CN212628234U - 5G system installation equipment - Google Patents

5G system installation equipment Download PDF

Info

Publication number
CN212628234U
CN212628234U CN202021872286.XU CN202021872286U CN212628234U CN 212628234 U CN212628234 U CN 212628234U CN 202021872286 U CN202021872286 U CN 202021872286U CN 212628234 U CN212628234 U CN 212628234U
Authority
CN
China
Prior art keywords
cabinet body
installation
threaded
bearing
installation cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021872286.XU
Other languages
Chinese (zh)
Inventor
董江龙
张挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Zhehui Technology Co ltd
Original Assignee
Hangzhou Zhehui Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Zhehui Technology Co ltd filed Critical Hangzhou Zhehui Technology Co ltd
Priority to CN202021872286.XU priority Critical patent/CN212628234U/en
Application granted granted Critical
Publication of CN212628234U publication Critical patent/CN212628234U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model relates to the technical field of installation equipment, in particular to 5G system installation equipment, which comprises an installation cabinet body, a bearing plate, radiating fan blades and cable fixing clamps, wherein the bottom of the installation cabinet body is fixedly provided with supporting legs, both sides of the installation cabinet body are respectively provided with a plurality of groups of ventilation holes, a first dust screen is embedded and installed in the ventilation holes, two threaded rods are installed inside the installation cabinet body, a plurality of groups of bearing plates are arranged between the threaded rods, the bottom of the bearing plate is positioned outside the threaded rods and is provided with a connecting sleeve, connecting oblique rods are installed between the front end and the rear end of the connecting sleeve and the bearing plate, the bottom of the connecting sleeve is fixedly connected with a hollow bearing, the bottom of the hollow bearing is fixedly connected with a threaded sleeve, the outside of the threaded sleeve is provided with an anti-skid, the wiring is reasonable and convenient to maintain, the heat dissipation effect is good, and certain popularization value is achieved.

Description

5G system installation equipment
Technical Field
The utility model relates to an erection equipment technical field specifically is a 5G system installation equipment.
Background
The 5G is a fifth generation mobile communication technology and also an extension behind the 4G, the peak value theoretical transmission speed of the 5G network as a fifth generation mobile communication network can reach dozens of Gb per second, which is hundreds of times faster than the transmission speed of the 4G network, the main objective of the 5G network is to enable an end user to be in a networking state all the time, the equipment supported by the 5G network in the future is far more than a smart phone and also supports a smart watch, a fitness wrist strap and smart home equipment such as a bird nest type indoor thermostat, etc., the 5G network is a next generation wireless network and is a real upgrade version of the 4G network, the basic requirements of the 5G network are different from the wireless network of today, the 5G network is in a test stage at present, large-scale test networking is already formed, and 5G network construction is started on the basis.
The 5G system needs multiple hardware equipment combination when the construction, and the current installation is hardware in the rack is more, and layout installation planning is unreasonable in the cabinet, leads to the rack volume great, and the cable of 5G network hardware equipment is more during the installation, walks the line in a jumble, is unfavorable for the later maintenance, and 5G network hardware equipment during operation can produce a large amount of heats, consequently needs a 5G system installation equipment to make the improvement to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a 5G system installation equipment to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
A5G system installation device comprises an installation cabinet body, bearing plates, radiating fan blades and cable fixing clamps, wherein supporting legs are fixedly installed at the bottom of the installation cabinet body, a plurality of groups of ventilation holes are formed in the two sides of the installation cabinet body, a first dustproof net is embedded and installed in the ventilation holes, two threaded rods are installed in the installation cabinet body, a plurality of groups of bearing plates are arranged between the threaded rods, a connecting sleeve is installed at the bottom of the bearing plate, which is positioned outside the threaded rods, a connecting inclined rod is installed between the front end and the rear end of the connecting sleeve and the bearing plates, a hollow bearing is fixedly connected to the bottom of the connecting sleeve, a threaded sleeve is fixedly connected to the bottom of the hollow bearing, an anti-skid sleeve is sleeved outside the threaded sleeve, a plurality of groups of cable fixing clamps are installed at, just four corners of circular arc fixture block all are equipped with the mounting hole, multiunit circular arc fixture block is installed to fixed plate one side equidistance, embedding installation second magnet strip on the circular arc fixture block, one side that the fixed plate was kept away from to the circular arc fixture block is equipped with the circular arc cardboard, embedding installation first magnet strip on the circular arc cardboard, the louvre has been seted up at installation cabinet body top, the second dust screen is installed to the embedding in the louvre, second dust screen below is located the downthehole fixed mounting of louvre has the mounting bracket, micro motor is installed to the mounting bracket bottom, the heat dissipation flabellum is installed to micro motor's output, the louvre both sides are located installation cabinet body top and all install the bracing piece, rain-proof top cap is installed at the.
Preferably, the lightning rod is connected with the ground through a grounding lead.
Preferably, the vent holes are arranged obliquely upwards, and the diameters of the vent holes are gradually reduced from outside to inside.
Preferably, both ends of the threaded rod are fixedly connected with the top end and the bottom end of the inside of the mounting cabinet body respectively.
Preferably, the threaded sleeve is in threaded connection with a threaded rod, and the threaded rod penetrates through the hollow bearing, the connecting sleeve and the bearing plate.
Preferably, the cable fixing clamp is fixedly connected with the mounting cabinet body through a bolt.
Preferably, the arc fixture block and the arc clamping plate are rotatably connected through a connecting hinge, rubber pads are arranged on the inner sides of the arc fixture block and the arc clamping plate, and the magnetic poles of the first magnet strip and the second magnet strip are opposite.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, through the bearing board and the threaded rod that set up, through thread bush and threaded rod threaded connection, the threaded rod passes the cavity bearing, adapter sleeve and bearing board, install the bearing board between two threaded rods, the height of bearing board can be adjusted through rotating the thread bush, and install between both ends and the bearing board around through the adapter sleeve and be connected the down tube, improve the stability of bearing board, increase the bearing capacity of bearing board, the position of the adjustment bearing board of being convenient for of whole equipment, optimize the inside installation space of equipment, utilize the less installation cabinet body to install more 5G network hardware equipment, the practicality is higher.
2. The utility model discloses in, cable fixation clamp through setting up, the cable fixation clamp passes through the bolt and installs on installation cabinet internal side wall, rotate through connecting the hinge through circular arc fixture block and circular arc cardboard and connect, place the cable of 5G network hardware equipment between circular arc fixture block and circular arc cardboard, magnetic pole through first magnet strip and second magnet strip is opposite, fasten circular arc fixture block and circular arc cardboard actuation, it is more reasonable to make the cable walk the line planning, all be equipped with the rubber pad through circular arc fixture block and circular arc cardboard inboard, can not scrape the cable parcel layer brokenly, seek when facilitating the use of service maintenance personnel maintenance, and the work efficiency is improved.
3. The utility model discloses in, through the ventilation hole and the heat dissipation flabellum that set up, slope through the ventilation hole upwards sets up, and the diameter outside-in ventilation hole diminishes gradually, can prevent that the rainwater from inside ventilation hole entering equipment, avoid the internal plant to damage, outside air is inside from ventilation hole entering equipment, drive heat dissipation flabellum work through micro motor, form the air flow, discharge the heat that 5G network hardware equipment during operation produced from the louvre, make equipment can steady operation, improve life.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic diagram of the structure of the support plate of the present invention;
fig. 3 is the schematic view of the cable fixing clip structure of the present invention.
In the figure: 1-mounting a cabinet body, 2-supporting legs, 3-threaded rods, 4-vent holes, 5-first dust screens, 6-connecting sleeves, 7-supporting plates, 8-supporting rods, 9-rainproof top covers, 10-lightning rods, 11-radiating holes, 12-second dust screens, 13-mounting frames, 14-micro motors, 15-radiating fan blades, 16-cable fixing clamps, 17-connecting inclined rods, 18-hollow bearings, 19-anti-skidding sleeves, 20-threaded sleeves, 21-fixing plates, 22-arc clamping blocks, 23-arc clamping plates, 24-first magnet strips, 25-second magnet strips and 26-mounting holes.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
A5G system installation device comprises an installation cabinet body 1, a bearing plate 7, radiating fan blades 15 and a cable fixing clamp 16, wherein supporting legs 2 are fixedly installed at the bottom of the installation cabinet body 1, a plurality of groups of vent holes 4 are formed in two sides of the installation cabinet body 1, the vent holes 4 are obliquely and upwards arranged, the diameters of the vent holes 4 are gradually reduced from outside to inside, a first dust screen 5 is embedded in the vent holes 4, two threaded rods 3 are installed inside the installation cabinet body 1, two ends of each threaded rod 3 are respectively and fixedly connected with the top end and the bottom end inside the installation cabinet body 1, a plurality of groups of bearing plates 7 are arranged between the threaded rods 3, a connecting sleeve 6 is installed at the bottom of each bearing plate 7 and positioned outside the threaded rod 3, connecting inclined rods 17 are installed between the front end and the rear end of each connecting sleeve 6 and the corresponding bearing plate, an anti-skid sleeve 19 is sleeved outside the threaded sleeve 20, the threaded sleeve 20 is in threaded connection with the threaded rod 3, the threaded rod 3 penetrates through the hollow bearing 18, the connecting sleeve 6 and the bearing plate 7, a plurality of groups of cable fixing clamps 16 are installed on one side inside the installation cabinet body 1, the cable fixing clamps 16 are fixedly connected with the installation cabinet body 1 through bolts, each cable fixing clamp 16 comprises a fixing plate 21, an arc fixture block 22 and an arc clamping plate 23, installation holes 26 are formed in four corners of each arc fixture block 22, a plurality of groups of arc fixture blocks 22 are installed on one side of the fixing plate 21 at equal intervals, second magnet strips 25 are embedded in the arc fixture blocks 22, the arc clamping plates 23 are arranged on one sides, away from the fixing plate 21, of the arc fixture blocks 22, the first magnet strips 24 are embedded in the arc clamping plates 23, the arc fixture blocks 22 are rotatably connected with the arc clamping, first magnet strip 24 is opposite with second magnet strip 25's magnetic pole, louvre 11 has been seted up at the installation cabinet body 1 top, second dust screen 12 has been installed to embedding in the louvre 11, second dust screen 12 below is located louvre 11 internal fixed mounting has mounting bracket 13, micro motor 14 is installed to mounting bracket 13 bottom, heat dissipation flabellum 15 is installed to micro motor 14's output, bracing piece 8 is all installed at the 11 both sides of louvre in the installation cabinet body 1 top, rain-proof top cap 9 is installed at bracing piece 8 top, lightning rod 10 is installed at rain-proof top cap 9 top, lightning rod 10 is connected with ground through ground lead.
The utility model discloses work flow: when the device is used, the threaded rod 3 is in threaded connection with the threaded rod 3 through the threaded sleeve 20, the threaded rod 3 penetrates through the hollow bearing 18, the connecting sleeve 6 and the bearing plate 7, the bearing plate 7 is installed between the two threaded rods 3, the height of the bearing plate 7 can be adjusted by rotating the threaded sleeve 20, the connecting inclined rods 17 are installed between the front end and the rear end of the connecting sleeve 6 and the bearing plate 7, the stability of the bearing plate 7 is improved, the bearing capacity of the bearing plate 7 is increased, the position of the bearing plate 7 is convenient to adjust by the whole device, the installation space in the device is optimized, more 5G network hardware devices are installed by using a small installation cabinet body, the cable fixing clamp 16 is arranged, the arc clamping block 22 and the arc clamping plate 23 are rotatably connected through the connecting hinge, the cable of the 5G network hardware devices is placed between the arc clamping block 22 and the arc clamping plate 23, and the magnetic poles of the first, the arc fixture block 22 and the arc clamping plate 23 are attracted and fastened, so that the cable routing planning is more reasonable, the rubber pads are arranged on the inner sides of the arc clamping block 22 and the arc clamping plate 23, so that the cable wrapping layer is not scraped, convenience is brought to a user to find during maintenance, the working efficiency is improved, the vent holes 4 are obliquely arranged upwards, and the diameters of the vent holes 4 are gradually reduced from outside to inside, so that rainwater can be prevented from entering the equipment from the vent holes 4, the damage of internal equipment is avoided, outside air enters the equipment from the vent holes 4, drive heat dissipation flabellum 15 work through micro motor 14, form the air flow, discharge the heat that 5G network hardware equipment during operation produced from louvre 11, make equipment can steady operation, improve life, whole equipment internally mounted space utilization is high, walks the reasonable convenient maintenance of line, and the radiating effect is better, has certain spreading value.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a 5G system installation equipment, includes the installation cabinet body (1), bearing board (7), heat dissipation fan blade (15) and cable fixation clamp (16), its characterized in that: the installation cabinet comprises an installation cabinet body (1), supporting legs (2) are fixedly installed at the bottom of the installation cabinet body (1), multiple groups of ventilation holes (4) are formed in the two sides of the installation cabinet body (1), a first dust screen (5) is installed in each ventilation hole (4) in an embedded mode, two threaded rods (3) are installed inside the installation cabinet body (1), multiple groups of bearing plates (7) are arranged between the threaded rods (3), connecting sleeves (6) are installed at the bottoms of the bearing plates (7) and located on the outer sides of the threaded rods (3), connecting oblique rods (17) are installed between the front end and the rear end of each connecting sleeve (6) and the corresponding bearing plates (7), hollow bearings (18) are fixedly connected at the bottoms of the connecting sleeves (6), anti-skidding sleeves (19) are sleeved on the outer sides of the threaded sleeves (20), and multiple groups of cable fixing clamps (16), the cable fixing clamp (16) is composed of a fixing plate (21), arc fixture blocks (22) and arc clamping plates (23), mounting holes (26) are formed in four corners of each arc fixture block (22), a plurality of groups of arc fixture blocks (22) are installed on one side of the fixing plate (21) at equal intervals, second magnet strips (25) are embedded and installed on the arc fixture blocks (22), the arc clamping plates (23) are arranged on one sides, away from the fixing plate (21), of the arc fixture blocks (22), first magnet strips (24) are embedded and installed on the arc clamping plates (23), heat dissipation holes (11) are formed in the top of the installation cabinet body (1), second dust screens (12) are embedded and installed in the heat dissipation holes (11), an installation frame (13) is fixedly installed in the position below the second dust screens (12) in the heat dissipation holes (11), and micro motors (14) are installed at the bottoms of the installation frame, radiating fan blade (15) are installed to the output of micro motor (14), louvre (11) both sides are located the installation cabinet body (1) top and all install bracing piece (8), rain-proof top cap (9) are installed at bracing piece (8) top, lightning rod (10) are installed at rain-proof top cap (9) top.
2. A 5G system installation apparatus according to claim 1, wherein: the lightning rod (10) is connected with the ground through a grounding lead.
3. A 5G system installation apparatus according to claim 1, wherein: the vent hole (4) is obliquely and upwards arranged, and the diameter of the vent hole (4) is gradually reduced from outside to inside.
4. A 5G system installation apparatus according to claim 1, wherein: the two ends of the threaded rod (3) are fixedly connected with the top end and the bottom end inside the installation cabinet body (1) respectively.
5. A 5G system installation apparatus according to claim 1, wherein: the threaded sleeve (20) is in threaded connection with the threaded rod (3), and the threaded rod (3) penetrates through the hollow bearing (18), the connecting sleeve (6) and the bearing plate (7).
6. A 5G system installation apparatus according to claim 1, wherein: the cable fixing clamp (16) is fixedly connected with the mounting cabinet body (1) through bolts.
7. A 5G system installation apparatus according to claim 1, wherein: the arc clamping block (22) is rotatably connected with the arc clamping plate (23) through a connecting hinge, rubber pads are arranged on the inner sides of the arc clamping block (22) and the arc clamping plate (23), and the magnetic poles of the first magnet strip (24) and the second magnet strip (25) are opposite.
CN202021872286.XU 2020-09-01 2020-09-01 5G system installation equipment Expired - Fee Related CN212628234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021872286.XU CN212628234U (en) 2020-09-01 2020-09-01 5G system installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021872286.XU CN212628234U (en) 2020-09-01 2020-09-01 5G system installation equipment

Publications (1)

Publication Number Publication Date
CN212628234U true CN212628234U (en) 2021-02-26

Family

ID=74704562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021872286.XU Expired - Fee Related CN212628234U (en) 2020-09-01 2020-09-01 5G system installation equipment

Country Status (1)

Country Link
CN (1) CN212628234U (en)

Similar Documents

Publication Publication Date Title
CN212628234U (en) 5G system installation equipment
CN209766143U (en) Pole insulator deicing device
CN210376561U (en) Fault positioning device for power transmission and distribution network
CN213361817U (en) Teaching equipment monitoring device with adjustable based on thing networking
CN210671036U (en) Computer network strutting arrangement
CN212957951U (en) 5G-based lamp pole mounting and supporting device for AAU base station
CN221009732U (en) Distribution frame for distribution line construction
CN217240834U (en) Switch installing support convenient to use
CN220042685U (en) Power distribution cabinet convenient to maintain
CN218672449U (en) Multifunctional constant-temperature dehumidification heat pump unit for swimming pool
CN219644360U (en) Internet information security acquisition terminal
CN220291981U (en) Electric power photovoltaic cable termination convenient to wiring operation
CN216819788U (en) Novel photovoltaic conflux case communication module
CN220688501U (en) Communication equipment base
CN220233897U (en) 10KV automatic complete equipment for power distribution network
CN219780174U (en) Distributed photovoltaic power station is based on 5G network data communication collection system
CN217928545U (en) Distributed comprehensive control smart rod based on smart city
CN214204342U (en) Integrated intelligent power distribution cabinet
CN213186577U (en) Wireless terminal equipment supporting 4G transmission
CN219875928U (en) Multifunctional POE switch
CN220733345U (en) Heat radiation structure for base station power supply
CN216055800U (en) Water supply control cabinet with adopt converter as collection equipment
CN215345463U (en) Open-air portable high definition wireless transmission equipment
CN217934732U (en) Energy-saving high-low voltage switch cabinet
CN219841369U (en) Wall-mounted wireless signal emission enhancer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210226

Termination date: 20210901

CF01 Termination of patent right due to non-payment of annual fee