CN212669212U - Nitrogen gas replacement device for needle coke hydrogen production unit - Google Patents

Nitrogen gas replacement device for needle coke hydrogen production unit Download PDF

Info

Publication number
CN212669212U
CN212669212U CN202021622230.9U CN202021622230U CN212669212U CN 212669212 U CN212669212 U CN 212669212U CN 202021622230 U CN202021622230 U CN 202021622230U CN 212669212 U CN212669212 U CN 212669212U
Authority
CN
China
Prior art keywords
nitrogen
nitrogen gas
hydrogen production
valve
stop valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021622230.9U
Other languages
Chinese (zh)
Inventor
王永
纪强胜
王洋洋
王康
石明朋
李法军
卢海涛
张燕燕
马曰宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jingyang Science And Technology Co ltd
Original Assignee
Shandong Jingyang Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jingyang Science And Technology Co ltd filed Critical Shandong Jingyang Science And Technology Co ltd
Priority to CN202021622230.9U priority Critical patent/CN212669212U/en
Application granted granted Critical
Publication of CN212669212U publication Critical patent/CN212669212U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catalysts (AREA)

Abstract

The utility model belongs to the technical field of needle coke production, concretely relates to needle coke hydrogen manufacturing unit nitrogen gas replacement device, including nitrogen buffer tank and hydrogen production ware, the nitrogen buffer tank pass through the nitrogen gas pipeline and be connected with the hydrogen production ware top, be equipped with nitrogen gas flowmeter, pressure sensor, first stop valve, electrical control valve, second stop valve and electric ball valve on the nitrogen gas pipeline in proper order, nitrogen gas flowmeter locates nitrogen buffer tank exit. The utility model adds a nitrogen line on the top of the hydrogen production reactor, which solves the technical defects that the reactor can not be cut off in the shutdown stage of the hydrogen production device and the catalyst in the reactor is separately protected by nitrogen replacement; and simultaneously, the utility model discloses can carry out the secondary to nitrogen gas flow and adjust, realize the accurate control to nitrogen gas flow, when electrical control valve and electric ball valve broke down, the normal operating of changeable valves guarantee production.

Description

Nitrogen gas replacement device for needle coke hydrogen production unit
Technical Field
The utility model belongs to the technical field of needle coke production, concretely relates to needle coke hydrogen manufacturing unit nitrogen gas replacement device.
Background
After the needle coke hydrogen production device is shut down, nitrogen needs to be injected to replace the reactor with nitrogen. At present, a nitrogen line of a reactor of a hydrogen production device is designed behind a methanol and acid water mixer at a feeding inlet, and nitrogen can only be injected into the nitrogen line to replace the nitrogen in the reactor after the hydrogen production device is shut down. However, when the feed lines and the heat exchangers for the reaction gas, the vaporizer and the superheater are out of order and need to be repaired, the reactor cannot be separately cut out for replacement and the catalyst protected.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: the nitrogen replacement device overcomes the defects of the prior art, provides the nitrogen replacement device for the needle coke hydrogen production unit, and solves the technical defects that the reactor cannot be cut off in the shutdown phase of the hydrogen production device and the catalyst in the reactor is separately protected by nitrogen replacement.
The utility model discloses an adopt following technical scheme to realize:
needle coke hydrogen manufacturing unit nitrogen gas replacement device, including nitrogen buffer tank and hydrogen production reactor, the nitrogen buffer tank pass through the nitrogen gas pipeline and be connected with the hydrogen production reactor top, be equipped with nitrogen gas flowmeter, pressure sensor, first stop valve, electrical control valve, second stop valve and electric ball valve on the nitrogen gas pipeline in proper order, nitrogen gas flowmeter locates nitrogen buffer tank exit.
And a nitrogen pipeline between the pressure sensor and the first stop valve is communicated with a nitrogen pipeline between the electric ball valve and the top of the hydrogen production reactor through a cross line, and a manual regulating valve and a third stop valve are arranged on the cross line.
And a nitrogen pipeline between the electric regulating valve and the second stop valve is communicated with a crossover line between the manual regulating valve and the third stop valve through a connecting pipeline, and a fourth stop valve is arranged on the connecting pipeline.
The working principle and the process are as follows:
after the hydrogen production device is shut down, a first stop valve, an electric regulating valve, a second stop valve and an electric ball valve on a nitrogen pipeline are opened, nitrogen is conveyed into the hydrogen production reactor from a nitrogen buffer tank for replacement, and after the nitrogen is secondarily regulated by the electric regulating valve and the electric ball valve, the accurate control of the nitrogen flow can be realized; when the electric regulating valve and the electric ball valve simultaneously break down, the first stop valve and the second stop valve are closed, the manual regulating valve and the third stop valve are opened, and nitrogen can be emergently conveyed into the hydrogen production reactor from the cross line; when the electric regulating valve breaks down, the first stop valve is closed, the manual regulating valve and the fourth stop valve are opened, and nitrogen can be conveyed into the hydrogen production reactor through the manual regulating valve and the electric ball valve; when the electric ball valve breaks down, the second stop valve is closed, the fourth stop valve and the third stop valve are opened, and nitrogen can be conveyed into the hydrogen production reactor through the electric regulating valve, the fourth stop valve and the third stop valve.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model adds a nitrogen line on the top of the hydrogen production reactor, which solves the technical defects that the reactor can not be cut off in the shutdown stage of the hydrogen production device and the catalyst in the reactor is separately protected by nitrogen replacement; and simultaneously, the utility model discloses can carry out the secondary to nitrogen gas flow and adjust, realize the accurate control to nitrogen gas flow, when electrical control valve and electric ball valve broke down, the normal operating of changeable valves guarantee production.
Drawings
Fig. 1 is a schematic structural view of the present invention;
in the figure: 1. a nitrogen buffer tank; 2. a nitrogen line; 3. a nitrogen gas flow meter; 4. a pressure sensor; 5. a first shut-off valve; 6. an electric control valve; 7. a second stop valve; 8. an electric ball valve; 9. a crossover line; 10. a manual regulating valve; 11. connecting a pipeline; 12. a fourth stop valve; 13. a third stop valve; 14. a hydrogen production reactor.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1, needle coke hydrogen production unit nitrogen gas replacement device, including nitrogen buffer tank 1 and hydrogen production reactor 14, nitrogen buffer tank 1 pass through nitrogen pipeline 2 and be connected with hydrogen production reactor 14 top, be equipped with nitrogen gas flowmeter 3, pressure sensor 4, first stop valve 5, electrical control valve 6, second stop valve 7 and electric ball valve 8 on the nitrogen pipeline 2 in proper order, nitrogen gas flowmeter 3 locates nitrogen buffer tank 1 exit.
And a nitrogen pipeline 2 between the pressure sensor 4 and the first stop valve 5 is communicated with a nitrogen pipeline 2 between the electric ball valve 8 and the top of the hydrogen production reactor 14 through a crossover line 9, and a manual regulating valve 10 and a third stop valve 13 are arranged on the crossover line 9.
And a nitrogen pipeline 2 between the electric regulating valve 6 and the second stop valve 7 is communicated with a crossover line 9 between the manual regulating valve 10 and the third stop valve 13 through a connecting pipeline 11, and a fourth stop valve 12 is arranged on the connecting pipeline 11.
During operation, after the hydrogen production device is shut down, the first stop valve 5, the electric regulating valve 6, the second stop valve 7 and the electric ball valve 8 on the nitrogen pipeline 2 are opened, nitrogen is conveyed from the nitrogen buffer tank 1 into the hydrogen production reactor 14 for replacement, and after the nitrogen is secondarily regulated by the electric regulating valve 6 and the electric ball valve 8, the accurate control of the nitrogen flow can be realized; when the electric regulating valve 6 and the electric ball valve 8 simultaneously break down, the first stop valve 5 and the second stop valve 7 are closed, the manual regulating valve 10 and the third stop valve 13 are opened, and nitrogen can be emergently conveyed into the hydrogen production reactor 14 from the overline 9; when the electric regulating valve 6 has a fault, the first stop valve 5 is closed, the manual regulating valve 10 and the fourth stop valve 12 are opened, and nitrogen can be conveyed into the hydrogen production reactor 14 through the manual regulating valve 10 and the electric ball valve 8; when the electric ball valve 8 has a fault, the second stop valve 7 is closed, the fourth stop valve 12 and the third stop valve 13 are opened, and nitrogen can be conveyed into the hydrogen production reactor 14 through the electric regulating valve 6, the fourth stop valve 12 and the third stop valve 13.
Of course, the above description is only a preferred embodiment of the present invention, and should not be taken as limiting the scope of the embodiments of the present invention. The present invention is not limited to the above examples, and the technical field of the present invention is equivalent to the changes and improvements made in the actual range of the present invention, which should be attributed to the patent coverage of the present invention.

Claims (3)

1. The utility model provides a needle coke hydrogen production unit nitrogen gas replacement device, includes nitrogen buffer tank (1) and hydrogen production ware (14), its characterized in that: nitrogen buffer tank (1) be connected with hydrogen production reactor (14) top through nitrogen gas pipeline (2), be equipped with nitrogen gas flowmeter (3), pressure sensor (4), first stop valve (5), electrical control valve (6), second stop valve (7) and electrical ball valve (8) on nitrogen gas pipeline (2) in proper order, nitrogen gas flowmeter (3) are located nitrogen gas buffer tank (1) exit.
2. The nitrogen replacement device for the needle coke hydrogen production unit according to claim 1, characterized in that: and a nitrogen pipeline (2) between the pressure sensor (4) and the first stop valve (5) is communicated with the nitrogen pipeline (2) between the electric ball valve (8) and the top of the hydrogen production reactor (14) through a crossover line (9), and a manual regulating valve (10) and a third stop valve (13) are arranged on the crossover line (9).
3. The nitrogen replacement device for the needle coke hydrogen production unit according to claim 2, characterized in that: nitrogen gas pipeline (2) between electric control valve (6) and second stop valve (7) and overline (9) between manual regulation valve (10) and third stop valve (13) pass through connecting line (11) intercommunication, be equipped with fourth stop valve (12) on connecting line (11).
CN202021622230.9U 2020-08-06 2020-08-06 Nitrogen gas replacement device for needle coke hydrogen production unit Active CN212669212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021622230.9U CN212669212U (en) 2020-08-06 2020-08-06 Nitrogen gas replacement device for needle coke hydrogen production unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021622230.9U CN212669212U (en) 2020-08-06 2020-08-06 Nitrogen gas replacement device for needle coke hydrogen production unit

Publications (1)

Publication Number Publication Date
CN212669212U true CN212669212U (en) 2021-03-09

Family

ID=74821177

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021622230.9U Active CN212669212U (en) 2020-08-06 2020-08-06 Nitrogen gas replacement device for needle coke hydrogen production unit

Country Status (1)

Country Link
CN (1) CN212669212U (en)

Similar Documents

Publication Publication Date Title
CN212669212U (en) Nitrogen gas replacement device for needle coke hydrogen production unit
CN104232846B (en) A kind of system and method to RH refining furnace steam supply
CN219526556U (en) BGL gasifier nitrogen gas feed system
CN212669213U (en) Needle coke hydrogen production and hydrogenation linkage energy-saving device
CN211570499U (en) Isobutane production device
CN113912010B (en) Methanol reforming hydrogen production purification device and process
US7452393B2 (en) Installation for hydrogen production and methods for using same
CN215982011U (en) Hydrogen-nitrogen ratio adjusting device for synthetic ammonia reaction
CN113999968B (en) Autoclave acid adding system and control method
CN101966472B (en) Device for reducing catalyst for catalytic synthesis of dimethyl ether by one-step method
CN204325413U (en) A kind of system to RH refining furnace steam supply
CN109028004A (en) Peak regulation gas fired-boiler feedwater flow and pressure double-balance control system
CN217952258U (en) Balanced energy-saving process system of boiler water supply system
CN210584343U (en) Exhaust gas purification device
CN111878843A (en) Wide load denitration flue gas temperature lift system
CN208684812U (en) A kind of system of modification and recovery acetic acid plant byproduct steam
CN219318415U (en) Phenol recycling medium-pressure superheated steam recycling system
CN111856940A (en) Control method and device for low-load operation of thermal power generating unit and storage medium
CN220376372U (en) Combined regulating and controlling device for preparing ammonia water by cross process
CN219571640U (en) Chemical plant steam temperature and pressure reducer transformation system
CN215489841U (en) Calorific value adjusting system of concentrated methane hydrogen production converter
CN214998143U (en) System is reformed transform to gas separation device propylene tower backwash pump
CN217329416U (en) System for recovering BOG in shutdown state
CN220878795U (en) Heat exchange structure for initial delivery of hydrogenation catalyst after filling in butanol and octanol production
CN216171191U (en) Pressure swing adsorption hydrogen production tail gas recycle device

Legal Events

Date Code Title Description
GR01 Patent grant