CN212675809U - Building engineering management bid display device - Google Patents
Building engineering management bid display device Download PDFInfo
- Publication number
- CN212675809U CN212675809U CN202021998024.8U CN202021998024U CN212675809U CN 212675809 U CN212675809 U CN 212675809U CN 202021998024 U CN202021998024 U CN 202021998024U CN 212675809 U CN212675809 U CN 212675809U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- frame
- spring bolt
- display board
- wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Devices For Indicating Variable Information By Combining Individual Elements (AREA)
Abstract
The utility model relates to the technical field of constructional engineering, and discloses a constructional engineering management bid display device, which comprises a display board and two support frames, the top of the display board is fixedly connected with a rain shielding top, the left side and the right side of the display board are both provided with slots, the opposite sides of the two support frames are both fixedly connected with an inserting block, the bottom of the supporting frame is fixedly connected with a T-shaped frame, the bottom of the T-shaped frame at the left side is fixedly connected with a first spring bolt, the bottom of the supporting frame is inserted with a wheel frame, the right side of the wheel frame is provided with an insertion hole, the right side of the supporting frame is fixedly connected with a second spring bolt, the bottom of the wheel frame is fixedly connected with two universal wheels, the front of the display board is provided with a groove, the inboard fixed mounting of recess has the display screen, the inboard rotation that hides the rain top is connected with elasticity rolling wheel. This display device is beckoned in building engineering management is convenient for assemble the dismantlement transportation, and is convenient for clear up the display screen.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering management signboard display device.
Background
The building engineering means the engineering entity formed by the construction of various building and its auxiliary facilities and the installation of the lines, pipes and equipment matching with them, the demand for the equipment of the building engineering management is increasing, the bidding display device is also an indispensable part, and is a necessary tool for good competition, when bidding, the bidding information is displayed.
General exhibition device integrated into one piece of calling up a bid, whole volume is great, is difficult for the dismouting, and the transportation of being not convenient for, general exhibition device is equipped with the display screen, and the display screen exposes for a long time outdoors, collects up the accumulated dust easily, causes the display effect not good, so proposes an architectural engineering management exhibition device of calling up a bid and solves the above-mentioned problem of proposing.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a display device is beckoned in building engineering management possesses the dismantlement transportation of being convenient for assemble, and is convenient for clear up the advantage such as display screen, has solved general display device that beckoned not convenient to assemble and dismantle the transportation, and is not convenient for clear up the problem to the display screen.
(II) technical scheme
For the transportation of the aforesaid be convenient for assemble dismantlement of realization, and be convenient for carry out the purpose of clearance to the display screen, the utility model provides a following technical scheme: a building engineering management bid display device comprises a display board and two support frames, wherein the top of the display board is fixedly connected with a rain shielding top, the left side and the right side of the display board are respectively provided with an inserting groove, the opposite sides of the two support frames are respectively and fixedly connected with an inserting block, the bottom of each support frame is fixedly connected with a T-shaped frame, the bottom of the T-shaped frame on the left side is fixedly connected with a first spring bolt, the bottom of each support frame is inserted with a wheel frame, the right side of each wheel frame is provided with an inserting hole, the right side of each support frame is fixedly connected with a second spring bolt, the bottom of each wheel frame is fixedly connected with two universal wheels, the front of the display board is provided with a groove, the inner side of the groove is fixedly provided with a display screen, the inner side of the rain shielding top is rotatably connected with an elastic, the bottom end of the connecting band is fixedly connected with a cleaning brush.
Preferably, the two insertion blocks are respectively inserted into the two insertion slots, and one opposite side of the two support frames is movably connected with the display board.
Preferably, the first spring bolt and the second spring bolt are composed of bolts, springs and handles, and the first spring bolt is inserted into the right T-shaped frame.
Preferably, the left end of the second spring bolt penetrates through the corresponding support frame and extends to the inner side of the corresponding jack.
Preferably, the bottom of connecting band runs through hides the rain top and extends to the bottom of hiding the rain top, and the connecting band is the rolling form in the outside of elasticity rolling wheel.
Preferably, the cleaning brush is located above the display screen, and the bottom of the cleaning brush is fixedly connected with a pull rod.
(III) advantageous effects
Compared with the prior art, the utility model provides a display device is beckoned in building engineering management possesses following beneficial effect:
this display device is beckoned in building engineering management, through pulling second spring bolt, break away from the jack with second spring bolt, can dismantle the wheel frame downwards, through the first spring bolt of lapse pulling, can break away from first spring bolt from right side T word frame, thereby can dismantle two support frames respectively to the left and right sides, with the show board separation, it is convenient wholly to dismantle, convenient to transport, the installation can according to above-mentioned principle reverse operation, through pulling clearance brush downwards, can directly clear up the display screen, the clearance is convenient, loosen the clearance brush after the clearance, elasticity rolling wheel resumes elasticity, it rolls to rotate the connecting band, upwards pack up the clearance brush, therefore, the clothes hanger is very convenient, this display device is beckoned in, be convenient for assemble and dismantle the transportation, and be convenient for clear up the display screen.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a partial right sectional view of the structure of the present invention.
In the figure: the device comprises a display board 1, a supporting frame 2, a rain shading top 3, a slot 4, an inserting block 5, a 6T-shaped frame, a first spring bolt 7, a wheel frame 8, an inserting hole 9, a second spring bolt 10, a universal wheel 11, a groove 12, a display screen 13, an elastic winding wheel 14, a connecting belt 15 and a cleaning brush 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a display device for building engineering management and bidding comprises a display board 1 and two support frames 2, wherein one side of each support frame 2 opposite to the display board 1 is movably connected with the display board, the top of the display board 1 is fixedly connected with a rain shielding top 3, slots 4 are respectively arranged on the left side and the right side of the display board 1, plug blocks 5 are respectively fixedly connected with one side of each support frame 2 opposite to the other side, the two plug blocks 5 are respectively plugged with the two slots 4, a T-shaped frame 6 is fixedly connected with the bottom of each support frame 2, a first spring bolt 7 is fixedly connected with the bottom of the left T-shaped frame 6, the first spring bolt 7 is plugged with the right T-shaped frame 6, a wheel frame 8 is plugged into the bottom of each support frame 2, a jack 9 is arranged on the right side of the wheel frame 8, a second spring bolt 10 is fixedly connected with the right side of each support frame 2, the left end of, the first spring bolt 7 and the second spring bolt 10 are composed of a bolt, a spring and a handle, the bolt is positioned on the inner side of the spring, one end of the bolt is fixedly connected with the handle, one end of the spring is fixedly connected with a connecting object, the other end of the spring is fixedly connected with the handle, the bolt of the first spring bolt 7 penetrates through the left T-shaped frame 6, the bolt of the first spring bolt is connected with the T-shaped frame 6 in a sliding manner, the bolt of the second spring bolt 10 penetrates through the corresponding supporting frame 2, the bolt of the second spring bolt is connected with the supporting frame 2 in a sliding manner, two universal wheels 11 are fixedly connected with the bottom of the wheel frame 8, a groove 12 is formed in the front surface of the display board 1, a display screen 13 is fixedly installed on the inner side of the groove 12, an elastic rolling wheel 14 is rotatably connected to the inner side of the rain shade top 3, a connecting belt 15 is, the connecting belt 15 is in a rolling shape at the outer side of the elastic rolling wheel 14, the bottom end of the connecting belt 15 is fixedly connected with a cleaning hairbrush 16, the cleaning hairbrush 16 is positioned above the display screen 13, the bottom of the cleaning hairbrush 16 is fixedly connected with a pull rod, the second spring bolt 10 is pulled to separate from the jack 9, the wheel frame 8 can be dismounted downwards, the first spring bolt 7 can be separated from the right T-shaped frame 6 by pulling the second spring bolt 10 downwards, so that the two supporting frames 2 can be respectively dismounted towards the left side and the right side and separated from the display plate 1, the whole dismounting is convenient and the transportation is convenient, the mounting can be carried out in a reverse direction according to the principle, the display screen 13 can be directly cleaned by pulling the cleaning hairbrush 16 downwards, the cleaning hairbrush 16 is convenient to clean, the elastic rolling wheel 14 recovers elasticity and rotates to roll the connecting belt 15, the brush 16 is folded upwards for cleaning, which is very convenient.
When using, through pulling second spring bolt 10, break away from jack 9 with second spring bolt 10, can dismantle wheel frame 8 downwards, through first spring bolt 7 of lapse pulling, can break away from first spring bolt 7 from right side T word frame 6, thereby can dismantle two support frames 2 respectively to the left and right sides, with show board 1 separation, it is convenient to wholly dismantle, the transportation of being convenient for, the installation can according to above-mentioned principle reverse operation, through pulling clearance brush 16 downwards, can directly clear up display screen 13, the clearance is convenient, loosen clearance brush 16 after the clearance, elasticity rolling wheel 14 resumes elasticity, rotate and roll connecting band 15, upwards pack up clearance brush 16, it is very convenient.
In conclusion, the building engineering management bid display device can detach the wheel frame 8 downwards by pulling the second spring bolt 10 to separate the second spring bolt 10 from the jack 9, detach the first spring bolt 7 from the right T-shaped frame 6 by pulling the first spring bolt 7 downwards, detach the two support frames 2 to the left and right sides respectively, separate from the display board 1, is convenient to integrally detach and transport, can be installed in reverse operation according to the principle, can directly clean the display screen 13 by pulling the cleaning brush 16 downwards, is convenient to clean, releases the cleaning brush 16 after cleaning, recovers elasticity of the elastic winding wheel 14, rotates to wind the connecting band 15, and collects the cleaning brush 16 upwards, and is very convenient, and the bid display device is convenient to assemble, detach and transport and clean the display screen 13, the problem of generally attract mark display device be not convenient for assemble the dismantlement transportation, and be not convenient for clear up the display screen is solved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a display device is beckoned in building engineering management, includes show board (1) and two support frames (2), its characterized in that: the rain shading display board is characterized in that a rain shading top (3) is fixedly connected to the top of the display board (1), slots (4) are formed in the left side and the right side of the display board (1), inserting blocks (5) are fixedly connected to one opposite sides of the two supporting frames (2), a T-shaped frame (6) is fixedly connected to the bottom of each supporting frame (2), a first spring bolt (7) is fixedly connected to the bottom of the T-shaped frame (6) on the left side, a wheel frame (8) is inserted into the bottom of each supporting frame (2), an inserting hole (9) is formed in the right side of each wheel frame (8), a second spring bolt (10) is fixedly connected to the right side of each supporting frame (2), two universal wheels (11) are fixedly connected to the bottom of each wheel frame (8), a groove (12) is formed in the front of the display board (1), and a display screen (13), hide inboard rotation of rain top (3) and be connected with elasticity rolling wheel (14), the outside fixedly connected with connecting band (15) of elasticity rolling wheel (14), the bottom fixedly connected with clearance brush (16) of connecting band (15).
2. A construction work management bid exhibiting apparatus according to claim 1, wherein: the two inserting blocks (5) are respectively inserted into the two inserting grooves (4), and the two opposite sides of the supporting frame (2) are movably connected with the display board (1).
3. A construction work management bid exhibiting apparatus according to claim 1, wherein: the first spring bolt (7) and the second spring bolt (10) are composed of bolts, springs and handles, and the first spring bolt (7) is connected with the right T-shaped frame (6) in an inserting mode.
4. A construction work management bid exhibiting apparatus according to claim 1, wherein: the left end of the second spring bolt (10) penetrates through the corresponding support frame (2) and extends to the inner side of the corresponding jack (9).
5. A construction work management bid exhibiting apparatus according to claim 1, wherein: the bottom of connecting band (15) runs through hides rain top (3) and extends to the bottom of hiding rain top (3), and connecting band (15) are the rolling form in the outside of elasticity rolling wheel (14).
6. A construction work management bid exhibiting apparatus according to claim 1, wherein: the cleaning brush (16) is positioned above the display screen (13), and the bottom of the cleaning brush (16) is fixedly connected with a pull rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021998024.8U CN212675809U (en) | 2020-09-14 | 2020-09-14 | Building engineering management bid display device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021998024.8U CN212675809U (en) | 2020-09-14 | 2020-09-14 | Building engineering management bid display device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212675809U true CN212675809U (en) | 2021-03-09 |
Family
ID=74824540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021998024.8U Active CN212675809U (en) | 2020-09-14 | 2020-09-14 | Building engineering management bid display device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212675809U (en) |
-
2020
- 2020-09-14 CN CN202021998024.8U patent/CN212675809U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212675809U (en) | Building engineering management bid display device | |
CN111653195A (en) | Outdoor advertising display screen convenient for dust removal | |
CN110217023B (en) | Writing blackboard capable of avoiding abrasion of writing curtain | |
CN213241687U (en) | New media information display fence in internet | |
CN209765971U (en) | Rolling curtain billboard | |
CN113241023B (en) | Advertisement signpost for environmental protection based on new forms of energy | |
CN209607323U (en) | A kind of Superthin type vertical type digital advertisement board | |
CN210325049U (en) | Outdoor LED advertising lamp box | |
CN213424499U (en) | Quick poster replacing mechanism of advertising lamp box | |
CN210073278U (en) | Novel movable billboard | |
CN208655187U (en) | A kind of card cloth advertising device | |
CN219457105U (en) | Advertisement box with bus stop convenient for replacing advertisement | |
CN220439179U (en) | Humanized roller painting system | |
CN215182938U (en) | Marketing planning and pushing board based on inner Mongolia mare's milk market | |
CN218332726U (en) | Intelligent unmanned vending machine | |
CN214984448U (en) | Chinese classroom teaching device based on flat-panel projection technology | |
CN218585599U (en) | Advertisement delivery system based on position movement | |
CN213150207U (en) | Outdoor multimedia advertising machine | |
CN216793197U (en) | Double-screen advertising machine | |
CN213691250U (en) | High-practicability billboard advertising machine | |
CN213716370U (en) | Electric power engineering construction information display device | |
CN211575672U (en) | Refrigerator shelf decorating strip of small lifting type refrigerator | |
CN221507702U (en) | Luminous easy-to-draw treasures | |
CN217982698U (en) | Safety warning board | |
CN210627803U (en) | Card cloth lamp box aluminum product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |