Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021018357.XU
Other languages
Chinese (zh)
Inventor
景成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021018357.XU priority Critical patent/CN212658244U/en
Application granted granted Critical
Publication of CN212658244U publication Critical patent/CN212658244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of settlement monitoring equipment, especially, be a concrete building settlement monitoring mark, the operation process that will take out the free section when using to current building settlement detection standard is complicated, the inconvenient problem that leads to the availability factor lower of operation, the following scheme of present proposition, it includes canned paragraph and free section, canned paragraph movable sleeve establishes in the free section outside, and the welding of canned paragraph outside has the spiral shell strip, and the one end of four compression springs of fixedly connected with on the canned paragraph bottom inner wall, four compression springs's other end fixed mounting have same push pedal, the free section bottom and push pedal swing joint, free section front side open and are equipped with the recess, and fixed mounting has the scale in the recess, the fixed cover in canned paragraph outside top is equipped with the sleeve. The utility model has the advantages of reasonable design, can be convenient for pop out it when fixing concrete building monitoring facilities's free section and monitor work to its availability factor has been improved.

Description

Concrete building settlement monitoring sign
Technical Field
The utility model relates to a settlement monitoring equipment technical field especially relates to a concrete building settlement monitoring mark.
Background
At present, the method for laying the settlement monitoring mark of the concrete building in foundation pit monitoring or newly-built building main body monitoring is to punch a hole on the concrete building by using an electric drill and embed the mark in the hole by using concrete, but the detection mark in the prior art is not easy to observe under the condition of insufficient light, and the visual transmission is poor due to the local part (an observation part); and it protrudes from the building, therefore, the part is often deformed by external force impact and directly affects the monitoring effect. Through retrieval, the Chinese patent with the publication number of CN207300223U discloses a concrete building main body settlement monitoring sign, which comprises a free section, a fixed section and a wrench lug, wherein the free section comprises a reflective steel ring; the reflective round steel consists of a steel pipe and a reflective layer plated on the outer side of the steel pipe; the left side and the right side of the reflective round steel are provided with external thread teeth which are parallel to the axial direction of the reflective round steel; a staff gauge parallel to the reflective round steel is arranged on the front side of the reflective round steel; the top of the reflective round steel is provided with a connecting seat; a square steel bar is arranged at the top of the connecting seat; a spiral groove is formed in one side face of the square steel bar; the fixed section comprises a circular rigid body; the top of the round steel body is provided with a positioning component fixedly connected with the round steel body; the periphery of the round steel body is welded with a spiral strip; the bottom end of the round steel body is provided with a conical steel bar fixedly connected with the round steel body; a cavity with an upward opening is arranged in the round steel body; and the inner wall of the cavity is provided with an internal thread matched with the external thread teeth.
But still have the shortcoming in the above-mentioned design, all need to control the promotion piece and screw in and screw out free section when using in above-mentioned design every time, the process is complicated, leads to the operation inconvenient, and the availability factor is lower, therefore we have proposed a concrete building settlement monitoring sign and have been used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects that the operation process that the free section is taken out is complicated and the operation is inconvenient to lead to the lower use efficiency when the existing building settlement detection standard is used, and providing a concrete building settlement monitoring mark.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a concrete building settlement monitoring mark comprises a fixed section and a free section, wherein the fixed section is movably sleeved outside the free section, a screw strip is welded outside the fixed section, one end of four compression springs is fixedly connected to the inner wall of the bottom of the fixed section, the other end of the four compression springs is fixedly provided with the same push plate, the bottom end of the free section is movably connected with the push plate, the front side of the free section is provided with a groove, a scale is fixedly arranged in the groove, the top end of the outer side of the fixed section is fixedly sleeved with a sleeve, the inner walls of two sides of the sleeve are respectively provided with a transverse groove, wedge plates are respectively and slidably arranged in the two transverse grooves, the two wedge plates are respectively and movably connected with the top end of the free section, the tops of the two wedge plates are respectively provided with a vertical groove, the two vertical grooves are respectively and slidably provided with a baffle plate, the two, the other end of two horizontal poles all extends to the sleeve outside and fixed mounting has the disc, and the equal fixed mounting in one side that two discs kept away from each other has the handball.
Preferably, two wedge boards keep away from the equal fixedly connected with reset spring's in one side one end each other, and two reset spring's the other end all with the transverse groove inner wall fixed connection who corresponds, resets two wedge boards.
Preferably, the bottom of each baffle is fixedly connected with one end of each connecting spring, and the other ends of the two connecting springs are fixedly connected with the inner wall of the corresponding vertical groove bottom to support and reset the two baffles.
Preferably, the through holes are formed in the inner wall, away from each other, of one side of each vertical groove, the two cross rods are movably connected with the inner walls of the tops of the corresponding through holes respectively, and the cross rods are convenient to mount and move and limit the baffle.
Preferably, the same limiting rod is fixedly connected between the top inner wall and the bottom inner wall of each through hole, and the two cross rods are respectively sleeved on the outer sides of the corresponding limiting rods in a sliding manner to guide and limit the two cross rods.
Preferably, the one end of free section rear side fixedly connected with spacer pin, set up the spacing groove with the spacer pin adaptation on the inner wall of canned paragraph rear side, the spacing groove top sets up for the opening, spacer pin and spacing groove swing joint, and there is the limiting plate canned paragraph top rear side through bolt fixed mounting, and the limiting plate setting is spacing directly over the spacer pin, and the motion to the free section that blocks through the limiting plate to the spacer pin is carried on spacingly.
In the utility model, when in use, firstly, the concrete building is punched, then the fixing section is screwed into the hole through the matching of the screw strip and the hole wall to fix the fixing section, if measurement is needed, two handball are held by hands and two transverse rods are driven by corresponding discs to move downwards, the two transverse rods drive two baffles to move downwards to compress the connecting spring and make the two baffles break away from the connection with the inner wall of the sleeve, then the two handball are pulled and the two transverse rods are driven to move towards one side close to each other, the two transverse rods respectively drive two wedge plates to move towards one side far away from each other through the matching with corresponding limiting rods so as to break away from the blocking of the free section and compress the two reset springs, because the compression springs are in a compression state initially, the push plate drives the free section to move upwards under the elastic action of the four compression springs, thereby facilitating the monitoring work;
in the utility model, a concrete building settlement monitoring sign, after the monitoring is accomplished, drive the free section through pushing down the free section and slide downwards in the fixed segment, slide to initial position after two wedges reset under reset spring's effect and block the free section to the side motion that is close to each other, thereby fix a position the free section under the cooperation of push pedal and two wedges about, two baffles move upwards under the effect that corresponds coupling spring and fix a position the wedge through the contact with the sleeve inner wall, thereby improve the fixed stability of free section, and can dismantle the limiting plate through the swivel bolt, thereby be convenient for pull down the free section;
the utility model has the advantages of reasonable design, can be convenient for pop out it when fixing free section to concrete building monitoring facilities and monitor work to improve its availability factor, the reliability is high.
Drawings
Fig. 1 is a schematic structural view of a settlement monitoring sign for a concrete building according to the present invention;
fig. 2 is a cross-sectional view of a concrete building settlement monitoring sign provided by the present invention;
fig. 3 is a schematic structural view of a portion a of a concrete building settlement monitoring mark provided by the present invention;
fig. 4 is a schematic structural diagram of a section B-B of the concrete building settlement monitoring sign according to the present invention.
In the figure: 1. a fixed section; 2. a free section; 3. a scale; 4. a helical strip; 5. a sleeve; 6. a compression spring; 7. pushing the plate; 8. a transverse slot; 9. a wedge plate; 10. a vertical groove; 11. a baffle plate; 12. a cross bar; 13. a disc; 14. a return spring; 15. a connecting spring; 16. a through hole; 17. a limiting rod; 18. a spacing pin; 19. a limiting groove; 20. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a concrete building settlement monitoring mark comprises a fixed section 1 and a free section 2, wherein the fixed section 1 is movably sleeved outside the free section 2, a spiral strip 4 is welded outside the fixed section 1, one end of four compression springs 6 is fixedly connected to the inner wall of the bottom of the fixed section 1, the other end of the four compression springs 6 is fixedly provided with a push plate 7, the bottom of the free section 2 is movably connected with the push plate 7, the front side of the free section 2 is provided with a groove, a scale 3 is fixedly arranged in the groove, the top of the outside of the fixed section 1 is fixedly sleeved with a sleeve 5, the inner walls of two sides of the sleeve 5 are respectively provided with a transverse groove 8, wedge plates 9 are respectively and slidably arranged in the two transverse grooves 8, the two wedge plates 9 are respectively and movably connected with the top of the free section 2, the tops of the two wedge plates 9 are respectively provided with, two baffles 11 all with 5 inner wall swing joint of sleeve, the one end of the equal fixedly connected with horizontal pole 12 in one side that two baffles 11 kept away from each other, the other end of two horizontal poles 12 all extends to the 5 outsides of sleeve and fixed mounting has disc 13, the equal fixed mounting in one side that two discs 13 kept away from each other has the handball.
The utility model discloses in, the equal fixedly connected with reset spring 14's in one side one end that two wedge plates 9 kept away from each other one end, two reset spring 14's the other end all with the transverse groove 8 inner wall fixed connection that correspond, reset two wedge plates 9.
The utility model discloses in, two baffle 11 bottom equal fixedly connected with connecting spring 15's one end, two connecting spring 15's the other end all with the vertical groove 10 bottom inner wall fixed connection who corresponds, support and reset two baffle 11.
The utility model discloses in, all seted up through-hole 16 on the one side inner wall that two vertical grooves 10 kept away from each other, two horizontal poles 12 respectively with the 16 top inner wall swing joint of through-hole that correspond, the installation and the motion of the horizontal pole 12 of being convenient for carry on spacingly to baffle 11.
The utility model discloses in, respectively the same gag lever post 17 of fixedly connected with between 16 top inner walls of two through-holes and the bottom inner wall, two horizontal poles 12 slide the cover respectively and establish in the corresponding gag lever post 17 outside, lead spacing to two horizontal poles 12.
The utility model discloses in, 2 rear side fixedly connected with spacer pins 18's of free section one end, set up on the 1 rear side inner wall of canned paragraph 19 with the spacing of 18 adaptations of spacer pin, 19 tops of spacing groove are the opening setting, 18 and 19 swing joints of spacing groove, 1 top rear side of canned paragraph has limiting plate 20 through bolt fixed mounting, limiting plate 20 sets up directly over spacer pin 18, stop through limiting plate 20 to spacer pin 18 carry on spacingly to free section 2's motion.
In the utility model, when in use, firstly, the concrete building is punched, then the fixed section 1 is screwed into the hole to fix the fixed section 1 through the matching of the spiral strip 4 and the hole wall, if the measurement is needed, two handball are held and two cross rods 12 are driven to move downwards through corresponding discs 13, the two cross rods 12 drive two baffles 11 to move downwards to compress the connecting spring 15 and make the two baffles 11 separate from the connection with the inner wall of the sleeve 5, then the two handball are pulled and drive the two cross rods 12 to move towards one side close to each other, the two cross rods 12 respectively drive two wedge plates 9 to move towards one side far away from each other through the matching with corresponding limiting rods 17 so as to separate from the blocking of the free section 2 and compress the two reset springs 14, because the compression springs 6 are in the initial compression state, the push plate 7 pushes the free section 2 to move upwards under the elastic action of the four compression springs 6, thereby facilitating the monitoring work, the free section 2 moves upwards while driving the limit pin 18 to move upwards in the limit groove 19, the limit pin 20 stops the limit pin 18 to limit the movement of the free section 2, the free section 2 is prevented from being disconnected from the fixed section 1, after the monitoring is finished, the free section 2 is driven to slide downwards in the fixed section 1 by pressing the free section 2 downwards, the two wedge-shaped plates 9 reset to move to one side close to each other under the action of the reset spring 14 after sliding to the initial position to stop the free section 2, thereby positioning the free section 2 under the left and right matching of the push plate 7 and the two wedge-shaped plates 9, the two baffles 11 move upwards under the action of the corresponding connecting springs 15 and position the wedge-shaped plates 9 through the contact with the inner wall of the sleeve 5, thereby improving the stability of the fixing of the free section 2, and the limit plate 20 can be detached by rotating the bolt, thereby facilitating removal of the free section 2.

Claims (6)

1. The utility model provides a concrete building settlement monitoring sign, includes canned paragraph (1) and free section (2), its characterized in that, canned paragraph (1) activity cover is established in the free section (2) outside, and canned paragraph (1) outside welding has spiral shell strip (4), and fixedly connected with four compression spring (6)'s one end on canned paragraph (1) bottom inner wall, and the other end fixed mounting of four compression spring (6) has same push pedal (7), free section (2) bottom and push pedal (7) swing joint, free section (2) front side division have a recess, and fixed mounting has scale (3) in the recess, canned paragraph (1) outside top cover is equipped with sleeve (5), has all seted up transverse groove (8) on the inner wall of sleeve (5) both sides, and equal slidable mounting has wedge (9) in two transverse groove (8), and two wedge (9) all with free section (2) top swing joint, vertical groove (10) have all been seted up at two wedge (9) tops, equal slidable mounting has baffle (11) in two vertical groove (10), two baffle (11) all with sleeve (5) inner wall swing joint, the one end of the equal fixedly connected with horizontal pole (12) in one side that two baffle (11) kept away from each other, the other end of two horizontal poles (12) all extends to sleeve (5) outside and fixed mounting has disc (13), the equal fixed mounting in one side that two disc (13) kept away from each other has the handball.
2. The concrete building settlement monitoring sign of claim 1, wherein one side of each of the two wedge plates (9) away from each other is fixedly connected with one end of a return spring (14), and the other end of each of the two return springs (14) is fixedly connected with the inner wall of the corresponding transverse groove (8).
3. The concrete building settlement monitoring sign according to claim 1, wherein one end of each of the connecting springs (15) is fixedly connected to the bottom of each of the two baffles (11), and the other end of each of the connecting springs (15) is fixedly connected to the inner wall of the bottom of the corresponding vertical groove (10).
4. The concrete building settlement monitoring sign according to claim 1, wherein the inner walls of the two vertical grooves (10) at the sides far away from each other are provided with through holes (16), and the two cross bars (12) are movably connected with the inner walls at the tops of the through holes (16) respectively.
5. The concrete building settlement monitoring sign according to claim 4, wherein the same limiting rod (17) is fixedly connected between the top inner wall and the bottom inner wall of the two through holes (16), and the two cross rods (12) are respectively sleeved on the outer sides of the corresponding limiting rods (17) in a sliding manner.
6. The concrete building settlement monitoring sign according to claim 1, wherein one end of a limiting pin (18) is fixedly connected to the rear side of the free section (2), a limiting groove (19) matched with the limiting pin (18) is formed in the inner wall of the rear side of the fixed section (1), the top of the limiting groove (19) is provided with an opening, the limiting pin (18) is movably connected with the limiting groove (19), a limiting plate (20) is fixedly mounted on the rear side of the top end of the fixed section (1) through a bolt, and the limiting plate (20) is arranged right above the limiting pin (18).
CN202021018357.XU 2020-06-05 2020-06-05 Concrete building settlement monitoring sign Expired - Fee Related CN212658244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021018357.XU CN212658244U (en) 2020-06-05 2020-06-05 Concrete building settlement monitoring sign

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021018357.XU CN212658244U (en) 2020-06-05 2020-06-05 Concrete building settlement monitoring sign

Publications (1)

Publication Number Publication Date
CN212658244U true CN212658244U (en) 2021-03-05

Family

ID=74754163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021018357.XU Expired - Fee Related CN212658244U (en) 2020-06-05 2020-06-05 Concrete building settlement monitoring sign

Country Status (1)

Country Link
CN (1) CN212658244U (en)

Similar Documents

Publication Publication Date Title
CN212658244U (en) Concrete building settlement monitoring sign
CN212793855U (en) Bearing pressing device
CN214943104U (en) Highway engineering construction rail guard device
CN115901247A (en) Novel device for detecting strength of anchor chain before leaving factory and using method thereof
CN113089501B (en) Self-locking type profile steel support frame for large cantilever bent cap construction
CN212011295U (en) Tool pliers for electric power wiring
CN211647294U (en) Anti-falling device of climbing formwork with adjustable space
CN220210532U (en) Conveniently-detached embedded comprehensive communication station
CN109403656B (en) Support structure for dismantling hollow truss
CN213115448U (en) Guide rail for building climbing frame
CN219495196U (en) Colliery roof subsides monitoring devices in pit
CN220336291U (en) Stainless steel railing base
CN219734689U (en) Novel gold steel pawl formula rag bolt
CN111152158A (en) Electric chest expander for maintaining oil field motor
CN220725164U (en) Assembled building foundation skeleton texture
CN213715374U (en) Novel transient ground electric wave and ultrasonic wave integrated partial discharge sensor
CN111594061B (en) Oil field sucker rod broken rod stopping device
CN215632846U (en) Raise boring machine with automatic rod connecting and disassembling function
CN216926387U (en) Pipe surface compressive resistance detection device is used in production of high-speed railway contact net cantilever
CN219287681U (en) Wall-mounted speaker embedded part for railway station room
CN215411045U (en) Intelligent building management equipment
CN211621933U (en) A intelligent monitoring device for municipal drainage
CN219795236U (en) Monitoring alarm device convenient to installation
CN217461569U (en) Telescopic edge protection tool
CN215711629U (en) Portable well lid opening tool based on magnetic lock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210305