CN212616795U - Ecmo pipeline fixing device easy to assemble and dismantle - Google Patents
Ecmo pipeline fixing device easy to assemble and dismantle Download PDFInfo
- Publication number
- CN212616795U CN212616795U CN202021432625.2U CN202021432625U CN212616795U CN 212616795 U CN212616795 U CN 212616795U CN 202021432625 U CN202021432625 U CN 202021432625U CN 212616795 U CN212616795 U CN 212616795U
- Authority
- CN
- China
- Prior art keywords
- sliding
- baffle
- fixing device
- slide bar
- splint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model relates to an Ecmo pipeline fixing device technical field just discloses an Ecmo pipeline fixing device easy to assemble and dismantlement, including first splint, the outside of first splint is fixed with first connecting plate, the outside of first splint is provided with first screw hole, the inboard of first screw hole is provided with first fixed screw, the outside of first fixed screw is provided with second splint. This Ecmo pipeline fixing device easy to assemble and dismantlement, through the first slide bar with first baffle bottom along third spout pulling roll-off, first slide bar rebound drives second baffle rebound, insert the second slide bar along the second baffle, loosen first slide bar, the second baffle receives the elasticity of spring and drives first slide bar rebound, first slide bar inserts in the fourth spout along third spout lapse, fix the second slide bar, more convenient installation and dismantlement have been realized, the practicality of device has been improved greatly.
Description
Technical Field
The utility model relates to an Ecmo pipeline fixing device technical field specifically is an Ecmo pipeline fixing device easy to assemble and dismantle.
Background
The pipeline fixing device is a device for fixing a pipeline bracket, which is used as a supporting structure of the pipeline, the pipe bracket is divided into a fixed mode and a movable mode according to the running performance and the arrangement requirement of the pipeline, the position where the fixed point is arranged becomes the fixing device, the pipeline and the pipeline fixing device cannot generate relative displacement, and the deformation of the fixed pipeline device after being stressed is small compared with the deformation value of the pipeline compensator because the pipe bracket has enough rigidity.
At present in the installation to Ecmo pipeline fixing device, generally all adopt screwed connection between two supports, the installation is got up and is wasted time and energy, inconvenient installation and dismantlement, greatly reduced work efficiency, and the stability of connecting is comparatively general, can not very effectual connection.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
An object of the utility model is to provide an Ecmo pipeline fixing device easy to assemble and dismantlement to in solving above-mentioned background art and proposing now in the installation to Ecmo pipeline fixing device, generally all adopt screwed connection between two supports, it wastes time and energy to install, inconvenient installation and dismantlement, greatly reduced work efficiency, and the stability of connecting is comparatively general, problem that can not very effective connection.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: an Ecmo pipeline fixing device convenient to mount and dismount comprises a first clamping plate, wherein a first connecting plate is fixed on the outer side of the first clamping plate, a first threaded hole is formed in the outer side of the first clamping plate, a first fixing screw is arranged on the inner side of the first threaded hole, a second clamping plate is arranged on the outer side of the first fixing screw, a first sliding groove is formed in the inner side of the first connecting plate, a second sliding groove is formed in the inner side of the first connecting plate, a hole cover is arranged at the upper end of the second sliding groove, a third sliding groove is formed in the inner side of the hole cover, a first sliding rod is arranged on the inner side of the third sliding groove, a first baffle is arranged at the upper end of the first sliding rod, a handle is arranged at the upper end of the first baffle, a spring is arranged at the bottom end of the hole cover, a second baffle is arranged on the outer side of the first sliding rod, a second sliding rod is arranged on, the upper end of the second sliding rod is provided with a fourth sliding groove, the right end of the second sliding rod is fixed with a third clamping plate, the inner side of the third clamping plate is provided with a second threaded hole, the outer side of the third clamping plate is provided with a fourth clamping plate, the inner side of the fourth clamping plate is provided with a third threaded hole, and the inner side of the third threaded hole is provided with a second fixing screw.
Preferably, the first threaded holes are symmetrically provided with two, the first fixing screws are symmetrically provided with two, the first threaded holes are in threaded connection with the first fixing screws, and the first fixing screws are in threaded connection with the second clamping plate.
Preferably, the third sliding chute is in sliding connection with the first sliding rod, the diameter of the third sliding chute is equal to that of the first sliding rod, the upper end of the spring is connected with the lower end of the third sliding chute, and the bottom end of the spring is connected with the upper end of the second baffle plate.
Preferably, the diameter of the second baffle is the same as that of the second chute, and the second baffle is in sliding connection with the second chute.
Preferably, the first sliding chute is in sliding connection with the second sliding rod, the first sliding rod is in sliding connection with the fourth sliding chute, and the diameter of the fourth sliding chute is the same as that of the third sliding chute.
Preferably, the second threaded holes are symmetrically provided with two, the third threaded holes are symmetrically provided with two, the second fixing screws are symmetrically provided with two, the second threaded holes are in threaded connection with the second fixing screws, the third threaded holes are in threaded connection with the second fixing screws, and the diameters of the second threaded holes are the same as those of the third threaded holes.
Compared with the prior art, the utility model provides an Ecmo pipeline fixing device easy to assemble and dismantle possesses following beneficial effect:
1. according to the Ecmo pipeline fixing device convenient to mount and dismount, in the process that a worker uses the pipeline fixing device, one pipeline is placed between the first clamping plate and the second clamping plate, the first clamping plate and the second clamping plate are fixedly connected by screwing the first fixing screws along the inner sides of the first threaded holes in the two sides of the first clamping plate, the pipeline is fixed, the second pipeline is placed between the third clamping plate and the fourth clamping plate, and the second fixing screws are screwed by rotating along the third threaded holes in the two sides of the fourth clamping plate and the second threaded holes in the two sides of the third clamping plate to fix the second pipeline, so that the pipeline is stably connected;
2. this Ecmo pipeline fixing device easy to assemble and dismantlement, at the staff's in-process that uses pipeline fixing device, through the first slide bar with first baffle bottom along third spout pulling roll-off, first slide bar rebound drives second baffle rebound, insert the second slide bar along the second baffle, loosen first slide bar, the second baffle receives the elasticity of spring and drives first slide bar rebound, first slide bar inserts in the fourth spout along third spout rebound, fix the second slide bar, more convenient installation and dismantlement have been realized.
Drawings
FIG. 1 is a schematic side view of the present invention;
FIG. 2 is a schematic structural view of a third splint according to the present invention;
fig. 3 is a schematic view of the three-dimensional structure of the present invention.
In the figure: 1. a first splint; 2. a first connecting plate; 3. a first threaded hole; 4. a first fixing screw; 5. a second splint; 6. a first chute; 7. a second chute; 8. an orifice cover; 9. a third chute; 10. a first slide bar; 11. a first baffle plate; 12. a handle; 13. a spring; 14. a second baffle; 15. a second slide bar; 16. a fourth chute; 17. a third splint; 18. a second threaded hole; 19. a fourth splint; 20. a third threaded hole; 21. and a second fixing screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: an Ecmo pipeline fixing device convenient to mount and dismount comprises a first clamping plate 1, a first connecting plate 2 is fixed on the outer side of the first clamping plate 1, a first threaded hole 3 is formed in the outer side of the first clamping plate 1, a first fixing screw 4 is arranged on the inner side of the first threaded hole 3, a second clamping plate 5 is arranged on the outer side of the first fixing screw 4, a first sliding groove 6 is formed in the inner side of the first connecting plate 2, a second sliding groove 7 is formed in the inner side of the first connecting plate 2, a hole cover 8 is arranged at the upper end of the second sliding groove 7, a third sliding groove 9 is formed in the inner side of the hole cover 8, a first sliding rod 10 is arranged on the inner side of the third sliding groove 9, a first baffle 11 is arranged at the upper end of the first sliding rod 10, a handle 12 is arranged at the upper end of the first baffle 11, a spring 13 is arranged at the bottom end of the hole cover 8, a second baffle 14 is arranged on the outer side of, a fourth sliding groove 16 is formed in the upper end of the second sliding rod 15, a third clamping plate 17 is fixed to the right end of the second sliding rod 15, a second threaded hole 18 is formed in the inner side of the third clamping plate 17, a fourth clamping plate 19 is arranged on the outer side of the third clamping plate 17, a third threaded hole 20 is formed in the inner side of the fourth clamping plate 19, and a second fixing screw 21 is arranged on the inner side of the third threaded hole 20.
Further, 3 symmetries of first screw hole are provided with two, and 4 symmetries of first fixed screw are provided with two, and first screw hole 3 is threaded connection with first fixed screw 4, and first fixed screw 4 is threaded connection with second splint 5, has realized the stable fixed to the pipeline.
Furthermore, the third sliding chute 9 is in sliding connection with the first sliding rod 10, the diameter of the third sliding chute 9 is equal to that of the first sliding rod 10, the upper end of the spring 13 is connected with the lower end of the third sliding chute 9, the bottom end of the spring 13 is connected with the upper end of the second baffle 14, and automatic rebound of the second baffle 14 is achieved.
Further, the diameter of the second baffle 14 is the same as that of the second chute 7, and the second baffle 14 is in sliding connection with the second chute 7, so that the second baffle 14 is blocked.
Furthermore, the first sliding chute 6 is in sliding connection with the second sliding rod 15, the first sliding rod 10 is in sliding connection with the fourth sliding chute 16, and the diameter of the fourth sliding chute 16 is the same as that of the third sliding chute 9, so that the first connecting plate 2 is connected with the third clamping plate 17 more conveniently.
Further, the second threaded holes 18 are symmetrically provided with two, the third threaded holes 20 are symmetrically provided with two, the second fixing screws 21 are symmetrically provided with two, the second threaded holes 18 are in threaded connection with the second fixing screws 21, the third threaded holes 20 are in threaded connection with the second fixing screws 21, the diameter of the second threaded holes 18 is the same as that of the third threaded holes 20, and stable fixing of another pipeline is achieved.
The working principle is as follows: when a worker uses the device, one of the pipelines is placed between the first clamping plate 1 and the second clamping plate 5, the first clamping plate 1 and the second clamping plate 5 are fixedly connected by screwing the first fixing screws 4 along the inner sides of the first threaded holes 3 at the two sides of the first clamping plate 1, the pipeline is fixed, the second pipeline is placed between the third clamping plate 17 and the fourth clamping plate 19, the second fixing screws 21 are rotatably screwed along the third threaded holes 20 at the two sides of the fourth clamping plate 19 and the second threaded holes 18 at the two sides of the third clamping plate 17, the stable connection of the pipeline is realized, the first sliding rod 10 at the bottom end of the first baffle plate 11 is pulled to slide out along the third sliding groove 9, the first sliding rod 10 moves upwards to drive the second baffle plate 14 to move upwards, the second sliding rod 15 is inserted along the second baffle plate 14, the first sliding rod 10 is loosened, the second baffle 14 is driven by the elastic force of the spring 13 to move the first sliding rod 10 downwards, the first sliding rod 10 is inserted into the fourth sliding groove 16 along the third sliding groove 9 in a downward sliding mode, the second sliding rod 15 is fixed, and therefore the installation and the disassembly are more convenient.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.
Claims (6)
1. The utility model provides an Ecmo pipeline fixing device easy to assemble and dismantle, includes first splint (1), its characterized in that: a first connecting plate (2) is fixed on the outer side of the first clamping plate (1), a first threaded hole (3) is formed in the outer side of the first clamping plate (1), a first fixing screw (4) is arranged on the inner side of the first threaded hole (3), a second clamping plate (5) is arranged on the outer side of the first fixing screw (4), a first sliding groove (6) is formed in the inner side of the first connecting plate (2), a second sliding groove (7) is formed in the inner side of the first connecting plate (2), a hole cover (8) is arranged at the upper end of the second sliding groove (7), a third sliding groove (9) is formed in the inner side of the hole cover (8), a first sliding rod (10) is arranged on the inner side of the third sliding groove (9), a first baffle plate (11) is arranged at the upper end of the first sliding rod (10), and a handle (12) is arranged at the upper end of the first baffle plate (11, the bottom of handhole door (8) is provided with spring (13), the outside of first slide bar (10) is provided with second baffle (14), the inboard of first spout (6) is provided with second slide bar (15), fourth spout (16) have been seted up to the upper end of second slide bar (15), the right-hand member of second slide bar (15) is fixed with third splint (17), second screw hole (18) have been seted up to the inboard of third splint (17), the outside of third splint (17) is provided with fourth splint (19), third screw hole (20) have been seted up to the inboard of fourth splint (19), the inboard of third screw hole (20) is provided with second fixed screw (21).
2. An easy-to-install and easy-to-detach Ecmo pipe fixing device as claimed in claim 1, wherein: first screw hole (3) symmetry is provided with two, first fixed screw (4) symmetry is provided with two, first screw hole (3) are threaded connection with first fixed screw (4), first fixed screw (4) are threaded connection with second splint (5).
3. An easy-to-install and easy-to-detach Ecmo pipe fixing device as claimed in claim 1, wherein: the third sliding chute (9) is in sliding connection with the first sliding rod (10), the diameter of the third sliding chute (9) is equal to that of the first sliding rod (10), the upper end of the spring (13) is connected with the lower end of the third sliding chute (9), and the bottom end of the spring (13) is connected with the upper end of the second baffle (14).
4. An easy-to-install and easy-to-detach Ecmo pipe fixing device as claimed in claim 1, wherein: the diameter of the second baffle (14) is the same as that of the second sliding chute (7), and the second baffle (14) is in sliding connection with the second sliding chute (7).
5. An easy-to-install and easy-to-detach Ecmo pipe fixing device as claimed in claim 1, wherein: the first sliding chute (6) is in sliding connection with the second sliding rod (15), the first sliding rod (10) is in sliding connection with the fourth sliding chute (16), and the diameter of the fourth sliding chute (16) is the same as that of the third sliding chute (9).
6. An easy-to-install and easy-to-detach Ecmo pipe fixing device as claimed in claim 1, wherein: the second screw hole (18) symmetry is provided with two, third screw hole (20) symmetry is provided with two, second fixed screw (21) symmetry is provided with two, second screw hole (18) are threaded connection with second fixed screw (21), third screw hole (20) are threaded connection with second fixed screw (21), the diameter of second screw hole (18) is the same with the diameter of third screw hole (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021432625.2U CN212616795U (en) | 2020-07-20 | 2020-07-20 | Ecmo pipeline fixing device easy to assemble and dismantle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021432625.2U CN212616795U (en) | 2020-07-20 | 2020-07-20 | Ecmo pipeline fixing device easy to assemble and dismantle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212616795U true CN212616795U (en) | 2021-02-26 |
Family
ID=74720947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021432625.2U Active CN212616795U (en) | 2020-07-20 | 2020-07-20 | Ecmo pipeline fixing device easy to assemble and dismantle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212616795U (en) |
-
2020
- 2020-07-20 CN CN202021432625.2U patent/CN212616795U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212616795U (en) | Ecmo pipeline fixing device easy to assemble and dismantle | |
CN214558587U (en) | Fixing device for elbow welding | |
CN212319145U (en) | Natural gas line protective structure | |
CN210858073U (en) | Face limit protection pole setting fixed baseplate | |
CN112393024A (en) | Indoor water pipe assembled fixed mounting structure | |
CN210600443U (en) | Novel water supply and drainage pipe installation and fixation device | |
CN107726016A (en) | A kind of hanger bracket for outdoor display | |
CN211371062U (en) | Novel keyway-shaped coupler | |
CN216657148U (en) | Steel pipe fixing device of steel pipe perforating machine | |
CN220470852U (en) | Drainage pipeline locating support | |
CN211780089U (en) | Convenient reassembling type camera installing support | |
CN220366031U (en) | Assembled heavy bracket for pipeline | |
CN215293278U (en) | Easy-to-assemble and disassemble stop ring for shaft | |
CN213685594U (en) | Indoor water pipe assembled fixed mounting structure | |
CN219453135U (en) | Assembled high stability pipeline gallows | |
CN218970024U (en) | Deep foundation pit inner support | |
CN215928777U (en) | Novel H-shaped pipe fitting | |
CN208624952U (en) | A kind of cupboard hanging on wall | |
CN211624420U (en) | Wall-mounted gas pipeline mounting pipe hoop | |
CN218122950U (en) | Combined display stand for outdoor stage | |
CN205034887U (en) | Portable electric power multiplexer utensil linkage | |
CN218992568U (en) | Pipeline clamping device | |
CN221077390U (en) | Graphite heat exchanger with area convenient to adjust | |
CN213629229U (en) | Spring seed buffer type supporting and hanging frame for boiler | |
CN220689428U (en) | Condenser nozzle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |