CN212656587U - Steel construction protection equipment - Google Patents

Steel construction protection equipment Download PDF

Info

Publication number
CN212656587U
CN212656587U CN202020394155.9U CN202020394155U CN212656587U CN 212656587 U CN212656587 U CN 212656587U CN 202020394155 U CN202020394155 U CN 202020394155U CN 212656587 U CN212656587 U CN 212656587U
Authority
CN
China
Prior art keywords
steel structure
sides
fixed plate
structure object
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020394155.9U
Other languages
Chinese (zh)
Inventor
许周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Bada Construction And Installation Engineering Co ltd
Original Assignee
Heilongjiang Bada Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Bada Construction And Installation Engineering Co ltd filed Critical Heilongjiang Bada Construction And Installation Engineering Co ltd
Priority to CN202020394155.9U priority Critical patent/CN212656587U/en
Application granted granted Critical
Publication of CN212656587U publication Critical patent/CN212656587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the technical field of construction equipment, and discloses steel structure construction protection equipment, which comprises a steel structure object, wherein the steel structure object is H-shaped steel, two sides of the steel structure object are both provided with first fixing plates, the first fixing plates are arranged in an L shape, the top surfaces of the transverse sections of the first fixing plates at two sides and the bottom surface of the top end part of the steel structure object are both arranged in a laminating way, the side walls of the first fixing plates at two sides, which are close to the side of the steel structure object, are both provided with limiting grooves, the top surface of the top end part of the steel structure object is provided with a second fixing plate, the second fixing plate is arranged in a T shape; the first fixing plates on two sides are both provided with screws and first threaded holes, the second fixing plate is provided with second threaded holes, the screws penetrate into the second threaded holes through the first threaded holes, and the end parts of the screws penetrating out of the second threaded holes are in threaded connection with locking nuts; the utility model has the characteristics of extension steel construction object life, assurance stability.

Description

Steel construction protection equipment
Technical Field
The utility model relates to a construction equipment technical field, concretely relates to steel construction protection equipment.
Background
At present, when a construction process is carried out on a steel structure building, workers need to operate or move at a position as high as the top of the steel structure building, so that safety protection equipment is generally required to be equipped to ensure that the workers can carry out construction safely, and accidents are avoided; in the prior art, most safety protection devices are fixed on a bearing surface of a steel structure building through connecting pieces such as screws, then workers wear the safety protection clothes, the safety protection clothes are connected with a rope in a buckling connection mode, and then the rope is connected to the safety protection devices fixed on the steel structure building, so that protection is performed; however, such safety protection devices in the prior art have a certain problem, and in the use process of the safety protection device, because the connecting piece used for fixing the safety protection device can directly contact with the bearing surface of the steel structure, the protective layer coated on the surface of the bearing surface (such as a coated active metal anticorrosive coating) is easily abraded and damaged, so that the steel structure is corroded, and the service life and the structural stability of the steel structure are affected.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a steel construction protection equipment.
In order to solve the technical problem, the technical scheme of the utility model is that: a steel structure construction protection device comprises a steel structure object, wherein the steel structure object is H-shaped steel, first fixing plates are arranged on two sides of the steel structure object and are arranged in an L shape, the first fixing plates are symmetrically arranged on two sides of the top end portion of the steel structure object, the top surfaces of the transverse sections of the first fixing plates on two sides and the bottom surface of the top end portion of the steel structure object are arranged in a fit mode, limiting grooves are formed in the side walls, close to the steel structure object side, of the first fixing plates on two sides, and two sides of the top end portion of the steel structure object penetrate into the limiting grooves formed in the first fixing plates on the corresponding sides; a second fixing plate is arranged on the top surface of the top end part of the steel structure object, the second fixing plate is arranged in a T shape, the bottom surface of the transverse section of the second fixing plate is attached to the top surface of the top end part of the steel structure object, and a hanging ring is arranged on the top surface of the vertical section of the second fixing plate; the first fixing plates on two sides are respectively provided with a screw and a first threaded hole matched with the screw, the screw is screwed in the first threaded hole, the second fixing plate is provided with a second threaded hole matched with the screw, the screw penetrates into the second threaded hole from the first threaded hole so as to fixedly connect the first fixing plate and the second fixing plate together, and the screw is screwed with a locking nut on the end part of the screw penetrated out from the second threaded hole.
Preferably, be equipped with first gasket on the top surface of first fixed plate horizontal segment, the bottom surface of first gasket and the top surface fixed connection of first fixed plate horizontal segment are in the same place, and the top surface of first gasket is the laminating setting with the bottom surface of steel construction object top portion.
Preferably, be equipped with the second gasket on the bottom surface of second fixed plate lateral section, the bottom surface of second gasket and the bottom surface fixed connection of second fixed plate lateral section are in the same place, and the top surface of second gasket is the laminating setting with the top surface of steel construction object top portion.
Preferably, the side walls of the two sides of the transverse section of the second fixing plate are both provided with wedging blocks, the wedging blocks are arranged in a trapezoidal shape, and the large ends of the wedging blocks are arranged towards the direction close to the side of the first fixing plate.
Preferably, the side wall of the first fixing plate, on which the limiting groove is formed, is also provided with a wedging groove, the shape, size and position of the wedging groove are matched with those of the wedging block, the first fixing plates on two sides are both provided with wedging grooves, and the wedging block on the side wall of the second fixing plate on two sides is inserted into the wedging groove on the corresponding side.
Preferably, be provided with the strengthening rib between second fixed plate horizontal segment and the vertical section, strengthening rib one end is in the same place with the top surface fixed connection of second fixed plate horizontal segment, and the other end is in the same place with the lateral wall fixed connection of second fixed plate vertical section, and the strengthening rib uses second fixed plate vertical section to be the symmetry setting as the symmetrical line on the second fixed plate.
Compare prior art, the utility model has the advantages that:
the utility model arranges the first fixing plate and the second fixing plate, installs the first fixing plate at the two sides of the top end part of the steel structure object along the limiting groove, arranges the second fixing plate on the top surface of the top end part of the steel structure object, wedges the first fixing plate and the second fixing plate together through the wedge block and the wedge groove, and fixedly connects the first fixing plate and the second fixing plate together through the screw, thereby fixing the first fixing plate and the second fixing plate on the steel structure object, being difficult to generate displacement, being difficult to generate the shedding phenomenon, being capable of being used normally, and avoiding the direct contact of the screw and the steel structure object under the premise of being used normally, ensuring that the surface of the steel structure object is difficult to generate the damage phenomenon, and simultaneously arranging the first gasket and the second gasket on the main acting face of the first fixing plate and the second fixing plate contacted with the steel structure object, the damage of preventing that steel construction object surface from taking place that can step forward guarantees the complete degree on steel construction object surface, and then prolongs the life of steel construction object and guarantees its structural stability.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a partial top view of the present invention;
fig. 3 is a partial side view of the present invention;
fig. 4 is an enlarged view at a.
Reference numerals: 1. a steel structural object; 2. a first fixing plate; 3. a limiting groove; 4. a second fixing plate; 5. lifting lugs; 6. a screw; 7. locking the nut; 8. a first gasket; 9. a second gasket; 10. wedging blocks; 11. wedging the slot; 12. and (5) reinforcing ribs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Example (b): referring to fig. 1 to 4, the present embodiment provides a steel structure construction protection device, which includes a steel structure object 1, the steel structure object 1 is H-shaped steel, first fixing plates 2 are disposed on both sides of the steel structure object 1, the first fixing plates 2 are disposed in an "L" shape, the first fixing plates 2 are symmetrically disposed on both sides of the top portion of the steel structure object 1, the top surfaces of the horizontal sections of the first fixing plates 2 on both sides are disposed in a manner of being attached to the bottom surface of the top portion of the steel structure object 1, therefore, the first fixing plates 2 are prevented from generating transverse displacement on the bottom surface of the top end part of the steel structure object 1, the side walls of the first fixing plates 2 at two sides, close to the steel structure object 1, are provided with limiting grooves 3, two sides of the top end part of the steel structure object 1 penetrate into the limiting grooves 3 arranged on the first fixing plates 2 at the corresponding sides, and the limiting grooves 3 are used for limiting the longitudinal displacement of the first fixing plates 2 at two sides of the top end part of the steel structure object 1; the top surface of the top end part of the steel structure object 1 is provided with a second fixing plate 4, the second fixing plate 4 is arranged in a T shape, the bottom surface of the transverse section of the second fixing plate 4 is attached to the top surface of the top end part of the steel structure object 1, so that the second fixing plate 4 is prevented from generating transverse displacement on the top surface of the top end part of the steel structure object 1, and the top surface of the vertical section of the second fixing plate 4 is provided with a hanging ring for hanging an external rope; the first fixing plates 2 on two sides are respectively provided with a screw 6 and a first threaded hole corresponding to the screw 6, the screw 6 is screwed in the first threaded hole, and the second fixing plate 4 is provided with a second threaded hole corresponding to the screw 6; the screw 6 penetrates into the second threaded hole from the first threaded hole so as to fixedly connect the first fixing plate 2 and the second fixing plate 4 together, the screw joint of the screw 6 on the end part penetrated out by the second threaded hole is provided with the locking nut 7, the locking nut 7 is used for locking the screw 6, the screw 6 is prevented from continuously rotating, the fixing effect is further realized, when the first fixing plate 2 and the second fixing plate 4 are connected together by the screw 6, the displacement of the first fixing plate 2 and the second fixing plate 4 on the steel structure object 1 is limited, at the moment, the first fixing plate 2 and the second fixing plate 4 are fixedly connected on the steel structure object 1.
Furthermore, a first gasket 8 is arranged on the top surface of the transverse section of the first fixing plate 2, the bottom surface of the first gasket 8 is fixedly connected with the top surface of the transverse section of the first fixing plate 2, the top surface of the first gasket 8 is attached to the bottom surface of the top end part of the steel structure object 1, the first gasket 8 is made of rubber material, the rubber material has the characteristics of large friction coefficient and wear resistance, the first gasket 8 is arranged between the top surface of the transverse section of the first fixing plate 2 and the bottom surface of the top end part of the steel structure object 1, the bottom surface of the top end part of the steel structure object 1 and the top surface of the transverse section of the first fixing plate 2 can be prevented from being worn, the surface of the steel structure object 1 can be protected, the friction coefficient can be increased, the first fixing plate 2 is further prevented from generating transverse displacement at the top end part of the steel structure object 1, a second gasket 9 is arranged on the bottom surface of the transverse section of the second fixing plate 4, the top surface of second gasket 9 is the laminating setting with the top surface of steel structure object 1 top portion, and second gasket 9 adopts rubber materials to make, and the principle that sets up of second gasket 9 is the same with the principle that sets up of first gasket 8, and second gasket 9 can be further prevent that second fixed plate 4 from producing lateral displacement in steel structure object 1 top portion.
Further, all be equipped with wedging block 10 on the both sides lateral wall of second fixed plate 4 horizontal segment, wedging block 10 is trapezoidal shape setting, and the main aspects of wedging block 10 set up towards the direction of pressing close to first fixed plate 2 side, still be equipped with wedging groove 11 on the lateral wall that first fixed plate 2 opened spacing groove 3, the shape size position of wedging groove 11 suits with wedging block 10, all be provided with wedging groove 11 on the first fixed plate 2 of both sides, wedging block 10 on the lateral wall of second fixed plate 4 both sides inserts in the wedging groove 11 of its side that corresponds, wedging block 10 and wedging groove 11 set up the stability that first fixed plate 2 and second fixed plate 4 are connected that can further guarantee.
Further, be provided with strengthening rib 12 between 4 horizontal segments of second fixed plate and the vertical section, the top surface fixed connection of 12 one ends of strengthening rib and 4 horizontal segments of second fixed plate is in the same place, and the other end is in the same place with the lateral wall fixed connection of 4 vertical segments of second fixed plate, and strengthening rib 12 uses 4 vertical segments of second fixed plate to be the symmetry setting as the symmetrical line on second fixed plate 4, and strengthening rib 12 can strengthen the structural strength of second fixed plate 4, prevents phenomenons such as its fracture from appearing.
The utility model discloses an installation: firstly, install first fixed plate 2 in the both sides of steel structure object 1 top portion along spacing groove 3, set up second fixed plate 4 on the top surface of steel structure object 1 top portion again, and make first fixed plate 2 and second fixed plate 4 through the connection wedging of wedging piece 10 with wedging groove 11 together, and make first fixed plate 2 and second fixed plate 4 fixed connection together through setting up screw 6, cooperate first gasket 8 and the second gasket 9 that sets up on first fixed plate 2 and the second fixed plate 4, make first fixed plate 2 and second fixed plate 4 fixed connection on steel structure object 1, be difficult to produce and slide, later hang the rope on lug 5, can use.
The utility model discloses when using, according to workman's actual weight and number, install a plurality ofly on steel construction object 1, guarantee with this the utility model discloses can play sufficient support nature, all pass the rope afterwards on this protective apparatus's lug 5, make a plurality of these protective apparatus atress simultaneously, reach the protection effect to the workman is biggest with this.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
The above is only the typical example of the utility model, in addition, the utility model can also have other multiple concrete implementation manners, and the technical scheme that all adopt equivalent replacement or equivalent transform to form all falls within the scope of the utility model.

Claims (6)

1. The utility model provides a steel construction protection equipment, includes steel construction object (1), and steel construction object (1) is H shaped steel, its characterized in that: the steel structure object comprises a steel structure object (1), wherein first fixing plates (2) are arranged on two sides of the steel structure object (1), the first fixing plates (2) are arranged in an L shape, the first fixing plates (2) are symmetrically arranged on two sides of the top end of the steel structure object (1), the top surfaces of the transverse sections of the first fixing plates (2) on two sides and the bottom surface of the top end of the steel structure object (1) are arranged in a laminating manner, limiting grooves (3) are formed in the side walls of the first fixing plates (2) on the two sides close to the steel structure object (1), and two sides of the top end of the steel structure object (1) penetrate into the limiting grooves (3) formed in the first fixing plates (2) on the corresponding; a second fixing plate (4) is arranged on the top surface of the top end portion of the steel structure object (1), the second fixing plate (4) is arranged in a T shape, the bottom surface of the transverse section of the second fixing plate (4) is attached to the top surface of the top end portion of the steel structure object (1), and a hanging ring is arranged on the top surface of the vertical section of the second fixing plate (4); all be equipped with screw (6) on first fixed plate (2) of both sides and open and have the first screw hole that suits with screw (6), screw (6) spiro union is in first screw hole, set up the second screw hole that suits with screw (6) on second fixed plate (4), screw (6) penetrate the second screw hole by first screw hole and be in the same place first fixed plate (2) and second fixed plate (4) fixed connection with this in order to be in the same place, spiro union has lock nut (7) on screw (6) the tip of being worn out by the second screw hole.
2. The steel structure construction protection device of claim 1, characterized in that: be equipped with first gasket (8) on the top surface of first fixed plate (2) horizontal segment, the bottom surface of first gasket (8) is in the same place with the top surface fixed connection of first fixed plate (2) horizontal segment, and the top surface of first gasket (8) is the laminating setting with the bottom surface in steel construction object (1) top portion.
3. The steel structure construction protection device of claim 2, characterized in that: be equipped with second gasket (9) on the bottom surface of second fixed plate (4) horizontal segment, the bottom surface of second gasket (9) is in the same place with the bottom surface fixed connection of second fixed plate (4) horizontal segment, and the top surface of second gasket (9) is the laminating setting with the top surface of steel construction object (1) top portion.
4. The steel structure construction protection device of claim 3, wherein: and the side walls of the two sides of the transverse section of the second fixing plate (4) are respectively provided with a wedging block (10), the wedging blocks (10) are arranged in a trapezoidal shape, and the large end of each wedging block (10) is arranged towards the direction close to the side of the first fixing plate (2).
5. The steel structure construction protection device of claim 4, wherein: the side wall of the first fixing plate (2) provided with the limiting groove (3) is also provided with a wedging groove (11), the shape and size positions of the wedging groove (11) are matched with those of the wedging blocks (10), the first fixing plates (2) on two sides are both provided with the wedging grooves (11), and the wedging blocks (10) on the side walls on two sides of the second fixing plate (4) are inserted into the wedging grooves (11) on the corresponding sides.
6. The steel structure construction protection device of claim 4, wherein: be provided with between second fixed plate (4) horizontal segment and the vertical section strengthening rib (12), strengthening rib (12) one end is in the same place with the top surface fixed connection of second fixed plate (4) horizontal segment, and the other end is in the same place with the lateral wall fixed connection of second fixed plate (4) vertical section, and strengthening rib (12) use second fixed plate (4) vertical section to be the symmetry setting as the symmetrical line on second fixed plate (4).
CN202020394155.9U 2020-03-25 2020-03-25 Steel construction protection equipment Active CN212656587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020394155.9U CN212656587U (en) 2020-03-25 2020-03-25 Steel construction protection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020394155.9U CN212656587U (en) 2020-03-25 2020-03-25 Steel construction protection equipment

Publications (1)

Publication Number Publication Date
CN212656587U true CN212656587U (en) 2021-03-05

Family

ID=74765971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020394155.9U Active CN212656587U (en) 2020-03-25 2020-03-25 Steel construction protection equipment

Country Status (1)

Country Link
CN (1) CN212656587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109059A (en) * 2021-11-24 2022-03-01 王晓东 Anti-falling device for building construction and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109059A (en) * 2021-11-24 2022-03-01 王晓东 Anti-falling device for building construction and use method thereof

Similar Documents

Publication Publication Date Title
CN207812283U (en) Large-tonnage adjustable height formula temporary support
CN212656587U (en) Steel construction protection equipment
CN214195005U (en) Assembled building hoist and mount girder steel
CN212249144U (en) Can have enough to meet need double-ribbed girder steel fixing device that encorbelments
CN212866329U (en) Steel structure
CN210457150U (en) Turnover tool
CN212153150U (en) Whole reinforcing apparatus of bridge
CN216688841U (en) Steel rail insulation decomposer
CN220364863U (en) Riding type steel anchor beam
CN217399412U (en) Suspension bridge lock clip
CN219638461U (en) Edge protection device for lower operation layer of aluminum die system
CN214785975U (en) Supporting beam template for building construction
CN212613723U (en) Creeping formwork guide rail structure
CN215629304U (en) Locking device of pre-buried channel
CN217580717U (en) Stay cable and door head steel structure connecting system of stay cable curtain wall
CN210658415U (en) Anti-floating pile head reinforcing steel bar locking device
CN214738827U (en) Connecting piece for fastening C-shaped purline and cross beam
CN211524052U (en) Special-shaped template convenient to use
CN212983628U (en) Steel construction bridge faces frontier defense guardrail
CN211285563U (en) Wall guiding and supporting device for underground continuous wall engineering
CN220457733U (en) Integrated form creeping formwork monitoring control box
CN211621603U (en) Supporting device for hydraulic engineering construction
CN216948777U (en) A support of encorbelmenting that is used for structure discrepancy in elevation position adjustable height
CN213626729U (en) Steel construction safety device that is under construction
CN219690322U (en) Bridge floor central concrete guardrail protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant