CN212616775U - Pipeline fixing device on scaffold is built in room - Google Patents

Pipeline fixing device on scaffold is built in room Download PDF

Info

Publication number
CN212616775U
CN212616775U CN202021510555.8U CN202021510555U CN212616775U CN 212616775 U CN212616775 U CN 212616775U CN 202021510555 U CN202021510555 U CN 202021510555U CN 212616775 U CN212616775 U CN 212616775U
Authority
CN
China
Prior art keywords
fixedly connected
pipeline
slider
threaded rod
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021510555.8U
Other languages
Chinese (zh)
Inventor
孙锡钢
刘思尧
张鹏
方媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202021510555.8U priority Critical patent/CN212616775U/en
Application granted granted Critical
Publication of CN212616775U publication Critical patent/CN212616775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline fixing device on scaffold is built in room, comprising a base plate, the top fixedly connected with stand of bottom plate, the top fixedly connected with stop device of stand, the lateral wall fixedly connected with strengthening rib of stand, the one end and the stop device fixed connection of stand are kept away from to the strengthening rib, the bottom of bottom plate is provided with fixing bolt, the bottom plate is installed through fixing bolt, the utility model relates to a building engineering technical field. This pipeline fixing device on scaffold is built in room has reached bottom plate, stand, stop device, strengthening rib, fixing bolt and has constituteed a whole, utilizes fixing bolt to install whole and scaffold frame, sets up stop device, is convenient for fix the pipeline, improves the protection to the pipeline, sets up strutting arrangement and reinforcing apparatus, further improves the protection to the pipeline, improves the life of pipeline, improves the security performance of construction, satisfies user demand's purpose.

Description

Pipeline fixing device on scaffold is built in room
Technical Field
The utility model relates to a building engineering field, more specifically say, relate to a pipeline fixing device on scaffold is built in room.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. In the building construction process, often need build the scaffold and arrange the pipeline, these pipelines are usually directly arranged on the scaffold, do not have the safeguard measure, cause the damage of pipeline easily, have certain danger, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
In the construction process to existence among the prior art, often need build the scaffold frame and arrange the pipeline, these pipelines are direct to be arranged on the scaffold frame usually, do not have safeguard measure, cause the damage of pipeline easily, there is certain danger, can't satisfy the problem of user demand, the utility model aims to provide a pipeline fixing device on scaffold frame is built in room, it can realize the bottom plate, the stand, stop device, the strengthening rib, whole is constituteed to fixing bolt, utilize fixing bolt to install whole and scaffold frame, set up stop device, be convenient for fix the pipeline, the improvement is to the protection of pipeline, set up strutting arrangement and reinforcing apparatus, further improve the protection to the pipeline, improve the life of pipeline, improve the security performance of construction, satisfy the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a pipeline fixing device on scaffold is built in room, includes the bottom plate, the top fixedly connected with stand of bottom plate, the top fixedly connected with stop device of stand, the lateral wall fixedly connected with strengthening rib of stand, the one end and the stop device fixed connection of stand are kept away from to the strengthening rib, the bottom of bottom plate is provided with fixing bolt, the bottom plate is installed through fixing bolt.
Preferably, the limiting device comprises a bracket, threaded rods are fixedly connected to the tops of the two sides of the bracket, a top frame is fixedly connected to the tops of the threaded rods, a supporting device and a reinforcing device are arranged on the threaded rods, and the supporting device corresponds to the reinforcing device.
Preferably, the supporting device comprises a first slider, the first slider is connected with a threaded rod in a sliding mode, a supporting plate is fixedly connected with the gap of the first slider, a first supporting block is arranged below the first slider and is connected with the threaded rod in a threaded mode, a limiting frame is arranged above the supporting plate, a first mounting bolt is fixedly connected with the bottom of the limiting frame and is sleeved with the supporting plate, and a first mounting nut is connected with the bottom of the first mounting bolt in a threaded mode.
Preferably, the reinforcing device comprises a second slider, the second slider is sleeved with a threaded rod, a gland is fixedly connected to the gap of the second slider, a limiting cover is arranged below the gland, a second mounting bolt is fixedly connected to the top of the limiting cover and sleeved with the gland, a second mounting nut is connected to the second mounting bolt in a threaded manner, and the limiting cover corresponds to the supporting device.
Preferably, the top of the second slider is fixedly connected with a supporting spring, the supporting spring is sleeved with a threaded rod, the second slider is fixedly connected with a moving block through the supporting spring, the moving block is sleeved with the threaded rod, a second supporting block is arranged above the moving block, and the second supporting block is in threaded connection with the threaded rod.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: the pipeline protection device is characterized in that the whole body is integrated with a scaffold through a bottom plate, an upright post, a limiting device, a reinforcing rib and a fixing bolt, the fixing bolt is utilized to install the whole body and the scaffold, the limiting device is arranged to facilitate the fixation of a pipeline and improve the protection of the pipeline, the limiting device comprises a bracket, a threaded rod and a top frame, and a supporting device and a reinforcing device are conveniently installed to further protect the pipeline, the service life of the pipeline is prolonged, the supporting device is arranged to install a limiting frame and a supporting plate and place the pipeline through the limiting frame, a first supporting block is rotated to drive a first sliding block to move and drive the supporting plate to move, the height of the limiting frame is conveniently adjusted, the reinforcing device is arranged to facilitate the reinforcement of the pipeline and further improve the protection of the pipeline, a limiting cover is installed on a gland, the limiting cover corresponds to the limiting frame to protect the pipeline, a second supporting block, drive motion piece downstream, drive second slider downstream through supporting spring, and then drive gland downstream, drive spacing lid downstream, increase supporting spring's elastic potential energy, it is fixed to extrude the pipeline, improve the protection to the pipeline, the bottom plate has been reached, a column, stop device, the strengthening rib, fixing bolt constitutes a whole, utilize fixing bolt to install whole and scaffold, set up stop device, be convenient for fix the pipeline, improve the protection to the pipeline, set up strutting arrangement and reinforcing apparatus, further improve the protection to the pipeline, improve the life of pipeline, improve the security performance of construction, satisfy user demand's purpose.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the position limiter of the present invention;
fig. 3 is a schematic view of a part of an enlarged structure of fig. 2 according to the present invention.
The reference numbers in the figures illustrate:
1. a base plate; 2. a column; 3. a limiting device; 31. a bracket; 32. a threaded rod; 33. a top frame; 4. reinforcing ribs; 5. fixing the bolt; 6. a support device; 61. a first slider; 62. a support plate; 63. a first support block; 64. a limiting frame; 65. a first mounting bolt; 66. a first mounting nut; 7. a reinforcement device; 71. a second slider; 72. a gland; 73. a limiting cover; 74. a second mounting bolt; 75. a second mounting nut; 76. a support spring; 77. a motion block; 78. a second support block.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a pipeline fixing device on scaffold is built in room, includes bottom plate 1, the top fixedly connected with stand 2 of bottom plate 1, the top fixedly connected with stop device 3 of stand 2, the lateral wall fixedly connected with strengthening rib 4 of stand 2, the one end and the 3 fixed connection of stop device of stand 2 are kept away from to strengthening rib 4, and the bottom of bottom plate 1 is provided with fixing bolt 5, and bottom plate 1 installs through fixing bolt 5. Bottom plate 1, stand 2, stop device 3, strengthening rib 4, fixing bolt 5 constitute a whole, utilize fixing bolt 5 to install whole and scaffold frame, set up stop device 3, be convenient for fix the pipeline, improve the protection to the pipeline.
Example 2:
referring to fig. 1, a pipeline fixing device on a building construction frame is substantially the same as that of embodiment 1, and further, the limiting device 3 includes a bracket 31, threaded rods 32 are fixedly connected to tops of both sides of the bracket 31, a top frame 33 is fixedly connected to tops of the threaded rods 32, the threaded rods 32 are provided with a supporting device 6 and a reinforcing device 7, and the supporting device 6 corresponds to the reinforcing device 7. Stop device 3 includes bracket 31, threaded rod 32 and roof-rack 33, is convenient for install strutting arrangement 6 and reinforcing apparatus 7, further protects the pipeline, improves the life of pipeline.
Example 3:
referring to fig. 2, a pipeline fixing device on a building construction frame is substantially the same as that in embodiment 2, and further, the supporting device 6 includes a first sliding block 61, the first sliding block 61 is slidably connected to the threaded rod 32, a supporting plate 62 is fixedly connected to a gap of the first sliding block 61, a first supporting block 63 is disposed below the first sliding block 61, the first supporting block 63 is in threaded connection with the threaded rod 32, a limiting frame 64 is disposed above the supporting plate 62, a first mounting bolt 65 is fixedly connected to the bottom of the limiting frame 64, the first mounting bolt 65 is sleeved with the supporting plate 62, and a first mounting nut 66 is connected to the bottom of the first mounting bolt 65. Set up strutting arrangement 6, install spacing frame 64 and layer board 62 to pass spacing frame 64 with the pipeline and place, rotate first support 63 pieces, drive first slider 61 motion, drive the motion of layer board 62, the height of the spacing frame 64 of adjustment of being convenient for facilitates the use.
Example 4:
referring to fig. 2, a pipeline fixing device on a building construction frame is substantially the same as that in embodiment 2, and further, the reinforcing device 7 includes a second slider 71, the second slider 71 is sleeved with the threaded rod 32, a gland 72 is fixedly connected to a gap of the second slider 71, a limiting cover 73 is disposed below the gland 72, a second mounting bolt 74 is fixedly connected to a top of the limiting cover 73, the second mounting bolt 74 is sleeved with the gland 72, a second mounting nut 75 is connected to the second mounting bolt 74 through a thread, and the limiting cover 73 corresponds to the supporting device 6. The reinforcing device 7 is arranged, so that the pipeline can be reinforced conveniently, the protection of the pipeline is further improved, the pressing cover 72 is provided with the limiting cover 73, and the limiting cover 73 corresponds to the limiting frame 64 to protect the pipeline.
Example 5:
referring to fig. 3, a pipeline fixing device on a building construction frame is substantially the same as that in embodiment 4, further, a supporting spring 76 is fixedly connected to the top of the second sliding block 71, the supporting spring 76 is sleeved with the threaded rod 32, the second sliding block 71 is fixedly connected with a moving block 77 through the supporting spring 76, the moving block 77 is sleeved with the threaded rod 32, a second supporting block 78 is arranged above the moving block 77, and the second supporting block 78 is in threaded connection with the threaded rod 32. The second supporting block 78 is rotated to drive the moving block 77 to move downwards, the second sliding block 71 is driven to move downwards through the supporting spring 76, and then the pressing cover 72 is driven to move downwards, the limiting cover 73 is driven to move downwards, the elastic potential energy of the supporting spring 76 is increased, the pipeline is extruded and fixed, and the protection of the pipeline is improved.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (5)

1. The utility model provides a pipeline fixing device on scaffold is built in room, includes bottom plate (1), its characterized in that: the top fixedly connected with stand (2) of bottom plate (1), the top fixedly connected with stop device (3) of stand (2), the lateral wall fixedly connected with strengthening rib (4) of stand (2), the one end and the stop device (3) fixed connection of stand (2) are kept away from in strengthening rib (4), the bottom of bottom plate (1) is provided with fixing bolt (5), install through fixing bolt (5) bottom plate (1).
2. The pipeline fixing device for the building construction frame of claim 1, wherein: stop device (3) include bracket (31), both sides top fixedly connected with threaded rod (32) of bracket (31), top fixedly connected with roof-rack (33) of threaded rod (32), threaded rod (32) are provided with strutting arrangement (6) and reinforcing apparatus (7), strutting arrangement (6) are corresponding with reinforcing apparatus (7).
3. The pipeline fixing device for the building construction frame of claim 2, wherein: support arrangement (6) include first slider (61), first slider (61) and threaded rod (32) sliding connection, clearance fixedly connected with layer board (62) of first slider (61), the below of first slider (61) is provided with first supporting block (63), first supporting block (63) and threaded rod (32) threaded connection, the top of layer board (62) is provided with spacing frame (64), the first construction bolt (65) of the bottom fixedly connected with of spacing frame (64), first construction bolt (65) cup joint with layer board (62), the bottom threaded connection of first construction bolt (65) has first construction nut (66).
4. The pipeline fixing device for the building construction frame of claim 2, wherein: reinforcing apparatus (7) includes second slider (71), second slider (71) cup joints with threaded rod (32), clearance fixedly connected with gland (72) of second slider (71), the below of gland (72) is provided with spacing lid (73), top fixedly connected with second mounting bolt (74) of spacing lid (73), second mounting bolt (74) cup joints with gland (72), second mounting bolt (74) threaded connection has second mounting nut (75), spacing lid (73) is corresponding with strutting arrangement (6).
5. The pipeline fixing device for the building construction frame of claim 4, wherein: the top fixedly connected with supporting spring (76) of second slider (71), supporting spring (76) cup joints with threaded rod (32), second slider (71) is through supporting spring (76) fixedly connected with motion piece (77), motion piece (77) cup joints with threaded rod (32), the top of motion piece (77) is provided with second supporting shoe (78), second supporting shoe (78) and threaded rod (32) threaded connection.
CN202021510555.8U 2020-07-28 2020-07-28 Pipeline fixing device on scaffold is built in room Expired - Fee Related CN212616775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021510555.8U CN212616775U (en) 2020-07-28 2020-07-28 Pipeline fixing device on scaffold is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021510555.8U CN212616775U (en) 2020-07-28 2020-07-28 Pipeline fixing device on scaffold is built in room

Publications (1)

Publication Number Publication Date
CN212616775U true CN212616775U (en) 2021-02-26

Family

ID=74730370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021510555.8U Expired - Fee Related CN212616775U (en) 2020-07-28 2020-07-28 Pipeline fixing device on scaffold is built in room

Country Status (1)

Country Link
CN (1) CN212616775U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112909853A (en) * 2021-03-18 2021-06-04 安徽山巅电力科技有限公司 Fixing structure assembly for power cable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112909853A (en) * 2021-03-18 2021-06-04 安徽山巅电力科技有限公司 Fixing structure assembly for power cable

Similar Documents

Publication Publication Date Title
CN213174809U (en) Strutting arrangement is used in building engineering construction
CN212616775U (en) Pipeline fixing device on scaffold is built in room
CN212317658U (en) Safety net rail mount that construction used
CN211114801U (en) Roof template supporting component for constructional engineering
CN209817099U (en) Large-span steel house room bearing structure
CN209568564U (en) A kind of civil engineering anti-seismic structure
CN206944436U (en) The adjustable rack of air-conditioner outdoor unit in system is built in a kind of room
CN210597409U (en) Foundation detection equipment with tripod horizontal support frame for building construction
CN211851241U (en) Building rail is used in municipal administration convenient to dismantle
CN214246754U (en) Civil engineering construction support
CN211037746U (en) Device for mounting climbing frame
CN214886108U (en) Building engineering safety protection net
CN208844881U (en) A kind of limit leg structure of construction tool rack
CN213461030U (en) Pipeline fixing device on civil construction scaffold
CN213402293U (en) Pipeline fixing device on civil and industrial building scaffold
CN217109992U (en) Installation base convenient to air conditioner drainage
CN213742360U (en) Quick-setting cement grouting machine for maintaining buildings
CN219773708U (en) Building engineering protection network
CN215564727U (en) Building engineering strutting arrangement
CN214879740U (en) Tower crane attachment device
CN211821082U (en) Municipal administration water supply and drainage pipeline strutting arrangement
CN213477265U (en) Anti-seismic support convenient to mount for constructional engineering
CN214744124U (en) Novel combination formula antidetonation gallows
CN219637869U (en) Rainproof reinforcing structure for foundation soil
CN219549776U (en) Support for fluid pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210226

Termination date: 20210728

CF01 Termination of patent right due to non-payment of annual fee