CN212671788U - Shield constructs to measure and moves station and uses hanging flower basket - Google Patents
Shield constructs to measure and moves station and uses hanging flower basket Download PDFInfo
- Publication number
- CN212671788U CN212671788U CN202021066282.2U CN202021066282U CN212671788U CN 212671788 U CN212671788 U CN 212671788U CN 202021066282 U CN202021066282 U CN 202021066282U CN 212671788 U CN212671788 U CN 212671788U
- Authority
- CN
- China
- Prior art keywords
- plate
- welded
- shield
- hole
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Measurement Of Radiation (AREA)
Abstract
The utility model discloses a shield constructs to measure and moves station and uses hanging flower basket, which comprises a supporting plate and i, the top one side symmetrical of layer board welding has two hanger plates, and one side top that two hanger plates kept away from each other all rotates and is connected with the semicircle board. The utility model discloses simple structure, wear the lug on the bolt and screw up the nut through two mounting holes, then can with the utility model discloses directly fixed to the section of jurisdiction on, clockwise rotation screw rod can drive anti-skidding rubber strip and paste tight circular base and brake circular base, loosen soon two lock nut and promote the layer board and can adjust the horizontal position that the shield constructs the survey total powerstation, counter-clockwise rotation screw rod, and when anti-skidding rubber strip breaks away from circular base, can adjust the angle that the shield constructs the survey total powerstation, make and need not punch on the section of jurisdiction, can not destroy the bulk strength of section of jurisdiction, the safe risk of using the percussion drill to bring has been avoided, easily install and demolish, time saving and labor saving, and be convenient for adjust the shield and construct angle and the level of surveying the total powerstation, high durability and convenient.
Description
Technical Field
The utility model relates to a shield constructs tunnel measuring equipment technical field, especially relates to a shield constructs to measure and moves station and uses hanging flower basket.
Background
The shield guidance measurement station shifting is the daily work of shield measurement, the basic working process is that a total station instrument, a rearview prism and communication hardware used for guidance are installed forwards along with the tunneling of the shield machine, and a new guidance attitude is generated by inputting the three-dimensional coordinates of a surveying station and a rearview hanging basket into a guidance system through re-measurement, so that the shield machine is ensured to continuously tunnel. During the station-shifting measurement process, the removal and installation of the total station and the rearview basket are important parts of the work.
Traditional shield constructs to measure total powerstation hanging flower basket that shifts station, the primary form is mostly shaped steel and angle steel combination welded bracket, and is bulky, and the quality is heavy, and the method of being connected with the section of jurisdiction uses electronic impact drill to punch at the shield section of jurisdiction, and the fixed hanging flower basket of installation inflation screw has following drawback in the traditional hanging flower basket installation: 1. the impact drill is needed in the installation process, the impact drill has high power, the phenomenon of hurting people is easy to occur, and the safety risk is high; 2. the traditional hanging basket is punched and installed on the pipe piece, the structure of the pipe piece is broken in the punching process, the overall strength of the pipe piece can be reduced, the strength of the shield pipe piece is high, the built-in steel bars are dense, punching is very difficult, and time and labor are consumed; 3. the traditional hanging basket is heavy and large in size, needs to be completed on a vertical step ladder in the dismantling process, is troublesome to disassemble and assemble, consumes long time, and can influence the normal tunneling of a shield, so that the hanging basket for shield measurement station moving is provided for solving the problems.
Disclosure of Invention
The utility model aims at solving the defects existing in the prior art and providing a hanging basket for shield measurement station moving.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a hanging basket for shield measurement and station transfer comprises a supporting plate, wherein two hanging plates are symmetrically welded on one side of the top of the supporting plate, the top of one side, away from each other, of each hanging plate is rotatably connected with a semicircular plate, a lifting lug is welded on the top of the semicircular plate, a mounting hole is formed in the lifting lug, an arc-shaped groove is formed in the semicircular plate, a fixed threaded rod is welded on the top of one side, away from each other, of each hanging plate, one end of the fixed threaded rod penetrates through the arc-shaped groove and extends to one side of the semicircular plate, a locking nut is connected to the outer wall of the fixed threaded rod in a threaded manner, one side of the locking nut is in contact with one side of the semicircular plate, a circular groove is formed in one side of the top of the supporting plate and is located at one side of the hanging plates, a shield measurement total, the bottom of the circular base extends into the circular groove and is in contact with the inner wall of the bottom of the circular groove, a vertical plate is welded on one side of the top of the supporting plate and is positioned on one side of the circular groove, two side plates are symmetrically welded on one side of the vertical plate, the bottoms of the side plates are welded with the top of the supporting plate, one side, close to each other, of the two side plates is connected with the same arc-shaped plate in a sliding mode, a first through hole is formed in the center of one side of the vertical plate, a screw rod is connected to the inner wall of the first through hole in a threaded mode, one end of the screw rod penetrates through the first through hole and is rotatably connected with one side of the arc-shaped plate, two supporting plates are symmetrically welded on the top of the supporting plate and are positioned on one side of the side plates, one side, close to each other, of the two supporting, the one end that two torsional springs kept away from each other welds with the one side that two backup pads are close to each other respectively mutually, and the one end that two torsional springs are close to each other welds with the both sides of cardboard respectively mutually, the bottom both sides of cardboard respectively with the top of arc and the top of circular base inconsistent.
Preferably, a nut is welded on the inner wall of the first through hole, one end of the screw rod penetrates through the nut and extends to one side of the vertical plate, and the screw rod is in threaded connection with the nut.
Preferably, one side top of hanger plate and one side top of semicircle board are provided with second through-hole and third through-hole respectively, the welding has the bearing on the inner wall of third through-hole, the welding has the pivot on the inner wall of second through-hole, the one end of pivot runs through the inner circle of second through-hole and bearing respectively and extends to one side of semicircle board, and the outer wall of pivot welds with the inner circle of bearing mutually.
Preferably, an antiskid plate is fixedly mounted on one side of the bottom of the clamping plate, a plurality of antiskid rubber strips which are arranged at equal intervals are fixedly mounted on the bottom of the antiskid plate, and the bottoms of the antiskid rubber strips are in contact with the top of the circular base.
Preferably, the guide rails are welded on one sides, close to each other, of the two side plates, the sliding blocks are welded on the two sides of the arc-shaped plate, and the sliding blocks are connected with the guide rails in a sliding mode.
Preferably, a limiting plate is welded at one end of the guide rail.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, the nuts on two adjacent bolts on the pipe sheet are firstly loosened, the lugs are threaded on the bolts through two mounting holes and the nuts are screwed, so that the utility model can be directly fixed on the pipe sheet, the circular base of the shield measurement total station is placed into the circular groove, the clockwise rotating screw rod can drive the arc plate to move towards the direction close to the clamping plate, the clamping plate can slide on the arc plate and rotate around the round rod as a pivot, and simultaneously the torsional spring can deform, and in the process of continuously rotating the screw rod, the clamping plate can drive the anti-slip rubber strip to tightly attach the circular base and brake the circular base, so that the shield measurement total station can be firmly fixed in the circular groove;
2. in the utility model, when the horizontal position of the shield measuring total station needs to be adjusted, two locking nuts are unscrewed, the supporting plate is pushed, the supporting plate can drive the hanging plate to rotate by taking the rotating shaft as a fulcrum, and the hanging plate can drive the fixed threaded rod to slide on the arc-shaped groove, and when the horizontal position of the shield measuring total station needs to be adjusted, the two locking nuts are screwed;
3. the utility model discloses in, when the angle that the shield structure measured the total powerstation is adjusted to needs, anticlockwise rotation screw rod can drive the arc and remove to the direction that is close to the riser, under the effect of torsional spring, can make the cardboard use the round bar to rotate as the fulcrum and make the cardboard slide on the arc, the cardboard can drive the anti-skidding rubber strip and break away from circular base simultaneously, when the anti-skidding rubber strip breaks away from circular base, can rotate the shield structure and measure the total powerstation and adjust the angle that the shield structure measured the total powerstation, after the adjustment is accomplished, clockwise rotation screw rod can make the anti-skidding rubber strip paste tight circular base and brake circular base again.
The utility model discloses simple structure, wear the lug on the bolt and screw up the nut through two mounting holes, then can with the utility model discloses directly fixed to the section of jurisdiction on, clockwise rotation screw rod can drive anti-skidding rubber strip and paste tight circular base and brake circular base, loosen soon two lock nut and promote the layer board and can adjust the horizontal position that the shield constructs the survey total powerstation, counter-clockwise rotation screw rod, and when anti-skidding rubber strip breaks away from circular base, can adjust the angle that the shield constructs the survey total powerstation, make and need not punch on the section of jurisdiction, can not destroy the bulk strength of section of jurisdiction, the safe risk of using the percussion drill to bring has been avoided, easily install and demolish, time saving and labor saving, and be convenient for adjust the shield and construct angle and the level of surveying the total powerstation, high durability and convenient.
Drawings
Fig. 1 is a three-dimensional schematic view of a hanging basket for shield measurement station transfer provided by the utility model;
fig. 2 is a three-dimensional schematic view of another view angle of a hanging basket for shield measurement station transfer provided by the utility model;
fig. 3 is a front view of a hanging basket for shield measurement station transfer proposed by the present invention;
fig. 4 is a rear view of a hanging basket for shield measurement station transfer proposed by the present invention;
fig. 5 is a left side view of a hanging basket for shield measurement station transfer provided by the utility model;
fig. 6 is a right side view of a hanging basket for shield measurement station transfer proposed by the present invention;
fig. 7 is a top view of a hanging basket for shield measurement station transfer proposed by the present invention;
fig. 8 is an enlarged view of a portion a of a hanging basket for shield measurement station transfer provided by the present invention;
fig. 9 is a bottom view of a hanging basket for shield measurement station transfer provided by the present invention;
fig. 10 is a three-dimensional schematic view of a shield measuring station without a shield measuring total station of a hanging basket for shield measuring station transfer proposed by the present invention;
fig. 11 is an enlarged view of a portion B of a hanging basket for shield measurement station transfer proposed by the present invention;
fig. 12 is a schematic view of the connection between the arc plate and the clamping plate of the hanging basket for shield measurement station transfer provided by the present invention;
fig. 13 is a three-dimensional schematic view of a clamping plate of a hanging basket for shield measurement station transfer provided by the utility model;
fig. 14 is a three-dimensional schematic view of an anti-skid rubber strip of a hanging basket for shield measurement station moving provided by the utility model.
In the figure: the device comprises a supporting plate 1, a circular groove 2, a shield measuring total station 3, a circular base 4, a vertical plate 5, a side plate 6, a supporting plate 7, a clamping plate 8, a screw rod 9, an arc plate 10, a hanging plate 11, a semicircular plate 12, a lifting lug 13, a mounting hole 14, a rotating shaft 15, an arc groove 16, a fixed threaded rod 17, a locking nut 18, a guide rail 19, a sliding block 20, a limiting plate 21, a circular rod 22, a torsion spring 23, an antiskid plate 24 and an antiskid rubber strip 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-14, a hanging basket for shield measurement station transfer comprises a supporting plate 1, two hanging plates 11 are symmetrically welded on one side of the top of the supporting plate 1, the top of the side, away from each other, of the two hanging plates 11 is rotatably connected with a semicircular plate 12, a lifting lug 13 is welded on the top of the semicircular plate 12, a mounting hole 14 is formed in the lifting lug 13, an arc-shaped groove 16 is formed in the semicircular plate 12, a fixed threaded rod 17 is welded on the top of the side, away from each other, of the two hanging plates 11, one end of the fixed threaded rod 17 penetrates through the arc-shaped groove 16 and extends to one side of the semicircular plate 12, a locking nut 18 is in threaded connection with the outer wall of the fixed threaded rod 17, one side of the locking nut 18 is in contact with one side of the semicircular plate 12, a circular groove 2 is formed in one side of the top of the supporting plate 1, a shield measurement total station 3 is arranged, the bottom of the circular base 4 extends into the circular groove 2 and contacts with the inner wall of the bottom of the circular groove 2, a vertical plate 5 is welded on one side of the top of the supporting plate 1, the vertical plate 5 is positioned on one side of the circular groove 2, two side plates 6 are symmetrically welded on one side of the vertical plate 5, the bottoms of the side plates 6 are welded with the top of the supporting plate 1, one sides of the two side plates 6, which are close to each other, are slidably connected with a same arc-shaped plate 10, a first through hole is formed in the center position of one side of the vertical plate 5, a screw rod 9 is in threaded connection with the inner wall of the first through hole, one end of the screw rod 9 penetrates through the first through hole and is rotatably connected with one side of the arc-shaped plate 10, two supporting plates 7 are symmetrically welded on the top of the supporting plate 1, the supporting plates 7 are positioned on one side of the side plates 6, one, the end of the two torsion springs 23 far away from each other is welded with the side of the two support plates 7 near each other, the end of the two torsion springs 23 near each other is welded with the two sides of the clamping plate 8, the two sides of the bottom of the clamping plate 8 are respectively abutted against the top of the arc plate 10 and the top of the circular base 4, the nuts on the two adjacent bolts on the pipe sheet are firstly loosened, the lifting lugs 13 are penetrated on the bolts through the two mounting holes 14 and the nuts are tightened, the utility model can be directly fixed on the pipe sheet, the circular base 4 of the shield measurement total station 3 is put into the circular groove 2, the clockwise rotating screw 9 can drive the arc plate 10 to move towards the direction near the clamping plate 8, the clamping plate 8 can slide on the arc plate 10, and the clamping plate 8 can rotate by taking the round rod 22 as a fulcrum, meanwhile, the torsion springs 23 can be deformed, in the process of continuously rotating the screw 9, the clamping plate 8 can drive the anti-skid rubber strip 25 to tightly adhere to the circular base 4 and brake the circular base 4, so that the shield measurement total station 3 can be firmly fixed in the circular groove 2, when the horizontal position of the shield measurement total station 3 needs to be adjusted, the two locking nuts 18 are unscrewed to push the supporting plate 1, the supporting plate 1 can drive the hanging plate 11 to rotate by taking the rotating shaft 15 as a pivot, the hanging plate 11 can drive the fixed threaded rod 17 to slide on the arc-shaped groove 16, when the horizontal position of the required shield measurement total station 3 is adjusted, the two locking nuts 18 are screwed, when the angle of the shield measurement total station 3 needs to be adjusted, the screw rod 9 is rotated anticlockwise to drive the arc-shaped plate 10 to move towards the direction close to the vertical plate 5, under the action of the torsion spring 23, the clamping plate 8 can be rotated by taking the circular rod 22 as a pivot and the clamping plate 8 can slide on the arc-shaped plate 10, meanwhile, the clamping plate 8 can drive the anti-skid rubber strip 25 to be separated from the circular base 4, when the anti-skid rubber strip 25 is separated from the circular base 4, the shield measurement total station 3 can be rotated to adjust the angle of the shield measurement total station 3, after the adjustment is finished, the screw 9 is rotated clockwise to enable the anti-skid rubber strip 25 to be attached to the circular base 4 and brake the circular base 4, the utility model has simple structure, the lifting lugs 13 are threaded on the bolts through the two mounting holes 14 and the nuts are screwed, then the utility model can be directly fixed on the pipe sheet, the screw 9 rotated clockwise can drive the anti-skid rubber strip 25 to be attached to the circular base 4 and brake the circular base 4, the two locking nuts 18 are unscrewed and the supporting plate 1 is pushed to adjust the horizontal position of the shield measurement total station 3, the screw 9 is rotated anticlockwise, and when the anti-skid rubber strip 25 is separated from the circular base 4, can adjust the shield and construct the angle of measuring total powerstation 3 for need not punch on the section of jurisdiction, can not destroy the bulk strength of section of jurisdiction, avoided using to strike the safety risk that bores and bring, easily install and demolish labour saving and time saving, and be convenient for adjust the shield and construct angle and the level of measuring total powerstation 3, convenient to use.
In the utility model, a nut is welded on the inner wall of a first through hole, one end of a screw rod 9 penetrates through the nut and extends to one side of a vertical plate 5, the screw rod 9 is connected with the nut in a threaded manner, a second through hole and a third through hole are respectively arranged on the top of one side of a hanging plate 11 and the top of one side of a semicircular plate 12, a bearing is welded on the inner wall of the third through hole, a rotating shaft 15 is welded on the inner wall of the second through hole, one end of the rotating shaft 15 penetrates through the inner rings of the second through hole and the bearing and extends to one side of the semicircular plate 12, the outer wall of the rotating shaft 15 is welded with the inner ring of the bearing, an antiskid plate 24 is fixedly arranged on one side of the bottom of a clamping plate 8, a plurality of antiskid rubber strips 25 which are arranged at equal intervals are fixedly arranged on the bottom of the antiskid plate 24, the bottom of the antiskid rubber strips 25 are contacted with the top of a, the sliding block 20 is connected with the guide rail 19 in a sliding manner, one end of the guide rail 19 is welded with a limiting plate 21, nuts on two adjacent bolts on the tube sheet are firstly loosened, the lifting lugs 13 are penetrated on the bolts through the two mounting holes 14 and the nuts are tightened, so that the utility model can be directly fixed on the tube sheet, the circular base 4 of the shield measurement total station 3 is placed into the circular groove 2, the clockwise rotating screw 9 can drive the arc plate 10 to move towards the direction close to the clamping plate 8, the clamping plate 8 can slide on the arc plate 10 and can rotate by taking the circular rod 22 as a pivot, and simultaneously the torsion spring 23 can be deformed, in the process of continuously rotating the screw 9, the clamping plate 8 can drive the anti-slip rubber strip 25 to cling to the circular base 4 and brake the circular base 4, so that the shield measurement total station 3 can be firmly fixed in the circular groove 2, when the horizontal position of the total station 3 needs to be adjusted, loosening two locking nuts 18, pushing the support plate 1, the support plate 1 can drive the hanging plate 11 to rotate by taking the rotating shaft 15 as a pivot, the hanging plate 11 can drive the fixed threaded rod 17 to slide on the arc-shaped groove 16, when the horizontal position of the required shield measurement total station 3 is adjusted, screwing the two locking nuts 18, when the angle of the shield measurement total station 3 needs to be adjusted, the anticlockwise rotating screw 9 can drive the arc-shaped plate 10 to move towards the direction close to the vertical plate 5, under the action of the torsion spring 23, the clamping plate 8 can rotate by taking the round rod 22 as the pivot and can slide on the arc-shaped plate 10, meanwhile, the clamping plate 8 can drive the anti-skid rubber strip 25 to be separated from the circular base 4, when the anti-skid rubber strip 25 is separated from the circular base 4, the shield measurement total station 3 can be rotated to adjust the angle of the shield measurement total station 3, after the adjustment is completed, then the screw 9 is rotated clockwise to make the antiskid rubber strip 25 cling to the round base 4 and brake the round base 4, the utility model has simple structure, the lifting lugs 13 are threaded on the bolts through the two mounting holes 14 and the nuts are tightened, the utility model can be directly fixed on the duct piece, the screw 9 is rotated clockwise to drive the antiskid rubber strip 25 to cling to the round base 4 and brake the round base 4, the two locking nuts 18 are unscrewed and the supporting plate 1 is pushed to adjust the horizontal position of the shield measurement total station 3, the screw 9 is rotated anticlockwise, and when the antiskid rubber strip 25 is separated from the round base 4, the angle of the shield measurement total station 3 can be adjusted, so that the duct piece does not need to be punched, the integral strength of the duct piece can not be damaged, the safety risk brought by using a percussion drill is avoided, the installation and the removal are easy, time and labor are saved, and the adjustment of the angle and the level of the shield measurement station 3 are convenient, convenient to use, wherein layer board 1, hanger plate 11, lug 13 and semicircle board 12 can be made with the aluminum alloy, because the aluminum alloy has intensity height and the big and light characteristics of quality of hardness, can make the utility model discloses an overall quality is lighter.
The working principle is as follows: firstly loosening nuts on two adjacent bolts on the pipe sheet, penetrating the lifting lugs 13 on the bolts through two mounting holes 14 and screwing the nuts, so that the utility model can be directly fixed on the pipe sheet, putting the circular base 4 of the shield measurement total station 3 into the circular groove 2, rotating the screw rod 9 clockwise, the screw rod 9 can rotate on the vertical plate 5, the screw rod 9 can drive the arc plate 10 to move towards the direction close to the clamping plate 8, the clamping plate 8 drives the sliding block 20 to slide on the guide rail 19, the clamping plate 8 can slide on the arc plate 10, and the clamping plate 8 can rotate by taking the circular rod 22 as a pivot, and simultaneously, the torsion spring 23 can be deformed, in the process of continuously rotating the screw rod 9, the clamping plate 8 drives the anti-skid plate 24 to be close to the top of the circular base 4, the anti-skid rubber strip 25 can be driven by the anti-skid rubber strip 24 to be tightly adhered to the circular base 4 and brake the circular base 4, the shield measurement total station 3 can be firmly fixed in the circular groove 2, when the horizontal position of the shield measurement total station 3 needs to be adjusted, two locking nuts 18 are unscrewed to push the supporting plate 1, the supporting plate 1 can drive the hanging plate 11 to rotate by taking the rotating shaft 15 as a fulcrum, the hanging plate 11 can drive the fixed threaded rod 17 to slide on the arc-shaped groove 16, when the horizontal position of the shield measurement total station 3 needs to be adjusted, the two locking nuts 18 are screwed, when the angle of the shield measurement total station 3 needs to be adjusted, the screw 9 is rotated anticlockwise, the screw 9 can drive the arc-shaped plate 10 to move towards the direction close to the vertical plate 5, under the action of the torsion spring 23, the clamping plate 8 can be rotated by taking the circular rod 22 as the fulcrum and the clamping plate 8 slides on the arc-shaped plate 10, meanwhile, the clamping plate 8 can drive the anti-skid rubber strip 25 to be separated from the circular base 4, when the anti-skid rubber strip 25 is separated from, can rotate shield structure and measure total powerstation 3 and adjust the angle that the total powerstation 3 was measured to the shield structure, after the adjustment was accomplished, clockwise rotation screw rod 9 can make anti-skidding rubber strip 25 paste tight circular base 4 and brake circular base 4 again, make and need not punch on the section of jurisdiction, can not destroy the bulk strength of section of jurisdiction, the safe risk of using the percussion drill to bring has been avoided, easily install and demolish, time saving and labor saving, and be convenient for adjust the shield structure and measure the angle and the level of total powerstation 3, high durability and convenient use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The hanging basket for shield measurement station moving comprises a supporting plate (1) and is characterized in that two hanging plates (11) are symmetrically welded on one side of the top of the supporting plate (1), the top of one side, away from each other, of each hanging plate (11) is rotatably connected with a semicircular plate (12), a lifting lug (13) is welded on the top of each semicircular plate (12), a mounting hole (14) is formed in each lifting lug (13), an arc-shaped groove (16) is formed in each semicircular plate (12), a fixed threaded rod (17) is welded on the top of one side, away from each other, of each hanging plate (11), one end of each fixed threaded rod (17) penetrates through each arc-shaped groove (16) and extends to one side of each semicircular plate (12), a locking nut (18) is connected to the outer wall of each fixed threaded rod (17) in a threaded manner, one side of each locking nut (18) is in contact with one, a circular groove (2) is arranged on one side of the top of the supporting plate (1), the circular groove (2) is positioned on one side of a hanging plate (11), a shield measuring total station (3) is arranged on the top of the supporting plate (1), a circular base (4) is arranged at the bottom of the shield measuring total station (3), the bottom of the circular base (4) extends into the circular groove (2) and is contacted with the inner wall of the bottom of the circular groove (2), a vertical plate (5) is welded on one side of the top of the supporting plate (1), the vertical plate (5) is positioned on one side of the circular groove (2), two side plates (6) are symmetrically welded on one side of the vertical plate (5), the bottoms of the side plates (6) are welded with the top of the supporting plate (1), the side, close to each other, of the two side plates (6) is slidably connected with the same arc-shaped plate (10), and a first through hole is formed, a screw rod (9) is connected with the inner wall of the first through hole in a threaded manner, one end of the screw rod (9) penetrates through the first through hole and is rotatably connected with one side of the arc-shaped plate (10), two supporting plates (7) are symmetrically welded at the top of the supporting plate (1), the supporting plates (7) are positioned at one side of the side plate (6), round rods (22) are rotatably connected at one sides of the two supporting plates (7) close to each other, one end of each round rod (22) close to each other is welded with the same clamping plate (8), the outer wall of the round rod (22) is sleeved with a torsion spring (23), one end of the two torsion springs (23) which are far away from each other is respectively welded with one side of the two supporting plates (7) which are close to each other, one end of the two torsion springs (23) which are close to each other is respectively welded with two sides of the clamping plate (8), the two sides of the bottom of the clamping plate (8) are respectively abutted against the top of the arc-shaped plate (10) and the top of the circular base (4).
2. The hanging basket for shield measurement station transfer according to claim 1, wherein a nut is welded on the inner wall of the first through hole, one end of the screw rod (9) penetrates through the nut and extends to one side of the vertical plate (5), and the screw rod (9) is in threaded connection with the nut.
3. The hanging basket for shield measurement station transfer according to claim 1, wherein a second through hole and a third through hole are respectively formed in the top of one side of the hanging plate (11) and the top of one side of the semicircular plate (12), a bearing is welded to the inner wall of the third through hole, a rotating shaft (15) is welded to the inner wall of the second through hole, one end of the rotating shaft (15) penetrates through the inner rings of the second through hole and the bearing respectively and extends to one side of the semicircular plate (12), and the outer wall of the rotating shaft (15) is welded to the inner ring of the bearing.
4. The hanging basket for shield measurement station transfer according to claim 1, wherein an anti-slip plate (24) is fixedly mounted on one side of the bottom of the clamping plate (8), a plurality of anti-slip rubber strips (25) arranged at equal intervals are fixedly mounted on the bottom of the anti-slip plate (24), and the bottoms of the anti-slip rubber strips (25) are in contact with the top of the circular base (4).
5. The shield measurement station-shifting hanging basket according to claim 1, wherein a guide rail (19) is welded on one side of each of two side plates (6) close to each other, a sliding block (20) is welded on two sides of each arc-shaped plate (10), and the sliding blocks (20) are slidably connected with the guide rails (19).
6. The shield measurement station-moving hanging basket according to claim 5, characterized in that a limiting plate (21) is welded at one end of the guide rail (19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021066282.2U CN212671788U (en) | 2020-06-11 | 2020-06-11 | Shield constructs to measure and moves station and uses hanging flower basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021066282.2U CN212671788U (en) | 2020-06-11 | 2020-06-11 | Shield constructs to measure and moves station and uses hanging flower basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212671788U true CN212671788U (en) | 2021-03-09 |
Family
ID=74822223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021066282.2U Active CN212671788U (en) | 2020-06-11 | 2020-06-11 | Shield constructs to measure and moves station and uses hanging flower basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212671788U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113267129A (en) * | 2021-06-01 | 2021-08-17 | 莱芜环球汽车零部件有限公司 | Camshaft lift contrast type detector |
CN114517701A (en) * | 2022-02-08 | 2022-05-20 | 中交二公局第三工程有限公司 | Tunnel steel arch frame lock foot anchor pipe angle control device |
CN114716042A (en) * | 2022-03-22 | 2022-07-08 | 浙江同济科技职业学院 | Installation method of modular domestic sewage treatment equipment |
-
2020
- 2020-06-11 CN CN202021066282.2U patent/CN212671788U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113267129A (en) * | 2021-06-01 | 2021-08-17 | 莱芜环球汽车零部件有限公司 | Camshaft lift contrast type detector |
CN114517701A (en) * | 2022-02-08 | 2022-05-20 | 中交二公局第三工程有限公司 | Tunnel steel arch frame lock foot anchor pipe angle control device |
CN114716042A (en) * | 2022-03-22 | 2022-07-08 | 浙江同济科技职业学院 | Installation method of modular domestic sewage treatment equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212671788U (en) | Shield constructs to measure and moves station and uses hanging flower basket | |
CN211954952U (en) | Detection apparatus for electric power construction safety belt hanger | |
CN210513160U (en) | Land levelness measuring device for city planning | |
CN209802543U (en) | Soil pressure box pre-embedding device for monitoring soil pressure of tunnel | |
CN201859048U (en) | Impact tester | |
CN211598586U (en) | Underground water monitoring well head protection device | |
CN219737106U (en) | Pipeline pressure-bearing detection structure | |
CN110625554B (en) | TBM cutter disc hob seat replacement, positioning and detecting device | |
CN215509866U (en) | Hydraulic dismounting system for rear matched wheel set of shield tunneling machine | |
CN211783215U (en) | Special automobile part checking fixture with good stability | |
CN212444048U (en) | Tooth pressing machine for underground centralizer | |
CN212704467U (en) | H-shaped steel automatic clamping device and drilling system suitable for different models | |
CN204771257U (en) | Large -scale cylindrical work piece equipment aligning device | |
CN210735216U (en) | Telescopic roller conveyor with good stability | |
CN202187723U (en) | Novel lifting type sleeve table for drilling machine | |
CN220726340U (en) | Mine safety protection support | |
CN109940565B (en) | Dismounting and mounting tool for shield machine wheel set | |
CN212059338U (en) | Shaft detection equipment for mechanical engineering | |
CN210998659U (en) | Auxiliary device for overhauling and installing power equipment | |
CN209755117U (en) | Shield constructs quick-witted wheel pair and dismantles installation frock | |
CN219139072U (en) | Self-adaptive platform for TBM construction of rock burst tunnel | |
CN211196410U (en) | Spare tire lifting and placing device | |
CN219931662U (en) | Steel construction installation device that stability is strong | |
CN2255606Y (en) | Dual-function sine gauge | |
CN213510622U (en) | Push bench for hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |