CN212688854U - Dyke heightening structure - Google Patents
Dyke heightening structure Download PDFInfo
- Publication number
- CN212688854U CN212688854U CN202021432705.8U CN202021432705U CN212688854U CN 212688854 U CN212688854 U CN 212688854U CN 202021432705 U CN202021432705 U CN 202021432705U CN 212688854 U CN212688854 U CN 212688854U
- Authority
- CN
- China
- Prior art keywords
- plate
- flood control
- connecting plate
- telescopic rod
- dead lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001125 extrusion Methods 0.000 claims abstract description 17
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000010935 stainless steel Substances 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a dyke increases structure, including flood control board, U template and joint board, flood control board's bottom is provided with the connecting plate, it has first dead lever to peg graft in one side of connecting plate, it has the second dead lever to peg graft to the opposite side of connecting plate, the bottom fixedly connected with fixed column of first dead lever. This dyke increases structure, set up the recess at the upper surface of dykes and dams in advance, first dead lever and second dead lever insert the both sides of connecting plate, fix inside the recess that sets up in advance through the bottom plate, first telescopic link and second telescopic link insert the both sides of fixed block, fix on ground through U type bottom plate and support fixedly, the inclination of flood control board is adjusted to the regulation of also being convenient for simultaneously, then backfill predetermined recess, U type board can joint second same equipment, fix through extrusion ring and screw hole threaded connection, also convenient to detach and installation simultaneously, the equipment is simple in structure, and is convenient to use.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a dyke increases structure.
Background
The hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting benefit, is also called water engineering, and a dike heightening structure is flood control auxiliary equipment and is used for temporarily heightening a dike to prevent flood from flowing out to submerge surrounding villages and environments,
the general heightening method is to prevent flood by piling up sandbags, but the method is labor-consuming, time-consuming and inconvenient to use, so that a further optimization scheme is provided for the problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a dyke increases structure, has solved the problem of proposing among the above-mentioned background art to the not enough of prior art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a dyke heightening structure, includes the flood control board, one side of flood control board is provided with the U template, the opposite side of flood control board is provided with the joint board, the bottom of flood control board is provided with the connecting plate, one side of connecting plate is pegged graft and is had first dead lever, the opposite side of connecting plate is pegged graft and is had the second dead lever, the bottom fixedly connected with fixed column of first dead lever, the bottom fixed connection of fixed column is at the upper surface of bottom plate, the side fixedly connected with fixed block of flood control board, one side of fixed block is pegged graft and is had first telescopic link, first telescopic link is through connecting telescopic link fixedly connected with second telescopic link, the surface threaded connection of connecting telescopic link has the regulation pole, the bottom of first telescopic link sets up the inside at U type bottom.
Optionally, the side surface of the U-shaped plate is in threaded connection with an extrusion ring, and the side surface of the clamping plate is provided with a threaded hole.
Optionally, the side of flood control board is provided with U type card frame, the upper surface grafting of U type card frame has warning board.
Optionally, the number of the extrusion rings is two, and the two extrusion rings are arranged on the side face of the U-shaped plate.
Optionally, the number of the threaded holes is two, and the two threaded holes are arranged on the side face of the clamping plate.
Optionally, the flood control plate is made of stainless steel.
(III) advantageous effects
The utility model provides a dyke increases structure possesses following beneficial effect:
the embankment heightening structure is characterized in that through the arrangement of the flood control plate, the U-shaped plate, the connecting plate, the first fixing rod, the second fixing rod, the fixing block, the first telescopic rod, the connecting telescopic rod, the second telescopic rod, the U-shaped bottom plate, the extrusion ring and the threaded hole, a groove is arranged on the upper surface of the dam in advance, a first fixed rod and a second fixed rod are inserted into the two sides of the connecting plate, the first telescopic rod and the second telescopic rod are inserted into two sides of the fixed block through the bottom plate fixed in the preset groove, the U-shaped bottom plate is fixed on the ground for supporting and fixing, and the inclination angle of the flood control plate can be adjusted conveniently, then backfill the predetermined recess, the U template can joint the same equipment of second, fixes through extrusion ring and screw hole threaded connection, also convenient to detach and installation simultaneously, and this equipment structure is simple, and it is comparatively convenient to use.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is an exploded view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1. flood control boards; 2. a U-shaped plate; 3. a clamping and connecting plate; 4. a connecting plate; 5. a first fixing lever; 6. a second fixing bar; 7. fixing a column; 8. a base plate; 9. a fixed block; 10. a first telescopic rod; 11. connecting a telescopic rod; 12. a second telescopic rod; 13. adjusting a rod; 14. a U-shaped bottom plate; 15. an extrusion ring; 16. a threaded hole; 17. a U-shaped clamping frame; 18. a warning panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: an embankment heightening structure comprises a flood control plate 1, wherein the flood control plate 1 is made of stainless steel, a U-shaped plate 2 is arranged on one side of the flood control plate 1, extrusion rings 15 are in threaded connection with the side faces of the U-shaped plate 2, the number of the extrusion rings 15 is two, the two extrusion rings 15 are arranged on the side faces of the U-shaped plate 2, a clamping plate 3 is arranged on the other side of the flood control plate 1, threaded holes 16 are formed in the side faces of the clamping plate 3, the number of the threaded holes 16 is two, the two threaded holes 16 are arranged on the side faces of the clamping plate 3, a connecting plate 4 is arranged at the bottom end of the flood control plate 1, a first fixing rod 5 is inserted into one side of the connecting plate 4, a second fixing rod 6 is inserted into the other side of the connecting plate 4, a fixing column 7 is fixedly connected to the bottom of the first fixing rod 5, the bottom end of the fixing column 7 is fixedly connected to the, a first telescopic rod 10 is inserted into one side of the fixed block 9, the first telescopic rod 10 is fixedly connected with a second telescopic rod 12 through a connecting telescopic rod 11, the surface of the connecting telescopic rod 11 is in threaded connection with an adjusting rod 13, the bottom end of the first telescopic rod 10 is arranged inside a U-shaped bottom plate 14, a U-shaped clamping frame 17 is arranged on the side surface of the flood control plate 1, and a warning plate 18 is inserted into the upper surface of the U-shaped clamping frame 17;
through the arrangement of the flood control plate 1, the U-shaped plate 2, the connecting plate 4, the first fixing rod 5, the second fixing rod 6, the fixing block 9, the first telescopic rod 10, the connecting telescopic rod 11, the second telescopic rod 12, the U-shaped bottom plate 14, the extrusion ring 15 and the threaded hole 16, when in use, a groove is formed in the upper surface of a dam in advance, the first fixing rod 5 and the second fixing rod 6 are inserted into two sides of the connecting plate 4 and are fixed in the preset groove through the bottom plate 8, the first telescopic rod 10 and the second telescopic rod 12 are inserted into two sides of the fixing block 9 and are fixed on the ground through the U-shaped bottom plate 14 for supporting and fixing, meanwhile, the inclination angle of the flood control plate 1 can be adjusted conveniently, then the preset groove is backfilled, the U-shaped plate 2 can be clamped with a second same device and is fixed through the threaded connection of the extrusion ring 15 and, the equipment has simple structure and is convenient to use.
As an optimal technical solution of the utility model: u template 2 can the joint second same equipment, fixes through extrusion ring 15 and screw hole 16 threaded connection, also convenient to detach and installation simultaneously.
The working steps of the device are as follows;
1. when the device is used, a groove is formed in the upper surface of a dam in advance, the first fixing rod 5 and the second fixing rod 6 are inserted into two sides of the connecting plate 4 and fixed inside the groove formed in advance through the bottom plate 8, the first telescopic rod 10 and the second telescopic rod 12 are inserted into two sides of the fixing block 9 and fixed on the ground through the U-shaped bottom plate 14 for supporting and fixing, the inclination angle of the flood control plate 1 can be adjusted conveniently, and then the groove is backfilled;
2. the U-shaped plate 2 can be clamped with a second same device and is fixed through the threaded connection of the extrusion ring 15 and the threaded hole 16, and meanwhile, the disassembly and the installation are convenient;
3. warning board 18 can play the warning effect to the pedestrian of passing by, connects telescopic link 11 and can adjust fixedly through adjusting pole 13, and the first telescopic link 10 of convenient to detach and second telescopic link 12 facilitate the use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A levee heightening structure comprising a flood barrier (1) characterized in that: a U-shaped plate (2) is arranged on one side of the flood control plate (1), a clamping plate (3) is arranged on the other side of the flood control plate (1), a connecting plate (4) is arranged at the bottom end of the flood control plate (1), a first fixing rod (5) is inserted into one side of the connecting plate (4), a second fixing rod (6) is inserted into the other side of the connecting plate (4), a fixing column (7) is fixedly connected to the bottom of the first fixing rod (5), the bottom end of the fixing column (7) is fixedly connected to the upper surface of the bottom plate (8), a fixing block (9) is fixedly connected to the side surface of the flood control plate (1), a first telescopic rod (10) is inserted into one side of the fixing block (9), the first telescopic rod (10) is fixedly connected with a second telescopic rod (12) through a connecting telescopic rod (11), and an adjusting rod (13) is in threaded connection, the bottom end of the first telescopic rod (10) is arranged in the U-shaped bottom plate (14).
2. A bank heightening structure according to claim 1, wherein: the side surface of the U-shaped plate (2) is in threaded connection with an extrusion ring (15), and the side surface of the clamping plate (3) is provided with a threaded hole (16).
3. A bank heightening structure according to claim 1, wherein: the side of flood control board (1) is provided with U type card frame (17), warning board (18) are pegged graft to the upper surface of U type card frame (17).
4. A bank heightening structure according to claim 2, wherein: the number of the extrusion rings (15) is two, and the two extrusion rings (15) are arranged on the side face of the U-shaped plate (2).
5. A bank heightening structure according to claim 2, wherein: the number of the threaded holes (16) is two, and the two threaded holes (16) are formed in the side face of the clamping plate (3).
6. A bank heightening structure according to claim 1, wherein: the flood control plate (1) is made of stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021432705.8U CN212688854U (en) | 2020-07-20 | 2020-07-20 | Dyke heightening structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021432705.8U CN212688854U (en) | 2020-07-20 | 2020-07-20 | Dyke heightening structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212688854U true CN212688854U (en) | 2021-03-12 |
Family
ID=74898373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021432705.8U Expired - Fee Related CN212688854U (en) | 2020-07-20 | 2020-07-20 | Dyke heightening structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212688854U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114438965A (en) * | 2022-02-25 | 2022-05-06 | 黄河勘测规划设计研究院有限公司 | Breach plugging device and rapid plugging method |
-
2020
- 2020-07-20 CN CN202021432705.8U patent/CN212688854U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114438965A (en) * | 2022-02-25 | 2022-05-06 | 黄河勘测规划设计研究院有限公司 | Breach plugging device and rapid plugging method |
CN114438965B (en) * | 2022-02-25 | 2024-01-23 | 黄河勘测规划设计研究院有限公司 | Breach blocking device and rapid blocking method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212688854U (en) | Dyke heightening structure | |
CN110616726A (en) | Water retaining cofferdam structure and construction process thereof | |
CN113718799B (en) | Quick emergency diagonal bracing for foundation pit rescue and construction method thereof | |
CN213508535U (en) | Reinforcement type civil engineering pile foundation construction structures | |
CN218322618U (en) | Frame component is fixed to revetment prevention of seepage membrane | |
CN211312488U (en) | Steel sheet pile structure suitable for pump station prevention of seepage | |
CN113585306A (en) | Water conservancy project impermeable membrane cofferdam structure and construction method thereof | |
CN218813818U (en) | Island-building cofferdam construction platform structure | |
CN214590312U (en) | Novel prefabricated assembled device of integrated cable pit and escape canal | |
CN212896386U (en) | Foundation pit supporting and reinforcing device | |
CN218263904U (en) | Geotechnical engineering adjustable rectangular supporting device | |
CN209836928U (en) | Reinforcing apparatus for hydraulic engineering dykes and dams | |
CN217203839U (en) | Concrete buried pile structure for flood prevention revetment | |
CN218813705U (en) | Steel landing leg system suitable for large-tonnage underwater steel pipe pile clearing device | |
CN219219048U (en) | Roadbed reinforcing device | |
CN218027485U (en) | Flood control concatenation wall for hydraulic engineering | |
CN212052823U (en) | Plug-in type cofferdam device for water conservancy construction | |
CN216360713U (en) | Soft soil foundation treatment structure | |
CN215164836U (en) | Box culvert type embankment penetrating structure for drainage station | |
CN212200495U (en) | Ecological concrete retaining wall | |
CN214940223U (en) | Basement foundation pit supporting structure | |
CN212175687U (en) | Ecological water conservancy bank protection | |
CN217601405U (en) | Take protective structure's linear type larsen steel sheet pile | |
CN218027513U (en) | Hydraulic engineering is flood prevention stake supporting device for bank protection | |
CN214832347U (en) | Hydraulic engineering river course flood control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210312 |
|
CF01 | Termination of patent right due to non-payment of annual fee |