CN212671328U - Transformer substation's assembled owner becomes framework structure - Google Patents

Transformer substation's assembled owner becomes framework structure Download PDF

Info

Publication number
CN212671328U
CN212671328U CN202020849031.5U CN202020849031U CN212671328U CN 212671328 U CN212671328 U CN 212671328U CN 202020849031 U CN202020849031 U CN 202020849031U CN 212671328 U CN212671328 U CN 212671328U
Authority
CN
China
Prior art keywords
prefabricated
framework
upper portion
post
hot wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020849031.5U
Other languages
Chinese (zh)
Inventor
徐光彬
姜文
杨金虎
周红
欧阳红
翟伟
鞠洪涛
王飞
杨力
胡嫚嫚
熊超奇
向鑫鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Electric Power Planning, Design and Research Institute Co.,Ltd.
Original Assignee
PowerChina Hubei Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Hubei Electric Engineering Co Ltd filed Critical PowerChina Hubei Electric Engineering Co Ltd
Priority to CN202020849031.5U priority Critical patent/CN212671328U/en
Application granted granted Critical
Publication of CN212671328U publication Critical patent/CN212671328U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled main become framework structure of transformer substation, including a pair of lower part just to setting up prevent hot wall, the prefabricated framework in hot wall upper end fixedly connected with upper portion is prevented to the lower part, connects through the framework roof beam between the prefabricated framework in upper portion, and the lower part prevents hot wall and includes the prefabricated post in a plurality of lower parts that the interval is the same, and the prefabricated framework in upper portion is fixed cup jointing with the prefabricated post in lower part, and the fixed lower part prefabricated roof beam that has cup jointed in upper end of the prefabricated post in lower part is equipped with prefabricated wallboard between two. The upper prefabricated framework adopts prefabricated reinforced concrete with a rectangular frame structure and has fireproof requirements; the prefabricated post in upper portion and the prefabricated post in lower part adopt to cup joint fixedly, and prefabricated wallboard size is unanimous, the integrated form assembly of the whole structure of all being convenient for.

Description

Transformer substation's assembled owner becomes framework structure
Technical Field
The utility model relates to a transformer substation carries technical field, specifically indicates a transformer substation's assembled owner becomes framework structure.
Background
In recent years, the assembly type construction of the transformer substation is taken as the development direction of engineering construction, and a plurality of technical breakthroughs are obtained. The fabricated main transformer firewall is used as an important transformer substation structure, and is rapidly developed and widely popularized and applied. Chinese patent ZL201420546897.3 discloses an assembled owner becomes prevents hot wall, adopts prefabricated reinforced concrete post + prefabricated reinforced concrete roof beam + prefabricated reinforced concrete wallboard structure, and the owner becomes and prevents hot wall upper portion and erect a font circular steel tube post as the main framed pillar that becomes. However, in case of a fire of the main transformer equipment, the main transformer circular steel tube frame column structure cannot prevent fire, and there is a risk that the main transformer frame column structure collapses due to the fire. In addition, in order to set up A style of calligraphy owner and become the frame post, its chevron shape span is less, leads to the precast beam interval of being connected rather than the lower extreme less, and the width of the prefabricated wall body of hot wall is inconsistent in the below, has increased the assembly degree of difficulty.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough of above-mentioned prior art existence, provide a transformer substation's assembled owner framework structure, the upper portion framework of this structure possess the fire prevention function, and prevent hot wall simple to operate with the lower part, and the prefabricated wallboard specification in lower part is unified, the assembly of being convenient for.
In order to achieve the above object, the utility model provides a transformer substation's assembled owner becomes framework structure, its characterized in that: the fireproof wall comprises a pair of lower fireproof walls which are arranged oppositely, upper prefabricated frameworks are fixedly connected to the upper fireproof walls, the upper prefabricated frameworks are connected through framework beams, the lower fireproof walls comprise a plurality of lower prefabricated columns with the same intervals, and the upper prefabricated frameworks are fixedly sleeved with the lower prefabricated columns.
Further, the upper prefabricated framework is of a rectangular structure and comprises two upper prefabricated columns and upper prefabricated beams connected between the upper ends of the upper prefabricated columns, and the framework beams are fixed between the upper prefabricated beams.
Furthermore, the upper end of the lower prefabricated column is fixedly sleeved with a lower prefabricated beam, and a prefabricated wall plate with the same size is arranged between every two adjacent lower prefabricated columns.
Furthermore, the upper end face and the side face of the lower prefabricated column are respectively provided with a sleeved reinforcing steel bar, the lower end of the upper prefabricated column and the two ends of the lower prefabricated beam are respectively fixedly provided with a connecting plate, and the connecting plates are provided with connecting holes matched with the sleeved reinforcing steel bars.
The utility model has the advantages as follows:
1. the prefabricated framework in upper portion possesses the fire prevention function. The prefabricated reinforced concrete of rectangle frame construction is adopted to the prefabricated framework in upper portion, has avoided probably meeting with the risk of conflagration when adopting A style of calligraphy steel-pipe column.
2. The prefabricated framework on the upper part and the prefabricated wall board are convenient to install. The prefabricated post in upper portion and the prefabricated post in lower part adopt to cup joint fixedly between, and the same messenger of lower part prefabricated post interval required prefabricated wallboard size is unanimous, the integrated form assembly of being convenient for.
Drawings
Fig. 1 is a schematic perspective view of the structure of the present invention.
FIG. 2 is a partial view of the junction of an upper preformed column and a lower preformed column.
The components in the figures are numbered as follows: the prefabricated wall plate comprises an upper prefabricated framework 1, an upper prefabricated column 101, an upper prefabricated beam 102, a connecting plate 103, a connecting hole 104, a lower fireproof wall 2, a lower prefabricated column 201, a lower prefabricated beam 202, a prefabricated wall plate 203, a sleeved reinforcing steel bar 204 and a framework beam 3.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings, which are not intended to limit the scope of the present invention.
As shown in FIGS. 1-2, a transformer substation assembled owner becomes framework structure, including a pair of lower part to setting up prevent hot wall 2, the hot wall 2 upper end fixedly connected with upper portion prefabricated framework 1 is prevented to the lower part, connect through framework roof beam 3 between the prefabricated framework 1 of upper portion, the hot wall 2 is prevented to the lower part includes the same prefabricated post 201 of lower part of a plurality of intervals, the prefabricated framework 1 of upper portion cup joints with the prefabricated post 201 of lower part fixedly, the fixed cover in upper end of the prefabricated post 201 of lower part has connect the prefabricated roof beam 202 of lower part, be equipped with prefabricated wallboard 203 between two adjacent prefabricated posts 201 of lower. Like this, because prefabricated framework in upper portion also adopts reinforced concrete, probably meet with the risk of conflagration when having avoided adopting A style of calligraphy steel-pipe column, the interval equals between the prefabricated post in lower part for the length and width size of prefabricated wallboard also equals, the integrated form assembly of prefabricated wallboard of being convenient for.
Preferably, the upper prefabricated framework 1 has a rectangular structure including two upper prefabricated columns 101 and upper prefabricated beams 102 connected between upper ends of the upper prefabricated columns 101, and the framework beams 3 are fixed between the upper prefabricated beams 102. The upper end face and the side face of the lower prefabricated column 201 are both provided with sleeved steel bars 204, the lower end of the upper prefabricated column 101 and the two ends of the lower prefabricated beam 202 are both fixedly provided with connecting plates 103, and the connecting plates 103 are provided with connecting holes 104 matched with the sleeved steel bars 204. Therefore, integrated assembly is achieved between the upper prefabricated framework and the lower fireproof wall, and assembly efficiency is greatly improved.

Claims (4)

1. The utility model provides a transformer substation's assembled owner becomes framework structure which characterized in that: prevent hot wall (2) including a pair of lower part to setting up, the hot wall (2) upper end fixedly connected with prefabricated framework in upper portion (1) are prevented to the lower part, connect through framework roof beam (3) between prefabricated framework in upper portion (1), hot wall (2) are prevented including the same prefabricated post in lower part (201) of a plurality of intervals in lower part, prefabricated framework in upper portion (1) and the fixed cup joint of prefabricated post in lower part (201).
2. A substation fabricated main transformer framework structure according to claim 1, characterized in that: the upper prefabricated framework (1) is of a rectangular structure and comprises two upper prefabricated columns (101) and upper prefabricated beams (102) connected between the upper ends of the upper prefabricated columns (101), and the framework beams (3) are fixed between the upper prefabricated beams (102).
3. A substation fabricated main transformer framework structure according to claim 2, characterized in that: the upper end of the lower prefabricated column (201) is fixedly sleeved with a lower prefabricated beam (202), and a prefabricated wall plate (203) with the same size is arranged between every two adjacent lower prefabricated columns (201).
4. A substation fabricated main transformer framework structure according to claim 3, characterized in that: the prefabricated roof beam of lower part (202) is characterized in that the up end and the side of lower part prefabricated column (201) all are equipped with and cup joint reinforcing bar (204), the lower extreme of upper part prefabricated column (101) and the both ends of lower part prefabricated beam (202) all are fixed and are equipped with connecting plate (103), be equipped with on connecting plate (103) with cup joint reinforcing bar (204) complex connecting hole (104).
CN202020849031.5U 2020-05-19 2020-05-19 Transformer substation's assembled owner becomes framework structure Active CN212671328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020849031.5U CN212671328U (en) 2020-05-19 2020-05-19 Transformer substation's assembled owner becomes framework structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020849031.5U CN212671328U (en) 2020-05-19 2020-05-19 Transformer substation's assembled owner becomes framework structure

Publications (1)

Publication Number Publication Date
CN212671328U true CN212671328U (en) 2021-03-09

Family

ID=74812673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020849031.5U Active CN212671328U (en) 2020-05-19 2020-05-19 Transformer substation's assembled owner becomes framework structure

Country Status (1)

Country Link
CN (1) CN212671328U (en)

Similar Documents

Publication Publication Date Title
KR200428188Y1 (en) Stepping board for architectural scaffold
KR100835681B1 (en) Scaffolding for building
CN209817172U (en) Horizontal seam unit is connected futilely to assembled shear force wall
CN215716111U (en) Beam-column mixed node area connecting structure
GB1590301A (en) Prefabricated wall element for use in the construction of buildings
CN212671328U (en) Transformer substation's assembled owner becomes framework structure
CN211228597U (en) Enclosure component of assembled underground structure and connection structure of enclosure component and arch plate
KR200424416Y1 (en) scaffolding for building
CN110107135A (en) The node connecting structure of buckling restrained brace and prefabricated construction beam column
CN109838034A (en) It is a kind of for assembling the roof structure in house
CN212358587U (en) Assembled concrete frame structure beam column with connected node
CN113565207B (en) Assembly type beam-column joint structure and construction method
CN210238769U (en) Assembled concrete frame node
CN210164045U (en) Assembly joint of primary and secondary beams
CN206971472U (en) Light gauge cold-formed steel shape steel plate shear force wall
CN219430999U (en) Connecting node structure of assembled frame concrete building
KR101885145B1 (en) Installation in a column to Beam Structure using SRC and PC
CN214994736U (en) Back-hanging assembly type steel structure combined sandwich structure
CN217105539U (en) Modularized multi-story and high-rise assembled steel structure prestress eccentric supporting system
CN212317148U (en) Assembled frame concrete building connected node structure
CN220747424U (en) Assembled composite beam
CN213038396U (en) A construction equipment for municipal bridge construction
KR100374537B1 (en) Joint of reinforced concrete column and steel beam
CN111576623B (en) Connecting node structure of assembled frame concrete building
CN215330555U (en) Connecting assembly for mounting external wall panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee after: Hubei Electric Power Planning, Design and Research Institute Co.,Ltd.

Address before: 430040 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee before: POWERCHINA HUBEI ELECTRIC ENGINEERING Corp.,Ltd.