CN212612212U - Building waste collection device - Google Patents

Building waste collection device Download PDF

Info

Publication number
CN212612212U
CN212612212U CN202020883136.2U CN202020883136U CN212612212U CN 212612212 U CN212612212 U CN 212612212U CN 202020883136 U CN202020883136 U CN 202020883136U CN 212612212 U CN212612212 U CN 212612212U
Authority
CN
China
Prior art keywords
handle
push rod
iron plate
mounting box
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020883136.2U
Other languages
Chinese (zh)
Inventor
婊¤揪
满达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Benquan Decoration Engineering Co ltd
Original Assignee
Chongqing Benquan Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Benquan Decoration Engineering Co ltd filed Critical Chongqing Benquan Decoration Engineering Co ltd
Priority to CN202020883136.2U priority Critical patent/CN212612212U/en
Application granted granted Critical
Publication of CN212612212U publication Critical patent/CN212612212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a construction waste collection device, including handle, collection structure, mounting box, push rod, piston, spring, air duct, iron plate, installation cover, magnetic path, regulation structure and fixed box. The utility model has the advantages that: the clearance personnel use and adjust fixed box to comfortable height of structure regulation, the iron nail on the building site is adsorbed to the magnetic force conduction of magnetic path to iron plate in the rethread fixed box, after adsorbing a certain amount, promote the push rod, the push rod slides in the inside of handle, the push rod promotes the piston and slides in the inside of mounting box, the inside cavity of mounting box diminishes, gas is by the inside of the leading-in fixed box of air duct, gas between installation cover and the iron plate increases, pressure increases, and then promote the magnetic path and slide to fixed box top with the installation cover, iron plate magnetic force reduces, change the size of magnetic force on the iron plate through adjusting the distance between iron plate and the magnetic path in the collection structure, and then adsorb or take off the iron nail, staff's work efficiency has been improved greatly.

Description

Building waste collection device
Technical Field
The utility model relates to a collection device specifically is a construction waste collection device, belongs to construction waste treatment technical field.
Background
The construction waste refers to dregs, spoil, waste materials, sludge and other wastes generated in the process of constructing, laying, dismantling and repairing various buildings, structures, pipe networks and the like by construction, construction units or individuals, and some waste materials are inevitably generated in the construction process of some construction sites and need to be further treated.
However, in the construction process of the current construction site, some abandoned iron nails need to be cleaned by cleaning personnel in time, and the cleaning personnel need to pick up the iron nails into the plastic barrel one by one and then do the treatment, thereby wasting time and energy and ensuring that the cleaning efficiency of the cleaning personnel is relatively poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a construction waste collection device just in order to solve above-mentioned problem, can change the size of magnetic force on the iron plate through the distance between iron plate and the magnetic path of adjusting in the collection structure, and then adsorb or take off the iron nail, improved staff's work efficiency greatly.
The utility model realizes the above purpose by the following technical proposal, a construction waste collecting device comprises a handle and a collecting structure fixed on the handle, the collecting structure comprises a mounting box, a push rod, a piston, a spring, an air duct, an iron plate, a mounting sleeve and a magnet block, the mounting box is arranged at one side of the handle, the piston is arranged inside the mounting box, the piston is connected with the mounting box in a sliding way, the top end of the piston is provided with the push rod, the push rod penetrates through the top end of the mounting box, the push rod is connected with the mounting box in a sliding way, the top end of the push rod penetrates through the handle, the push rod is connected with the handle in a sliding way, one side of the piston, which deviates from the push rod, is connected with the spring, one end of the spring, which deviates from the piston, is connected with the bottom end of, the bottom end of the mounting box is provided with the air guide tube, the air guide tube is communicated with the mounting box, one end of the air guide tube, which is far away from the mounting box, is connected to the side wall of the fixing box, the mounting sleeve is arranged inside the fixing box, the magnetic block is fixed inside the mounting sleeve, the iron plate is arranged at the bottom end of the fixing box, and the iron plate is welded with the fixing box; the bottom end of the handle is provided with an adjusting structure.
Preferably, in order to be applicable to the crowd of different heights, adjust the structure and include slide bar, screw rod, connecting block, connecting axle and installation piece, the slide bar is located the inside of handle, the slide bar with sliding connection between the handle, the inside of slide bar is equipped with the screw rod, the screw rod with threaded connection between the slide bar, the screw rod with rotate between the handle and be connected, the bottom of slide bar is connected with the connecting block, the bottom of connecting block is equipped with the installation piece, the installation piece is located the inside of fixed box, the installation piece with be equipped with between the connecting block the connecting axle.
Preferably, for the convenience of no dead angle adsorption iron nail, the cross-section of connecting axle is "worker" font structure, the connecting axle weld in the installation piece, the connecting axle with rotate between the connecting block and be connected.
Preferably, in order to increase the adsorption area, the cross section of the iron plate is of an arc structure, and the cross section of the mounting sleeve is of an arc structure.
Preferably, in order to facilitate the rotation of the screw, the cross section of the screw is a T-shaped structure, and a groove is formed at the terminal end of the screw.
Preferably, in order to fix the air guide tube, two limiting sleeves are arranged on one side of the handle, one limiting sleeve is arranged on one side of the bottom end of the sliding rod, the cross section of each limiting sleeve is of an 8-shaped structure, the air guide tube penetrates through the limiting sleeves, and the air guide tube is connected with the limiting sleeves in a sliding mode.
Preferably, in order to improve the comfort of users, the cross section of the handle is of an L-shaped structure, and the end part of the push rod is of an L-shaped structure.
The utility model has the advantages that: the clearance personnel use and adjust fixed box to comfortable height of structure regulation, the iron nail on the building site is adsorbed to the magnetic force conduction of magnetic path to iron plate in the rethread fixed box, after adsorbing a certain amount, promote the push rod, the push rod slides in the inside of handle, the push rod promotes the piston and slides in the inside of mounting box, the inside cavity of mounting box diminishes, gas is by the inside of the leading-in fixed box of air duct, gas between installation cover and the iron plate increases, pressure increases, and then promote the magnetic path and slide to fixed box top with the installation cover, iron plate magnetic force reduces, change the size of magnetic force on the iron plate through adjusting the distance between iron plate and the magnetic path in the collection structure, and then adsorb or take off the iron nail, staff's work efficiency has been improved greatly.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a connection structure of the slide rod and the screw shown in FIG. 1;
FIG. 3 is a schematic view of the connection structure of the fixing box and the airway tube shown in FIG. 1;
fig. 4 is an enlarged view of the structure of the part a shown in fig. 1.
In the figure: 1. the device comprises a handle, 2, a collecting structure, 21, a mounting box, 22, a push rod, 23, a piston, 24, a spring, 25, an air guide pipe, 26, an iron plate, 27, a mounting sleeve, 28, a magnetic block, 3, an adjusting structure, 31, a sliding rod, 32, a screw rod, 33, a connecting block, 34, a connecting shaft, 35, a mounting block, 4, a fixing box, 5 and a limiting sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a construction waste collecting device comprises a handle 1 and a collecting structure 2 fixed on the handle 1, the collecting structure 2 comprises a mounting box 21, a push rod 22, a piston 23, a spring 24, an air duct 25, an iron plate 26, a mounting sleeve 27 and a magnet block 28, the mounting box 21 is arranged on one side of the handle 1, the piston 23 is arranged inside the mounting box 21, the piston 23 is slidably connected with the mounting box 21, the push rod 22 is arranged at the top end of the piston 23, the push rod 22 penetrates through the top end of the mounting box 21, the push rod 22 is slidably connected with the mounting box 21, the top end of the push rod 22 penetrates through the handle 1, the push rod 22 is slidably connected with the handle 1, the spring 24 is connected at one side of the piston 23 departing from the push rod 22, one end of the spring 24 departing from the piston 23 is connected with the bottom end of the mounting box 21, the air duct 25 is arranged at, one end, away from the mounting box 21, of the air duct 25 is connected to the side wall of the fixing box 4, a mounting sleeve 27 is arranged inside the fixing box 4, a magnetic block 28 is fixed inside the mounting sleeve 27, an iron plate 26 is arranged at the bottom end of the fixing box 4, and the iron plate 26 is welded with the fixing box 4; the bottom end of the handle 1 is provided with an adjusting structure 3.
As a technical optimization scheme, adjust structure 3 and include slide bar 31, screw rod 32, connecting block 33, connecting axle 34 and installation piece 35, slide bar 31 locates handle 1's inside, sliding connection between slide bar 31 and the handle 1, slide bar 31's inside is equipped with screw rod 32, threaded connection between screw rod 32 and the slide bar 31, rotate between screw rod 32 and the handle 1 and be connected, slide bar 31's bottom is connected with connecting block 33, connecting block 33's bottom is equipped with installation piece 35, the inside of fixed box 4 is located to installation piece 35, be equipped with connecting axle 34 between installation piece 35 and the connecting block 33.
As a technical optimization scheme of the utility model, the cross-section of connecting axle 34 is "worker" font structure, and connecting axle 34 welds in installation piece 35, rotates between connecting axle 34 and the connecting block 33 to be connected.
As a technical optimization scheme of the utility model, the cross-section of iron plate 26 is the arc structure, and the cross-section of installation cover 27 is the arc structure.
As a technical optimization scheme of the utility model, the cross-section of screw rod 32 is T shape structure, and the terminal of screw rod 32 is equipped with the recess.
As a technical optimization scheme of the utility model, one side of handle 1 is equipped with two stop collar 5, and bottom one side of slide bar 31 is equipped with a stop collar 5, and the cross-section of stop collar 5 is "8" font structure, and air duct 25 runs through in stop collar 5, sliding connection between air duct 25 and the stop collar 5.
As a technical optimization scheme of the utility model, the cross-section of handle 1 is L shape structure, and the tip of push rod 22 is L shape structure.
When the utility model is used, firstly, the cleaning personnel rotates the screw rod 32, the screw rod 32 drives the slide rod 31 to slide in the handle 1, one end of the slide rod 31 is provided with the fixing box 4, the purpose of adjusting the fixing box 4 to a comfortable height is achieved by rotating the screw rod 32, the iron nail on the construction site is adsorbed by the magnetic conduction of the magnetic block 28 in the fixing box 4 to the iron plate 26, when a certain amount of the iron nail is adsorbed, the push rod 22 is pushed, the push rod 22 slides in the handle 1, the push rod 22 pushes the piston 23 to slide in the mounting box 21, the cavity in the mounting box 21 is reduced, the gas is guided into the fixing box 4 through the air duct 25, the gas between the mounting sleeve 27 and the iron plate 26 in the fixing box 4 is increased, the pressure is increased, and then the magnetic block 28 and the mounting sleeve 27 are pushed to slide towards the top end of the fixing box 4, the iron plate 26 is reduced, the magnetic force of the iron nail falls, pressure between iron plate 36 and the installation cover 27 in the fixing box 4 is reduced, magnetic block 28 continues to adsorb the iron nail with iron plate 26 cooperation, slide bar 31 passes through connecting block 33 and connecting axle 34 and is connected fixing box 4, make things convenient for fixing box 4 to rotate and adsorb the iron nail in different position, change the size of magnetic force on iron plate 26 through adjusting the distance between iron plate 26 and the magnetic block 28 in collecting structure 2, and then adsorb or take off the iron nail, staff's work efficiency has been improved greatly, the problem that can't lead to gas leading-in fixing box 4 has effectively been avoided the winding of air duct 25 to the setting up of stop collar 5.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. A construction waste collecting device, includes handle (1) and is fixed in collection structure (2) on handle (1), its characterized in that: the collecting structure (2) comprises a mounting box (21), a push rod (22), a piston (23), a spring (24), an air guide pipe (25), an iron plate (26), a mounting sleeve (27) and a magnetic block (28), the mounting box (21) is arranged on one side of the handle (1), the piston (23) is arranged inside the mounting box (21), the piston (23) is connected with the mounting box (21) in a sliding manner, the push rod (22) is arranged at the top end of the piston (23), the push rod (22) penetrates through the top end of the mounting box (21), the push rod (22) is connected with the mounting box (21) in a sliding manner, the top end of the push rod (22) penetrates through the handle (1), the push rod (22) is connected with the handle (1) in a sliding manner, one side, deviating from the push rod (22), of the piston (23) is connected with the spring (24), one end, deviating from the piston (23), of the spring (24) is connected to the bottom end of the mounting box (21), the bottom end of the mounting box (21) is provided with the air guide pipe (25), the air guide pipe (25) is communicated with the mounting box (21), one end, deviating from the mounting box (21), of the air guide pipe (25) is connected to the side wall of the fixing box (4), the mounting sleeve (27) is arranged inside the fixing box (4), the magnetic block (28) is fixed inside the mounting sleeve (27), the iron plate (26) is arranged at the bottom end of the fixing box (4), and the iron plate (26) is welded with the fixing box (4); the bottom end of the handle (1) is provided with an adjusting structure (3).
2. The construction waste collecting device according to claim 1, wherein: adjust structure (3) and include slide bar (31), screw rod (32), connecting block (33), connecting axle (34) and installation piece (35), slide bar (31) are located the inside of handle (1), slide bar (31) with sliding connection between handle (1), the inside of slide bar (31) is equipped with screw rod (32), screw rod (32) with threaded connection between slide bar (31), screw rod (32) with rotate between handle (1) and connect, the bottom of slide bar (31) is connected with connecting block (33), the bottom of connecting block (33) is equipped with installation piece (35), installation piece (35) are located the inside of fixed box (4), installation piece (35) with be equipped with between connecting block (33) connecting axle (34).
3. The construction waste collecting device according to claim 2, wherein: the cross-section of connecting axle (34) is "worker" font structure, connecting axle (34) weld in installation piece (35), connecting axle (34) with rotate between connecting block (33) and be connected.
4. The construction waste collecting device according to claim 1, wherein: the cross section of the iron plate (26) is of an arc-shaped structure, and the cross section of the mounting sleeve (27) is of an arc-shaped structure.
5. The construction waste collecting device according to claim 2, wherein: the cross section of the screw rod (32) is of a T-shaped structure, and a groove is formed in the terminal end of the screw rod (32).
6. The construction waste collecting device according to claim 2, wherein: one side of the handle (1) is provided with two limiting sleeves (5), one side of the bottom end of the sliding rod (31) is provided with one limiting sleeve (5), the cross section of the limiting sleeve (5) is of an 8-shaped structure, the air guide pipe (25) penetrates through the limiting sleeve (5), and the air guide pipe (25) is connected with the limiting sleeves (5) in a sliding mode.
7. The construction waste collecting device according to claim 1, wherein: the cross section of the handle (1) is of an L-shaped structure, and the end part of the push rod (22) is of an L-shaped structure.
CN202020883136.2U 2020-05-24 2020-05-24 Building waste collection device Expired - Fee Related CN212612212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020883136.2U CN212612212U (en) 2020-05-24 2020-05-24 Building waste collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020883136.2U CN212612212U (en) 2020-05-24 2020-05-24 Building waste collection device

Publications (1)

Publication Number Publication Date
CN212612212U true CN212612212U (en) 2021-02-26

Family

ID=74751019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020883136.2U Expired - Fee Related CN212612212U (en) 2020-05-24 2020-05-24 Building waste collection device

Country Status (1)

Country Link
CN (1) CN212612212U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113426570A (en) * 2021-05-17 2021-09-24 浙江英洛华磁业有限公司 Iron-containing dust cleaning device for powder metallurgy

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113426570A (en) * 2021-05-17 2021-09-24 浙江英洛华磁业有限公司 Iron-containing dust cleaning device for powder metallurgy
CN113426570B (en) * 2021-05-17 2024-03-29 浙江英洛华磁业有限公司 Iron-containing dust cleaning device for powder metallurgy

Similar Documents

Publication Publication Date Title
CN212612212U (en) Building waste collection device
CN205147172U (en) Steel bar bending device
CN202834380U (en) Pipe-jacking construction guide pipe provided with deviation rectification wing board
CN214437637U (en) Air pollution control device for tunnel construction
CN213774019U (en) Solar power generation glass curtain wall
CN213269007U (en) Protection device for construction is built in room
CN205309629U (en) Welder transmission
CN212251775U (en) Fixing device for building electrical equipment
CN203124925U (en) Conveniently-moved wire feeding machine
CN208021248U (en) A kind of new-energy automobile charging pile of automatic plug
CN208464297U (en) Digitize artificial tooth engraving machine
CN212384425U (en) Thin-wall round tube closing tool
CN217151099U (en) Mortar fillet forming device
CN214838872U (en) Prevent air pipe of condensation
CN217813516U (en) Angle adjusting tool for reserved steel bars of tunnel inverted arch
CN219920953U (en) Detachable straw assembly of cleaning machine
CN206816152U (en) A kind of new screen door structure
CN215808217U (en) Solar street lamp
CN208423624U (en) A kind of electric power prospecting engineering cable fixer
CN109297176A (en) A kind of air-conditioning noise reduction device and installation method
CN215483426U (en) Fixing device is used in construction of rain sewage pipe network
CN211027898U (en) Construction steel bar device of flare-outing
CN220052373U (en) Autoclaved aerated concrete block grooving device
CN216713860U (en) Green construction cementer of assembled building
CN207134735U (en) A kind of laying cable unit manually

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210226