CN212611932U - Temporary fixing and pre-deviation adjusting device for bridge support - Google Patents

Temporary fixing and pre-deviation adjusting device for bridge support Download PDF

Info

Publication number
CN212611932U
CN212611932U CN202021519315.4U CN202021519315U CN212611932U CN 212611932 U CN212611932 U CN 212611932U CN 202021519315 U CN202021519315 U CN 202021519315U CN 212611932 U CN212611932 U CN 212611932U
Authority
CN
China
Prior art keywords
bridge
temporary
block
upper bracket
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021519315.4U
Other languages
Chinese (zh)
Inventor
李高升
师艳武
严嘉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Longxiang New Materials Technology Co ltd
Wuhan Qiaozhiheng Bridge Engineering Technology Co ltd
Original Assignee
Shandong Longxiang New Materials Technology Co ltd
Wuhan Qiaozhiheng Bridge Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Longxiang New Materials Technology Co ltd, Wuhan Qiaozhiheng Bridge Engineering Technology Co ltd filed Critical Shandong Longxiang New Materials Technology Co ltd
Priority to CN202021519315.4U priority Critical patent/CN212611932U/en
Application granted granted Critical
Publication of CN212611932U publication Critical patent/CN212611932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a device that is used for interim fixed and skew adjustment in advance of bridge beam supports, include respectively with bridge superstructure, bridge substructure connection's upper bracket board, the undersetting board, be connected with a plurality of interim fixing device between upper bracket board and the undersetting board, still be equipped with two adjusting device that leans towards in advance between upper bracket board and the undersetting board, adjusting device that leans towards in advance includes and is connected fixed interim fixture block with the upper bracket board and is connected fixed spacing fixture block with the undersetting board, be equipped with drive assembly between interim fixture block and the spacing fixture block, drive assembly drives the relative undersetting board of upper bracket board and slides. The temporary fixing and pre-deviation adjusting device for the bridge support not only can realize the fixing of the bridge support in the transportation and installation processes, but also can realize the pre-deviation adjustment and re-adjustment of the bridge support, and is low in installation cost and convenient to construct.

Description

Temporary fixing and pre-deviation adjusting device for bridge support
Technical Field
The utility model relates to a bridge technical field especially relates to a device that is used for interim fixed and pre-deflection of bridge beam supports to adjust.
Background
Bridge bearings are vital structural components that connect the upper and lower structures of a bridge. The support is used for reliably transmitting the counter force and the deformation (displacement and corner) of the upper structure of the bridge to the lower structure of the bridge, so that the actual stress condition of the bridge structure conforms to the theory of calculation, and the safety of bridge construction is ensured. Before leaving the factory, the support must be assembled with a reliable and convenient fixing device to prevent the support from sliding in the transportation and installation processes to cause safety accidents. In addition, with the progress of modern science and technology, the bridge span of the continuous beam is larger and larger, and the long construction period is more and more common. Therefore, the requirements on the support for the prestressed concrete continuous cast-in-place beam are higher and higher, and the support has a pre-deflection function before delivery or installation so as to adapt to displacement of a bridge body under the action of factors such as folding temperature, concrete self shrinkage and creep and the like, reduce deformation of the bridge body and ensure the performance of the bridge body.
However, the conventional mount fixtures currently provide only a fixing function, and do not allow pre-bias adjustment to be performed or performed multiple times. For the product pre-deviation value, a customer can not provide the product pre-deviation value before the support leaves a factory, and the product pre-deviation value is usually actually adjusted according to the actual conditions of beam construction, such as temperature and other factors. In the actual construction process, the delivered product needs to be adjusted on site. At this time, the conventional locking device needs to be removed to adjust the product to be pre-biased, but the matching hole pitch and the like of the parts for the support fixing device are fixed. The fixing device of the original product fails after pre-deviation adjustment, and cannot be used again, and only measures such as temporary welding or skid block are adopted. When the on-site pre-deviation adjustment is performed, special techniques or after-sales personnel need to be assigned to guide the adjustment, so that the after-sales pressure and the cost of the product are increased. In addition, the welding or wood-laying method is adopted to damage the appearance of the delivered product, so that the corrosion resistance of the product is influenced, the product maintenance cost and the customer complaint risk are increased, and the temporary welding, wood-laying method and other methods are adopted in the construction process, so that potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned not enough of prior art, the utility model provides a device that is used for interim fixed and the skew adjustment in advance of bridge beam supports, solve and have now in actual work progress, can't carry out high-efficient, safe field adjustment's technical problem to bridge beam supports skew in advance.
The utility model discloses a realize through following technical scheme:
the utility model provides a device that is used for interim fixed and pre-deflection of bridge beam supports to adjust, includes upper bracket board, the bottom suspension fagging that is connected with bridge superstructure, bridge substructure respectively, be connected with a plurality of interim fixing device between upper bracket board and the bottom suspension fagging, still be equipped with two pre-deflection adjusting device between upper bracket board and the bottom suspension fagging, pre-deflection adjusting device includes and is connected fixed interim fixture block with the upper bracket board and is connected fixed spacing fixture block with the bottom suspension fagging, be equipped with drive assembly between interim fixture block and the spacing fixture block, drive assembly drives the relative bottom suspension fagging of upper bracket board slides.
Further, the transmission assembly comprises a screw hole block installed in a matched mode with the temporary clamping block, the screw hole block is installed in a matched mode through a clamping groove formed in the temporary clamping block in an inserted mode, balls are further arranged in the clamping groove, relative rotation occurs between the screw hole block and the temporary clamping block through the balls, and the trapezoidal screw penetrates through the screw hole block and the two ends of the trapezoidal screw are connected and fixed with the two limiting clamping blocks respectively.
Furthermore, a small hole for meshing the wrench is formed in the screw hole block.
Furthermore, the transmission assembly comprises a screw hole block fixedly mounted with the temporary clamping block, the trapezoidal screw penetrates through the screw hole block, and two ends of the trapezoidal screw are respectively connected with the two limiting clamping blocks in a rotating mode.
Furthermore, a small hole for meshing the wrench is formed in the trapezoidal screw.
Furthermore, the pre-deviation adjusting device and the temporary fixing device are arranged longitudinally along the bridge support.
Compared with the prior art, the beneficial effects of the utility model reside in that:
according to the device for temporary fixing and pre-deviation adjusting of the bridge support, the pre-deviation of the bridge support is adjusted by driving the upper support plate and the lower support plate to move relatively through the rotary transmission assembly; and then the bridge support is fixed by the temporary fixing device, the whole construction process is safe and efficient, the cost is low, and additional internal force generated in the beam body can be effectively avoided by pre-deviation adjustment, so that adverse influence on the beam body is reduced, the supporting performance of the bridge support is effectively ensured, and the temporary fixing device is widely applied to bridge engineering.
Drawings
Fig. 1 is a front view of a device for temporary fixing and pre-deviation adjustment of a bridge bearer according to a first embodiment of the present invention;
fig. 2 is a top view of a device for temporary fixing and pre-deviation adjustment of a bridge bearer according to a first embodiment of the present invention;
FIG. 3 is a schematic structural view of the threaded block shown in FIG. 1;
FIG. 4 is a schematic view of an installation structure among the screw hole block, the temporary block and the ball shown in FIG. 1;
fig. 5 is a front view of a device for temporary fixing and pre-deviation adjustment of a bridge bearer according to a second embodiment of the present invention;
fig. 6 is a top view of a device for temporary fixing and pre-deviation adjustment of a bridge bearer according to the second embodiment of the present invention.
In the figure:
1. an upper support plate; 2. a pre-bias adjustment device; 21. a transmission assembly; 22. a limiting clamping block; 23. a trapezoidal screw; 24. a temporary clamping block; 25. a screw hole block; 26. a ball bearing; 3. a temporary fixing device; 4. a lower support plate.
Detailed Description
The technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example one
As shown in fig. 1-2, a device for temporary fixation and pre-deviation adjustment of a bridge support comprises an upper support plate 1 and a lower support plate 4 which are respectively connected with a bridge superstructure and a bridge substructure, two pre-deviation adjusting devices 2 are arranged between the upper support plate 1 and the lower support plate 4, the pre-deviation adjusting devices 2 are respectively arranged along two longitudinal sides of a bridge, each pre-deviation adjusting device 2 comprises a temporary fixture block 24 fixedly connected with the upper support plate 1 and a limiting fixture block 22 fixedly connected with the lower support plate 4, the upper support plate 1 and the temporary fixture block 24 are fixedly connected with each other by bolts, the lower support plate 4 and the limiting fixture block are fixedly connected with each other by bolts, and a transmission assembly 21 is arranged between the temporary fixture block 24 and the limiting fixture block 22. The transmission assembly 21 rotates to drive the limiting clamping block 22 and the temporary clamping block 24 to move relatively in the longitudinal direction of the bridge, so that the relative movement between the upper support plate 1 and the lower support plate 4 is realized, and the pre-deviation adjustment of the bridge support is realized; still be connected with four interim fixing device 3 between upper bracket board 1 and the bottom suspension bedplate 4, at each two of the vertical both sides of bridge, fix the bridge beam supports after 2 regulation of pre-deviation adjusting device through interim fixing device 3, convenient transportation, and the construction installation is simple.
Specifically, as shown in fig. 4, the transmission assembly 21 includes a screw hole block 25 installed in cooperation with the temporary locking block 24, the screw hole block 25 is installed in cooperation by being inserted into a locking groove on the temporary locking block 24, a ball 26 is further disposed in the locking groove, the screw hole block 25 and the temporary locking block 24 rotate relatively through the ball 26, the ball 26 rolls flexibly, the screw hole block 25 running on the screw hole block can slide flexibly, the situation that the screw hole block 25 rotates due to too large friction force is avoided, and friction can be reduced through other modes. The limiting clamping blocks 22 are provided with round holes matched with the trapezoidal screws 23, the screw hole blocks 25 are provided with threaded holes matched with the trapezoidal screws 23, the trapezoidal screws 23 penetrate through the threaded holes in the screw hole blocks 25, and two ends of each trapezoidal screw 23 are respectively connected and fixed with the two limiting clamping blocks 22. The screw hole block 25 is rotated, and the clamping groove and the ball 26 limit the relative displacement of the screw hole block 25 and the upper support plate 1 in the longitudinal direction of the bridge. The screw hole block 25 is provided with a small hole (as shown in fig. 3) for engagement of a wrench, so that the screw hole block 25 can be rotated by the wrench more conveniently to adjust the offset.
Example two
As shown in fig. 5-6, a device for temporary fixation and pre-deviation adjustment of a bridge support comprises an upper support plate 1 and a lower support plate 4 which are respectively connected with a bridge superstructure and a bridge substructure, two pre-deviation adjusting devices 2 are arranged between the upper support plate 1 and the lower support plate 4, the pre-deviation adjusting devices 2 are respectively arranged along two longitudinal sides of a bridge, each pre-deviation adjusting device 2 comprises a temporary fixture block 24 fixedly connected with the upper support plate 1 and a limiting fixture block 22 fixedly connected with the lower support plate 4, the upper support plate 1 and the temporary fixture block 24 are fixedly connected with each other by bolts, the lower support plate 4 and the limiting fixture block are fixedly connected with each other by bolts, and a transmission assembly 21 is arranged between the temporary fixture block 24 and the limiting fixture block 22. The transmission assembly 21 rotates to drive the limiting clamping block 22 and the temporary clamping block 24 to move relatively in the longitudinal direction of the bridge, so that the relative movement between the upper support plate 1 and the lower support plate 4 is realized, and the pre-deviation adjustment of the bridge support is realized; four temporary fixing devices 3 are connected between the upper support plate 1 and the lower support plate 4, and two temporary fixing devices are arranged on two longitudinal sides of the bridge; the bridge bearing adjusted by the pre-deviation adjusting device 2 is fixed through the temporary fixing device 3, so that the transportation is convenient, and the construction and installation are simple.
Specifically, the transmission assembly 21 includes a screw hole block 25 fixedly mounted with the temporary clamping block 24, the temporary clamping block 24 is connected with the screw hole block 25 through a bolt, a round hole matched with the trapezoidal screw 23 is formed in the limiting clamping block 22, a threaded hole matched with the trapezoidal screw 23 is formed in the screw hole block 25, the trapezoidal screw 23 penetrates through the threaded hole in the screw hole block 25, and two ends of the trapezoidal screw are respectively connected with the two limiting clamping blocks 22 in a rotating mode. The trapezoidal screw 23 is rotated, and the limit fixture block 22 limits the trapezoidal screw 23 to move relative to the lower support plate 4 in the longitudinal direction of the bridge. The trapezoidal screw 23 is provided with a small hole for engaging a wrench. The trapezoidal screw 23 can be more conveniently rotated through the wrench, and the offset is adjusted.
To sum up, adopt the device that is used for interim fixed and the pre-deflection of bridge beam supports to adjust of this application, realize fixing in transportation and the installation to bridge beam supports through interim fixing device, realize adjusting and readjusting the pre-deflection of bridge beam supports through pre-deflection adjusting device. The adjusting device has high safety performance, high construction efficiency and low construction cost, and can be widely applied to bridge engineering. And the additional internal force generated in the beam body can be effectively avoided through pre-deviation adjustment, so that the adverse effect on the beam body is reduced, and the supporting performance of the bridge bearing is effectively ensured.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a device that is used for interim fixed and pre-deflection of bridge beam supports to adjust, includes upper bracket board (1), bottom suspension bedplate (4) of being connected with bridge superstructure, bridge substructure respectively, be connected with a plurality of interim fixing device (3) between upper bracket board (1) and bottom suspension bedplate (4), its characterized in that, still be equipped with two pre-deflection adjusting device (2) between upper bracket board (1) and bottom suspension bedplate (4), pre-deflection adjusting device (2) include be connected fixed interim fixture block (24) with upper bracket board (1) and be connected fixed spacing fixture block (22) with bottom suspension bedplate (4), be equipped with drive assembly (21) between interim fixture block (24) and spacing fixture block (22), drive assembly (21) drive upper bracket board (1) is relative bottom suspension bedplate (4) and slides.
2. The device for temporary fixation and pre-deviation adjustment of a bridge bearer according to claim 1, wherein the transmission assembly (21) comprises a threaded block (25) cooperatively mounted with the temporary clamping block (24), the threaded block (25) is cooperatively mounted by being inserted into a clamping slot on the temporary clamping block (24), a ball (26) is further disposed in the clamping slot, the threaded block (25) and the temporary clamping block (24) relatively rotate through the ball (26), and the trapezoidal screw (23) passes through the threaded block (25) and two ends of the trapezoidal screw are respectively connected and fixed with the two limiting clamping blocks (22).
3. Device for temporary attachment and adjustment of the pre-deflection of a bridge beam according to claim 2, characterized in that the threaded block (25) is provided with a small hole for engagement of a wrench.
4. The device for temporary fixation and pre-deflection adjustment of a bridge bearer according to claim 1, wherein the transmission assembly (21) comprises a threaded block (25) fixedly installed with the temporary clamping block (24), the trapezoidal screw (23) passes through the threaded block (25) and both ends of the trapezoidal screw are respectively rotatably connected with the two limit clamping blocks (22).
5. Device for temporary fixation and pre-deflection adjustment of a bridge bearer according to claim 4, characterized in that the trapezoidal screw (23) is provided with a small hole for a wrench to engage.
6. A device for temporary attachment and adjustment of pre-deflection of a bridge deck according to any of claims 1-5, characterised in that the pre-deflection adjustment means (2) and the temporary attachment means (3) are arranged longitudinally along the bridge deck.
CN202021519315.4U 2020-07-28 2020-07-28 Temporary fixing and pre-deviation adjusting device for bridge support Active CN212611932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021519315.4U CN212611932U (en) 2020-07-28 2020-07-28 Temporary fixing and pre-deviation adjusting device for bridge support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021519315.4U CN212611932U (en) 2020-07-28 2020-07-28 Temporary fixing and pre-deviation adjusting device for bridge support

Publications (1)

Publication Number Publication Date
CN212611932U true CN212611932U (en) 2021-02-26

Family

ID=74730088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021519315.4U Active CN212611932U (en) 2020-07-28 2020-07-28 Temporary fixing and pre-deviation adjusting device for bridge support

Country Status (1)

Country Link
CN (1) CN212611932U (en)

Similar Documents

Publication Publication Date Title
CN111719419A (en) Temporary fixing and pre-deviation adjusting device for bridge support
CN212611932U (en) Temporary fixing and pre-deviation adjusting device for bridge support
CN110331784B (en) Splayed inclined groove connecting assembly and inclined groove locking connecting assembly thereof
CN109235244B (en) Adjusting device for bridge support
CN113206475A (en) Support tool for overhauling pipe bus
CN114336453B (en) Bridge for high-voltage cable
CN111392018B (en) Sinking type marine engine mounting base device and mounting method thereof
CN210316003U (en) Switching angle sign indicating number and splayed inclined elongated slot coupling assembling thereof
CN104909240A (en) Guide rail for tower climbing equipment
CN204714280U (en) Step on the guide rail that tower equipment uses
CN201521284U (en) Automatic regulating device for horsehead of pumping unit
CN218091960U (en) Wall-attached support main body
CN110873115A (en) Check bolt fastener for electric tower
CN220790090U (en) Bearing column connecting assembly
CN110485561A (en) A kind of bolt connection node and its construction method of adjustable prefabricated components length
CN218814564U (en) Metal wall steel plate modular connection structure
CN217378623U (en) Rear anchor beam capable of self-adjusting angle
CN219671676U (en) Portal rigid frame factory building wall purlin drawknot device
CN220504629U (en) Building structure roof beam reinforced structure
CN220394280U (en) Bridge support convenient to partially install
CN215714567U (en) Pressure-bearing anchor head supporting pad structure
CN220285024U (en) Box-type steel member
CN221500419U (en) Tower crane attachment frame and tower crane
CN213738159U (en) Steel construction hoist device
CN218990977U (en) Wallboard component fixing clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant