CN212686762U - Ore spills blanking and concentrates discharge device - Google Patents

Ore spills blanking and concentrates discharge device Download PDF

Info

Publication number
CN212686762U
CN212686762U CN202021481994.0U CN202021481994U CN212686762U CN 212686762 U CN212686762 U CN 212686762U CN 202021481994 U CN202021481994 U CN 202021481994U CN 212686762 U CN212686762 U CN 212686762U
Authority
CN
China
Prior art keywords
belt
chute
funnel
guide chute
blanking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021481994.0U
Other languages
Chinese (zh)
Inventor
杨庚
何博
周雨龙
宁伟涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caofeidian Port Ore Wharf Co ltd
Original Assignee
Caofeidian Port Ore Wharf Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Caofeidian Port Ore Wharf Co ltd filed Critical Caofeidian Port Ore Wharf Co ltd
Priority to CN202021481994.0U priority Critical patent/CN212686762U/en
Application granted granted Critical
Publication of CN212686762U publication Critical patent/CN212686762U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

The utility model relates to a scattered blanking of ore concentrates discharge device belongs to harbour machinery and electrical technology field. The technical scheme is as follows: the lower end of the belt (3) is positioned outside the tower room (19), and the high end is positioned above the belt (8) in the tower room inside the tower room; a guide chute (2), a chute (16) and a transfer funnel (1) are sequentially arranged above the lower end of the belt, the outlet of the transfer funnel is connected with the inlet of the chute, the outlet of the chute is connected with the upper opening of the guide chute, and the lower opening of the guide chute is provided with a skirt (10); switching funnel sets up on funnel support (15), and the belt setting is on bearing roller (4), and the bearing roller setting is on the bearing roller frame, and the tip of belt sets up driving roll (5), and driving roll and bearing roller frame set up on truss (6), and the truss setting is on belt feeder support (7). The utility model discloses think about ingenious, rational arrangement controls portably, and the good reliability when guaranteeing harbour production efficiency, effectively reduces labour cost, and the commonality is strong, the facilitate promotion.

Description

Ore spills blanking and concentrates discharge device
Technical Field
The utility model relates to a scattered blanking of ore concentrates discharge device, especially near switching tower room ore spills blanking and concentrates discharge device belongs to harbour machinery and electrical technology field.
Background
The belt conveyor is an important component of a specialized ore wharf and is a necessary link for conveying ores, and the belt is arranged in a tower room. In the operation process, the material scattering condition can occur due to the problems of belt deviation, sticky materials, improper sweeper and the like. In the prior art, accumulated materials are required to be cleaned manually and then placed on a belt conveyor to finish discharging, but because the space of a tower room at a switching part is small, the belt conveyor in part of the tower room is higher in position, the accumulated materials are manually transferred to the belt conveyor at a high position, the difficulty is high, a large amount of manpower and time are consumed for cleaning the accumulated materials, the accumulated materials are more and more caused by untimely cleaning, and even the connection and the disconnection of ships are delayed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a discharge device is concentrated to ore spills blanking, equipment combination is ingenious, and the operation is safe, and simple installation can labour saving and time saving ground with near long-pending material of tower room clearance of concentrating, on transporting the belt feeder in the tower room of eminence, solves the above-mentioned problem that exists among the background art.
The technical scheme of the utility model is that:
an ore sprinkling, blanking and centralized discharging device comprises a transfer funnel, a guide chute, a belt, a carrier roller frame, a driving roller, a truss, a belt conveyor bracket, a chute and a belt in a tower room, wherein the belt is obliquely arranged, and the lower end of the belt is positioned outside the tower room; the high end of the belt is positioned above the belt in the tower room inside the tower room; a guide chute, a chute and a transfer funnel are sequentially arranged above the lower end of the belt, the outlet of the transfer funnel is connected with the inlet of the chute, the chute inclines forwards by 16 degrees along the running direction of the belt, the outlet of the chute is connected with the upper opening of the guide chute, the lower opening of the guide chute is provided with a skirt, the skirt is made of polyurethane materials and is in direct contact with the belt, and a gap between the guide chute and the belt is sealed; the switching funnel is arranged on the funnel support, the belt is arranged on the carrier roller, the carrier roller is arranged on the carrier roller frame, the end part of the belt is provided with the driving roller, the driving roller and the carrier roller frame are arranged on the truss, and the truss is arranged on the belt conveyor support; and guide chute supports are arranged on two sides of the belt, and the guide chutes are fixed on the guide chute supports.
The skirt is fixed on the guide chute through a skirt clip.
The material guide groove is a rectangular cylinder formed by four material guide groove mother boards, wherein the two material guide groove mother boards are arranged in parallel with the running direction of the belt and are respectively fixed on two material guide groove lining boards, and the two material guide groove lining boards are respectively fixed on material guide groove supports on two sides of the belt.
The belt conveyor support is composed of belt conveyor support stand columns and belt conveyor support inclined supports, the two belt conveyor support stand columns are parallel to each other and are arranged perpendicular to the ground, the two belt conveyor support stand columns are connected through the belt conveyor support inclined supports, and the truss is arranged on the tops of the two belt conveyor support stand columns.
Because baffle box and belt can not direct contact, have the gap, in order to prevent that the material from unrestrained from the gap, installed polyurethane material's apron on the baffle box, with the belt laminating, prevent that the material from unrestrained from the gap.
Wear-resisting welts are all installed in the interior of baffle box, chute and switching funnel, prevent wearing and tearing.
The driving rollers are arranged on the two sides of the head and the tail of the belt, the belt is made of nylon core adhesive tape, bending deflection is reduced, the upper side of the belt is provided with groove-shaped carrier rollers, and the return stroke is provided with flat carrier rollers.
The belt conveyor support is composed of three belt conveyor supports with different heights according to the inclination of the belt conveyor. In order to meet the requirements of tower rooms with different heights, the height of the belt conveyor support can be adjusted in a telescopic mode.
The utility model discloses be applied to near the tower room, because the tower room space is little, the forklift can't get into, and the tower room inner belt position along the line of operation is high, and the manual work can't transport long-pending material to tower room inner belt along the line. Collecting the spilled blanking by using a forklift, then pouring the spilled blanking into a transfer hopper outside the tower room, conveying the spilled blanking into a belt in the tower room through the belt, conveying the blanking to a storage yard, and finishing the discharging.
The utility model discloses can be used to ore transport material trade such as harbour, steel mill, also can be applicable to the concentrated clearance of other bulk cargos such as coal, grit. A large amount of manpower and material resources can be saved, and the operation efficiency is improved.
The utility model has the advantages that: the design is ingenious, reasonable layout, simple and convenient to operate and control, high in reliability, strong in universality and convenient to popularize, and labor cost is effectively reduced while port production efficiency is guaranteed.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view of a material guiding chute according to an embodiment of the present invention;
FIG. 3 is a side view of a material guide chute according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of a chute arrangement in an embodiment of the present invention;
FIG. 5 is a side view of a chute in an embodiment of the invention;
fig. 6 is a schematic view of a belt conveyor support in an embodiment of the present invention;
in the figure: the device comprises a transfer funnel 1, a guide chute 2, a belt 3, a carrier roller 4, a driving roller 5, a truss 6, a belt conveyor support 7, a belt 8 in a tower room, a guide chute mother board 9, a skirt 10, a skirt clip 11, a guide chute support 12, a guide chute lining board 13, a tower room inner belt support 14, a funnel support 15, a chute 16, a belt conveyor support upright post 17, a belt conveyor support inclined support 18, a tower room 19 and a carrier roller frame 20.
Detailed Description
The present invention will be further explained by way of examples with reference to the accompanying drawings.
An ore sprinkling, blanking and centralized discharging device comprises a transfer funnel 1, a material guide chute 2, a belt 3, a carrier roller 4, a carrier roller frame 20, a driving roller 5, a truss 6, a belt conveyor bracket 7, a chute 16 and a belt 8 in a tower room, wherein the belt 3 is obliquely arranged, and the lower end of the belt 3 is positioned outside a tower room 19; the high end of the belt 3 is positioned above the belt 8 in the tower room 19; a guide chute 2, a chute 16 and a transfer funnel 1 are sequentially arranged above the lower end of the belt 3, the outlet of the transfer funnel 1 is connected with the inlet of the chute 16, the chute 16 tilts forwards by 16 degrees along the running direction of the belt, the outlet of the chute 16 is connected with the upper opening of the guide chute 2, the lower opening of the guide chute 2 is provided with a skirt 10, the skirt 10 is made of polyurethane material and is in direct contact with the belt 3, and the gap between the guide chute 2 and the belt 3 is closed; switching funnel 1 sets up on funnel support 15, belt 3 sets up on bearing roller 4, and bearing roller 4 sets up on bearing roller frame 20, and the tip of belt 3 sets up driving drum 5, and driving drum 5 and bearing roller frame 20 set up on truss 6, and truss 6 sets up on belt feeder support 7. Guide chute supports 12 are arranged on two sides of the belt 3, and the guide chutes 2 are fixed on the guide chute supports 12.
The skirt 10 is fixed on the material guide groove 2 through a skirt clip 11.
The material guide chute 2 is a rectangular cylinder formed by four material guide chute mother boards 9, wherein the two material guide chute mother boards 9 are arranged in parallel with the running direction of the belt 3 and are respectively fixed on two material guide chute lining boards 13, and the two material guide chute lining boards 13 are respectively fixed on material guide chute supports 12 on two sides of the belt 3.
The belt conveyor support 7 is composed of belt conveyor support uprights 17 and belt conveyor support inclined supports 18, the two belt conveyor support uprights 17 are parallel to each other and are arranged perpendicular to the ground, the two belt conveyor support uprights 17 are connected through the belt conveyor support inclined supports 18, and the truss 6 is arranged on the tops of the two belt conveyor support uprights 17.
Because the baffle box can not directly contact with the belt 2 and has a gap, in order to prevent the material from spilling from the gap, the skirt 10 made of polyurethane material is arranged on the baffle box and is attached to the belt 3, so that the material is prevented from spilling from the gap.
Wear-resistant lining plates are arranged in the guide chute 2, the chute 16 and the transfer funnel 1 to prevent wear.
The driving rollers are arranged on the two sides of the head and the tail of the belt, the belt is made of nylon core adhesive tape, bending deflection is reduced, the upper side of the belt is provided with groove-shaped carrier rollers, and the return stroke is provided with flat carrier rollers.
The belt conveyor support 7 is composed of three belt conveyor supports with different heights according to the inclination of the belt conveyor. In order to meet the requirements of tower rooms with different heights, the height of the belt conveyor support can be adjusted in a telescopic mode.
The belt 8 in the tower room is positioned in the tower room 19 and is arranged on the belt bracket 14 in the tower room.
The utility model discloses be applied to near the tower room, because the tower room space is little, the forklift can't get into, and the tower room inner belt position along the line of operation is high, and the manual work can't transport long-pending material to tower room inner belt along the line. Collecting the scattered material by a forklift, pouring the collected material into a transfer funnel 1 outside a tower 19, conveying the scattered material by a belt 3 to fall into a belt 8 in the tower, conveying the scattered material to a storage yard, and finishing discharging.
In the embodiment, the transfer funnel 1 is located outside the tower 19, the maximum side of the transfer funnel 1 is 3500X 3500mm square, the lower part of the transfer funnel 1 is closed to 1000X 1000mm, the outlet of the transfer funnel 1 is connected with the inlet of the chute 16, and the chute 16 is connected with the material guide chute 2 by inclining forwards by 16 degrees along the running direction of the belt. The materials are collected by a forklift and put into the transfer hopper 1, enter the belt 3 after being buffered by the chute 16 and changing the blanking direction, and are stably conveyed along the belt 3 through the guide chute 2. The apron 10 of baffle box both sides installation polyurethane material, the apron 10 is fixed by apron checkpost 11, is equipped with down the triangle-shaped tooth on the apron checkpost 11, and the apron 10 hangs on down the triangle-shaped tooth, can make the apron 10 adjust downwards through down the triangle-shaped tooth to can not upwards shift during the assurance operation.
The belt running is realized by driving the roller to rotate. Considering that the belt conveyor is shorter, in order to reduce the deflection, the belt is a nylon core conveyor belt with the model number of EP200(6+3) 1400. The whole length of belt feeder 12m, every interval 1m installation a set of cell type bearing roller, correspond return stroke installation flat roller, all adopt rectangular hole fixed for the adjustment bearing roller frame both sides position, in order to reach the tuningout purpose.
The belt conveyor support 7 is composed of three belt conveyor supports with different heights. Each support can stretch out and draw back by changing the pin shaft hole, so that the purpose of adjusting the height is achieved, and the support can be used in tower houses with different heights.
The control mode of the belt 3 of the utility model is commonly known in the field.
The utility model discloses holistic row's material process does: cleaning and gathering materials inside and nearby the tower room → collecting by a forklift → a transfer funnel → a belt in the tower room → conveying to a storage yard to finish discharging.
Because the ore spills near blanking concentrated discharge device mainly is applied to the tower room, the tower room space is little, and the forklift can't get into, and the operation tower room inner belt position along the line is high, and the manual work can't transport long-pending material to tower room inner belt along the line, the utility model discloses can solve above-mentioned problem, when guaranteeing harbour production efficiency, effectively reduce labour cost, and the commonality is strong, the facilitate promotion.

Claims (5)

1. The utility model provides a discharge device is concentrated in ore spills blanking which characterized in that: the device comprises a transfer funnel (1), a material guide groove (2), a belt (3), a carrier roller (4), a carrier roller frame (20), a driving roller (5), a truss (6), a belt conveyor support (7), a chute (16) and a belt (8) in a tower room, wherein the belt (3) is obliquely arranged, and the lower end of the belt (3) is positioned outside the tower room (19); the high end of the belt (3) is positioned above the belt (8) in the tower room (19); a guide chute (2), a chute (16) and a transfer funnel (1) are sequentially arranged above the lower end of the belt (3), the outlet of the transfer funnel (1) is connected with the inlet of the chute (16), the chute (16) inclines forwards by 16 degrees along the running direction of the belt, the outlet of the chute (16) is connected with the upper opening of the guide chute (2), a skirt (10) is arranged at the lower opening of the guide chute (2), the skirt (10) is made of polyurethane material and is in direct contact with the belt (3), and the gap between the guide chute (2) and the belt (3) is closed; the switching funnel (1) is arranged on a funnel support (15), the belt (3) is arranged on a carrier roller (4), the carrier roller (4) is arranged on a carrier roller frame (20), the end part of the belt (3) is provided with a driving roller (5), the driving roller (5) and the carrier roller frame (20) are arranged on a truss (6), and the truss (6) is arranged on a belt conveyor support (7); guide chute supports (12) are arranged on two sides of the belt (3), and the guide chutes (2) are fixed on the guide chute supports (12).
2. The ore sprinkling, blanking, centralized discharging device according to claim 1, characterized in that: the skirt (10) is fixed on the guide chute (2) through a skirt clip (11).
3. An ore sprinkling, blanking, centralized discharging device according to claim 1 or 2, characterized in that: the material guide groove (2) is a rectangular cylinder formed by four material guide groove mother boards (9), wherein the two material guide groove mother boards (9) are arranged in parallel with the running direction of the belt (3) and are respectively fixed on two material guide groove lining boards (13), and the two material guide groove lining boards (13) are respectively fixed on material guide groove supports (12) on two sides of the belt (3).
4. An ore sprinkling, blanking, centralized discharging device according to claim 1 or 2, characterized in that: belt feeder support (7) comprise belt feeder support stand (17) and belt feeder support bearing diagonal (18), and two belt feeder support stands (17) are parallel to each other, and equal perpendicular to ground arranges, connects through belt feeder support bearing diagonal (18) between two belt feeder support stands (17), and truss (6) set up at two belt feeder support stand (17) tops.
5. An ore sprinkling, blanking, centralized discharging device according to claim 1 or 2, characterized in that: wear-resistant lining plates are arranged in the guide chute (2), the chute (16) and the switching funnel (1).
CN202021481994.0U 2020-07-24 2020-07-24 Ore spills blanking and concentrates discharge device Expired - Fee Related CN212686762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021481994.0U CN212686762U (en) 2020-07-24 2020-07-24 Ore spills blanking and concentrates discharge device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021481994.0U CN212686762U (en) 2020-07-24 2020-07-24 Ore spills blanking and concentrates discharge device

Publications (1)

Publication Number Publication Date
CN212686762U true CN212686762U (en) 2021-03-12

Family

ID=74899056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021481994.0U Expired - Fee Related CN212686762U (en) 2020-07-24 2020-07-24 Ore spills blanking and concentrates discharge device

Country Status (1)

Country Link
CN (1) CN212686762U (en)

Similar Documents

Publication Publication Date Title
CN210972640U (en) Full rolling friction chain plate riding wheel feeder
CN206218745U (en) A kind of chamfering work piece automatic feed conveyer
CN113086572B (en) Electrical automatic control coal conveying device and method
CN212686762U (en) Ore spills blanking and concentrates discharge device
CN102491056A (en) Garbage feeder
CN201942254U (en) Environmental protection type wrapped hoist
CN203903429U (en) Material receiving belt conveyer of tripper car
CN205932562U (en) Powder ore bin storehouse top dust pelletizing system
CN106943910B (en) Fertilizer distributor
CN201494868U (en) Middle part unloading-type driving device for great inclination-angle downward-conveying belt conveyor
CN209143248U (en) A kind of bagged material automatic loading machine
CN210479874U (en) Heavy plate type feeding machine of feed back device
CN207072670U (en) A kind of feed proportioning system of pitch batching plant
CN208037445U (en) A kind of new type nut feeding equipment
CN201250023Y (en) Offset trailer unloading device for transverse feed of a stacker-reclaimer
CN220011202U (en) Belt conveying accumulation preventing device
CN217497608U (en) Novel double-cantilever stacking equipment
CN112033111A (en) Lump ore drying machine with three-section detachable lifting plate
CN206502427U (en) Material paves conveying arrangement
CN213010815U (en) Sintering hybrid system convenient to maintain
CN220771901U (en) Ore smelting furnace roof feeding conveying device
CN217024030U (en) Conveying structure of AOD automatic feeding machine
CN212314987U (en) Ship unloaders and portable head funnel device thereof
CN209367254U (en) Multi roll material conveyor
CN217200433U (en) Frame mechanism of lifting belt conveyor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210312

Termination date: 20210724

CF01 Termination of patent right due to non-payment of annual fee