CN212689167U - Nodular cast iron square shaft - Google Patents

Nodular cast iron square shaft Download PDF

Info

Publication number
CN212689167U
CN212689167U CN202021479530.6U CN202021479530U CN212689167U CN 212689167 U CN212689167 U CN 212689167U CN 202021479530 U CN202021479530 U CN 202021479530U CN 212689167 U CN212689167 U CN 212689167U
Authority
CN
China
Prior art keywords
well
flange
screw rod
flange plate
cast iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021479530.6U
Other languages
Chinese (zh)
Inventor
陈凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengshi Li'an Foundry Co ltd
Original Assignee
Bengshi Li'an Foundry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengshi Li'an Foundry Co ltd filed Critical Bengshi Li'an Foundry Co ltd
Priority to CN202021479530.6U priority Critical patent/CN212689167U/en
Application granted granted Critical
Publication of CN212689167U publication Critical patent/CN212689167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to the technical field of sewage treatment equipment, and discloses a nodular cast iron square well, which comprises a first well chamber, wherein a plurality of convex blocks are connected below the first well chamber, a sealing gasket is connected below the first well chamber, a second well chamber is connected outside the convex blocks, a first flange plate is connected below the first well chamber and close to the sealing gasket, a second through hole is arranged inside the first flange plate, a screw rod is connected inside the second through hole, a first flange plate and a second flange plate are sequentially connected outside the screw rod, a nut is sleeved at the end of the screw rod, a second well chamber is connected inside the second flange plate, the utility model discloses a first flange plate, a second flange plate, a screw rod and a nut, the screw rod sequentially penetrates through the inside of a screw hole of the flange plate, the flange plate is connected with the square well, and the square well can be conveniently spliced on site, the problem of maintenance cycle length that traditional on-spot concrete placement caused is solved.

Description

Nodular cast iron square shaft
Technical Field
The utility model relates to an urban drainage treatment facility technical field specifically is a nodular cast iron square shaft.
Background
The square well is used as an important ring for building urban infrastructure of a drainage system, is usually used for regularly checking and cleaning pipelines, and is a workstation for dredging the pipelines and preventing the pipelines from being blocked.
At present, a plurality of square wells exist in the market, but the square wells generally adopt several construction processes such as building block masonry and on-site concrete pouring, and have the defects of easy leakage, long maintenance period and the like, so that a person skilled in the art provides a nodular cast iron square well to solve the problems in the background art.
Disclosure of Invention
An object of the utility model is to provide a nodular cast iron square shaft to solve the problem of proposing in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a nodular cast iron square shaft, includes first well room, the below of first well room is connected with a plurality of lug, the below of first well room just is located the lug and is connected with sealed the pad all around, the outside of lug is connected with the second well room, the inside of second well room is including connecting the recess in the lug outside, the below of first well room is close to sealed pad and is connected with first ring flange, the second through-hole has been seted up to the inside of first ring flange, the internal connection of second through-hole has the screw rod, the outside of screw rod has connected gradually first ring flange and second ring flange, the inside of second ring flange is including connecting the third through-hole in the screw rod outside, the nut has been cup jointed to the end of screw rod, the inboard of second ring flange is connected with the second well room.
As a further aspect of the present invention: both sides of the second well chamber are all connected with flange pipes in a penetrating manner, and one end of each flange pipe is provided with a plurality of first through holes.
As a further aspect of the present invention: the inner wall both sides of first well room and second well room all are connected with the cat ladder, the inner wall both sides of second well room just are located the below of cat ladder and are connected with the workstation.
As a further aspect of the present invention: the first well chamber is connected with the second well chamber in an inserting mode through the convex block and the groove.
As a further aspect of the present invention: the first flange plate and the second flange plate are connected through a screw rod and a nut bolt.
As a further aspect of the present invention: the position between the two work tables corresponds to the positions of the two flange pipes.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through first ring flange, second ring flange, screw rod and nut, inside the screw that the screw rod runs through the ring flange in proper order, the ring flange is connected with the square shaft, under the joining action of screw rod and nut, can make things convenient for the other side well to carry out the scene concatenation, has solved the problem of traditional on-the-spot concrete placement and the maintenance cycle length that causes.
2. Through lug, recess and sealed the pad, through the zonulae occludens of lug and recess, can reduce the azimuth deviation probability between two square wells, can solve the easy seepage problem that traditional building block built by laying bricks or stones and cause through sealed the pad.
Drawings
FIG. 1 is a schematic structural diagram of a nodular cast iron square well;
FIG. 2 is a cross-sectional view of a first flange and a second flange in a ductile iron square well;
FIG. 3 is a top view of a ductile iron square well;
fig. 4 is a cross-sectional view of a projection and a groove in a ductile iron square well.
In the figure: 1. a first well chamber; 2. a first flange plate; 3. a screw; 4. a second flange plate; 5. a second well chamber; 6. a first through hole; 7. a flange pipe; 8. climbing a ladder; 9. a nut; 10. a gasket; 11. a second through hole; 12. a third through hole; 13. a work table; 14. a bump; 15. and (4) a groove.
Detailed Description
Please refer to fig. 1-4, in the embodiment of the present invention, a nodular cast iron square well, including first well room 1, the below of first well room 1 is connected with a plurality of lug 14, below of first well room 1 and the sealed pad 10 that is connected with all around that is located lug 14, the outside of lug 14 is connected with second well room 5, the inside of second well room 5 is including connecting the recess 15 in the lug 14 outside, the below of first well room 1 is close to sealed pad 10 and is connected with first ring flange 2, second through-hole 11 has been seted up to the inside of first ring flange 2, the internal connection of second through-hole 11 has screw rod 3, the outside of screw rod 3 has connected gradually first ring flange 2 and second ring flange 4, the inside of second ring flange 4 is including connecting the third through-hole 12 in the screw rod 3 outside, nut 9 has been cup jointed to the end of screw rod 3, the inboard of second ring flange 4 is connected with second well room 5.
In fig. 3: the both sides of second well room 5 all through connection have flange pipe 7, and the first through-hole 6 of a plurality of has been seted up to the one end of flange pipe 7, can be with outside water pipe and flange pipe 7 flange joint through first through-hole 6.
In fig. 3: the two sides of the inner walls of the first well chamber 1 and the second well chamber 5 are both connected with a ladder stand 8, the two sides of the inner wall of the second well chamber 5 and the lower part of the ladder stand 8 are connected with a workbench 13,
in fig. 4: the first well chamber 1 is spliced with the second well chamber 5 through the convex block 14 and the groove 15, when a square well is installed, the second well chamber 5 is placed at a specified position, then the first well chamber 1 is hoisted through a crane, the convex block 14 and the groove 15 are manually corresponding in position and then are placed down, and the first well chamber 1 is spliced with the second well chamber 5.
In fig. 2: the first flange plate 2 and the second flange plate 4 are connected through a screw rod 3 and a nut 9 through bolts, the screw rod 3 is inserted into the second through hole 11 and the third through hole 12 in sequence, the nut 9 is connected to the tail end of the screw rod 3, and the screw rod is screwed tightly.
In fig. 3: the position between the two workbenches 13 corresponds to the position between the two flange pipes 7, so that water of the flange pipes can smoothly pass through the position between the two workbenches 13, and a stable and safe operation environment is provided for workers.
The utility model discloses a theory of operation is: when the nodular cast iron square well needs to be used, the second well chamber 5 is placed at a designated position, the first well chamber 1 is lifted by a crane, the positions of the convex blocks 14 and the grooves 15 are manually corresponding and then placed down, the first well chamber 1 is connected with the second well chamber in an inserting mode, the screw rods 3 are sequentially inserted into the second through holes 11 and the third through holes 12, the nuts 9 are connected to the tail ends of the screw rods 3 and screwed, after the first well chamber 1 and the second well chamber 5 are fixed, the external water pipes and the flange pipes 7 can be connected through the first through holes 6 in a flange mode, water of the flange pipes can smoothly pass through the position between the two working tables 13, and workers can reach the working tables 13 through the crawling ladder 8 to operate.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a nodular cast iron square well, includes first well room (1), its characterized in that, the below of first well room (1) is connected with a plurality of lug (14), the below of first well room (1) just is located lug (14) and is connected with sealed pad (10) all around, the outside of lug (14) is connected with second well room (5), the inside of second well room (5) is including connecting recess (15) in the lug (14) outside, the below of first well room (1) is close to sealed pad (10) and is connected with first ring flange (2), second through-hole (11) have been seted up to the inside of first ring flange (2), the internal connection of second through-hole (11) has screw rod (3), the outside of screw rod (3) has connected gradually first ring flange (2) and second ring flange (4), the inside of second ring flange (4) is including connecting third through-hole (12) in the screw rod (3) outside, the tail end of the screw rod (3) is sleeved with a nut (9), and the inner side of the second flange plate (4) is connected with a second well chamber (5).
2. The nodular cast iron square well according to claim 1, wherein a flange pipe (7) is connected through both sides of the second well chamber (5), and one end of the flange pipe (7) is provided with a plurality of first through holes (6).
3. The nodular cast iron square shaft of claim 1, wherein the inner wall of the first well chamber (1) and the second well chamber (5) are connected with climbing ladders (8) on both sides, and the inner wall of the second well chamber (5) is connected with a working platform (13) on both sides and under the climbing ladders (8).
4. The nodular cast iron square well according to claim 1, wherein the first well chamber (1) and the second well chamber (5) are plugged by a projection (14) and a groove (15).
5. A nodular cast iron square shaft according to claim 1, characterised in that the first flange (2) and the second flange (4) are bolted by means of a screw (3) and a nut (9).
6. A nodular cast iron square shaft according to claim 3, characterised in that the position between two said work stations (13) corresponds to the position of two flange pipes (7).
CN202021479530.6U 2020-07-24 2020-07-24 Nodular cast iron square shaft Active CN212689167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021479530.6U CN212689167U (en) 2020-07-24 2020-07-24 Nodular cast iron square shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021479530.6U CN212689167U (en) 2020-07-24 2020-07-24 Nodular cast iron square shaft

Publications (1)

Publication Number Publication Date
CN212689167U true CN212689167U (en) 2021-03-12

Family

ID=74899756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021479530.6U Active CN212689167U (en) 2020-07-24 2020-07-24 Nodular cast iron square shaft

Country Status (1)

Country Link
CN (1) CN212689167U (en)

Similar Documents

Publication Publication Date Title
CN108867844A (en) Combined-type sewage well prefabricated component
CN104776268A (en) Mechanical construction method for mounting large-caliber reinforced concrete drainage pipe
CN110185118B (en) Sewage pipeline plugging device and construction method thereof
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN212689167U (en) Nodular cast iron square shaft
CN210266161U (en) Vertical jacking device in horizontal steel jacking pipe
CN209975581U (en) Assembled precast concrete inspection shaft
CN108612918B (en) Sealing device for pipeline penetrating through differential settlement double walls and construction method
CN108396781B (en) Assembled shaft fore shaft circle beam member structure
CN210562244U (en) Sealing device for joint of inspection well and shaft
CN211775776U (en) Socket joint type exhaust passage structure for multi-story and high-rise building
CN211644419U (en) Assembled tower crane overhauls platform
CN111593763B (en) Fixing device for mounting underground pipe gallery and using method thereof
CN113175058A (en) Existing underground jacking pipe access construction method
CN209798811U (en) Tower crane foundation structure in foundation ditch of reservation reinforcing bar
CN208579038U (en) A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement
CN215592325U (en) Lifting appliance for prefabricating inspection well
CN216552056U (en) Modularized power equipment foundation connected by steel bar sleeve grouting
CN219450814U (en) Prefabricated assembled underground utility tunnel
CN114319400B (en) Assembling and lowering process of steel cofferdam for underwater bearing platform construction
CN113833928B (en) Construction method for closure sealing of large-caliber deep buried drain pipe
CN220888884U (en) Inspection shaft structure
CN215749114U (en) Internal operation platform of thrust support
CN212983912U (en) From waterproof bottom plate steel pipe downcast pipe well embedded component that wears
CN202325349U (en) Split self-sealing well sealer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant