scaffold for water conservancy construction, the fishplate bar is "U" font platelike structure, the joint pipe is "J" font structure, the second connecting rod passes through the fishplate bar and the joint pipe end to end connection.
As the utility model discloses an adjustable is preferred technical scheme of scaffold for water conservancy construction, the backup pad is platelike structure, just backup pad one end welded spacing cardboard is provided with two.
As the utility model discloses an adjustable is preferred technical scheme of scaffold for water conservancy construction, jib, first connecting rod, second connecting rod, first bracing piece, second bracing piece and third bracing piece are the steel pipe component of same diameter.
Compared with the prior art, the beneficial effects of the utility model are that: the first connecting rod can conveniently rotate at the end part of the suspender through a hinge arranged between the suspender and the first connecting rod, the suspender and the first connecting rod can be conveniently erected on the outer wall of the water conservancy dam body, meanwhile, the lower part of the first connecting rod is provided with a second connecting rod connected with a clamping pipe through a suspender plate, simultaneously, the clamping pipe integrally formed at the upper end of the second connecting rod is clamped inside the second connecting rod welded at the lower end of the first connecting rod, the scaffold is conveniently prolonged, the laying convenience of the scaffold is improved, meanwhile, a supporting plate arranged on the side surface of the first connecting rod and the second connecting rod is arranged through a positioning assembly, the installation angle of the supporting plate is conveniently adjusted, the supporting plate is convenient to keep horizontal, the construction convenience is improved, meanwhile, the positioning assembly comprises a first supporting rod, a limiting clamping plate, a second supporting rod, a third supporting rod, an internal thread sleeve, a screw rod and a positioning sleeve connecting ring, the limiting clamping plate welded at one end of the supporting plate is sleeved outside the first, meanwhile, the screw rods screwed at two ends of the internal thread sleeve are respectively connected with the second supporting rod and the third supporting rod through the positioning sleeve connecting rings, the positioning sleeve connecting ring fixed at the end part of one screw rod is fixed outside the second supporting rod, and the positioning sleeve connecting ring fixed at the end part of the other screw rod is fixed outside the third supporting rod, so that the angle body adjustment of the supporting plate is facilitated.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic side view of the present invention;
fig. 2 is a schematic view of the structure of the present invention;
fig. 3 is a schematic view of the connection structure of the hinge, the second suspension rod and the support plate according to the present invention;
FIG. 4 is an enlarged schematic view of the structure at A in FIG. 2;
in the figure: 1. a boom; 2. a first link; 3. a hinge; 4. a second link; 5. hoisting and connecting the plate; 6. clamping the connecting pipe; 7. a support plate; 8. a first support bar; 9. a limiting clamping plate; 10. a second support bar; 11. a third support bar; 12. an internally threaded sleeve; 13. a screw; 14. and a positioning sleeve connecting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an adjustable scaffold for water conservancy construction comprises a suspender 1, wherein a first connecting rod 2 is arranged at the end part of the suspender 1, a hinge 3 is arranged between the suspender 1 and the first connecting rod 2, the end parts of the suspender 1 and the first connecting rod 2 are respectively welded on the surfaces of two hinges of the hinge 3, a second connecting rod 4 is arranged at the lower end of the first connecting rod 2, a clamping pipe 6 is integrally formed at the upper end of the second connecting rod 4 by bending, a hoisting plate 5 is welded at the lower end of the first connecting rod 2, the clamping pipe 6 is clamped in the hoisting plate 5, supporting plates 7 are respectively arranged on the side surfaces of the first connecting rod 2 and the second connecting rod 4, positioning components are respectively arranged at the two ends of the supporting plates 7, each positioning component comprises a first supporting rod 8, a limiting clamping plate 9, a second supporting rod 10, a third supporting rod 11, an internal thread sleeve 12, a screw 13 and a positioning sleeve connecting ring 14, the first supporting rod 8 and the third supporting rod 11 are respectively welded on the surfaces of the, third bracing piece 11 welds the surface at the one end of backup pad 7, spacing cardboard 9 welds the surface at the backup pad 7 other end, and spacing cardboard 9 cup joints the outside at first bracing piece 8, the both ends of internal thread sleeve 12 are closed soon respectively to screw rod 13, the other end at third bracing piece 11 is welded to position sleeve adapter ring 14, the outside at second bracing piece 10 is fixed to one of them screw rod 13 tip welded position sleeve adapter ring 14, the outside at third bracing piece 11 is fixed to another screw rod 13 tip welded position sleeve adapter ring 14.
In the embodiment, through the hinge 3 installed between the suspender 1 and the first connecting rod 2, the first connecting rod 2 is convenient to rotate at the end part of the suspender 1, the suspender 1 and the first connecting rod 2 are convenient to erect on the outer wall of a water conservancy dam body, meanwhile, the second connecting rod 4 connected with the clamping pipe 6 is arranged below the first connecting rod 2 through the suspender plate 5, meanwhile, the clamping pipe 6 integrally formed at the upper end of the second connecting rod 4 is clamped inside the second connecting rod 4 welded at the lower end of the first connecting rod 2, the construction frame is convenient to extend, the laying convenience of the construction frame is improved, meanwhile, the supporting plates 7 installed on the side surfaces of the first connecting rod 2 and the second connecting rod 4 are installed through the positioning assembly, the installation angle of the supporting plates 7 is convenient to adjust, the supporting plates 7 are convenient to keep horizontal, the construction convenience is improved, and meanwhile, the positioning assembly is composed of the first supporting rod 8, the limiting clamping plate 9 and the second supporting rod 10, Third bracing piece 11, internal thread sleeve 12, screw 13 and position sleeve adapter ring 14 constitute, and the spacing cardboard 9 cover of backup pad 7 one end welded is outside at 2 surface welded first bracing pieces of first connecting rod, screw 13 that internal thread sleeve 12 both ends were closed soon simultaneously passes through position sleeve adapter ring 14 and is connected with second bracing piece 10 and third bracing piece 11 respectively, the position sleeve adapter ring 14 of one of them screw 13 end fixing simultaneously fixes in the outside of second bracing piece 10, the position sleeve adapter ring 14 that another screw 13 end ring is fixed fixes in the outside of third bracing piece 11, be convenient for carry out the angle body to backup pad 7 and adjust.
Specifically, the maximum rotation angle between the suspension rod 1 and the first connecting rod 2 is 135 degrees.
In this embodiment, the maximum rotation included angle between the suspender 1 and the first connecting rod 2 is 135 degrees, so that the first connecting rod 2 is suspended outside the water conservancy dam body conveniently.
Specifically, hang and connect board 5 for "U" font platelike structure, joint pipe 6 is "J" font structure, and second connecting rod 4 is through hanging board 5 and 6 end to end connections of joint pipe.
In this embodiment, the connection of the first link 2 and the second link 4 is facilitated.
Specifically, the supporting plate 7 is of a plate-shaped structure, and two limiting clamping plates 9 welded to one end of the supporting plate 7 are arranged.
In this embodiment, it is convenient to support the support plate 7.
Specifically, the suspension rod 1, the first connecting rod 2, the second connecting rod 4, the first supporting rod 8, the second supporting rod 10 and the third supporting rod 11 are all steel pipe members with the same diameter.
In this embodiment, the production of scaffold is convenient for.
The utility model discloses a theory of operation and use flow: during the use, highly select the second connecting rod 4 of suitable quantity according to the water conservancy dam body, fix jib 1 in the upper end of dam body, first connecting rod 2 overturns the one side of dam body simultaneously, second connecting rod 4 is connected with 2 lower extreme welded hanger plate 5 of first connecting rod through upper end integrated into one piece's joint pipe 6 this moment, 7 one end welded spacing cardboard 9 covers in the outside of first bracing piece 8 of backup pad simultaneously, rotate internal thread sleeve 12, make the inside shrink of internal thread sleeve 12 including third bracing piece 11, make third bracing piece 11 transfer into the level form.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides an adjustable scaffold for water conservancy construction, includes jib (1), its characterized in that: the utility model discloses a hinge structure, including jib (1), first connecting rod (2), hinge (3) are installed to the tip of jib (1), the tip of jib (1) and first connecting rod (2) welds respectively on two hinge surfaces of hinge (3), the lower extreme of first connecting rod (2) is provided with second connecting rod (4), the upper end of second connecting rod (4) has joint pipe (6) through buckling integrated into one piece, the lower extreme welding of first connecting rod (2) has joint board (5), joint pipe (6) block is in the inside of joint board (5), the side surface of first connecting rod (2) and second connecting rod (4) all is provided with backup pad (7), locating component is all installed at the both ends of backup pad (7), and locating component includes first bracing piece (8), spacing cardboard (9), second bracing piece (10), A third supporting rod (11), an internal thread sleeve (12), a screw rod (13) and a positioning sleeve ring (14), the first supporting rod (8) and the third supporting rod (11) are welded on the surfaces of the first connecting rod (2) and the second connecting rod (4), the third supporting rod (11) is welded on the surface of one end of the supporting plate (7), the limiting clamping plate (9) is welded on the surface of the other end of the supporting plate (7), and the limiting clamping plate (9) is sleeved outside the first supporting rod (8), the screw rods (13) are respectively screwed at two ends of the internal thread sleeve (12), the positioning sleeve joint ring (14) is welded at the other end of the third support rod (11), one positioning sleeve connecting ring (14) welded at the end part of the screw rod (13) is fixed outside the second supporting rod (10), and the other positioning sleeve connecting ring (14) welded at the end part of the screw rod (13) is fixed outside the third supporting rod (11).
2. The adjustable scaffold for water conservancy construction according to claim 1, wherein: the maximum rotation included angle of the suspension rod (1) and the first connecting rod (2) is 135 degrees.
3. The adjustable scaffold for water conservancy construction according to claim 1, wherein: the hoisting and connecting plate (5) is of a U-shaped plate structure, the clamping and connecting pipe (6) is of a J-shaped structure, and the second connecting rod (4) is connected with the clamping and connecting pipe (6) end to end through the hoisting and connecting plate (5).
4. The adjustable scaffold for water conservancy construction according to claim 1, wherein: the supporting plate (7) is of a plate-shaped structure, and two limiting clamping plates (9) welded to one end of the supporting plate (7) are arranged.
5. The adjustable scaffold for water conservancy construction according to claim 1, wherein: the hanger rod (1), the first connecting rod (2), the second connecting rod (4), the first supporting rod (8), the second supporting rod (10) and the third supporting rod (11) are all steel pipe components with the same diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020581635.6U CN212714767U (en) | 2020-04-18 | 2020-04-18 | Adjustable scaffold for water conservancy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020581635.6U CN212714767U (en) | 2020-04-18 | 2020-04-18 | Adjustable scaffold for water conservancy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212714767U true CN212714767U (en) | 2021-03-16 |
Family
ID=74943760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020581635.6U Expired - Fee Related CN212714767U (en) | 2020-04-18 | 2020-04-18 | Adjustable scaffold for water conservancy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212714767U (en) |
-
2020
- 2020-04-18 CN CN202020581635.6U patent/CN212714767U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212714767U (en) | Adjustable scaffold for water conservancy construction | |
CN211080987U (en) | High-rise building external scaffolding fixed knot constructs | |
CN212095099U (en) | Detachable large-scale penstock Mi word props device | |
CN206942157U (en) | One kind hangs color steel tripod | |
CN210459924U (en) | Novel construction scaffold | |
CN211622567U (en) | Scaffold for building | |
CN211396641U (en) | Formwork diagonal bracing for building construction | |
CN211004160U (en) | Concrete prefabricated component's hybrid hoist | |
CN209474004U (en) | It is affiliated to collapsible musical instrument hanger more | |
CN117146164B (en) | Suspension bracket of laser level meter | |
CN212534972U (en) | Building scaffold support device | |
CN218968727U (en) | Stable tower crane supporting frame | |
CN201714048U (en) | Chrysanthemum clip connection type scaffold | |
CN215670748U (en) | Universal adjustable dry-hanging positioning support system | |
CN217583985U (en) | Anti-seismic support for camera arm, operating lamp and tower crane suspension bridge | |
CN109175856A (en) | A kind of spherical tank group is to tooling framework | |
CN217175656U (en) | Angle-adjustable connecting piece | |
CN212053888U (en) | Protective structure for increasing building shock resistance | |
CN215105356U (en) | Be used for excavation supporting connecting device | |
CN216340738U (en) | Novel scaffold is used in chemical engineering construction | |
CN214246140U (en) | Form-adjustable cast steel joint | |
CN218091927U (en) | Foldable cantilever platform | |
CN211873800U (en) | Scaffold connecting structure | |
CN219261701U (en) | Adjusting and fixing device and girder riding hanging basket system using same | |
CN213664995U (en) | Novel bath basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210713 Address after: 110324 No.71, pinganbao village, Damintun Town, Xinmin City, Huludao City, Liaoning Province Patentee after: Yan Zhiyong Patentee after: Yang Yong Address before: 114000 building 46, Changxing street, Tiedong District, Anshan City, Liaoning Province Patentee before: Huang Xiaoqian |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210316 |
|
CF01 | Termination of patent right due to non-payment of annual fee |