CN212670816U - Top die for building steel structure - Google Patents

Top die for building steel structure Download PDF

Info

Publication number
CN212670816U
CN212670816U CN202020996026.7U CN202020996026U CN212670816U CN 212670816 U CN212670816 U CN 212670816U CN 202020996026 U CN202020996026 U CN 202020996026U CN 212670816 U CN212670816 U CN 212670816U
Authority
CN
China
Prior art keywords
roof beam
top mould
top die
setting
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020996026.7U
Other languages
Chinese (zh)
Inventor
闵志乐
钟晓丽
唐锐杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhenhe Construction Engineering Co ltd
Original Assignee
Guangdong Zhenhe Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhenhe Construction Engineering Co ltd filed Critical Guangdong Zhenhe Construction Engineering Co ltd
Priority to CN202020996026.7U priority Critical patent/CN212670816U/en
Application granted granted Critical
Publication of CN212670816U publication Critical patent/CN212670816U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a top mould for building steel construction, be in including top mould roof beam, setting the installing frame, the setting of top mould roof beam periphery are in connecting rod, setting between installing frame and the top mould roof beam are in the connecting seat of installing frame one end, evenly set up connecting jib and setting around the connecting seat are in the connecting backing plate of department that is connected with the connecting seat of connecting jib, the connecting backing plate is connected with the connecting seat through set screw. The utility model relates to a building steel construction is with top mould supports top mould roof beam through the connecting rod, and is convenient for carry on spacingly all around to top mould roof beam through the installing frame to the effectual stability of guaranteeing top mould roof beam, and be convenient for be connected top mould roof beam with the installation face through connecting the jib, and then the effectual stability that is connected between top mould roof beam and the installation face that has improved.

Description

Top die for building steel structure
Technical Field
The utility model relates to a relevant technical field of steel construction specifically is a building steel construction is with top mould.
Background
Steel-based structures are one of the major building structure types. The steel has the characteristics of high strength, light dead weight, good integral rigidity and strong deformability, so the steel is particularly suitable for building large-span, ultrahigh and overweight buildings; the material has good homogeneity and isotropy, belongs to an ideal elastomer and most conforms to the basic assumption of general engineering mechanics; the material has good plasticity and toughness, can deform greatly and can bear dynamic load well; the construction period is short; the industrialization degree is high, and the specialized production with high mechanization degree can be carried out; high-strength steel materials should be researched in the future of the steel structure, so that the yield point strength of the steel structure is greatly improved; in addition, new types of section steel, such as H-shaped steel (also called wide-flange section steel), T-shaped steel, profiled steel plates and the like, need to be rolled to meet the needs of large-span structures and super high-rise buildings;
the inventor of the utility model finds that the top die for the steel structure in the prior art has simple structure and single use mode due to the design characteristics of the top die, reduces the stability of the connection between the top die and the mounting surface in the actual use process, and further reduces the stability of the whole steel structure, thereby being incapable of meeting various use requirements of the top die for the steel structure at present;
therefore, we propose a top die for a construction steel structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a top mould for building steel construction aims at improving the steel construction among the prior art and uses the top mould because the design characteristics of its own, and simple structure and using-way are single, in the use of reality, have reduced the stability that the top mould is connected with the installation face, and then have reduced the holistic stability of steel construction to can't satisfy the problem to the multiple user demand of steel construction with the top mould at present.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a top die for a building steel structure comprises a top die beam, a mounting frame arranged on the periphery of the top die beam, a connecting rod arranged between the mounting frame and the top die beam, a connecting seat arranged at one end of the mounting frame, connecting suspension rods uniformly arranged on the periphery of the connecting seat and a connecting base plate arranged at the connecting part of the connecting suspension rods and the connecting seat, wherein the connecting base plate is connected with the connecting seat through fixing screws, so that the top die beam is conveniently supported through the connecting rod, and the periphery of the top die beam is conveniently limited through the mounting frame, thereby effectively ensuring the stability of the top die beam, and being convenient for connecting the top die beam with a mounting surface through the connecting suspension rods, and further effectively improving the stability of connection between the top die beam and the mounting surface;
as a preferable aspect of the present invention, the periphery of the top mold beam is fixedly connected with the mounting frame, and the top mold beam is arranged at the middle lower part of the inner cavity of the mounting frame, and the mounting frame is arranged as i-shaped steel, so that the stability of the connection between the top mold beam and the mounting frame is effectively improved, and the connection between the adjacent mounting frames is facilitated;
as a preferable aspect of the present invention, both ends of the connecting rod are respectively connected to the mounting frame, and one end of the connecting rod is fixedly connected to the top mold beam, so that the top mold beam is conveniently supported by the connecting rod, thereby effectively ensuring the stability of the whole top mold beam;
as a preferable aspect of the present invention, the connecting seat is fixedly connected to the periphery of the mounting frame, and the connecting seat is configured to be a frame-shaped structure, thereby facilitating the installation of the decorative plate body through the connecting seat;
as a preferable aspect of the utility model, the utility model further comprises anti-slip grooves respectively arranged on the periphery of the top die beam, the anti-slip grooves are arranged in an arc structure, and the inner walls of the anti-slip grooves are arranged in smooth arc surfaces, thereby effectively increasing the stability of the connection between the top die beam and the decoration panel through the anti-slip grooves;
as a preferred aspect of the utility model, still including setting up the connecting axle sleeve and evenly setting up the spacing pearl on connecting the jib in connecting jib and connection pads board junction in addition, connecting axle sleeve and connection pads board fixed connection, and connecting axle sleeve is connected with the connection jib through the block structure, and then be convenient for will connect the jib through connecting axle sleeve and be connected with connection pads board, spacing pearl with be connected jib fixed connection, and then be convenient for through the effectual stability that is connected jib and installation face and is connected that has increased of spacing post.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the characteristics of reasonable in design and easy operation, the utility model relates to a building steel construction is with top mould includes a mould roof beam, sets up the installing frame, the setting of top mould roof beam periphery are in connecting rod, setting between installing frame and the top mould roof beam are in the connecting seat of installing frame one end, evenly set up connecting jib and setting around the connecting seat are in the connecting jib is connected the backing plate of department with the connecting seat, connecting the backing plate and being connected with the connecting seat through set screw, and then be convenient for support a mould roof beam through the connecting rod, and be convenient for carry on spacingly all around a mould roof beam through the installing frame to the effectual stability of having guaranteed a mould roof beam, and be convenient for be connected a mould roof beam with the installation face through connecting the jib, and then the effectual stability that is connected between improving a mould roof beam and the installation face.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of a partial cross-sectional view of the overall structure of a top die for a construction steel structure of the present invention;
fig. 2 is a schematic structural view of an enlarged view at a of fig. 1 in the top mold for a construction steel structure of the present invention;
FIG. 3 is a schematic structural view of the overall structure of the top form for construction steel structure of the present invention;
fig. 4 is a schematic structural view of another view angle of fig. 3 in the top mold for the construction steel structure of the present invention;
in the figure: 1-top mould beam, 10-anti-skidding groove, 2-mounting frame, 3-connecting seat, 4-connecting rod, 5-connecting suspension rod, 51-limiting bead, 6-connecting backing plate and 61-connecting shaft sleeve.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
Referring to fig. 1, fig. 2, fig. 3 and fig. 4, the present invention provides a technical solution: a top die for a building steel structure comprises a top die beam 1, an installation frame 2 arranged on the periphery of the top die beam 1, a connecting rod 4 arranged between the installation frame 2 and the top die beam 1, a connecting seat 3 arranged at one end of the installation frame 2, connecting suspenders 5 uniformly arranged on the periphery of the connecting seat 3 and a connecting base plate 6 arranged at the connecting part of the connecting suspenders 5 and the connecting seat 3, wherein the connecting base plate 6 is connected with the connecting seat 3 through fixing screws, so that the top die beam 1 is conveniently supported through the connecting rod 4, and the periphery of the top die beam 1 is conveniently limited through the installation frame 2, thereby effectively ensuring the stability of the top die beam 1, and the top die beam 1 is conveniently connected with an installation surface through the connecting suspenders 5, and further effectively improving the stability of connection between the top die beam 1 and the installation surface;
referring to fig. 1, 2, 3 and 4, the periphery of the top mold beam 1 is fixedly connected with the mounting frame 2, the top mold beam 1 is arranged at the middle lower part of the inner cavity of the mounting frame 2, and the mounting frame 2 is made of I-shaped steel, so that the connection stability of the top mold beam 1 and the mounting frame 2 is effectively improved, and the adjacent mounting frames 2 are conveniently connected;
referring to fig. 1, 2, 3 and 4, two ends of a connecting rod 4 are respectively connected with the mounting frame 2, and one end of the connecting rod 4 is fixedly connected with the top formwork beam 1, so that the top formwork beam 1 is conveniently supported by the connecting rod 4, and the overall stability of the top formwork beam 1 is effectively ensured;
referring to fig. 1, 2, 3 and 4, the connecting seat 3 is fixedly connected to the periphery of the mounting frame 2, and the connecting seat 3 is configured to be a frame-shaped structure, so that the decorative plate can be conveniently mounted through the connecting seat 3;
referring to fig. 1, 2, 3 and 4, the top mold beam further comprises anti-slip grooves 10 respectively arranged on the periphery of the top mold beam 1, the anti-slip grooves 10 are arc-shaped structures, and the inner walls of the anti-slip grooves 10 are smooth arc surfaces, so that the stability of connection between the top mold beam 1 and a decorative panel is effectively improved through the anti-slip grooves 10;
in addition, the connecting rod mechanism further comprises a connecting shaft sleeve 61 arranged at the connecting part of the connecting suspension rod 5 and the connecting backing plate 6 and limiting beads 51 evenly arranged on the connecting suspension rod 5, the connecting shaft sleeve 61 is fixedly connected with the connecting backing plate 6, the connecting shaft sleeve 61 is connected with the connecting suspension rod 5 through a clamping structure, the connecting suspension rod 5 is conveniently connected with the connecting backing plate 6 through the connecting shaft sleeve 61, the limiting beads 51 are fixedly connected with the connecting suspension rod 5, and the stability that the connecting suspension rod 5 is connected with a mounting surface is effectively improved through limiting columns.
The working principle is as follows: the utility model discloses a set up a mould roof beam 1, the installing frame 2 of setting in a mould roof beam 1 periphery, the connecting rod 4 of setting between installing frame 2 and a mould roof beam 1, the setting is at the connecting seat 3 of 2 one ends of installing frame, evenly set up connecting jib 5 and the connecting backing plate 6 of setting in connecting jib 5 and connecting seat 3 department of being connected all around at connecting seat 3, connecting backing plate 6 is connected with connecting seat 3 through set screw, and then be convenient for support a mould roof beam 1 through connecting rod 4, and be convenient for carry on spacingly all around a mould roof beam 1 through installing frame 2, thereby the effectual stability of guaranteeing a mould roof beam 1, and be convenient for be connected a mould roof beam 1 with the installation face through connecting jib 5, and then the effectual stability that is connected between an mould roof beam 1 and the installation face that has improved
The device obtained through the design can basically meet the requirement of improving the top die for the steel structure in the prior art, and due to the design characteristics of the device, the structure is simple, the using mode is single, the stability that the top die is connected with the mounting surface is reduced in the actual using process, the integral stability of the steel structure is further reduced, the use of the problems of multiple using requirements of the top die for the steel structure at present cannot be met, the purpose of further improving the functions of the top die is achieved, and a designer improves the device further.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building is top mould for steel construction which characterized in that: including top mould roof beam (1), set up installing frame (2), the setting of top mould roof beam (1) periphery are in connecting rod (4), setting between installing frame (2) and top mould roof beam (1) are in connecting seat (3), the even setting of installing frame (2) one end are in connecting rod (5) and setting around connecting seat (3) are in connecting tie plate (6) of jib (5) and connecting seat (3) department of being connected, connecting tie plate (6) are connected with connecting seat (3) through set screw.
2. The top die for the building steel structure as claimed in claim 1, wherein the periphery of the top die beam (1) is fixedly connected with the mounting frame (2) respectively, the top die beam (1) is arranged at the middle lower part of the inner cavity of the mounting frame (2), and the mounting frame (2) is made of I-shaped steel.
3. The top form for the building steel structure according to claim 2, wherein two ends of the connecting rod (4) are respectively connected with the mounting frame (2), and one end of the connecting rod (4) is fixedly connected with the top form beam (1).
4. The top form for the construction steel structure according to claim 3, wherein the connecting base (3) is fixedly connected with the periphery of the mounting frame (2), and the connecting base (3) is configured to be a frame-shaped structure.
5. The top die for the building steel structure according to claim 4, further comprising anti-slip grooves (10) respectively arranged on the periphery of the top die beam (1), wherein the anti-slip grooves (10) are arranged in an arc structure, and the inner walls of the anti-slip grooves (10) are arranged in a smooth arc surface.
6. The top form for the building steel structure according to claim 5, further comprising a connecting shaft sleeve (61) arranged at the connecting position of the connecting suspension rod (5) and the connecting backing plate (6) and limiting beads (51) uniformly arranged on the connecting suspension rod (5), wherein the connecting shaft sleeve (61) is fixedly connected with the connecting backing plate (6), and the connecting shaft sleeve (61) is connected with the connecting suspension rod (5) through a clamping structure.
CN202020996026.7U 2020-06-03 2020-06-03 Top die for building steel structure Expired - Fee Related CN212670816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020996026.7U CN212670816U (en) 2020-06-03 2020-06-03 Top die for building steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020996026.7U CN212670816U (en) 2020-06-03 2020-06-03 Top die for building steel structure

Publications (1)

Publication Number Publication Date
CN212670816U true CN212670816U (en) 2021-03-09

Family

ID=74812653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020996026.7U Expired - Fee Related CN212670816U (en) 2020-06-03 2020-06-03 Top die for building steel structure

Country Status (1)

Country Link
CN (1) CN212670816U (en)

Similar Documents

Publication Publication Date Title
CN212670816U (en) Top die for building steel structure
CN210459766U (en) Beam column for steel structure
CN210195038U (en) Steel structure supporting column with good stability
CN209742221U (en) High-strength box column convenient to install
CN212613054U (en) Steel construction building wall and basic connecting device
CN205224263U (en) Symmetry steel construction
CN205082898U (en) Steel construction desk
CN205088488U (en) Steel construction clothes hanger that dries in air
CN205153118U (en) Steel construction
CN216105611U (en) Connecting and fixing device for hoisting steel structure for building
CN205083024U (en) Steel construction seat
CN211665936U (en) Steel structure column
CN221073224U (en) Steel construction spandrel post for construction
CN206784593U (en) A kind of steel construction coupled column
CN217732510U (en) Assembled building tower crane base
CN214574687U (en) Steel house concatenation part
CN213774046U (en) Three-dimensional arc arch truss combined steel structure roof truss
CN213204443U (en) Steel structure supporting piece of outdoor air conditioner
CN205082338U (en) Steel construction big -arch shelter
CN209873543U (en) Foundation support of steel structure bridge
CN216196864U (en) Steel structure support frame with stable structure
CN211621245U (en) Template of pier stud construction usefulness
CN213329425U (en) Novel membrane structure square view platform
CN210976582U (en) Aluminum alloy template for building construction
CN220014003U (en) Steel structure connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210309