CN212701137U CN202021003623.1U CN202021003623U CN212701137U CN 212701137 U CN212701137 U CN 212701137U CN 202021003623 U CN202021003623 U CN 202021003623U CN 212701137 U CN212701137 U CN 212701137U
Authority
CN
China
Prior art keywords
fixedly connected
box
pipe
adsorption
dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021003623.1U
Other languages
Chinese (zh)
Inventor
林荣
曹敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Xinwei Automation Equipment Co ltd
Original Assignee
Yangzhou Xinwei Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Xinwei Automation Equipment Co ltd filed Critical Yangzhou Xinwei Automation Equipment Co ltd
Priority to CN202021003623.1U priority Critical patent/CN212701137U/en
Application granted granted Critical
Publication of CN212701137U publication Critical patent/CN212701137U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model belongs to the technical field of dust collecting equipment, especially, be a production central dedusting system, including the installing frame, the fan is installed to the interior roof of installing frame, the top fixedly connected with intake pipe of fan, the intake pipe runs through to the outside of installing frame, the first connecting pipe of bottom fixedly connected with of fan, the internally mounted of installing frame has adsorption tank, rose box and removes the flavor case, first connecting pipe runs through to the inside of adsorption tank, the water pump is installed to the interior diapire of adsorption tank, the side fixedly connected with spray pipe of water pump. The utility model discloses a cooperation between water pump, spray pipe and the atomizer makes the dust in the air through water to the extraction adsorb to guaranteed that the effect is better when removing dust, avoided the part only to dissolve in the dust of water can't clear away, cause the pollution to the environment, thereby reduced dust removal effect.

Description

Production central authorities dust pelletizing system
Technical Field
The utility model relates to a dust collecting equipment technical field specifically is a production central authorities dust pelletizing system.
Background
In production, various kinds of dust are generated frequently, and after the dust is collected, the dust needs to be removed through a uniform device, and the device needed for removing the dust is called a central dust removal system.
However, the existing central dust removal system has the following problems:
1. when dust removal is carried out, dust only dissolved in water is inconvenient to remove, so that the removing effect is not ideal;
2. the existing filtering is usually from top to bottom, and under the condition of long-time filtering, the filter screen is blocked, so that the normal use is influenced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a production central authorities dust pelletizing system has solved inconvenient dust to only dissolving in water and has clear away and under the long-time filterable condition, leads to the filter screen to take place to block up the problem of proposing.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a central dust removal system for production comprises an installation frame, wherein a fan is installed on the inner top wall of the installation frame, an air inlet pipe is fixedly connected to the top of the fan and penetrates to the outside of the installation frame, a first connecting pipe is fixedly connected to the bottom of the fan, an adsorption box, a filter box and a smell removal box are installed inside the installation frame, the first connecting pipe penetrates into the adsorption box, a water pump is installed on the inner bottom wall of the adsorption box, a water spray pipe is fixedly connected to the side edge of the water pump, an atomization spray nozzle is fixedly connected to the side edge of the water spray pipe, a water inlet pipe and a drain pipe are fixedly connected to the side edge of the adsorption box, the water inlet pipe and the drain pipe both penetrate through the outside of the installation frame, a second connecting pipe is fixedly connected to the other side of the adsorption box and penetrates into the filter box, and a dust collection box is fixedly connected to, the dust collecting box comprises a dust collecting box body, and is characterized in that a first partition plate is fixedly connected to the top of the dust collecting box body, a second partition plate is fixedly connected to the inner top wall of the filter box body, a filter plate is fixedly connected between the first partition plate and the second partition plate, a chip removal pipe is fixedly connected to the side edge of the dust collecting box body and penetrates through the outer portion of the mounting frame, a third connecting pipe is fixedly connected to the side edge of the filter box body, and the third connecting pipe is fixedly connected with the odor removing box body.
As a preferred technical scheme of the utility model, remove the inner wall of flavor case and install the active carbon adsorption pipe, the tip fixedly connected with outlet duct of active carbon adsorption pipe, the outlet duct runs through to the outside of installing frame.
As a preferred technical scheme of the utility model, the tip fixedly connected with of intake pipe gathers flush, the fixed surface that gathers flush is connected with and divides the flow head, the top fixedly connected with mount of installing frame, the mount is connected with the fixed surface that gathers flush.
As a preferred technical scheme of the utility model, adsorption tank, rose box and the surface that removes the flavor case all are connected with the chamber door through the hinge rotation, the fixed surface of chamber door is connected with the observation window.
As a preferred technical scheme of the utility model, the spacing post of inside wall fixedly connected with of adsorption tank, spacing post and spray pipe fixed connection, the inside wall fixedly connected with baffle of adsorption tank.
As a preferred technical scheme of the utility model, remove the inside wall fixedly connected with fixed plate of flavor case, fixed plate and active carbon adsorption pipe fixed connection.
(III) advantageous effects
Compared with the prior art, the utility model provides a production central authorities dust pelletizing system possesses following beneficial effect:
1. this production central authorities dust pelletizing system makes through the cooperation between water pump, spray pipe and the atomizer adsorb the dust in the air through water to the extraction to guaranteed that the effect is better when removing dust, avoided the part only to dissolve in the dust of water can't clear away, cause the pollution to the environment, thereby reduced dust removal effect.
2. This production central authorities dust pelletizing system makes through the cooperation between first baffle and the second baffle when filtering, and gaseous bottom through the filter filters to avoided under the long-time filterable circumstances, the dust is attached to on the filter screen, can't drop, influences normal use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the adsorption box of the present invention;
FIG. 3 is a schematic view of the structure of the filtering box of the present invention;
fig. 4 is a schematic view of the odor removing box of the present invention.
In the figure: 1. installing a frame; 2. an air inlet pipe; 3. a fan; 4. a first connecting pipe; 5. an adsorption tank; 6. a filter box; 7. a deodorizing box; 8. a water pump; 9. a water spray pipe; 10. an atomizing spray head; 11. a water inlet pipe; 12. a blow-off pipe; 13. a second connecting pipe; 14. a dust collecting box; 15. a first separator; 16. a second separator; 17. a filter plate; 18. a chip removal pipe; 19. a third connecting pipe; 20. an activated carbon adsorption tube; 21. an air outlet pipe; 22. aligning the heads; 23. a flow dividing head; 24. a fixed mount; 25. a box door; 26. an observation window; 27. a limiting column; 28. a baffle plate; 29. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a production central dust removal system comprises a mounting frame 1, a fan 3 is installed on the inner top wall of the mounting frame 1, an air inlet pipe 2 is fixedly connected to the top of the fan 3, the air inlet pipe 2 penetrates to the outside of the mounting frame 1, a first connecting pipe 4 is fixedly connected to the bottom of the fan 3, an adsorption box 5, a filter box 6 and a smell removal box 7 are installed inside the mounting frame 1, the first connecting pipe 4 penetrates to the inside of the adsorption box 5, a water pump 8 is installed on the inner bottom wall of the adsorption box 5, a water spray pipe 9 is fixedly connected to the side edge of the water pump 8, an atomization nozzle 10 is fixedly connected to the side edge of the water spray pipe 9, a water inlet pipe 11 and a sewage discharge pipe 12 are fixedly connected to the side edge of the adsorption box 5, the water inlet pipe 11 and the sewage discharge pipe 12 both penetrate to the outside of the mounting frame 1, a second connecting pipe 13 is fixedly connected to the other side edge of the adsorption box, the top fixedly connected with first baffle 15 of dust collection box 14, the interior roof fixedly connected with second baffle 16 of rose box 6, fixedly connected with filter 17 between first baffle 15 and the second baffle 16, the side fixedly connected with chip removal pipe 18 of dust collection box 14, chip removal pipe 18 run through to the outside of installing frame 1, the side fixedly connected with third connecting pipe 19 of rose box 6, third connecting pipe 19 with remove flavor box 7 fixed connection.
In the embodiment, dust is extracted into the adsorption box 5 through the air inlet pipe 2 and the first connecting pipe 4 to be adsorbed by starting the fan 3, when the adsorption is carried out, water in the adsorption box 5 is extracted by starting the water pump 8 and then is sprayed through the water spray pipe 9 and the atomizing spray head 10, so that the adsorption effect on air needing dust removal is achieved, the adsorbed dust is conveniently discharged through the drain pipe 12, the water is conveniently added through the water inlet pipe 11, the adsorbed gas is discharged into the filter box 6 through the arranged second connecting pipe 13 to be filtered, the filtered dust is collected through the dust collection box 14 when the filtration is carried out, the flow guiding effect on the gas is played through the first partition plate 15 and the second partition plate 16, the filtration effect is played through the filter plate 17, the dust in the dust collection box 14 is conveniently discharged through the dust discharge pipe 18, the third connection pipe 19 facilitates the discharge of dust into the deodorization tank 7 for deodorization.
Specifically, remove the inner wall of flavor box 7 and install active carbon adsorption tube 20, the tip fixedly connected with outlet duct 21 of active carbon adsorption tube 20, outlet duct 21 runs through to the outside of installing frame 1.
In this embodiment, the activated carbon adsorption tube 20 adsorbs the odor in the gas, and the gas after dust removal is conveniently discharged through the arranged gas outlet tube 21.
Specifically, the end of the air inlet pipe 2 is fixedly connected with an aligning head 22, the surface of the aligning head 22 is fixedly connected with a shunting head 23, the top of the mounting frame 1 is fixedly connected with a fixing frame 24, and the fixing frame 24 is fixedly connected with the surface of the aligning head 22.
In this embodiment, dust at other positions outside is collected into the collecting head 22 through the diversion head 23, and the fixing support is achieved through the fixing frame 24.
Specifically, the surfaces of the adsorption box 5, the filter box 6 and the odor removal box 7 are rotatably connected with a box door 25 through hinges, and the surface of the box door 25 is fixedly connected with an observation window 26.
In this embodiment, the door 25 and the observation window 26 are used to facilitate observation and maintenance of the working conditions in the adsorption tank 5, the filter tank 6 and the odor removal tank 7, so that the use is more convenient.
Specifically, the inside wall fixedly connected with spacing post 27 of adsorption tank 5, spacing post 27 and spray pipe 9 fixed connection, the inside wall fixedly connected with baffle 28 of adsorption tank 5.
In this embodiment, play fixed effect through spacing post 27, play the effect that separates through the baffle 28 that sets up, avoided the dust to drop to the interior diapire of adsorption tank 5.
Specifically, the inner side wall of the odor removing box 7 is fixedly connected with a fixing plate 29, and the fixing plate 29 is fixedly connected with the activated carbon adsorption tube 20.
In this embodiment, the fixing plate 29 plays a role of fixing and supporting, so as to ensure the stability of the use of the activated carbon adsorption tube 20.
The utility model discloses a theory of operation and use flow: when the dust collector is used, dust at other positions outside is uniformly collected into the collecting head 22 through the flow dividing head 23, the fixing support effect is achieved through the fixing frame 24, then the dust is extracted into the adsorption box 5 through the air inlet pipe 2 and the first connecting pipe 4 to be adsorbed through the starting fan 3, when the adsorption is performed, water in the adsorption box 5 is extracted through the starting water pump 8 and then sprayed through the water spraying pipe 9 and the atomizing spray head 10, so that the effect of adsorbing air needing dust removal is achieved, the dust after adsorption is conveniently discharged through the blow-off pipe 12, the water is conveniently added through the water inlet pipe 11, the gas after adsorption is discharged into the filter box 6 through the arranged second connecting pipe 13 to be filtered, the dust after filtration is collected through the dust collecting box 14 when the filtration is performed, the gas flow guiding effect is achieved through the first partition plate 15 and the second partition plate 16, the filter plate 17 plays a role of filtering, the dust in the dust collecting box 14 is conveniently discharged through the dust discharging pipe 18, the dust is conveniently discharged into the odor removing box 7 through the third connecting pipe 19 for odor removing, when the odor removal is carried out, the odor in the gas is absorbed through the activated carbon absorption tube 20, the gas outlet pipe 21 is arranged to facilitate the discharge of the dedusted gas, the box door 25 and the observation window 26 facilitate the observation and maintenance of the working conditions in the adsorption box 5, the filter box 6 and the deodorization box 7, so that the use is more convenient, the fixing function is realized through the limiting column 27, the separating function is realized through the baffle 28, the dust is prevented from falling to the inner bottom wall of the adsorption box 5 to influence the water extraction of the water pump 8, the fixing plate 29 plays a role of fixing and supporting, and the stability of the use of the activated carbon adsorption tube 20 is ensured.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a dust pelletizing system of production central authorities, includes installing frame (1), its characterized in that: the fan (3) is installed on the inner top wall of the installation frame (1), an air inlet pipe (2) is fixedly connected to the top of the fan (3), the air inlet pipe (2) penetrates through the outer portion of the installation frame (1), a first connecting pipe (4) is fixedly connected to the bottom of the fan (3), an adsorption box (5), a filter box (6) and an odor removal box (7) are installed inside the installation frame (1), the first connecting pipe (4) penetrates through the inner portion of the adsorption box (5), a water pump (8) is installed on the inner bottom wall of the adsorption box (5), a water spray pipe (9) is fixedly connected to the side of the water pump (8), an atomization spray nozzle (10) is fixedly connected to the side of the water spray pipe (9), a water inlet pipe (11) and a sewage discharge pipe (12) are fixedly connected to the side of the adsorption box (5), the water inlet pipe (11) and the sewage discharge pipe (12) both penetrate through the outer portion of, the opposite side fixedly connected with second connecting pipe (13) of adsorption box (5), second connecting pipe (13) run through to the inside of rose box (6), the interior diapire fixedly connected with dust collection box (14) of rose box (6), the first baffle of top fixedly connected with (15) of dust collection box (14), the interior roof fixedly connected with second baffle (16) of rose box (6), fixedly connected with filter (17) between first baffle (15) and second baffle (16), the side fixedly connected with chip removal pipe (18) of dust collection box (14), chip removal pipe (18) run through to the outside of installing frame (1), the side fixedly connected with third connecting pipe (19) of rose box (6), third connecting pipe (19) with remove flavor case (7) fixed connection.
2. A production central dust extraction system according to claim 1, wherein: the inner wall of the smell removing box (7) is provided with an active carbon adsorption tube (20), the end part of the active carbon adsorption tube (20) is fixedly connected with an air outlet tube (21), and the air outlet tube (21) penetrates through the outside of the mounting frame (1).
3. A production central dust extraction system according to claim 1, wherein: the end part of the air inlet pipe (2) is fixedly connected with an assembly head (22), the surface of the assembly head (22) is fixedly connected with a shunting head (23), the top of the mounting frame (1) is fixedly connected with a fixing frame (24), and the fixing frame (24) is fixedly connected with the surface of the assembly head (22).
4. A production central dust extraction system according to claim 1, wherein: the surface of the adsorption box (5), the surface of the filter box (6) and the surface of the odor removal box (7) are all connected with a box door (25) through hinges in a rotating manner, and the surface of the box door (25) is fixedly connected with an observation window (26).
5. A production central dust extraction system according to claim 1, wherein: the utility model discloses a spray tank, including adsorption tank (5), inside wall fixedly connected with spacing post (27), spacing post (27) and spray pipe (9) fixed connection, the inside wall fixedly connected with baffle (28) of adsorption tank (5).
6. A production central dust extraction system according to claim 1, wherein: the inside wall of the smell removing box (7) is fixedly connected with a fixing plate (29), and the fixing plate (29) is fixedly connected with the activated carbon adsorption tube (20).
CN202021003623.1U 2020-06-04 2020-06-04 Production central authorities dust pelletizing system Active CN212701137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021003623.1U CN212701137U (en) 2020-06-04 2020-06-04 Production central authorities dust pelletizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021003623.1U CN212701137U (en) 2020-06-04 2020-06-04 Production central authorities dust pelletizing system

Publications (1)

Publication Number Publication Date
CN212701137U true CN212701137U (en) 2021-03-16

Family

ID=74949131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021003623.1U Active CN212701137U (en) 2020-06-04 2020-06-04 Production central authorities dust pelletizing system

Country Status (1)

Country Link
CN (1) CN212701137U (en)

Similar Documents

Publication Publication Date Title
CN208320379U (en) A kind of efficient pneumatic filter
CN209985137U (en) Dye waste gas purification treatment device
CN212701137U (en) Production central authorities dust pelletizing system
CN219764888U (en) Integrated tube bundle dust remover
CN110496483B (en) Large-scale environmental protection dust collecting equipment
CN207628162U (en) A kind of non-ferrous metal metallurgy cloth bag integrating device
CN214513584U (en) Environment-friendly exhaust treatment device
CN214809549U (en) Multistage self-adjusting flue gas dust removal device
CN112013484B (en) Air purifier
CN110694417B (en) Spray tower dust remover
CN115324629A (en) Filtering dust-settling device and dust-settling method for N00 construction method
CN114288844A (en) Novel tail gas absorption tower increases start-up governing valve for compound workshop
CN212881767U (en) Efficient oil smoke purifier
CN211411475U (en) Novel spray tower dust remover
CN220229180U (en) Negative pressure exhaust device for garbage incineration
CN220939831U (en) Methyl acetoacetate tail gas purifying box
CN220878382U (en) Tail gas treatment and purification device for dioxolane production
CN218221821U (en) Flue gas adsorption reaction device
CN217961789U (en) Flue gas dust removal equipment
CN220370713U (en) Detachable adsorption and filtration spray tower
CN214075720U (en) Flue gas treatment device
CN220558870U (en) Spray dedusting desulfurizing tower
CN218130864U (en) A spray column for circuit board disassembles usefulness
CN221015230U (en) High-pressure gas rotary tower
CN217287834U (en) Exhaust gas purification device for industrial production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant