CN212670695U - Water circulation system for construction - Google Patents

Water circulation system for construction Download PDF

Info

Publication number
CN212670695U
CN212670695U CN202020936504.5U CN202020936504U CN212670695U CN 212670695 U CN212670695 U CN 212670695U CN 202020936504 U CN202020936504 U CN 202020936504U CN 212670695 U CN212670695 U CN 212670695U
Authority
CN
China
Prior art keywords
water
storage bucket
floor
construction
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020936504.5U
Other languages
Chinese (zh)
Inventor
洪峰
王世维
周文锴
周毅
戴建华
黄思淳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN202020936504.5U priority Critical patent/CN212670695U/en
Application granted granted Critical
Publication of CN212670695U publication Critical patent/CN212670695U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction water circulation system, by the water tank, water supply installation, the backflow pipeline, filter equipment constitutes, water supply installation is by the pump machine, water supply pipe and place the storage bucket in each floor and constitute, filter equipment comprises filtering ponds and filter screen, the water tank is placed at the bottommost floor, a storage bucket is placed to above every floor, pump machine water inlet one end is connected to the water tank through a water supply pipe, delivery port one end is connected to the storage bucket of each floor through another water supply pipe, the upper portion of every storage bucket is equipped with the gap, every storage bucket overflow mouth passes through the backflow pipeline and links to each other with the filtering ponds, the delivery port of filtering ponds links to each other with the water tank backward flow mouth of installing the filter screen through another backflow pipeline. The utility model discloses the not enough problem of water when effectively solving the floor construction, water storage bucket water storage mode is favorable to the using water wisely, avoids extravagant, is convenient for clean the management, and civilized construction is difficult for appearing the condition that the construction water floods, and the environmental protection is pleasing to the eye, and labour saving and time saving, easy operation.

Description

Water circulation system for construction
The technical field is as follows:
the utility model relates to a construction water circulation system. The method is mainly used for green construction of constructional engineering.
Background art:
for projects which are difficult to access municipal pipeline water sources, construction water is an important factor influencing performance and civilized construction, how to forcefully improve water supply strength, reduce the difficulty of field civilized construction management, reduce cost, save energy and protect environment, and is a problem to be solved urgently. At present, for the project which is difficult to access to the municipal pipe network, the defects of the conventional water supply system are as follows:
1. the water tank is connected with a pump machine and conveyed to a floor, the requirement on the capacity of the water tank is high, the problem of insufficient water supply often occurs, and the site construction progress is influenced;
2. in a conventional construction water system, connection points are arranged on floors and are mostly water tap valves, so that the situation that workers forget to close the valves or the valves are loosened or damaged easily occurs, waste of water resources is caused, meanwhile, civilized construction on a construction site is difficult to guarantee, the situation that the floors are dirty and poor easily occurs, and even the electricity utilization safety is threatened;
3. the conventional construction water system only has a water delivery system, the utilization rate is low, and the wastewater is difficult to be secondarily filtered and utilized.
The utility model has the following contents:
the utility model discloses an aim at solving current above-mentioned problem, provide a construction water circulation system, utilize backflow pipeline and filter equipment to combine together, fine solution job site water is difficult, the problem that the water storage is few. The utility model discloses need not too much input, utilize water supply installation to carry to each floor through the pump machine, and return line utilizes gravity potential difference to flow back to the filtering ponds naturally from the floor, filters and gets into the water tank after complete, cyclic utilization, environmental protection convenience.
The utility model discloses the technical scheme who realizes does:
construction water circulation system comprises water tank, water supply installation, backflow pipeline, filter equipment, and water supply installation comprises pump machine, water supply pipe and the storage bucket of placing in each floor, and filter equipment comprises filtering ponds and filter screen, its characterized in that: the water tank is placed at the bottommost floor, and a water storage bucket is placed to above every floor, and pump machine water inlet one end is connected to the water tank through a water supply pipe, and delivery port one end is connected to the water storage bucket of each floor through another water supply pipe, and the upper portion of every water storage bucket is equipped with the gap, and every water storage bucket gap passes through backflow pipeline and links to each other with the filtering ponds, and the delivery port of filtering ponds links to each other with the water tank backward flow mouth of installing the filter screen through another backflow pipeline.
The water tank is made of stainless steel or plastic materials. And selecting water tanks with different volumes according to the project scale. Because the water storage barrels arranged in each floor are provided with overflow ports, redundant water can enter the return pipeline through the overflow ports and flow back to the water tank.
The backflow pipeline and the water supply pipeline are rubber tubes or plastic tubes.
The filtering tank is a three-stage filtering tank, so that impurities in water can be effectively filtered, and the water quality is guaranteed.
The utility model discloses be applied to in the building construction site, can place the water storage bucket at each floor, provide interim water, to the project of non-access municipal pipe network, every floor water storage bucket all can store interim water in advance, increases whole water supply installation capacity. The return line can utilize gravitational potential energy to return surplus water to the filtering ponds of substructure and filter to flow back to the water tank, reuse. The utility model discloses effectively solved the not enough problem of water when the floor is under construction, water storage bucket water storage mode is favorable to the using water wisely, avoids extravagant, is convenient for clean the management, and civilized construction is difficult for appearing the condition that the construction water floods, and the environmental protection is pleasing to the eye, and labour saving and time saving, easy operation.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the water storage bucket of the present invention.
The specific implementation mode is as follows:
the present invention will be described in detail with reference to the accompanying drawings:
as shown in fig. 1 and 2, the utility model discloses constitute by water tank 1, water supply installation, backflow pipeline 3, filter equipment, water supply installation comprises pump machine 7, water supply pipeline 2 and places the water storage bucket 4 in each floor, and filter equipment comprises tertiary filtering ponds 5 and filter screen 6, its characterized in that: water tank 1 places at the bottommost floor, a water storage bucket 4 is placed to above every floor, 7 water inlet one ends of pump machine are connected to water tank 1 through a water supply pipe 2, delivery port one end is connected to the water storage bucket 4 of each floor through another water supply pipe 2, the upper portion of every water storage bucket 4 is equipped with the gap, every water storage bucket gap passes through backflow pipeline 3 and links to each other with tertiary filtering ponds 5, tertiary filtering ponds 5's delivery port links to each other with 1 backward flow mouths of water tank that install filter screen 6 through another backflow pipeline. The water tank is made of stainless steel materials. And selecting water tanks with different volumes according to the project scale. Because the water storage barrels arranged in each floor are provided with overflow ports, redundant water can enter the return pipeline through the overflow ports and flow back to the water tank. The reflux pipeline and the water supply pipeline are plastic pipes.
When the system works, the pump 7 conveys water in the water tank 1 to the water storage barrels 4 of all floors through the water supply pipeline 2, and all floors can directly take water from the water storage barrels 4 or can be connected with water through pipelines. When the water requirement for subsequent work is large, the water storage barrel 4 can be fully stored for standby. When the water level in the water storage barrel 4 rises to the overflow port, water flows back to the three-stage filter tank 5 through the backflow pipeline 3 by utilizing gravitational potential energy, flows back to the water tank backflow port after passing through three-stage filtration, and enters the water tank 1 through the last filtration of the filter screen 6 arranged on the backflow port for recycling.

Claims (4)

1. Construction water circulation system comprises water tank, water supply installation, backflow pipeline, filter equipment, and water supply installation comprises pump machine, water supply pipe and the storage bucket of placing in each floor, and filter equipment comprises filtering ponds and filter screen, its characterized in that: the water tank is placed at the bottommost floor, and a water storage bucket is placed to above every floor, and pump machine water inlet one end is connected to the water tank through a water supply pipe, and delivery port one end is connected to the water storage bucket of each floor through another water supply pipe, and the upper portion of every water storage bucket is equipped with the gap, and every water storage bucket gap passes through backflow pipeline and links to each other with the filtering ponds, and the delivery port of filtering ponds links to each other with the water tank backward flow mouth of installing the filter screen through another backflow pipeline.
2. The construction water circulation system according to claim 1, wherein: the water tank is made of stainless steel or plastic materials.
3. The construction water circulation system according to claim 1 or 2, wherein: the backflow pipeline and the water supply pipeline are rubber tubes or plastic tubes.
4. The construction water circulation system according to claim 1 or 2, wherein: the filtering tank is a three-stage filtering tank.
CN202020936504.5U 2020-05-28 2020-05-28 Water circulation system for construction Active CN212670695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020936504.5U CN212670695U (en) 2020-05-28 2020-05-28 Water circulation system for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020936504.5U CN212670695U (en) 2020-05-28 2020-05-28 Water circulation system for construction

Publications (1)

Publication Number Publication Date
CN212670695U true CN212670695U (en) 2021-03-09

Family

ID=74812158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020936504.5U Active CN212670695U (en) 2020-05-28 2020-05-28 Water circulation system for construction

Country Status (1)

Country Link
CN (1) CN212670695U (en)

Similar Documents

Publication Publication Date Title
CN206267267U (en) A kind of rainwater-collecting reclaiming system
CN204001088U (en) A kind of building rainwater and daily life sewage intermediate water reuse system
CN105625295B (en) Foundation ditch water recharge system
CN206143897U (en) Multi -functional rainwater is collected and is handled recycling system
CN103253782A (en) Device for washing car by utilizing rain water and recycling car-washing waste water
CN201292951Y (en) Negative pressure water box pumping device
CN211922818U (en) Novel rainwater is collected device
CN212670695U (en) Water circulation system for construction
CN101519885B (en) Method for synthetically utilizing concrete curing water and rain water in constructional engineering
CN201768409U (en) Gas floating type reverse washing sand filtering continuous filter device
CN207228278U (en) A kind of intelligent city builds rain recycling system
CN210683374U (en) Concrete grit waste water circulation recovery system
CN209873929U (en) Corrugated pipe rainwater recycling system
CN212405409U (en) Rainwater collection system
CN208811704U (en) A kind of cutting fluid management system
CN208747857U (en) A kind of construction site waste water, rainwater cyclic utilization system
CN206205044U (en) A kind of urinal washing system for recycling waste water
CN204676676U (en) Work progress Water Sproading with utilize system
CN218501352U (en) Building site waste water cycle recycle system
CN205569851U (en) Seawater desalination uses horizontal filter for installation
CN105289060A (en) Horizontal type filter device for sea water desalination
CN212293029U (en) Water circulation equipment
CN206252889U (en) For the purification tank for liquid waste of flyash curing
CN218421252U (en) Mobile pipeline pressing and flushing equipment
CN215602381U (en) Ecological treatment system that softens of stereoplasm abrupt slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant