CN212614084U - Water injection guardrail piece for building construction - Google Patents
Water injection guardrail piece for building construction Download PDFInfo
- Publication number
- CN212614084U CN212614084U CN202021204353.0U CN202021204353U CN212614084U CN 212614084 U CN212614084 U CN 212614084U CN 202021204353 U CN202021204353 U CN 202021204353U CN 212614084 U CN212614084 U CN 212614084U
- Authority
- CN
- China
- Prior art keywords
- baffle
- base
- guardrail
- water
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 86
- 238000002347 injection Methods 0.000 title claims abstract description 18
- 239000007924 injection Substances 0.000 title claims abstract description 18
- 238000009435 building construction Methods 0.000 title claims description 12
- 238000010276 construction Methods 0.000 claims abstract description 5
- 230000037431 insertion Effects 0.000 claims description 11
- 238000003780 insertion Methods 0.000 claims description 11
- 238000007789 sealing Methods 0.000 claims description 9
- 229920003023 plastic Polymers 0.000 description 5
- 239000004033 plastic Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- 238000007599 discharging Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a water injection guardrail piece that construction used relates to building engineering technical field. The utility model discloses a base, the inside fixedly connected with water bag of base, and the left and right sides of base rotates respectively through first connecting block and is connected with left baffle and right baffle, and the rear side and the front side of base rotate through the second connecting block and are connected with backplate and preceding baffle, and the upper surface of backplate and preceding baffle is provided with the overhead gage, and the overhead gage passes through connecting device and backplate and preceding baffle fixed connection, and connecting device passes through fixed block and overhead gage fixed connection. The utility model discloses a set up left baffle, right baffle, preceding baffle, backplate and overhead gage, use first connecting block, second connecting block to rotate left baffle, right baffle, preceding baffle and backplate and base and be connected, can fold left baffle, right baffle, preceding baffle, backplate and overhead gage after the guardrail finishes using, the transport of the staff of being convenient for and the piling up when the guardrail is deposited.
Description
Technical Field
The utility model belongs to the technical field of building engineering, especially, relate to a water injection guardrail piece that construction used.
Background
When the facility is built, in order to improve staff's safety, can place the guardrail near the construction site and enclose the fender usually, remind the personnel of passing and vehicle here being under construction, the kind of guardrail a lot of roughly divide into metal guardrail and water injection plastics guardrail, compare the water injection plastics guardrail with the metal guardrail and have low in manufacturing cost, light in weight's characteristics, because the quality is too light, need pour into a large amount of water in the inside of plastics guardrail when using, in order to improve the stability of placing of plastics guardrail, avoid strong wind to blow away the plastics guardrail, at present, current water injection guardrail exists when using, the structure of guardrail is great, be not convenient for staff's taking, work load is great when placing and retrieving, and take up an area of too big when storing and transporting, and when putting out the inside water of guardrail consuming time longer.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a water injection guardrail piece for building construction, a left baffle and a right baffle are rotatably connected with a base by a first connecting block, a front baffle and a rear baffle are rotatably connected with the base by a second connecting block, the device can be folded after water in a water bag is discharged, the occupied space of the device is reduced, the device is convenient to carry and stack, the arranged upper baffle can increase the connection firmness degree among the front baffle, the rear baffle, the left baffle and the right baffle and simultaneously protect the upper surface of the water bag, the water bag is arranged to ensure that the device cannot leak when holding water, the water bag can be extruded to increase the water discharging speed when discharging the water out of the guardrail, simultaneously, the water discharge in the guardrail is more thorough, the problems of larger structure of the existing guardrail and inconvenience for taking by workers are solved, the workload is larger when placing and recovering, and the occupied area is too large during storage and transportation, and the time consumption is long when the water in the guardrail is discharged.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a water injection guardrail piece for building construction, which comprises a base, the inside of the base is fixedly connected with a water bag, the left side and the right side of the base are respectively connected with a left baffle and a right baffle through a first connecting block in a rotating way, the rear side and the front side of the base are connected with a rear baffle and a front baffle through a second connecting block in a rotating way, the upper surfaces of the rear baffle and the front baffle are provided with upper baffles, the upper baffles are fixedly connected with the rear baffle and the front baffle through connecting devices, and the connecting devices are fixedly connected with the upper baffles through fixed blocks; the connecting device comprises an inserting rod, and the middle part of the inserting rod is fixedly connected with a sliding block through a mounting block; the upper part of the water bag is provided with a water inlet, the lower part of the water bag is provided with a water outlet, and the water inlet and the water outlet are both in threaded connection with sealing covers.
Furthermore, the second connecting blocks on the rear baffle and the front baffle are both provided with two connecting blocks, the second connecting blocks are symmetrically arranged on the vertical plane where the symmetrical shafts of the rear baffle and the front baffle are located, third placing grooves are formed in the positions, corresponding to the base, of the second connecting blocks, and second inserting holes are formed in the positions, corresponding to the positions, on the base, of the third placing grooves.
Furthermore, the width of the rear baffle is smaller than that of the front baffle, the rear baffle and the front baffle are respectively provided with a light reflecting sticker, the light reflecting stickers are distributed on the outer surface of one side, away from the water bag, of the rear baffle and the front baffle at equal intervals, and the positions, corresponding to the connecting devices, of the rear baffle and the front baffle are respectively provided with a first placing groove.
Furthermore, first link block on left baffle and the right baffle all is provided with two, and first link block sets up about the vertical plane symmetry in symmetry axis place of left baffle and right baffle, the second resettlement groove has all been seted up to position department on the first link block corresponds the base, first jack has all been seted up to the lateral wall department that the second resettlement groove corresponds the base, left side baffle length is greater than the length of right baffle.
Further, the equal fixedly connected with fixture block in both ends about backplate and preceding baffle, the length of fixture block equals with the width of backplate and preceding baffle respectively, the fixture block corresponds the position department on left baffle and the right baffle and has all seted up the draw-in groove, fixture block and draw-in groove mutually support.
Furthermore, the position of the mounting block corresponding to the upper baffle plate is provided with a sliding groove, the length of the sliding groove is smaller than that of the first placement groove, the width of the first placement groove is equal to that of the fixed block, the length of the first placement groove is larger than that of the inserting rod, inserting holes are formed in the positions of the first placement groove corresponding to the inner walls of the rear baffle plate and the front baffle plate, and the diameter of each inserting hole is equal to that of the inserting rod.
Furthermore, through holes are formed in the upper baffle and the front baffle, the through holes in the upper baffle and the front baffle are respectively arranged corresponding to the water inlet and the water outlet, and the diameter of each through hole is larger than that of the sealing cover.
The utility model discloses following beneficial effect has:
1. the utility model discloses a set up left baffle, right baffle, preceding baffle, backplate and overhead gage, use first connecting block, second connecting block to rotate left baffle, right baffle, preceding baffle and backplate and base and be connected, can fold left baffle, right baffle, preceding baffle, backplate and overhead gage after the guardrail is used up, be convenient for staff's transport and the pile-up of guardrail when depositing, reduce the space that the guardrail was deposited and occupy, overhead gage can fix the upper portion of left baffle, right baffle, preceding baffle and backplate, improve the structural strength of guardrail, through set up the fixture block on preceding baffle and backplate, make preceding baffle and backplate can live left baffle and right baffle, fix left baffle and right baffle when the guardrail is used, the structure of having solved the guardrail is great, be not convenient for staff's taking, the work load is great when placing and retrieving, and the occupied area is too large during storage and transportation.
2. The utility model discloses a set up the water bag in the inside of guardrail for store moisture, compensate folding guardrail's defect, avoid water to flow from connecting gap department between the baffle, after the guardrail finishes using, take off behind the overhead gage and behind the sealed lid of drain outlet department, directly extrude the water bag, can increase the speed that water discharged from the guardrail, the staff of increase retrieves the efficiency of guardrail, has solved the long problem consuming time when putting out the inside water of guardrail.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of a water injection guardrail sheet for building construction according to the present invention;
fig. 2 is a schematic view of the opening of the upper baffle plate of the present invention;
FIG. 3 is a schematic view of a partial structure of the present invention;
FIG. 4 is a schematic view of the connection between the tailgate and the base of FIG. 1 according to the present invention;
FIG. 5 is a schematic view of the front baffle of FIG. 1 according to the present invention;
fig. 6 is a schematic structural view of an upper baffle plate in the utility model body 1;
FIG. 7 is a schematic view of the structure of the left baffle of FIG. 1 according to the present invention;
fig. 8 is a schematic structural view of the right baffle of fig. 4 according to the present invention;
fig. 9 is a schematic structural view of the connection device of fig. 1 according to the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a tailgate; 101. a first placement groove; 102. a clamping block; 2. a left baffle; 201. a card slot; 202. a first connection block; 3. a base; 301. a second placement groove; 302. a third placement groove; 303. a first jack; 304. a second jack; 4. a connecting device; 401. inserting a rod; 402. a slider; 403. mounting blocks; 5. an upper baffle plate; 501. a chute; 502. a fixed block; 6. a front baffle; 601. a second connecting block; 602. reflecting light; 7. a water bag; 701. a water inlet; 702. a sealing cover; 703. a water outlet; 8. And a right baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-9, the utility model relates to a water injection guardrail sheet for building construction, which comprises a base 3, a water bag 7 is fixedly connected inside the base 3, the guardrail is used for storing water when in use, increasing the weight of the guardrail and improving the stability when the guardrail is placed, a left baffle 2 and a right baffle 8 are respectively and rotatably connected with the left side and the right side of the base 3 through a first connecting block 202 to protect the left side and the right side of the water bag 7, a rear baffle 1 and a front baffle 6 are rotatably connected with the rear side and the front side of the base 3 through a second connecting block 601 to respectively protect the front surface and the rear surface of the water bag 7, an upper baffle 5 is arranged on the upper surfaces of the rear baffle 1 and the front baffle 6, the upper baffle 5 fixes the rear baffle 1 and the front baffle 6, limits the positions of the rear baffle 1 and the front baffle 6 and protects the upper surface of the water bag 7, the upper baffle 5 is fixedly connected with the rear baffle 1 and the front baffle 6 through a connecting device 4, the connecting device 4 is convenient for fixing the upper baffle 5 with the rear baffle 1 and the front baffle 6, and the connecting device 4 is fixedly connected with the upper baffle 5 through the fixing block 502 to facilitate the installation of the connecting device 4 on the upper baffle 5; the connecting device 4 comprises an inserting rod 401, the middle part of the inserting rod 401 is fixedly connected with a sliding block 402 through a mounting block 403, when the rear baffle 1 and the front baffle 6 are fixed by the upper baffle 5, the inserting rod 401 is pulled rightwards through the sliding block 402, the inserting rod 401 moves rightwards and is inserted into inserting holes formed in the inner walls of the rear baffle 1 and the front baffle 6, the upper baffle 5 is fixed on the rear baffle 1 and the front baffle 6, and meanwhile, the rear baffle 1 and the front baffle 6 are limited by the upper baffle 5 and cannot rotate on the base 3; the upper part of the water bag 7 is provided with a water inlet 701, the guardrail rotates a sealing cover 702 on the water inlet 701 before use, the sealing cover 702 is taken down to add water into the water bag 7, the lower part of the water bag 7 is provided with a water outlet 703, after the guardrail is used, the sealing cover 702 on the water outlet 703 is opened to discharge the water in the water bag 7, the water inlet 701 and the water outlet 703 are both in threaded connection with the sealing cover 702 to seal the water inlet 701 and the water outlet 703 so as to prevent the water from flowing out through the water inlet 701 and the water outlet 703.
Wherein, as shown in fig. 1-5 and 7-8, two second connecting blocks 601 are arranged on the back baffle 1 and the front baffle 6, and the second connecting blocks 601 are symmetrically arranged about the vertical plane of the symmetry axis of the back baffle 1 and the front baffle 6, so as to improve the connection degree between the back baffle 1 and the base 3 and the front baffle 6 and enable the back baffle 1 and the front baffle 6 to rotate on the base 3 more stably, the second connecting blocks 601 are provided with third placing grooves 302 at positions corresponding to the base 3, the third placing grooves 302 are provided with second jacks 304 at positions corresponding to the base 3, so as to facilitate the rotation connection between the second connecting blocks 601 and the base 3, the width of the back baffle 1 is smaller than that of the front baffle 6, when folding, the back baffle 1 is rotated to the horizontal position first, then the front baffle 6 is rotated to the horizontal position, and the width of the back baffle 1 is smaller than that of the front baffle 6 can ensure that the folding of the back baffle 1 can not affect the folding of the front baffle 6, the front baffle 6 can be horizontally placed, the left baffle 2, the right baffle 8, the front baffle 6 and the rear baffle 1 are sequentially rotated to be in a horizontal position when the guardrail is folded, the rear baffle 1 and the front baffle 6 are respectively provided with a light reflecting sticker 602, the light reflecting stickers 602 are distributed on the outer surface of one side of the rear baffle 1 and the front baffle 6, which is far away from the water bag 7, at equal intervals, the light reflecting stickers 602 have better light reflecting effect, so that the guardrail has better warning effect at night, the positions, corresponding to the connecting devices 4, on the rear baffle 1 and the front baffle 6 are respectively provided with a first accommodating groove 101, when the upper baffle 5 is connected with the rear baffle 1 and the front baffle 6, the inserted bar 401 can be directly placed in the first accommodating groove 101, the left end and the right end of the rear baffle 1 and the left end and the right end of the front baffle 6 are both fixedly connected with a clamping block 102, the length of the clamping block 102 is respectively equal to the width of the rear baffle 1 and the front baffle 6, the clamping block 102 is respectively provided, when the baffle plates are unfolded, the clamping blocks 102 on the rear baffle plate 1 and the front baffle plate 6 are respectively clamped into the corresponding clamping grooves 201 on the left baffle plate 2 and the right baffle plate 8, the clamping block 102 and the clamping groove 201 are mutually matched, two first connecting blocks 202 are arranged on the left baffle plate 2 and the right baffle plate 8, and first link block 202 sets up about the vertical plane symmetry in the symmetry axis place of left baffle 2 and right baffle 8, improve left baffle 2 and right baffle 8's joint strength, guarantee left baffle 2 and right baffle 8's stable rotation, first link block 202 corresponds the position department on the base 3 and has all seted up second resettlement groove 301, first jack 303 has all been seted up in the lateral wall department that second resettlement groove 301 corresponds base 3, 2 length of left baffle is greater than the length of right baffle 8, first link block 202 is located second resettlement groove 301 when left baffle 2 and right baffle 8 are installed, first link block 202 is convenient for to first jack 303 is connected with base 3's rotation.
As shown in fig. 1-6, a sliding groove 501 is formed at a position of the mounting block 403 corresponding to the upper baffle 5 to limit a moving track of the sliding block 402, a length of the sliding groove 501 is smaller than a length of the first disposition groove 101, when the mounting block 403 slides to a rightmost end of the sliding groove 501, the insertion rod 401 is completely inserted into the insertion hole, a width of the first disposition groove 101 is equal to a length of the fixing block 502, when the upper baffle 5 is fixed on the rear baffle 1 and the front baffle 6, the fixing block 502 is clamped in the first disposition groove 101, so that the upper baffle 5 cannot rock back and forth on the rear baffle 1 and the front baffle 6, the length of the first disposition groove 101 is larger than the length of the insertion rod 401 to provide a sufficient space for placing the insertion rod 401, insertion holes are formed at positions of the first disposition groove 101 corresponding to inner walls of the rear baffle 1 and the front baffle 6, so that the upper baffle 5 is conveniently fixed on the rear baffle 1 and the front baffle 6 through the insertion rod 401, the diameter of spliced eye equals with inserted bar 401's diameter, improve inserted bar 401 and to the fixed effect of last baffle 5, the through-hole has all been seted up on last baffle 5 and preceding baffle 6, the through-hole on last baffle 5 and preceding baffle 6 corresponds the setting with water inlet 701 and outlet 703 respectively, the diameter of through-hole is greater than the diameter of sealed lid 702, when the guardrail uses, water inlet 701 and outlet 703 and sealed lid 702 are through running through overhead gage 5 and preceding baffle 6, make the surface of overhead gage 5 and preceding baffle 6 can with the upper surface and the front surface laminating of water bag 7, improve the protective effect of overhead gage 5 and preceding baffle 6 to water bag 7.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The above is only the preferred embodiment of the present invention, and the present invention is not limited thereto, any technical solution recorded in the foregoing embodiments is modified, and some technical features are replaced by equivalent, all belonging to the protection scope of the present invention.
Claims (7)
1. The utility model provides a water injection guardrail piece that construction used, includes base (3), its characterized in that: the water bag (7) is fixedly connected inside the base (3), the left side and the right side of the base (3) are respectively connected with the left baffle (2) and the right baffle (8) in a rotating mode through the first connecting block (202), the rear side and the front side of the base (3) are connected with the rear baffle (1) and the front baffle (6) in a rotating mode through the second connecting block (601), the upper surfaces of the rear baffle (1) and the front baffle (6) are provided with the upper baffle (5), the upper baffle (5) is fixedly connected with the rear baffle (1) and the front baffle (6) through the connecting device (4), and the connecting device (4) is fixedly connected with the upper baffle (5) through the fixing block (502); the connecting device (4) comprises an inserting rod (401), and the middle part of the inserting rod (401) is fixedly connected with a sliding block (402) through a mounting block (403); the upper part of the water bag (7) is provided with a water inlet (701), the lower part of the water bag (7) is provided with a water outlet (703), and the water inlet (701) and the water outlet (703) are both in threaded connection with sealing covers (702).
2. The water injection guardrail sheet for building construction as claimed in claim 1, wherein two second connecting blocks (601) are arranged on the rear baffle (1) and the front baffle (6), the second connecting blocks (601) are symmetrically arranged about a vertical plane where symmetry axes of the rear baffle (1) and the front baffle (6) are located, third placing grooves (302) are formed in positions of the second connecting blocks (601) corresponding to the base (3), and second inserting holes (304) are formed in positions of the third placing grooves (302) corresponding to the base (3).
3. The water injection guardrail sheet for building construction as claimed in claim 1, wherein the width of the rear baffle (1) is smaller than that of the front baffle (6), the rear baffle (1) and the front baffle (6) are both provided with light reflecting stickers (602), the light reflecting stickers (602) are distributed on the outer surface of one side of the rear baffle (1) and the front baffle (6) far away from the water bag (7) at equal intervals, and the positions of the rear baffle (1) and the front baffle (6) corresponding to the connecting device (4) are both provided with first accommodating grooves (101).
4. The water injection guardrail sheet for building construction as claimed in claim 1, wherein the number of the first connecting blocks (202) on the left baffle (2) and the right baffle (8) is two, the first connecting blocks (202) are symmetrically arranged about the vertical plane where the symmetry axes of the left baffle (2) and the right baffle (8) are located, the positions of the first connecting blocks (202) corresponding to the base (3) are provided with second placement grooves (301), the positions of the second placement grooves (301) corresponding to the side walls of the base (3) are provided with first insertion holes (303), and the length of the left baffle (2) is greater than that of the right baffle (8).
5. The water injection guardrail sheet for building construction as claimed in claim 1, wherein the left and right ends of the rear baffle (1) and the front baffle (6) are fixedly connected with a fixture block (102), the length of the fixture block (102) is equal to the width of the rear baffle (1) and the width of the front baffle (6), the fixture block (102) is provided with a clamping groove (201) at a position corresponding to the left baffle (2) and the right baffle (8), and the fixture block (102) and the clamping groove (201) are matched with each other.
6. The water injection guardrail sheet for building construction as claimed in claim 1, wherein a sliding groove (501) is formed at a position of the mounting block (403) corresponding to the upper baffle (5), the length of the sliding groove (501) is smaller than that of the first placement groove (101), the width of the first placement groove (101) is equal to that of the fixing block (502), the length of the first placement groove (101) is larger than that of the insertion rod (401), insertion holes are formed at positions of the first placement groove (101) corresponding to inner walls of the rear baffle (1) and the front baffle (6), and the diameter of the insertion holes is equal to that of the insertion rod (401).
7. The water injection guardrail sheet for building construction as claimed in claim 1, wherein the upper baffle (5) and the front baffle (6) are both provided with through holes, the through holes on the upper baffle (5) and the front baffle (6) are respectively arranged corresponding to the water inlet (701) and the water outlet (703), and the diameter of the through holes is larger than that of the sealing cover (702).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021204353.0U CN212614084U (en) | 2020-06-24 | 2020-06-24 | Water injection guardrail piece for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021204353.0U CN212614084U (en) | 2020-06-24 | 2020-06-24 | Water injection guardrail piece for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212614084U true CN212614084U (en) | 2021-02-26 |
Family
ID=74742547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021204353.0U Expired - Fee Related CN212614084U (en) | 2020-06-24 | 2020-06-24 | Water injection guardrail piece for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212614084U (en) |
-
2020
- 2020-06-24 CN CN202021204353.0U patent/CN212614084U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212614084U (en) | Water injection guardrail piece for building construction | |
CN204257141U (en) | A kind of casing and LED display device | |
CN220155680U (en) | Battery pack installing support, energy storage cluster and energy storage cabinet | |
CN113310022A (en) | New forms of energy street lighting that possesses explosion-proof parcel structure | |
CN210837828U (en) | Explosion-proof type car battery install bin | |
CN100494014C (en) | Hinge components of folding cabinet | |
CN203213699U (en) | Folding fence rack | |
CN214798282U (en) | High-low voltage power distribution cabinet protective structure convenient to dismouting | |
CN212984886U (en) | Guardrail for construction | |
CN206087012U (en) | A electronic dolly for express mail is delivered | |
CN212460984U (en) | Warning sign is used in municipal construction convenient to carry | |
CN209694707U (en) | A kind of single side combination Cantilever Racking | |
CN209936874U (en) | Multifunctional tool box for water and electricity installation | |
CN210135520U (en) | District security protection is with control street lamp | |
CN209160535U (en) | A kind of container of the shrinkable box house of chamber door | |
CN208119911U (en) | A kind of Demountable combined-type energy storage container structure | |
CN213263305U (en) | Green, environment-friendly, energy-saving and consumption-reducing bounding wall box | |
CN112324289A (en) | A cabinet door that can open fast for power maintenance instrument bin | |
CN206250805U (en) | A kind of outdoor protection type Emergency Power case | |
CN221241202U (en) | Pet fence | |
CN221119135U (en) | Folding slope erecting platform | |
CN215529558U (en) | Flood prevention box for hydraulic engineering design | |
CN219707809U (en) | Motor rack convenient to motor installation | |
CN219997689U (en) | Solar energy integral type traffic light | |
CN216019654U (en) | Mathematics teaching aid containing box convenient to carry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210226 |