CN212642102U - Scaffold board lays work piece in succession - Google Patents

Scaffold board lays work piece in succession Download PDF

Info

Publication number
CN212642102U
CN212642102U CN202021043174.3U CN202021043174U CN212642102U CN 212642102 U CN212642102 U CN 212642102U CN 202021043174 U CN202021043174 U CN 202021043174U CN 212642102 U CN212642102 U CN 212642102U
Authority
CN
China
Prior art keywords
scaffold board
scaffold
steel
steel pipe
pipe fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021043174.3U
Other languages
Chinese (zh)
Inventor
凌鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Cosco KHI Ship Engineering Co Ltd
Original Assignee
Dalian Cosco KHI Ship Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Cosco KHI Ship Engineering Co Ltd filed Critical Dalian Cosco KHI Ship Engineering Co Ltd
Priority to CN202021043174.3U priority Critical patent/CN212642102U/en
Application granted granted Critical
Publication of CN212642102U publication Critical patent/CN212642102U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a work piece is laid in succession to scaffold board, fixed mounting's riser on bottom plate and bottom plate, the riser is equipped with a plurality ofly altogether, the through hole has all been seted up on a plurality of risers, and the through hole endotheca is equipped with the steel-pipe fitting, the last laminating of steel-pipe fitting has scaffold board. The utility model discloses in, owing to adopt joint formula splice plate structure, realized scaffold board concatenation of each other and compressed tightly to realized laying the installation in succession of scaffold board, again owing to adopt the steel pipe to run through extension fixed knot structure, realized the steel-pipe fitting and be convenient for connect the installation, and scaffold board lays comparatively conveniently, reduces the inconvenient defect of scaffold frame installation in the hull space simultaneously.

Description

Scaffold board lays work piece in succession
Technical Field
The utility model relates to a scaffold board equipment technical field especially relates to a work piece is laid in succession to scaffold board.
Background
The scaffold board is also called scaffold piece, and is laid on scaffold frame and operation frame, so that it is convenient for workers to walk above the scaffold board, transfer material and make construction operation, and can be made up by using steel, wood, bamboo, aluminium alloy and plastics, etc. and the mass of single scaffold board is not greater than 30 KG.
Firstly, the existing scaffold boards are often required to be installed and fixed in an auxiliary manner through a large number of scaffolds in the using process, so that the laying and installation efficiency of the scaffold boards is low; secondly, the bottom pipe fitting length is limited when current scaffold board is laid in succession, is difficult to carry out longer stable support, and current hull space is limited, and it is comparatively inconvenient to install scaffold.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem of supporting and laying the scaffold boards, the scaffold boards are provided with workpieces which are laid continuously.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a work piece is laid in succession to scaffold board, includes the riser of fixed mounting on bottom plate and the bottom plate, the riser is equipped with a plurality ofly altogether, the through hole has all been seted up on a plurality of risers, and the through hole endotheca is equipped with the steel-pipe fitting, the last laminating of steel-pipe fitting has the scaffold board.
As a further description of the above technical solution:
the steel pipe fittings and the through holes are at least two, and the at least two steel pipe fittings and the through holes correspond to each other one by one.
As a further description of the above technical solution:
be equipped with first steel pipe, second steel pipe and fastener in the steel-pipe fitting, the fastener is connected the end department with between first steel pipe and the second steel pipe and is laminated.
As a further description of the above technical solution:
the fastener is equipped with a plurality ofly, wherein passes through bolt fixed connection between two adjacent fasteners in a plurality of fasteners.
As a further description of the above technical solution:
the scaffold board is equipped with a plurality ofly altogether, draw-in groove and buckle have all been seted up to both sides on the scaffold board, draw-in groove and buckle opposite direction on the scaffold board both sides.
As a further description of the above technical solution:
the clamping groove is clamped with the buckle.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, adopt joint formula concatenation plate structure, owing to adopted the through hole of seting up on a plurality of risers to and through hole clearance fit's steel-pipe fitting, realized laying the scaffold board on the steel-pipe fitting, owing to adopted the joint between buckle and the draw-in groove, realized the concatenation of scaffold board each other and compressed tightly again, thereby realized laying the installation in succession of scaffold board.
2. The utility model discloses in, adopt the steel pipe to run through extension fixed knot and construct, owing to adopted the fastener that the junction cover was established between first steel pipe and the second steel pipe to and the bolt fixed connection between the fastener, realized the steel-pipe fitting on the one hand and be convenient for connect the installation, and scaffold board lays comparatively conveniently, and on the other hand reduces scaffold frame installation inconvenience in the hull space, influences the defect of hull structure easily.
Drawings
Fig. 1 shows a schematic front view structure diagram provided according to an embodiment of the present invention;
fig. 2 shows a schematic side view structure provided according to an embodiment of the present invention;
fig. 3 shows a schematic top view structure provided according to an embodiment of the present invention;
fig. 4 shows a schematic cross-sectional structure diagram of the scaffold board joint according to the embodiment of the present invention
Illustration of the drawings:
1. a vertical plate; 2. a steel pipe fitting; 201. a first steel pipe; 202. a second steel pipe; 3. a fastener; 4. a scaffold board; 401. a card slot; 402. buckling; 5. a base plate; 6. a through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a work piece is laid in succession to scaffold board, riser 1 of fixed mounting on bottom plate 5 and bottom plate 5, riser 1 is equipped with a plurality ofly altogether, through hole 6 has all been seted up on a plurality of risers 1, and the through hole 6 endotheca is equipped with steel pipe fitting 2, the last laminating of steel pipe fitting 2 has scaffold board 4, so that scaffold board 4 and steel pipe fitting 2 lay fast fixedly under current hull condition, thereby make fast fixed scaffold board 4 and steel pipe fitting 2 under the many baffle conditions of hull, and can not influence hull inner structure stability, wherein this paper fixed connection all can adopt welding or bolt fixed connection's fixed connection mode to realize.
Specifically, as shown in fig. 3, at least two steel pipes 2 and at least two through holes 6 are provided, and the at least two steel pipes 2 and the through holes 6 are in one-to-one correspondence with each other, so that the steel pipes 2 are fixedly used by penetrating through the through holes 6.
Specifically, as shown in fig. 3, a first steel pipe 201, a second steel pipe 202 and a fastener 3 are arranged in the steel pipe fitting 2, and the fastener 3 is attached to the connecting end between the first steel pipe 201 and the second steel pipe 202, so that the fastener 3 integrally connects the first steel pipe 201 and the second steel pipe 202 to form a whole, and the steel pipe fitting 2 is integrally connected and fixed.
Specifically, as shown in fig. 2, the fasteners 3 are provided with a plurality of fasteners, wherein two adjacent fasteners 3 in the plurality of fasteners 3 are fixedly connected by bolts, so that the fasteners 3 are attached to each other two by two to block the joint between the first steel pipe 201 and the second steel pipe 202.
Specifically, as shown in fig. 4, the plurality of scaffold boards 4 are provided, the two sides of the scaffold board 4 are both provided with a plurality of slots 401 and fasteners 402, the directions of the slots 401 and the fasteners 402 on the two sides of the scaffold board 4 are opposite, and the slots 401 and the fasteners 402 are in clearance fit.
Specifically, as shown in fig. 4, the slot 401 is connected to the buckle 402 in a clamping manner, so that the plurality of scaffold boards 4 are mutually connected in a clamping manner to form a planar integral structure, and the gap between the slot 401 and the buckle 402 reduces the possibility of fracture at the joint of the scaffold boards 4.
The working principle is as follows: when the scaffold board is used, firstly, the scaffold boards 4 are paved on the steel pipe pieces 2 through the through holes 6 formed in the vertical plates 1 and the steel pipe pieces 2 in clearance fit with the through holes 6, and then the scaffold boards 4 are mutually spliced and pressed through the clamping connection between the buckles 402 and the clamping grooves 401, so that the scaffold boards 4 are continuously paved and installed; secondly, through the fastener 3 of establishing of junction cover between first steel pipe 201 and the second steel pipe 202 to and the bolt fixed connection between the fastener 3, make steel pipe fitting 2 be convenient for connect the installation, thereby make scaffold board 4 lay comparatively convenient.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a work piece is laid in succession to scaffold board, includes riser (1) of fixed mounting on bottom plate (5) and bottom plate (5), its characterized in that, riser (1) are equipped with a plurality ofly altogether, through hole (6) have all been seted up on a plurality of risers (1), and through hole (6) endotheca is equipped with steel-pipe fitting (2), laminating has scaffold board (4) on steel-pipe fitting (2).
2. The scaffold board continuous laying work piece according to claim 1, wherein at least two steel pipes (2) and through holes (6) are provided, and the at least two steel pipes (2) and the through holes (6) are in one-to-one correspondence.
3. The scaffold board continuous laying workpiece as claimed in claim 2, wherein a first steel pipe (201), a second steel pipe (202) and a fastener (3) are arranged in the steel pipe fitting (2), and the fastener (3) is attached to the connecting end point between the first steel pipe (201) and the second steel pipe (202).
4. A scaffold board continuous laying work according to claim 3, characterized in that the fasteners (3) are provided in plurality, wherein adjacent two fasteners (3) of the plurality of fasteners (3) are fixedly connected by bolts.
5. The continuous laying workpiece of the scaffold boards as claimed in claim 1, wherein the scaffold boards (4) are provided in plurality, the scaffold boards (4) are provided with clamping grooves (401) and buckles (402) on two sides, and the clamping grooves (401) and the buckles (402) on the two sides of the scaffold boards (4) are opposite in direction.
6. A scaffold board continuous laying work according to claim 5, characterized in that the slot (401) is snapped with a snap (402).
CN202021043174.3U 2020-06-09 2020-06-09 Scaffold board lays work piece in succession Active CN212642102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021043174.3U CN212642102U (en) 2020-06-09 2020-06-09 Scaffold board lays work piece in succession

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021043174.3U CN212642102U (en) 2020-06-09 2020-06-09 Scaffold board lays work piece in succession

Publications (1)

Publication Number Publication Date
CN212642102U true CN212642102U (en) 2021-03-02

Family

ID=74791355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021043174.3U Active CN212642102U (en) 2020-06-09 2020-06-09 Scaffold board lays work piece in succession

Country Status (1)

Country Link
CN (1) CN212642102U (en)

Similar Documents

Publication Publication Date Title
CN212642102U (en) Scaffold board lays work piece in succession
CN215442527U (en) Assembly type building wallboard connecting device that civil engineering used
CN210658695U (en) Factory building steel construction beam column
CN210032088U (en) Easily install steel construction assembled node
CN217000827U (en) Connecting assembly for mounting and fixing scaffold steel plate net
CN212405556U (en) Prefabricated wall for prefabricated building
CN217204626U (en) Steel structure node component
CN217537822U (en) Construction formwork mounting structure
CN207080787U (en) Angle steel quickly fixes theft-prevention supporter
CN217500750U (en) Integral type fitment structure
CN210086544U (en) Novel fixed code and connecting structure thereof
CN217693145U (en) Supporting and mounting structure of solar photovoltaic panel
CN216098532U (en) Fiber cement board strip type mounting device
CN217557386U (en) Concatenation combination formula light composite sound insulation board
CN217870929U (en) Assembled prefabricated component
CN212169455U (en) Auxiliary tool for welding steel structure in air
CN211817922U (en) Steel pipe scaffold springboard antiskid supporting mechanism
CN215858612U (en) Novel industry and civilian building wall body is consolidated device
CN215715958U (en) Waterproof structure of assembled floor and prefabricated balcony junction node
CN217934800U (en) Fixing clamp convenient to install and used for electric power design
CN217811809U (en) Admire wall convenient to hang fixedly
CN214402739U (en) Plate-type structure for engineering design building
CN220483866U (en) Spliced construction site is with reinforcing bar piling up ridge
CN210669338U (en) Cable fixing support
CN218521600U (en) Clamping piece structure for bolt connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant