CN212671612U - Oil well operation field pipe arranging device - Google Patents

Oil well operation field pipe arranging device Download PDF

Info

Publication number
CN212671612U
CN212671612U CN202120333071.9U CN202120333071U CN212671612U CN 212671612 U CN212671612 U CN 212671612U CN 202120333071 U CN202120333071 U CN 202120333071U CN 212671612 U CN212671612 U CN 212671612U
Authority
CN
China
Prior art keywords
frame
lifting
walking
shaft
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120333071.9U
Other languages
Chinese (zh)
Inventor
房志凯
张科
姚姗姗
徐建业
刘小龙
张树岗
李媛
王江华
赵立伟
刘超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Ryo Intelligent Equipment Co ltd
Original Assignee
Shandong Ryo Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Ryo Intelligent Equipment Co ltd filed Critical Shandong Ryo Intelligent Equipment Co ltd
Priority to CN202120333071.9U priority Critical patent/CN212671612U/en
Application granted granted Critical
Publication of CN212671612U publication Critical patent/CN212671612U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to an oil well operation scene calandria device. The technical scheme is as follows: rails are arranged on two sides of the rail base, a first lifting assembly and a second lifting assembly are respectively installed on the rails, a first shifting shaft is installed on the first lifting assembly, and a second shifting shaft, an alignment trolley and a baffle are installed on the second lifting assembly; the two ends of the synchronizing shaft are provided with universal shafts which are respectively connected with the flange shafts through the universal shafts, the outer side of each flange shaft is provided with a chain wheel assembly, each chain wheel assembly comprises a chain wheel, a chain wheel seat and a walking motor, the chain wheels are installed on the flange shafts through the chain wheel seats, and the walking motors are arranged on the outer sides of the chain wheels. The beneficial effects are that: the utility model discloses a two cranes adopt synchronizing shaft synchronous drive, can guarantee the crane synchronous motion of both sides, in addition, dial the axle at a riser installation, another riser installation is dialled the axle, is aligned dolly and baffle, can dial the pipe or align with oil pipe, has improved calandria work efficiency, has reduced artifical calandria intensity of labour.

Description

Oil well operation field pipe arranging device
Technical Field
The utility model relates to an oil workover equipment technical field, in particular to on-spot calandria device of oil well operation.
Background
The oil field well repairing operation is an important component part in the oil field production process, when an oil pipe is lifted in the oil exploitation field, the oil pipe needs to be conveyed to an upper platform or a lower platform by a pipe arranging mechanism, when the same oil field is excavated, a plurality of oil pipes need to be conveyed to the inside of the platform so as to ensure the excavating efficiency of the oil field to the oil, and the plurality of used oil pipes need to be conveyed to the ground from the platform.
Along with the refinement of the production, operation and management of the oil field, the oil pipes are respectively arranged on the pipe frames on the site according to the standard site arrangement requirement and the arrangement principle of 'oil pipe layered arrangement and ten-one-head-out', and the oil pipe rods need to be arranged more than 1250 kilometers each year; at present, the standardized discharge of oil pipes is completely operated manually, 4-5 persons usually transport the oil pipes to the pipe racks by the matching of a pipe grabbing machine when each pipe rack discharges the oil pipes, one person steps on the oil pipes and primarily arranges the oil pipes by rolling with feet, and then one end of an oil pipe coupling is arranged by manually pushing and pulling, so that the labor intensity of workers in the discharge mode is very high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an oil well operation scene calandria device to the above-mentioned defect that prior art exists for realize that oil pipe's mechanization is discharged, improve calandria work efficiency, reduce artifical calandria's intensity of labour.
The utility model relates to an oil well operation scene calandria device, its technical scheme is: the track comprises a track base, a first lifting assembly, a second lifting assembly, a chain wheel assembly, a universal coupling and a synchronizing shaft, wherein tracks are arranged on two sides of the track base, the first lifting assembly and the second lifting assembly are respectively installed on the tracks, and the chain wheel assembly, the universal coupling and the synchronizing shaft are arranged at one end of the track base; a first shifting shaft is arranged on the first lifting assembly, and a second shifting shaft, an alignment trolley and a baffle are arranged on the second lifting assembly; the two ends of the synchronizing shaft are provided with universal shafts which are respectively connected with the flange shafts through the universal shafts, the outer side of each flange shaft is provided with a chain wheel assembly, each chain wheel assembly comprises a chain wheel, a chain wheel seat and a walking motor, the chain wheels are installed on the flange shafts through the chain wheel seats, and the walking motors are arranged on the outer sides of the chain wheels.
Preferably, the first lifting assembly comprises a first lifting frame, a first shifting shaft, a first walking roller group, a first walking trolley frame and a first connecting frame, the first walking roller group is arranged at the bottom of the first walking trolley frame, the first lifting frame is installed on the first walking trolley frame, and the first connecting frame is arranged at the top of the first walking trolley frame.
Preferably, the inner end of the first lifting frame is movably connected with the first travelling trolley frame, and the outer end of the first lifting frame is provided with a first poking shaft.
Preferably, the second lifting assembly comprises a second lifting frame, a second shifting shaft, a second walking roller group, a second walking trolley frame and a second connecting frame, the second walking roller group is arranged at the bottom of the second walking trolley frame, the second lifting frame is installed on the second walking trolley frame, and the second connecting frame is arranged at the top of the second walking trolley frame.
Preferably, the inner end of the second lifting frame is movably connected with the second walking trolley frame, the alignment oil cylinder is installed, the outer end of the second lifting frame is provided with a second shifting shaft and an alignment trolley, the middle of the second lifting frame is provided with a baffle, and the alignment trolley is connected with an output shaft of the alignment oil cylinder.
Preferably, the lower side of the alignment trolley is provided with an alignment plate, the upper part of the alignment trolley is a trolley main body, the top of the alignment trolley main body is provided with a connector, the trolley main body is sleeved on the transverse lifting frame, and the connector at the top of the trolley main body is connected with an output shaft of the head aligning oil cylinder to realize the movement of the trolley main body in the horizontal direction.
The utility model has the advantages that: the two lifting frames of the utility model adopt synchronous shaft synchronous drive, which can ensure the lifting frames on both sides to move synchronously, in addition, a shaft is arranged on one lifting frame, a shaft, an alignment trolley and a baffle are arranged on the other lifting frame, so that the oil pipe can be pulled or aligned, the lifting frames can move up and down according to the discharge height of the oil pipe, and finally the oil pipe is arranged neatly and beautifully; the lifting frame is driven by a chain and can meet the requirement of unevenness in the track direction; thereby ensuring the reliability of the equipment; the structure and the arrangement form of a common ship-shaped cofferdam and a conveyor are not required to be changed, the traditional small repair well field arrangement is met, the mechanical discharge of oil pipes is greatly improved, the work efficiency of pipe arrangement is improved, and the labor intensity of manual pipe arrangement is reduced.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of a first lift assembly;
FIG. 3 is a schematic view of a second lift assembly;
FIG. 4 is a schematic structural view of a synchronizing shaft and a universal joint;
FIG. 5 is a schematic view of the alignment device;
in the upper diagram: the device comprises an oil pipe a, a ship-shaped cofferdam b, a minor overhaul catwalk c, a track base 100, a first lifting assembly 200, a second lifting assembly 300, a chain wheel assembly 400, a universal coupling 500, a synchronizing shaft 600, a first lifting frame 210, a first shifting shaft 220, a first walking roller group 230, a first walking trolley frame 240, a first connecting frame 250, a chain wheel 410, a chain wheel seat 420, a walking motor 430, a universal shaft 510, a flange shaft 520, a second lifting frame 310, a second shifting shaft 320, a second walking roller group 330, a second walking trolley frame 340, a second connecting frame 350, an alignment trolley 360, a baffle 370, a flush oil cylinder 380, an alignment plate 360.1, a trolley main body 360.2 and a connector 360.3.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Embodiment 1, referring to fig. 1 to 4, the utility model relates to an oil well operation field calandria device, is equipped with ship type cofferdam b in current minor overhaul catwalk c one side, installs oil well operation field calandria device in ship type cofferdam b both sides, including track base 100, first lift assembly 200, second lift assembly 300, sprocket assembly 400, universal coupling 500, synchronizing shaft 600, is equipped with the track in track base 100 both sides, installs first lift assembly 200 and second lift assembly 300 respectively, is equipped with sprocket assembly 400, universal coupling 500 and synchronizing shaft 600 in one end of track base 100; a first shifting shaft 220 is arranged on the first lifting assembly 200, and a second shifting shaft 320, an alignment trolley 360 and a baffle 370 are arranged on the second lifting assembly 300; the both ends of synchronizing shaft 600 are equipped with cardan shaft 510, connect flange axle 520 through cardan shaft 510 respectively, are equipped with sprocket assembly 400 in the outside of flange axle 520, sprocket assembly 400 includes sprocket 410, sprocket seat 420, walking motor 430, and sprocket 410 passes through sprocket seat 420 and installs at flange axle 520, is equipped with walking motor 430 in the outside of sprocket 410, and its mounted position can be near oil pipe machine one end of lifting, also can be the other end.
Referring to fig. 2, the first lifting assembly 200 of the present invention includes a first lifting frame 210, a first shaft 220, a first walking roller set 230, a first walking carriage frame 240, and a first connecting frame 250, wherein the first walking roller set 230 is disposed at the bottom of the first walking carriage frame 240, the first lifting frame 210 is mounted on the first walking carriage frame 240, and the first connecting frame 250 is disposed at the top of the first walking carriage frame 240.
The inner end of the first lifting frame 210 is movably connected with the first walking trolley frame 240, and the outer end of the first lifting frame 210 is provided with a first poking shaft 220.
Referring to fig. 3, the utility model discloses a second lift assembly 300 includes second crane 310, second dial axle 320, second walking roller train 330, second walking trolley frame 340, second link 350, the bottom of second walking trolley frame 340 is equipped with second walking roller train 330, installs second crane 310 on the second walking trolley frame 340, is equipped with second link 350 at the top of second walking trolley frame 340.
The inner end of the second lifting frame 310 is movably connected with the second walking trolley frame 340 and is provided with a flush oil cylinder 380, the outer end of the second lifting frame 310 is provided with a second shifting shaft 320 and an alignment trolley 360, the middle part of the second lifting frame 310 is provided with a baffle 370, and the alignment trolley 360 is connected with an output shaft of the flush oil cylinder 380.
Referring to fig. 5, the alignment plate 360.1 is disposed at the lower side of the alignment trolley 360, the trolley main body 360.2 is disposed at the upper portion, the connector 360.3 is disposed at the top portion, the trolley main body 360.2 is sleeved on the second lifting frame 310, and the connector 360.3 at the top portion is connected with the output shaft of the head aligning oil cylinder 380, so that the trolley main body 360.2 can move in the horizontal direction.
The utility model discloses during the use, a plurality of oil pipes are put on the pipe support on ship type cofferdam b, and two cranes adopt synchronizing shaft 600 synchronous drive, have realized the synchronous motion of two cranes, in addition, install on one crane and dial the axle, install on another crane and dial the axle, align dolly 360 and baffle 370, can dial the pipe operation with oil pipe, dial it to minor repair catwalk c department, when needs align, then move through flush hydro-cylinder 380 and align dolly 360, cooperate with baffle 370 again, align oil pipe; in addition, the two lifting frames can move up and down according to the discharge height of the oil pipes, and finally the oil pipes are arranged neatly and attractively.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solutions described above. Therefore, any simple modifications or equivalent changes made according to the technical solution of the present invention belong to the scope of the present invention as far as possible.

Claims (6)

1. An oil well operation field pipe arranging device is characterized in that: the lifting device comprises a track base (100), a first lifting assembly (200), a second lifting assembly (300), a chain wheel assembly (400), a universal coupling (500) and a synchronous shaft (600), wherein tracks are arranged on two sides of the track base (100) and are respectively provided with the first lifting assembly (200) and the second lifting assembly (300), and the chain wheel assembly (400), the universal coupling (500) and the synchronous shaft (600) are arranged at one end of the track base (100); a first shifting shaft (220) is arranged on the first lifting assembly (200), and a second shifting shaft (320), an alignment trolley (360) and a baffle plate (370) are arranged on the second lifting assembly (300); the both ends of synchronizing shaft (600) are equipped with cardan shaft (510), connect flange axle (520) through cardan shaft (510) respectively, are equipped with sprocket assembly (400) in the outside of flange axle (520), sprocket assembly (400) include sprocket (410), sprocket seat (420), walking motor (430), and sprocket (410) are installed at flange axle (520) through sprocket seat (420), are equipped with walking motor (430) in the outside of sprocket (410).
2. The pipe discharging device for the oil well operation site according to claim 1, wherein: the first lifting assembly (200) comprises a first lifting frame (210), a first shifting shaft (220), a first walking roller group (230), a first walking trolley frame (240) and a first connecting frame (250), wherein the first walking roller group (230) is arranged at the bottom of the first walking trolley frame (240), the first lifting frame (210) is installed on the first walking trolley frame (240), and the first connecting frame (250) is arranged at the top of the first walking trolley frame (240).
3. The pipe discharging device for the oil well operation site according to claim 2, wherein: the inner end of the first lifting frame (210) is movably connected with the first walking trolley frame (240), and the outer end of the first lifting frame (210) is provided with a first poking shaft (220).
4. The pipe discharging device for the oil well operation site according to claim 1, wherein: the second lifting assembly (300) comprises a second lifting frame (310), a second shifting shaft (320), a second walking roller group (330), a second walking trolley frame (340) and a second connecting frame (350), wherein the second walking roller group (330) is arranged at the bottom of the second walking trolley frame (340), the second lifting frame (310) is installed on the second walking trolley frame (340), and the second connecting frame (350) is arranged at the top of the second walking trolley frame (340).
5. The pipe discharging device for the oil well operation site according to claim 4, wherein: the inner end of the second lifting frame (310) is movably connected with the second walking trolley frame (340), the flush oil cylinder (380) is installed, the outer end of the second lifting frame (310) is provided with a second shifting shaft (320) and an alignment trolley (360), the middle of the second lifting frame (310) is provided with a baffle (370), and the alignment trolley (360) is connected with an output shaft of the flush oil cylinder (380).
6. The pipe discharging device for the oil well operation site according to claim 5, wherein: the downside of alignment dolly (360) be equipped with alignment board (360.1), upper portion is dolly main part (360.2), and the top is equipped with connector (360.3), and dolly main part (360.2) cover is at horizontal crane, through connector (360.3) at top and the output shaft of neat head hydro-cylinder (380), realize the removal of the horizontal direction of dolly main part (360.2).
CN202120333071.9U 2021-02-05 2021-02-05 Oil well operation field pipe arranging device Active CN212671612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120333071.9U CN212671612U (en) 2021-02-05 2021-02-05 Oil well operation field pipe arranging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120333071.9U CN212671612U (en) 2021-02-05 2021-02-05 Oil well operation field pipe arranging device

Publications (1)

Publication Number Publication Date
CN212671612U true CN212671612U (en) 2021-03-09

Family

ID=74824799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120333071.9U Active CN212671612U (en) 2021-02-05 2021-02-05 Oil well operation field pipe arranging device

Country Status (1)

Country Link
CN (1) CN212671612U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796686A (en) * 2021-03-19 2021-05-14 东营恒源机械制造有限公司 Automatic pipe arranging device for oil field well repairing operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112796686A (en) * 2021-03-19 2021-05-14 东营恒源机械制造有限公司 Automatic pipe arranging device for oil field well repairing operation

Similar Documents

Publication Publication Date Title
CN104355122B (en) Conveyor of lifting roller machine
CN203021883U (en) Wheel-track railway track laying unit
CN212671612U (en) Oil well operation field pipe arranging device
CN114033398B (en) Construction method for returning tunnel of low-gravity-center pulling method shield rear matched trolley
CN205400756U (en) Variable section platform truck
CN114542153A (en) Mounting and dismounting device and mounting and dismounting method for mining hydraulic support
CN207761671U (en) A kind of girder formula built tunnel piping equipment
CN112127814B (en) Ground tubular column hoisting and moving device
CN206939728U (en) A kind of step conveying device for step assembling line
CN112049584A (en) Elevated catwalk
CN104842441B (en) Floor overturning cutter of aerated concrete
CN110700107A (en) Sliding type construction method for hoisting prefabricated anti-collision wall
CN106468041A (en) A kind of relevant track-laying machine traveling process automatically becomes cross-device and becomes across method
CN110145317A (en) A kind of technique on shield machine's station-crossing construction method
CN207863434U (en) A kind of job platform that can certainly walk along H profile steel
CN207048698U (en) Hydraulic lifting workbench
CN205875843U (en) Pick up car vertical lift class stereo garage of ware of adoption
CN207209829U (en) A kind of oil tank transport, installation integrated apparatus
CN102976240B (en) A kind of manned lift platform truck
CN205836825U (en) Railway D type construction beam vertical shift accessory cart
CN112627882B (en) Transferring machine tool for large shield tunnel mid-board and mounting method
CN212202075U (en) Trackless self-propelled tunnel secondary lining trolley
CN106884543A (en) A kind of curtain wall lifting and transporting device
CN114126989A (en) Method for refurbishing bucket-wheel reclaimers
CN220955643U (en) Multifunctional comprehensive operation trolley for arch-collecting installation

Legal Events

Date Code Title Description
GR01 Patent grant