CN212659908U - Hydroelectric engineering is with device of sunkening cord - Google Patents

Hydroelectric engineering is with device of sunkening cord Download PDF

Info

Publication number
CN212659908U
CN212659908U CN202021344821.4U CN202021344821U CN212659908U CN 212659908 U CN212659908 U CN 212659908U CN 202021344821 U CN202021344821 U CN 202021344821U CN 212659908 U CN212659908 U CN 212659908U
Authority
CN
China
Prior art keywords
fixedly connected
thick bamboo
wall
section
thing groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021344821.4U
Other languages
Chinese (zh)
Inventor
沈长军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Zhongcheng Jingye Construction Engineering Co ltd
Original Assignee
Sichuan Zhongcheng Jingye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Zhongcheng Jingye Construction Engineering Co ltd filed Critical Sichuan Zhongcheng Jingye Construction Engineering Co ltd
Priority to CN202021344821.4U priority Critical patent/CN212659908U/en
Application granted granted Critical
Publication of CN212659908U publication Critical patent/CN212659908U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The utility model discloses a water and electricity engineering is with device of sunkening cord, which comprises a supporting table, the equal fixedly connected with backup pad in top one side outer wall both ends of brace table, and the top intermediate position of backup pad has all opened puts the thing groove, and the bottom inner wall of putting the thing groove sets up to the hemisphere, and the inside of putting the thing groove is pegged graft and is had paying out machine structure, the top one side intermediate position of brace table is opened there is the through-hole, and pegs graft in the inside of through-hole has a movable section of thick bamboo, the bottom of a movable section of thick bamboo sets up to the arc, and the bottom fixedly connected with of a movable section of thick bamboo lays a section of thick bamboo, lays the one. The utility model discloses be convenient for bury the line to water electrical engineering and handle, replace artifical line operation of burying, reduce people's work degree, adjust the height of laying the overall structure that a section of thick bamboo and a movable section of thick bamboo constitute for inside laying a section of thick bamboo and can stretching into the wire casing of the different degree of depth, be convenient for bury the line to the wire casing of the different degree of depth and handle.

Description

Hydroelectric engineering is with device of sunkening cord
Technical Field
The utility model relates to a water and electricity engineering technical field especially relates to a water and electricity engineering is with device of sunkening cord.
Background
Water is a basic element that human beings rely on for survival, electric power is a main energy source for social development, the science of water conservancy and hydropower engineering is an engineering science that regulates and controls and utilizes hydroenergy resources by engineering or non-engineering measures on the basis of research on natural characteristics of water, the hydropower engineering comprises a dam, a hydropower station factory building, a gate, a water inlet building, a water diversion building, a water discharge building and the like, and when the hydropower engineering is constructed, a cable needs to be buried.
At present, when the existing hydroelectric engineering buries the line, dig the back of establishing earlier with the wire casing, carry out the manual work again and lay the processing, nevertheless to long distance cable laying operation, not only increaseed people's work degree, also reduced and buried line efficiency, consequently, need to design a hydroelectric engineering with burying traditional thread binding putting and solving above-mentioned problem urgently.
Disclosure of Invention
The utility model aims at solving the defects existing in the prior art and providing a wire burying device for hydroelectric engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a water and electricity engineering is with device of sunkening cord, includes a supporting bench, the equal fixedly connected with backup pad in top one side outer wall both ends of a supporting bench, and the top intermediate position of backup pad has all opened puts the thing groove, and the bottom inner wall of putting the thing groove sets up to the hemisphere, and the inside of putting the thing groove is pegged graft and is had paying out machine structure, the top one side intermediate position of a supporting bench is opened there is the through-hole, and pegs graft in the inside of through-hole and has a movable section of thick bamboo, the bottom of a movable section of thick bamboo sets up to the arc, and the bottom fixedly connected with of a movable section of thick bamboo lays a section of thick bamboo, lays the one end fixedly connected with conical head of a section of thick bamboo, the threaded.
Preferably, the telescopic rod is fixedly connected between the two sides of the top of the laying barrel and the two sides of the bottom of the supporting table, the mounting plate is fixedly connected to the bottom of one side of the telescopic rod, and the soil scraping plates are fixedly connected to the two sides of the bottom of the mounting plate.
Preferably, paying out machine constructs including the bracing piece, and the outer wall of bracing piece has cup jointed the drawing drum, the equal fixedly connected with retaining ring in outer wall both sides of bracing piece.
Preferably, the outer wall of drawing drum twines there is the cable, and the cable passes a movable section of thick bamboo and lays the inside of a section of thick bamboo, and the outer wall top fixedly connected with spacing collar of a movable section of thick bamboo.
Preferably, the bottom four corners of the supporting table are fixedly connected with supporting legs, and the bottom of each supporting leg is fixedly connected with a moving wheel.
Preferably, one side of the top of the supporting table is fixedly connected with a push plate, and two ends of the top of the outer wall of one side of the push plate are fixedly connected with push handles.
Preferably, the inner wall of the bottom of the storage groove is provided with grooves distributed equidistantly, rolling balls are inserted into the grooves, and the outer walls of the rolling balls are in contact with the outer wall of the supporting rod.
The utility model has the advantages that:
1. through the brace table that sets up, push away the handle, remove the wheel, the backup pad, put the thing groove, the bracing piece, the drawing drum, the cable, the through-hole, a movable section of thick bamboo, the awl head, lay a section of thick bamboo, mounting panel and scraping plate, peg graft bracing piece and drawing drum in the inside of putting the thing groove, and make the cable pass through a movable section of thick bamboo in proper order and lay the inside of a section of thick bamboo, make the cable lay at the wire inslot dug in advance again, utilize to push away and remove the whole device of wheel promotion and remove, make the cable carry out the unwrapping wire processing on the drawing drum, and carry out the buried line operation through scraping plate, be convenient for carry out the buried line processing to water and electricity engineering, replace artifical buried line operation.
2. Through brace table, screw hole, the threaded rod that sets up, lay a section of thick bamboo and telescopic link, the overall structure's that a section of thick bamboo and a movable cylinder are constituteed height is laid in the position of adjusting threaded rod in the screw hole to the regulation for inside laying a section of thick bamboo and can stretching into the wire casing of the different degree of depth, be convenient for bury the line processing to the wire casing of the different degree of depth, convenient operation.
3. Through the backup pad that sets up, put thing groove, recess and spin, when bracing piece and drawing drum rotated, can make the bracing piece rotate on the spin, utilized the spin to reduce the bracing piece and put the frictional force in thing groove for the unwrapping wire and the removal of whole device are more smooth and easy.
Drawings
Fig. 1 is a schematic sectional front view showing a structure of a buried wire device for hydroelectric power engineering in accordance with example 1;
FIG. 2 is a schematic structural view of a pay-off reel and a laying barrel of the wire burying device for hydroelectric engineering in embodiment 1;
fig. 3 is a schematic structural diagram of a rolling ball of the wire burying device for hydroelectric engineering provided in embodiment 2.
In the figure: 1 brace table, 2 supporting legs, 3 conical heads, 4 movable cylinders, 5 laying cylinders, 6 threaded rods, 7 cables, 8 scraping plates, 9 pushing handles, 10 telescopic rods, 11 limiting rings, 12 storage grooves, 13 pay-off reels, 14 supporting plates, 15 supporting rods and 16 rolling balls.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-2, a water and electricity engineering is with device of sunkening cord, including brace table 1, brace table 1's top one side outer wall both ends all weld and have backup pad 14, and the top intermediate position of backup pad 14 has all been opened and has been put thing groove 12, the bottom inner wall of putting thing groove 12 sets up to the hemisphere, it has paying out machine to peg graft in the inside of putting thing groove 12, brace table 1's top one side intermediate position is opened has the through-hole, and the inside of through-hole is pegged graft and has a movable section of thick bamboo 4, the bottom of a movable section of thick bamboo 4 sets up to the arc, and the bottom welding of a movable section of thick bamboo 4 has a section of thick bamboo 5 of laying, the one end welding of a section of thick bamboo 5 has conical head 3, brace table 1's top opposite side.
Wherein, the welding has telescopic link 10 between the top both sides of laying a section of thick bamboo 5 and the bottom both sides of brace table 1, and the welding has the mounting panel in one side bottom of telescopic link 10, and scraper 8 has all been welded to the bottom both sides of mounting panel.
Wherein, paying out machine constructs including bracing piece 15, and the outer wall of bracing piece 15 has cup jointed drawing drum 13, and the retaining ring has all been welded to the outer wall both sides of bracing piece 15.
Wherein, the outer wall winding of drawing drum 13 has cable 7, and cable 7 passes a movable section of thick bamboo 4 and lays the inside of a section of thick bamboo 5, and the welding of the outer wall top of a movable section of thick bamboo 4 has spacing collar 11.
Wherein, the bottom four corners of brace table 1 all welds and has supporting leg 2, and the bottom of supporting leg 2 all has the removal wheel through bolted connection.
Wherein, the welding of the top of brace table 1 has the push pedal, and the top both ends of push pedal one side outer wall all weld and push away handle 9.
The working principle is as follows: during the use, the user pegs graft bracing piece 15 and drawing drum 13 in the inside of putting thing groove 12, and make cable 7 pass through movable cylinder 4 in proper order and lay the inside of a section of thick bamboo 5, make cable 7 lay in the wire casing dug in advance again, utilize to push away 9 and remove the wheel and promote whole device and remove, make cable 7 carry out the unwrapping wire processing on drawing drum 13, and carry out the buried wire operation through scraper 8, be convenient for carry out the buried wire processing to water and electricity engineering, replace artifical buried wire operation, reduce people's work degree, user's adjustable threaded rod 6 is in the position of screwed hole, adjust the height of the overall structure who lays a section of thick bamboo 5 and a movable cylinder 4 and constitute, make it can stretch into the wire casing of the different degree of depth to lay a section of thick bamboo 5, be convenient for carry out the buried wire processing to the wire casing of the different degree.
Example 2
Referring to fig. 3, compared with embodiment 1, in the present embodiment, grooves are formed in the inner wall of the bottom of the storage tank 12, the grooves are distributed equidistantly, rolling balls 16 are inserted into the grooves, and the outer walls of the rolling balls 16 are in contact with the outer walls of the support rods 15.
The working principle is as follows: when bracing piece 15 and drawing drum 13 rotated, can make bracing piece 15 rotate on spin 16, utilize spin 16 to reduce bracing piece 15 and put the frictional force of thing groove 12 for the unwrapping wire and the removal of whole device are more smooth and easy.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a water and electricity is wire embedding device for engineering, includes brace table (1), its characterized in that, the equal fixedly connected with backup pad (14) in top one side outer wall both ends of brace table (1), and the top intermediate position of backup pad (14) has all opened puts thing groove (12), and the bottom inner wall of putting thing groove (12) sets up to the hemisphere, and it has paying out machine to peg graft in the inside of putting thing groove (12), the top one side intermediate position of brace table (1) is opened there is the through-hole, and pegs graft in the inside of through-hole has a movable section of thick bamboo (4), the bottom of a movable section of thick bamboo (4) sets up to the arc, and the bottom fixedly connected with of a movable section of thick bamboo (4) lays a section of thick bamboo (5), lays the one end fixedly connected with conical head (3) of a section of thick bamboo (5), the top opposite side intermediate position, the bottom of the threaded rod (6) is rotatably connected with the top of the movable cylinder (4) through a bearing.
2. The wire burying device for the hydroelectric engineering according to claim 1, wherein telescopic rods (10) are fixedly connected between two sides of the top of the laying barrel (5) and two sides of the bottom of the supporting platform (1), a mounting plate is fixedly connected to the bottom of one side of each telescopic rod (10), and soil scraping plates (8) are fixedly connected to two sides of the bottom of the mounting plate.
3. The wire burying device for the hydroelectric engineering according to claim 2, wherein the paying-off mechanism comprises a supporting rod (15), a paying-off reel (13) is sleeved on the outer wall of the supporting rod (15), and retaining rings are fixedly connected to two sides of the outer wall of the supporting rod (15).
4. The wire burying device for the hydroelectric engineering according to claim 3, wherein a cable (7) is wound on the outer wall of the pay-off reel (13), the cable (7) penetrates through the movable cylinder (4) and the laying cylinder (5), and a limiting ring (11) is fixedly connected to the top of the outer wall of the movable cylinder (4).
5. The wire burying device for the hydropower project according to claim 4, wherein four corners of the bottom of the support platform (1) are fixedly connected with support legs (2), and the bottoms of the support legs (2) are fixedly connected with moving wheels.
6. A hydroelectric engineering used wire burying device according to any one of claims 1-5, characterized in that one side of the top of the supporting platform (1) is fixedly connected with a push plate, and both ends of the top of the outer wall of one side of the push plate are fixedly connected with push handles (9).
7. The wire burying device for the hydropower project according to claim 1, wherein grooves are formed in the inner wall of the bottom of the storage groove (12) and distributed equidistantly, rolling balls (16) are inserted into the grooves, and the outer walls of the rolling balls (16) are in contact with the outer walls of the supporting rods (15).
CN202021344821.4U 2020-07-10 2020-07-10 Hydroelectric engineering is with device of sunkening cord Expired - Fee Related CN212659908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021344821.4U CN212659908U (en) 2020-07-10 2020-07-10 Hydroelectric engineering is with device of sunkening cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021344821.4U CN212659908U (en) 2020-07-10 2020-07-10 Hydroelectric engineering is with device of sunkening cord

Publications (1)

Publication Number Publication Date
CN212659908U true CN212659908U (en) 2021-03-05

Family

ID=74760844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021344821.4U Expired - Fee Related CN212659908U (en) 2020-07-10 2020-07-10 Hydroelectric engineering is with device of sunkening cord

Country Status (1)

Country Link
CN (1) CN212659908U (en)

Similar Documents

Publication Publication Date Title
CN203690811U (en) Multifunctional cable laying and paying-off apparatus for cable drum
CN212659908U (en) Hydroelectric engineering is with device of sunkening cord
CN111900670B (en) Long-distance and large-diameter cable laying construction device and construction method in cable trench
CN210053372U (en) Photovoltaic module for unmanned aerial vehicle
CN214100134U (en) Wiring disc for electric power engineering who facilitates use
CN210857941U (en) Lifting device for housing construction
CN212497099U (en) Pipeline rust removing device for hydraulic engineering
CN213923830U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN211480756U (en) Positioning and arranging device for laying power line
CN210509015U (en) Novel electric power overhaul ladder
CN211468490U (en) Urban electric power overhauls shallow
CN213402251U (en) Thread burying device for water conservancy and hydropower engineering
CN216335776U (en) Water conservancy and hydropower construction pipe laying pay-off
CN213753928U (en) Cable support frame for power distribution engineering
CN218326512U (en) Resistance to compression protector convenient to concatenation is used in gas pipeline construction
CN220022118U (en) Weak current engineering wiring device
CN210634604U (en) Electric power storage transport vechicle
CN213163770U (en) Special welding set of square steel frame
CN218619678U (en) Cable pay-off device
CN215037311U (en) Tool box for disassembling and maintaining harvesting machine accessories
CN213445888U (en) Pipe burying device for garden pipeline construction
CN211091086U (en) Support irrigation equipment with stable structure
CN214365322U (en) Pole tower erecting device for electric power construction
CN218261387U (en) Cable winding and unwinding devices with limit structure
CN211475059U (en) Municipal works are with pipeline shop line frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210305

Termination date: 20210710