CN212622344U - Building door and window curtain thermal insulation performance detection device - Google Patents

Building door and window curtain thermal insulation performance detection device Download PDF

Info

Publication number
CN212622344U
CN212622344U CN202021437902.9U CN202021437902U CN212622344U CN 212622344 U CN212622344 U CN 212622344U CN 202021437902 U CN202021437902 U CN 202021437902U CN 212622344 U CN212622344 U CN 212622344U
Authority
CN
China
Prior art keywords
window curtain
plate
insulation performance
thermal insulation
detection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021437902.9U
Other languages
Chinese (zh)
Inventor
田原
周向朋
肖剑驰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kaifeng Yellow River Engineering Quality Inspection Co ltd
Original Assignee
Kaifeng Yellow River Engineering Quality Inspection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaifeng Yellow River Engineering Quality Inspection Co ltd filed Critical Kaifeng Yellow River Engineering Quality Inspection Co ltd
Priority to CN202021437902.9U priority Critical patent/CN212622344U/en
Application granted granted Critical
Publication of CN212622344U publication Critical patent/CN212622344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The utility model relates to a detect technical field, concretely relates to building door and window curtain thermal insulation performance detection device, including detecting room and first fixed block, the inside that detects the room is provided with solid fixed splint, the inside that detects the room is provided with the connecting plate, first spout has all been seted up at the both ends that detect the room, the inside slidable mounting of first spout has the slider, every group be provided with the head rod through the pivot between the first fixed block. The utility model discloses a be provided with solid fixed splint, connecting plate, first spout, slider and head rod, make the staff can pull out the inside that detects the room with solid fixed splint, then install the door and window curtain and can detect door and window curtain in solid fixed splint's inside, made things convenient for staff's installation and dismantlement, saved staff's time and efforts simultaneously.

Description

Building door and window curtain thermal insulation performance detection device
Technical Field
The utility model relates to a detect technical field, specifically be a building door and window curtain thermal insulation performance detection device.
Background
The building door and window curtain wall heat preservation performance detection system is special detection equipment which can simulate specific indoor and outdoor climatic conditions when the building door and window curtain wall is used, and can calibrate the building outer window heat preservation performance by accurately measuring the heat transmitted by a test piece. In actual life, energy is greatly wasted by heat dissipated by the building through the curtain wall of the building door and window. At present, the country is strongly developing the conservation-oriented society, popularizing the energy-saving building is one aspect which is urgently needed at present, and the country provides strict mandatory indexes for the heat insulation performance indexes of the building door and window curtain walls, so that a heat insulation performance detection system of the building door and window curtain walls is needed to detect the heat insulation performance of the door and window curtain walls, select the door and window curtain walls with better heat insulation performance and reduce the energy dissipated by the building door and window curtain walls.
Traditional building door and window curtain detection device most all need the staff with door and window curtain direct fixed mounting on detection device, then detect it through detection device, wait to detect and dismantle it after accomplishing again, very inconvenient, wasted staff's a large amount of time and energy, so need design a building door and window curtain thermal insulation performance detection device and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building door and window curtain thermal insulation performance detection device to solve traditional building door and window curtain detection device that proposes in the above-mentioned background art most all need the staff with the direct fixed mounting of door and window curtain on detection device, then detect it through detection device, wait to detect and dismantle it after accomplishing again, it is very inconvenient, wasted the problem of staff's plenty of time and energy.
In order to achieve the above object, the utility model provides a following technical scheme:
a building door and window curtain wall thermal insulation performance detection device comprises a detection mechanism and a transportation device, wherein the detection mechanism comprises a base, a detection chamber is arranged at the top end of the base, temperature controllers are arranged on two sides of the top end inside the detection chamber, temperature sensors are uniformly arranged on the inner walls of two sides inside the detection chamber, a storage groove is formed in the back surface of the detection chamber, a connection plate is arranged inside the detection chamber, a fixed clamping plate is arranged inside the detection chamber, first fixed blocks are arranged on one side of the detection chamber and one side of the connection plate, the number of the first fixed blocks is two, the number of the first fixed blocks in each group is four, a first connecting rod is arranged between the first fixed blocks in each group through a rotating shaft, first sliding grooves are formed in two ends of the detection chamber, and sliding blocks are arranged inside the first sliding grooves in a sliding manner, one end of the sliding block is fixedly connected with the connecting plate.
Preferably, the both ends of solid fixed splint all evenly are provided with first fixed plate, the quantity of first fixed plate is two sets of, and every group the quantity of first fixed plate all is six, the inserted bar is all inserted and installed to one side of first fixed plate, the spring is all cup jointed in the outside of inserted bar and installed, the one end of spring all with one side fixed connection of first fixed plate, the other end of spring all with the board fixed connection in the inserted bar outside, the one end of inserted bar all is provided with the sucking disc.
Preferably, one side of the connecting plate is provided with a groove, both sides of the interior of the groove are provided with fixing rods through rotating shafts, and one side of each fixing rod is fixedly connected with one side of the fixing clamping plate.
Preferably, the transportation device comprises a bottom plate and a top plate, wherein one side of the bottom plate, which is close to the top plate, is provided with four second fixed blocks, the top end of the bottom plate is provided with a second chute, a toothed bar is slidably arranged in the second chute, two sides of one end of the toothed bar are provided with slide bars, universal wheels are uniformly arranged at the bottom end of the bottom plate, the number of the universal wheels is four, a second fixed plate is arranged at the top end of the bottom plate, one side of the top end of the bottom plate is provided with a servo motor, a gear is fixedly arranged on a rotating shaft at one end of the servo motor and is fixedly connected with the second fixed plate through the rotating shaft, the toothed bar is meshed with the gear, the second fixed blocks are provided with second connecting rods through the rotating shaft, the number of the second connecting rods is two, and the number of the second connecting rods in each group is two, and one end of each second connecting rod is provided with a roller through a rotating shaft, and each second connecting rod is fixedly connected with the middle of the corresponding second connecting rod through a rotating shaft.
Preferably, one side on roof top is provided with the baffle, the both sides on roof top all are provided with the third fixed plate, the one end of third fixed plate all with baffle one side fixed connection, the both sides on baffle top all are provided with the backup plate.
Preferably, a rubber pad is arranged at the top end of the top plate, and the rubber pad is arranged between the two third fixing plates.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through being provided with solid fixed splint, connecting plate, first spout, slider and head rod, make the staff can pull out the inside that detects the room with solid fixed splint, then install the door and window curtain and can detect the door and window curtain in solid fixed splint's inside, made things convenient for staff's installation and dismantlement, saved staff's time and efforts simultaneously, increased the structure practicality of device, promoted staff's use and experienced.
2. Through being provided with the inserted bar, spring and sucking disc, make door and window curtain adsorb by the sucking disc when installing in the inside of solid fixed splint, and the elasticity of spring makes the inseparabler and door and window curtain's of sucking disc surface contact, it is more firm to make the sucking disc adsorb, the structural stability of device has been increased, through being provided with dead lever and recess, make two solid fixed splint open to both sides, the staff is direct to press from both sides door and window curtain between solid fixed splint and can install door and window curtain, and door and window curtain forms encapsulated situation with the rubber circle on solid fixed splint surface, the installation and the dismantlement of staff have been made things convenient for.
3. Through being provided with conveyer, make the staff make things convenient for transportation door and window curtain to assigned position, increased staff's use and experienced, through being provided with second spout, ratch, gear and second connecting rod, make the roof can be raised to assigned position, do not need the staff to lift up the installation with door and window curtain, saved staff's physical power, increased the structure practicality of device, saved staff's time and vigor.
Drawings
Fig. 1 is a schematic structural front sectional view of the present invention.
Fig. 2 is a schematic side view of the structure of the present invention.
Fig. 3 is a schematic top view of the structure of the present invention.
Fig. 4 is a schematic side view of the structure of the transportation device of the present invention.
Fig. 5 is a schematic side view of the rack bar structure of the present invention.
Fig. 6 is a partially enlarged schematic view of a portion a in fig. 1 according to the present invention.
Fig. 7 is a partially enlarged schematic view of the position B in fig. 1 according to the present invention.
In the figure: 100. a detection mechanism; 110. a base; 111. a detection chamber; 112. a temperature sensor; 113. a temperature controller; 114. fixing the clamping plate; 115. a receiving groove; 116. a connecting plate; 117. fixing the rod; 118. a first chute; 119. a slider; 120. a first fixing plate; 121. inserting a rod; 122. a spring; 123. a suction cup; 124. a first connecting rod; 125. a groove; 126. a first fixed block; 200. a transportation device; 210. a base plate; 211. a top plate; 212. a second chute; 213. a rack bar; 214. a second fixing plate; 215. a gear; 216. a servo motor; 217. a second fixed block; 218. a second connecting rod; 219. a roller; 220. a slide bar; 221. a universal wheel; 222. a baffle plate; 223. a third fixing plate; 224. a backup plate; 225. and (7) a rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides an embodiment:
the utility model provides a building door and window curtain thermal insulation performance detection device, including detection mechanism 100 and conveyer 200, detection mechanism 100 includes base 110, the top of base 110 is provided with detection room 111, the both sides on the inside top of detection room 111 all are provided with temperature controller 113, the inner wall of the inside both sides of detection room 111 all evenly is provided with temperature sensor 112, the back of detection room 111 is provided with accomodates groove 115, the inside of detection room 111 is provided with connecting plate 116, the inside of detection room 111 is provided with solid fixed splint 114, one side of detection room 111 one side and connecting plate 116 all is provided with first fixed block 126, the quantity of first fixed block 126 is two sets of, the quantity of the first fixed block 126 of every group is four, all be provided with head rod 124 through the pivot between the first fixed block 126 of every group, first spout 118 has all been seted up at the both ends of detection room 111, the inside of first spout 118 all has slider 119.
Slider 119's one end all with connecting plate 116 fixed connection, recess 125 has been seted up to one side of connecting plate 116, the inside both sides of recess 125 all are provided with dead lever 117 through the pivot, one side of dead lever 117 all is connected with one side of solid fixed splint 114, make the staff can pull out solid fixed splint 114 from the inside of detecting room 111, then the rotation is opened two solid fixed splint 114, install door and window curtain in solid fixed splint 114's inside again, make things convenient for the staff to install the door and window curtain.
The both ends of solid fixed splint 114 all evenly are provided with first fixed plate 120, the quantity of first fixed plate 120 is two sets of, and the quantity of every first fixed plate 120 of group all is six, the inserted bar 121 is all inserted to install in one side of first fixed plate 120, the outside of inserted bar 121 all cup joints and installs spring 122, the one end of spring 122 all with one side fixed connection of first fixed plate 120, the other end of spring 122 all with the board fixed connection in the inserted bar 121 outside, the one end of inserted bar 121 all is provided with sucking disc 123, when making door and window curtain install between two solid fixed splint 114, adsorb by sucking disc 123, because spring 122's elasticity, make sucking disc 123 absorbent more firm, the structural stability of device has been increased.
Conveyer 200 includes bottom plate 210 and roof 211, one side that bottom plate 210 and roof 211 are close to each other all is provided with second fixed block 217, the quantity of second fixed block 217 is four, the top of bottom plate 210 is provided with second spout 212, the inside slidable mounting of second spout 212 has ratch 213, the both sides of ratch 213 one end all are provided with slide bar 220, the bottom of bottom plate 210 evenly is provided with universal wheel 221, the quantity of universal wheel 221 is four, the top of bottom plate 210 is provided with second fixed plate 214, one side on bottom plate 210 top is provided with servo motor 216, gear 215 is installed to the pivot regulation of servo motor 216 one end.
Gear 215 is through pivot and second fixed plate 214 fixed connection, ratch 213 and gear 215 intermeshing, second fixed block 217 all is provided with second connecting rod 218 through the pivot, the quantity of second connecting rod 218 is two sets of, the quantity of every group second connecting rod 218 is two, the one end of second connecting rod 218 all is provided with gyro wheel 219 through the pivot, the centre of every group second connecting rod 218 all is through pivot fixed connection, make roof 211 can be risen, do not need the staff to lift door and window curtain and install again, staff's physical power has been saved, staff's use experience has been increased.
One side on roof 211 top is provided with baffle 222, and the both sides on roof 211 top all are provided with third fixed plate 223, and the one end of third fixed plate 223 all with baffle 222 one side fixed connection, the both sides on baffle 222 top all are provided with backup plate 224, make the staff can lay the door and window curtain and transport on roof 211, saved staff's time and physical power.
The top of roof 211 is provided with rubber pad 225, and rubber pad 225 installs between two third fixed plates 223, makes the door and window curtain increase the frictional force of contact surface when laying on roof 211, and the door and window curtain is difficult to slide to, has increased the structural stability of device.
The working principle is as follows: when the worker needs to inspect the door and window curtain wall, the worker drags the fixing clamping plates 114 to enable the first connecting rods 124 to move to the outer side of the accommodating grooves 115, meanwhile, the sliding blocks 119 slide in the first sliding grooves 118 to enable the connecting plates 116 to be pulled to the outer side of the detection chamber 111, and then the worker pulls the fixing clamping plates 114 to the two sides to enable the two fixing clamping plates 114 to be opened.
Then the staff places the door and window curtain wall that needs to detect between the third fixed plate 223 at the top of roof 211, place on rubber pad 225, then lean on one side of backup plate 224 with the one end of the curtain wall of door and window, then the staff promotes conveyer 200 to the assigned position, the staff opens servo motor 216's switch, control servo motor 216 anticlockwise rotation, make tooth bar 213 move to one side of second spout 212 in the inside of second spout 212, drive two gyro wheels 219 and slide on the surface of bottom plate 210 and roof 211 respectively, thereby drive second connecting rod 218 and rotate, make roof 211 rise upwards.
When the top plate 211 rises to the assigned position, the staff closes the servo motor 216, the staff lifts up the door and window curtain wall to vertical state, then the fixed splint 114 is rotated to make it clip the door and window curtain wall, at this moment, the surface of the door and window curtain wall is absorbed by the suction cup 123, then the spring 122 generates elasticity, act on the suction cup 123, make the suction cup 123 clip the door and window curtain wall firmly along with the closure of the fixed splint 114, when the fixed splint 114 clips the door and window curtain wall completely, at this moment, the sealing ring on the fixed splint 114 surface has formed a sealed state with the door and window curtain wall, then the staff pushes the fixed splint 114 to the inside of the detection room 111, make the first connecting rod 124 begin to rotate and contract and get into the inside of the accommodating groove.
When the fixing clamp plate 114 completely enters the interior of the detection chamber 111, the worker opens the temperature raising temperature controller 113 in the detection chamber 111 on one side to raise the temperature on one side, and detects the temperature in the detection chamber 111 on the other side by the temperature sensor 112 on the other side to detect the heat insulation performance; or the temperature controller 113 on the other side is opened, the temperature in the detection chamber 111 on the other side is reduced, the temperature in the detection chamber 111 on one side is detected through the temperature sensor 112 on one side, and the heat insulation performance of the door and window curtain wall is detected.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a building door and window curtain thermal insulation performance detection device, includes detection mechanism (100) and conveyer (200), its characterized in that: the detection mechanism (100) comprises a base (110), a detection chamber (111) is arranged at the top end of the base (110), temperature controllers (113) are arranged on two sides of the top end inside the detection chamber (111), temperature sensors (112) are evenly arranged on the inner walls of the two sides inside the detection chamber (111), a storage groove (115) is arranged on the back surface of the detection chamber (111), a connecting plate (116) is arranged inside the detection chamber (111), a fixing clamping plate (114) is arranged inside the detection chamber (111), first fixing blocks (126) are arranged on one side of the detection chamber (111) and one side of the connecting plate (116), the number of the first fixing blocks (126) is two groups, each group of the first fixing blocks (126) is four, and a first connecting rod (124) is arranged between the first fixing blocks (126) through a rotating shaft, first spout (118) have all been seted up at the both ends of detection room (111), the inside slidable mounting of first spout (118) has slider (119), the one end and the connecting plate (116) of slider (119) are connected.
2. The building door and window curtain wall thermal insulation performance detection device of claim 1, characterized in that: the both ends of solid fixed splint (114) all evenly are provided with first fixed plate (120), the quantity of first fixed plate (120) is two sets of, and every group the quantity of first fixed plate (120) all is six, inserted bar (121) are all installed in one side of first fixed plate (120), spring (122) are all installed in the cup jointing in the outside of inserted bar (121), the one end of spring (122) is connected with one side of first fixed plate (120), the other end and the board connection in inserted bar (121) outside of spring (122), the one end of inserted bar (121) is provided with sucking disc (123).
3. The building door and window curtain wall thermal insulation performance detection device of claim 1, characterized in that: one side of the connecting plate (116) is provided with a groove (125), two sides inside the groove (125) are provided with fixing rods (117) through rotating shafts, and one side of each fixing rod (117) is connected with one side of the fixing splint (114).
4. The building door and window curtain wall thermal insulation performance detection device of claim 1, characterized in that: the transportation device (200) comprises a bottom plate (210) and a top plate (211), wherein a second fixing block (217) is arranged on one side, close to each other, of the bottom plate (210) and the top plate (211), the number of the second fixing blocks (217) is four, and a second sliding groove (212) is formed in the top end of the bottom plate (210).
5. The building door and window curtain wall thermal insulation performance detection device of claim 4, characterized in that: the inside slidable mounting of second spout (212) has ratch (213), the both sides of ratch (213) one end all are provided with slide bar (220), the bottom of bottom plate (210) evenly is provided with universal wheel (221), the quantity of universal wheel (221) is four.
6. The building door and window curtain wall thermal insulation performance detection device of claim 5, characterized in that: the top of bottom plate (210) is provided with second fixed plate (214), one side at bottom plate (210) top is provided with servo motor (216), gear (215) are installed to the pivot regulation of servo motor (216) one end, just gear (215) are connected with second fixed plate (214) through the pivot, ratch (213) and gear (215) intermeshing.
7. The building door and window curtain wall thermal insulation performance detection device of claim 4, characterized in that: the second fixed block (217) is provided with second connecting rods (218) through a rotating shaft, the number of the second connecting rods (218) is two, the number of the second connecting rods (218) in each group is two, one end of each second connecting rod (218) is provided with a roller (219) through a rotating shaft, and the middle of each second connecting rod (218) in each group is connected through a rotating shaft.
CN202021437902.9U 2020-07-21 2020-07-21 Building door and window curtain thermal insulation performance detection device Active CN212622344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021437902.9U CN212622344U (en) 2020-07-21 2020-07-21 Building door and window curtain thermal insulation performance detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021437902.9U CN212622344U (en) 2020-07-21 2020-07-21 Building door and window curtain thermal insulation performance detection device

Publications (1)

Publication Number Publication Date
CN212622344U true CN212622344U (en) 2021-02-26

Family

ID=74720519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021437902.9U Active CN212622344U (en) 2020-07-21 2020-07-21 Building door and window curtain thermal insulation performance detection device

Country Status (1)

Country Link
CN (1) CN212622344U (en)

Similar Documents

Publication Publication Date Title
CN212622344U (en) Building door and window curtain thermal insulation performance detection device
CN209992422U (en) Building door and window thermal insulation performance detection device
CN216160504U (en) Building energy-saving effect detection device
CN212060004U (en) Device for dynamically testing thermal performance of building wall
CN213148791U (en) Door and window heat transfer coefficient detection device
CN211576775U (en) Locking clamp for door and window detector
CN209198421U (en) Methylene oxide detecting instrument in a kind of multifunctional room
CN220305211U (en) Building door and window thermal insulation performance detection device
CN207798347U (en) A kind of leak detection apparatus of boiler pressure-bearing device
CN214374442U (en) Window thermal insulation performance detection cabinet
CN202676641U (en) Sunlight-based shading coefficient determining system
CN212780948U (en) Electric power measurement cabinet with dampproofing leak protection function
CN218068014U (en) Device for detecting endotoxin tubes in batches
CN215765504U (en) Temperature and humidity sensing automatic adjustment pet air conditioner
CN217558202U (en) Sealing strip mounting device for door and window mounting
CN215448218U (en) Temperature measuring device for heat exchanger
CN220304705U (en) A temperature rifle for detecting temperature-sensing detector in fire control facility
CN219792987U (en) Constant temperature drug sensitive plate
CN218495996U (en) A measuring device for plastic tubing processing
CN216144361U (en) Novel environment detection equipment
CN218766732U (en) Panel heat-proof quality detection device
CN214120422U (en) Balcony flat plate collector installation frame of easily installing
CN218034859U (en) Flatness detection device for building heat insulation material
CN221073543U (en) High-precision glass curtain wall installing and positioning device
CN216082570U (en) Heat-insulating material steady-state thermal resistance testing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant