CN212643823U - Butt-joint structure for chemical pipeline installation - Google Patents

Butt-joint structure for chemical pipeline installation Download PDF

Info

Publication number
CN212643823U
CN212643823U CN202020582726.1U CN202020582726U CN212643823U CN 212643823 U CN212643823 U CN 212643823U CN 202020582726 U CN202020582726 U CN 202020582726U CN 212643823 U CN212643823 U CN 212643823U
Authority
CN
China
Prior art keywords
pipeline
plate
butt joint
arc
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020582726.1U
Other languages
Chinese (zh)
Inventor
冯晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xingrui Chemical Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020582726.1U priority Critical patent/CN212643823U/en
Application granted granted Critical
Publication of CN212643823U publication Critical patent/CN212643823U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model discloses a dock structure for chemical pipeline installation, which comprises a pipe, be equipped with on the pipeline and be used for making the pipeline remove the butt joint device that aligns the pipeline port in the laminating, this dock structure for chemical pipeline installation passes through butt joint device, can make the in-process of two chemical pipeline port butt joints laminating at removal chemical pipeline, make the pipeline port align to make the pipeline port directly align the butt joint, so that modes such as subsequent welding or flange are fixed, so both can save time and can reduce the consumption of physical power and energy, thereby reduce staff's working strength and improvement work efficiency.

Description

Butt-joint structure for chemical pipeline installation
Technical Field
The utility model relates to a pipeline butt-joint structural technical field specifically is a chemical industry is butt-joint structure for piping erection.
Background
The main material of the steel-plastic chemical pipe is ultra-high molecular weight polyethylene (UHMW-PE), which is thermoplastic engineering plastic with the average molecular weight more than 200 ten thousand and is polymerized by ethylene and butadiene monomers under the action of a catalyst. The composite plastic has excellent comprehensive performance, and has the highest wear resistance, low temperature resistance, corrosion resistance, self lubrication and impact resistance in all plastics, the wear resistance is superior to that of polytetrafluoroethylene, nylon, carbon steel and other materials, the composite plastic can work at the temperature of-269 ℃ to +80 ℃ for a long time, and the composite plastic is called as 'surprising plastic', and is an ideal pipe.
The current chemical pipeline need pass through flange joint with two pipelines when the installation, the welding, accept or threaded connection together, because the port of pipeline need align earlier just can connect together fixedly, especially the connection of vertical pipe, because the pipeline is heavier, inconvenient when moving the pipeline with the fine alignment of two pipeline ports, generally with two pipeline port butt joints together earlier, rethread specific device makes two ports align, then just carry out fixed connection and couple together two pipelines, so not only need spend very long time still need spend more physical power and vigor, thereby increase staff's working strength and reduction work efficiency. Therefore, the butt joint structure for chemical pipeline installation is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can satisfy and can make the in-process of two chemical pipeline port docks at the removal chemical pipeline, make the pipeline port align, so both can save time and can reduce the consumption of physical power and energy to reduce staff's working strength and the chemical pipeline butt joint structure for installation that improves the work efficiency demand, with the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a dock structure is used in chemical pipeline installation, includes the pipeline, be equipped with on the pipeline and be used for making the pipeline remove the butt joint device that aligns the pipeline port in the laminating, through butt joint device, can make the in-process of two chemical pipeline port butt joint laminatings at removal chemical pipeline, make the pipeline port align to make the direct butt joint that aligns of pipeline port, so that modes such as subsequent welding or flange are fixed, so both can save time and can reduce the consumption of physical power and energy, thereby reduce staff's working strength and improvement work efficiency.
The butt joint device comprises two fixing plates, the two fixing plates are symmetrically arranged on the outer sides of the pipelines and are fixedly connected with each other through screws, the two fixing plates are respectively and symmetrically provided with a guide device used for guiding the moving pipelines to enable the ports of the two pipelines to be aligned, and the two guide devices can be driven to be symmetrically fixed on the outer sides of the pipelines or removed from the outer sides of the pipelines through the two fixing plates.
Preferably, guider includes the arc, the arc is fixed on fixed plate outside upper portion, and is equipped with the swash plate on the arc, the swash plate inboard is equipped with oblique spout, and the top is fixed with the roof, the roof bottom is equipped with the bracing piece, the bracing piece is fixed on the arc, be equipped with a plurality of guides that are convenient for make the pipeline slide align on the swash plate, be equipped with the through-hole of being convenient for the staff to the observation and the fixed connection operation of butt joint department on the fixed plate, the through-hole is located the fixed plate lower part, is convenient for insert the removal end of pipeline in the big round mouth that two roofs formed, and the pipeline that slowly promotes to get into the funnel shape hole of two oblique spouts formation holds, along with the reduction of the section radius of funnel hole, and the port that guide pipeline removed port and another.
Preferably, the guide includes the arc pole, be equipped with the slot hole on the swash plate, the arc is transversely fixed at the slot hole middle part, and rotates on the arc and be connected with a plurality of leading wheels, reduces the resistance, and the removal port of guide a pipeline aligns the butt joint with another pipeline port.
Preferably, the outer side of the top plate exceeds the outer side of the top of the inclined plate, so that the pipeline is prevented from being inserted to the outer side of the top plate.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a interfacing apparatus can make the in-process of two chemical pipeline port butt joints laminating at the removal chemical pipeline, makes the pipeline port align to make the pipeline port directly align the butt joint, so that modes such as subsequent welding or flange are fixed, so both can save time and can reduce the consumption of physical power and energy, thereby reduce staff's working strength and improvement work efficiency.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the docking assembly;
fig. 3 is a top view of the docking device.
In the figure: 1-a docking device; 2, fixing a plate; 3-a guiding device; 4-arc-shaped plates; 5-a sloping plate; 6-inclined sliding chutes; 7-a top plate; 8-a support bar; 9-a guide; 10-a through hole; 11-an arc-shaped rod; 12-long holes; 13-guide wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a butt joint structure for chemical pipeline installation comprises pipelines, wherein butt joint devices 1 used for aligning pipeline ports while moving and fitting the pipelines are arranged on the pipelines, each butt joint device 1 comprises two fixing plates 2, the two fixing plates 2 are symmetrically arranged on the outer sides of the pipelines and fixedly connected with each other through screws, and the two fixing plates 2 can be fixed on the outer sides of the pipelines with different diameters and are convenient to install and disassemble;
the two fixed plates 2 are respectively and symmetrically provided with a guide device 3 for guiding the moving pipelines to align the ports of the two pipelines, the guide device 3 comprises an arc-shaped plate 4, the arc-shaped plate 4 is fixed on the upper part of the outer side of the fixed plates 2, the arc-shaped plate 4 is provided with an inclined plate 5, the inner side of the inclined plate 5 is provided with an inclined chute 6, and the inclined chutes 6 on the two symmetrical inclined plates 5 form a funnel shape, so that the guide pipelines can move towards the aperture minimum;
a top plate 7 is fixed on the top of the inclined plate 5, and the inner side of the top plate 7 is flush and smoothly connected with the inner side of the inclined plate 5; the bottom of the top plate 7 is provided with a support rod 8, the support rod 8 supports the inclined plate 5 and the top plate 7, and the situation that when a vertical pipe is butted, the service life of the inclined plate 5 is shortened and the use effect is weakened due to the fact that the inclined plate 5 and the top plate 7 are subjected to large pressure caused by the gravity or the too fast movement of a pipeline is avoided;
the bracing piece 8 is fixed on arc 4, be equipped with a plurality of guides 9 that are convenient for make the pipeline slide to align on swash plate 5, guides 9 includes arc 11, be equipped with slot hole 12 on swash plate 5, arc 4 is transversely fixed at slot hole 12 middle part, and rotates on the arc 4 and is connected with a plurality of leading wheels 13, reduces the resistance, and the removal port of a guide pipeline aligns the butt joint with another pipeline port.
Wherein, be equipped with the through-hole 10 that is convenient for the staff to the observation and the fixed connection operation of butt joint department on fixed plate 2, through-hole 10 is located fixed plate 2 lower part, and through-hole 10 establishes to microscler, and the staff of being convenient for welds fixed connection operation such as.
In addition, the outer side of the top plate 7 extends beyond the outer side of the top of the sloping plate 5, and the pipeline is prevented from being inserted to the outer side of the top plate 7.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. The utility model provides a dock structure is used in chemical pipeline installation, includes the pipeline, its characterized in that: the pipeline is provided with a butt joint device (1) for aligning pipeline ports when the pipeline is attached in a moving way, the butt joint device (1) comprises two fixing plates (2), the two fixing plates (2) are symmetrically arranged on the outer side of the pipeline and are fixedly connected with each other through screws, the two fixing plates (2) are respectively and symmetrically provided with a guide device (3) for guiding the pipeline to move to align the two pipeline ports, the guide device (3) comprises an arc-shaped plate (4), the arc-shaped plate (4) is fixed on the upper part of the outer side of the fixing plate (2), the arc-shaped plate (4) is provided with an inclined plate (5), the inner side of the inclined plate (5) is provided with an inclined chute (6), the top of the inclined plate is fixed with a top plate (7), the bottom of the top plate (7) is provided with a support rod (8), and the support rod (8), the utility model discloses a pipeline aligning device, including swash plate (5), the symmetry is equipped with a plurality of guides (9) of being convenient for make the pipeline slide to align on swash plate (5), be equipped with through-hole (10) of being convenient for the staff to the observation and the fixed connection operation of butt joint department on fixed plate (2), through-hole (10) are located fixed plate (2) lower part.
2. The butt joint structure for chemical pipeline installation according to claim 1, wherein: the guide piece (9) comprises an arc rod (11), a long hole (12) is formed in the inclined plate (5), the arc plate (4) is transversely fixed in the middle of the long hole (12), and the arc plate (4) is connected with a plurality of guide wheels (13) in a rotating mode.
3. The butt joint structure for chemical pipeline installation according to claim 1, wherein: the outer side of the top plate (7) exceeds the outer side of the top of the inclined plate (5).
CN202020582726.1U 2020-04-19 2020-04-19 Butt-joint structure for chemical pipeline installation Active CN212643823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020582726.1U CN212643823U (en) 2020-04-19 2020-04-19 Butt-joint structure for chemical pipeline installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020582726.1U CN212643823U (en) 2020-04-19 2020-04-19 Butt-joint structure for chemical pipeline installation

Publications (1)

Publication Number Publication Date
CN212643823U true CN212643823U (en) 2021-03-02

Family

ID=74794215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020582726.1U Active CN212643823U (en) 2020-04-19 2020-04-19 Butt-joint structure for chemical pipeline installation

Country Status (1)

Country Link
CN (1) CN212643823U (en)

Similar Documents

Publication Publication Date Title
CN212643823U (en) Butt-joint structure for chemical pipeline installation
CN210153392U (en) Oil gas warehousing and transportation is with connecting oil leak recovery unit
CN216178055U (en) Underground pipeline repairing and welding device
CN213809418U (en) Galvanized pipeline with stable turning part
CN211496654U (en) Single-clamp lifting system for carbon anode transfer station
CN113882673A (en) Vertical shaft concrete conveying buffer device and method
CN211817435U (en) Subway station side wall reinforced concrete protective layer thickness control fixture
CN209705474U (en) A kind of concrete delivery pump pipe connection transformational structure
CN103031977B (en) High-strength flexible hubbed flange structure
CN217232972U (en) Angle steel reinforcing apparatus
CN206943664U (en) A kind of Double-metal composite elbow pipe fitting
CN200985276Y (en) Air flow conveying system track switching mechanism for PET automatic canning line
CN217147792U (en) Combined elbow for powder conveying
CN201884855U (en) Wear-resistant polyethylene elbow pipe
CN205907787U (en) Hose guide box cage and boxes and baskets formula hose guider
CN216690395U (en) Pump line system suitable for high slope domatic frame roof beam is pour
CN219933219U (en) Concrete conveying device for mountain area complex terrain
CN214638260U (en) Feeding device for hydraulic pipeline before pipe clamp assembly
CN220600804U (en) HDPE mud pipe with flow guiding function
CN219639736U (en) Abrasion-resistant lining rubber inclined three-way pipeline
CN218506772U (en) Coal breakage unloading elephant trunk
CN215803289U (en) Inclined shaft unloading buffer and inclined shaft unloading system
CN213390540U (en) Quick-connection dog bone type deformed steel
CN218950797U (en) Special hoisting tool for cooling tube bundles of natural ventilation direct air cooling system
CN210754500U (en) Extrusion roller for reinforced straight welded pipe production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240129

Address after: Room 1115, Laite Comprehensive Building, No. 38 Hongtu Road, Jinyintan, Dongxihu District, Wuhan City, Hubei Province, 430000

Patentee after: Wuhan Xingrui Chemical Co.,Ltd.

Country or region after: China

Address before: 265400 No.98 Linglong Road, Zhaoyuan City, Yantai City, Shandong Province

Patentee before: Feng Xiaoyan

Country or region before: China

TR01 Transfer of patent right