CN212587162U - Construction progress management display device for building engineering - Google Patents

Construction progress management display device for building engineering Download PDF

Info

Publication number
CN212587162U
CN212587162U CN202021088241.3U CN202021088241U CN212587162U CN 212587162 U CN212587162 U CN 212587162U CN 202021088241 U CN202021088241 U CN 202021088241U CN 212587162 U CN212587162 U CN 212587162U
Authority
CN
China
Prior art keywords
folding
rod
telescopic rod
ceiling
folding rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021088241.3U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yuanyao Construction Engineering Co.,Ltd.
Original Assignee
Shenzhen Lanfeng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Lanfeng Technology Co ltd filed Critical Shenzhen Lanfeng Technology Co ltd
Priority to CN202021088241.3U priority Critical patent/CN212587162U/en
Application granted granted Critical
Publication of CN212587162U publication Critical patent/CN212587162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Display Racks (AREA)

Abstract

The utility model discloses a construction progress management display device for building engineering relates to construction technical field, including the show board, the fly leaf is installed to the upper end and the lower extreme of show board, and one side of fly leaf installs the folded sheet, the outside of show board is connected with the rotation axis, and the opposite side of rotation axis is connected with first telescopic link, and the lower extreme of first telescopic link is connected with the second telescopic link, the outside of second telescopic link is connected with the folding rod, and the second telescopic link is connected with the folding rod through first hinge, one side of folding rod is connected with the foot rest, and the foot rest is connected with the folding rod through first hinge. The utility model discloses in, use first hinged joint folding rod in the outside of second telescopic link, put down the folding rod through first hinge, put the layer board in the upper end of folding rod, the constructor of building site just can have a rest on the layer board to the foot rest at folding rod end-to-end connection can play the effect of support.

Description

Construction progress management display device for building engineering
Technical Field
The utility model relates to a construction technical field especially relates to a construction progress management display device for building engineering.
Background
With the development of science and technology and the progress of times, the progress of the display construction of the display rack installed on the site of the building construction can enable constructors to know the building process of a building to a certain extent, and the constructors can adjust the construction speed according to the construction process displayed on the display rack.
Most of the existing display stands are fixedly installed in one place, however, most of the movable display stands are difficult to carry, and the existing display stands are single in function and only can be used for displaying, so that the function of the display stands is difficult to maximize.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving present show shelf is fixed mounting mostly in a place, and mobilizable show shelf is mostly difficult to the transport however to present show shelf function singleness can only be done the show usefulness, makes the effect of show shelf be difficult to obtain the shortcoming of maximize, and the construction progress management display device for the building engineering who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction progress management display device for construction engineering comprises a display plate, wherein movable plates are installed at the upper end and the lower end of the display plate, a folding plate is installed at one side of each movable plate, a rotating shaft is connected to the outer side of the display plate, a first telescopic rod is connected to the other side of the rotating shaft, a second telescopic rod is connected to the lower end of the first telescopic rod, a folding rod is connected to the outer side of the second telescopic rod, the second telescopic rod is connected with the folding rod through a first hinge, a foot rest is connected to one side of the folding rod, the foot rest is connected with the folding rod through the first hinge, a support rod is installed at the inner side of the second telescopic rod, a fixing plate is connected to the outer side of the lower end of the support rod, the fixing plate is connected with the support rod through a fixing bolt, a support frame is connected to the lower end of, the spring is installed in the upper end outside of bracing piece, and the baffle is installed to the upper end of spring, the ceiling is installed on the top of first telescopic link, and the outside of ceiling is connected with folding ceiling, the ceiling passes through the second hinged joint with folding ceiling, the upper end of folding rod is connected with the layer board.
Preferably, the folding rod and the second telescopic rod form a rotating structure through a first hinge, and the folding rod is transversely symmetrical about the second telescopic rod.
Preferably, the support rod and the second telescopic rod form an elastic structure through a spring, and the cross section of the lower half section of the support rod is square.
Preferably, a folding structure is formed between the movable plates through a folding plate, and the height of the movable plates is equal to that of the folding plate.
Preferably, the display board and the first telescopic rod form a rotating structure through a rotating shaft, and the rotating shaft is installed in the middle half of the display board.
Preferably, the cross section of the ceiling is of an arc-shaped structure, and the cross section of the joint of the ceiling and the first telescopic rod is trapezoidal.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, use first hinged joint folding rod in the outside of second telescopic link, put down the folding rod through first hinge, put the layer board in the upper end of folding rod, the constructor of building site just can have a rest on the layer board to the foot rest at folding rod end-to-end connection can play the effect of support.
2. The utility model discloses in, increase the show area of show shelf through increasing the show board quantity of installing between the fly leaf, use the show board to be connected with first telescopic link and can avoid seeing clearly the content on the show board in the reflection of light through angle of adjustment to use the folded sheet to connect the fly leaf and can fold the show board when not using and deposit, shared space when reducing and depositing.
3. The utility model discloses in, can play absorbing effect at the in-process of show shelf transport through the outside installation spring of bracing piece, so the in-process direction uncontrolled in order to prevent the transport of show shelf is the square with the design of bracing piece second section, can make things convenient for the transport of show shelf at the lower extreme installation universal wheel of support frame.
Drawings
FIG. 1 is a front view of the display rack of the present invention;
FIG. 2 is a schematic side view of the display rack of the present invention;
FIG. 3 is an enlarged schematic view of the position A of the present invention;
FIG. 4 is an enlarged schematic view of the position B of the present invention;
fig. 5 is an enlarged schematic structural diagram of the middle C of the present invention.
Illustration of the drawings:
1. a display board; 2. a first telescopic rod; 3. a ceiling; 4. a rotating shaft; 5. a movable plate; 6. folding the board; 7. a folding bar; 8. a second telescopic rod; 9. a foot rest; 10. a support plate; 11. a universal wheel; 12. a support frame; 13. folding the ceiling; 14. a support bar; 15. a baffle plate; 16. a fixing plate; 17. fixing the bolt; 18. a spring; 19. a first hinge; 20. a second hinge.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1 to 5, a construction progress management and display device for construction engineering, comprising a display plate 1, a first telescopic rod 2, a ceiling 3, a rotating shaft 4, a movable plate 5, a folding plate 6, a folding rod 7, a second telescopic rod 8, a foot rest 9, a support plate 10, universal wheels 11, a support frame 12, a folding ceiling 13, a support rod 14, a baffle 15, a fixing plate 16, a fixing bolt 17, a spring 18, a first hinge 19 and a second hinge 20, wherein the movable plate 5 is installed at the upper end and the lower end of the display plate 1, the folding plate 6 is installed at one side of the movable plate 5, the rotating shaft 4 is connected to the outer side of the display plate 1, the first telescopic rod 2 is connected to the other side of the rotating shaft 4, the second telescopic rod 8 is connected to the lower end of the first telescopic rod 2, the folding rod 7 is connected to the outer side of the second telescopic rod 8, and, one side of folding rod 7 is connected with foot rest 9, and foot rest 9 is connected with folding rod 7 through first hinge 19, bracing piece 14 is installed to the inboard of second telescopic link 8, and the lower extreme outside of bracing piece 14 is connected with fixed plate 16, fixed plate 16 is connected through fixing bolt 17 with bracing piece 14, and the lower extreme of fixed plate 16 is connected with support frame 12, fixed plate 16 passes through fixing bolt 17 with support frame 12 and is connected, and universal wheel 11 is installed to the lower extreme of support frame 12, spring 18 is installed in the upper end outside of bracing piece 14, and baffle 15 is installed to the upper end of spring 18, ceiling 3 is installed on the top of first telescopic link 2, and the outside of ceiling 3 is connected with folding ceiling 13, ceiling 3 passes through second hinge 20 with folding ceiling 13 and is connected, the upper end of folding rod 7 is connected with.
Furthermore, the folding rod 7 and the second telescopic rod 8 form a rotating structure through a first hinge 19, the folding rod 7 is transversely symmetrical relative to the second telescopic rod 8, and the foot rest 9 is connected to the tail end of the folding rod 7 through the first hinge 19, so that the folding rod 7 can play a supporting role after being put down.
Furthermore, the support rod 14 and the second telescopic rod 8 form an elastic structure through the spring 18, the cross section of the lower half section of the support rod 14 is square, and the lower half section of the support rod 14 is designed to be square, so that the rotation in the direction can be prevented when the display shelf is carried.
Furthermore, a folding structure is formed between the movable plates 5 through the folding plates 6, the height of the movable plates 5 is equal to that of the folding plates 6, and the display area of the display rack can be increased by increasing the number of the movable plates 5 and the display plates 1.
Furthermore, the display board 1 forms a rotating structure with the first telescopic rod 2 through the rotating shaft 4, and the rotating shaft 4 is installed at one half of the middle part of the display board 1, and the rotating shaft 4 is installed at the middle part of the display board 1, so that the display board 1 can be conveniently rotated.
Further, the cross-section of ceiling 3 is arc column structure, and the cross-section of ceiling 3 and the 2 junctions of first telescopic link is trapezoidal, also trapezoidal can prevent that ceiling 3 from droing with the junction design of first telescopic link 2 and ceiling 3.
The working principle is as follows: when in use, a certain number of movable plates 5 are connected by using a folding plate 6, then the display plate 1 is arranged between the movable plates 5, then the display plate 1 is arranged at the inner side of a first telescopic rod 2 by using a rotating shaft 4, then a ceiling 3 is arranged at the upper end of the first telescopic rod 2, then the display rack is transported to a construction site by using a universal wheel 11 arranged at the lower end of a supporting frame 12, a spring 18 arranged between a supporting rod 14 and a baffle 15 can play a role in shock absorption during transportation, a constructor can put down a folding rod 7 arranged at the outer side of a second telescopic rod 8 during rest time, then put a supporting plate 10 at the upper end of the folding rod 7, the constructor can rest on the supporting plate 10, a foot stand 9 can play a supporting role after putting down the folding rod 7, the ceiling 3 and a folding ceiling 13 can play a role in sun shading, the display plate 1 can be folded by using the folding plate 6 arranged on the, after being folded, the utility model can reduce the space needed for storage.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The construction progress management display device for the building engineering comprises a display plate (1) and is characterized in that a movable plate (5) is installed at the upper end and the lower end of the display plate (1), a folding plate (6) is installed on one side of the movable plate (5), a rotating shaft (4) is connected to the outer side of the display plate (1), a first telescopic rod (2) is connected to the other side of the rotating shaft (4), a second telescopic rod (8) is connected to the lower end of the first telescopic rod (2), a folding rod (7) is connected to the outer side of the second telescopic rod (8), the second telescopic rod (8) is connected with the folding rod (7) through a first hinge (19), a foot rest (9) is connected to one side of the folding rod (7), the foot rest (9) is connected with the folding rod (7) through a first hinge (19), and a support rod (14) is installed on the inner side of the second telescopic rod (8), and the lower extreme outside of bracing piece (14) is connected with fixed plate (16), fixed plate (16) are connected through fixing bolt (17) with bracing piece (14), and the lower extreme of fixed plate (16) is connected with support frame (12), fixed plate (16) are connected through fixing bolt (17) with support frame (12), and the lower extreme of support frame (12) installs universal wheel (11), spring (18) are installed in the upper end outside of bracing piece (14), and baffle (15) are installed to the upper end of spring (18), ceiling (3) are installed on the top of first telescopic link (2), and the outside of ceiling (3) is connected with folding ceiling (13), ceiling (3) are connected through second hinge (20) with folding ceiling (13), the upper end of folding rod (7) is connected with layer board (10).
2. The construction progress management and display device for building engineering according to claim 1, wherein the folding rod (7) and the second telescopic rod (8) form a rotating structure through a first hinge (19), and the folding rod (7) is transversely symmetrical about the second telescopic rod (8).
3. The construction progress management and display device for the building engineering as claimed in claim 1, wherein the support rod (14) and the second telescopic rod (8) form an elastic structure through a spring (18), and the cross section of the lower half section of the support rod (14) is square.
4. The construction progress management and display device for constructional engineering as claimed in claim 1, wherein the movable plates (5) are folded by the folding plates (6), and the height of the movable plates (5) is equal to the height of the folding plates (6).
5. The construction progress management and display device for the constructional engineering as claimed in claim 1, wherein the display board (1) forms a rotating structure with the first telescopic rod (2) through a rotating shaft (4), and the rotating shaft (4) is installed at a middle half of the display board (1).
6. The construction progress management and display device for the building engineering as claimed in claim 1, wherein the cross section of the ceiling (3) is an arc-shaped structure, and the cross section of the connection part of the ceiling (3) and the first telescopic rod (2) is a trapezoid.
CN202021088241.3U 2020-06-14 2020-06-14 Construction progress management display device for building engineering Active CN212587162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021088241.3U CN212587162U (en) 2020-06-14 2020-06-14 Construction progress management display device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021088241.3U CN212587162U (en) 2020-06-14 2020-06-14 Construction progress management display device for building engineering

Publications (1)

Publication Number Publication Date
CN212587162U true CN212587162U (en) 2021-02-23

Family

ID=74650521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021088241.3U Active CN212587162U (en) 2020-06-14 2020-06-14 Construction progress management display device for building engineering

Country Status (1)

Country Link
CN (1) CN212587162U (en)

Similar Documents

Publication Publication Date Title
CN205568288U (en) Novel exhibition data frame
CN212587162U (en) Construction progress management display device for building engineering
CN205961043U (en) Solar photovoltaic fixed bolster
CN217087809U (en) Folding photovoltaic power plant is removed in push-and-pull
CN214432704U (en) Multifunctional surveying and mapping platform
CN212541727U (en) Warning sign for building convenient to fold and prevent empting
CN211873770U (en) Civil engineering construction mounting frame
CN210374121U (en) Self-balancing flexible photovoltaic panel support
CN216999756U (en) Supporting construction is used in subway deep basal pit construction
CN220849052U (en) Roof tent convenient to use
CN219969553U (en) Automobile luggage rack
CN220769100U (en) Multi-angle adjustable telescopic urban road fence
CN217929270U (en) Photovoltaic support structure for slope and photovoltaic system
CN221239387U (en) Rotatable windproof display rack
CN213205892U (en) Combined support for internal construction of transverse tower
CN221058220U (en) Photovoltaic support and photovoltaic power generation system
CN213535480U (en) Collapsible and storage cage that has function of weighing
CN212728191U (en) Roof planting device for green building
CN210089160U (en) Stable solar rack that just can install fast
AU2023200155A1 (en) Foldable solar power generation device
CN219268800U (en) Folding photovoltaic power generation assembly
CN209993168U (en) Be used for natural resources asset propaganda education device
CN218522353U (en) Large-area-based push-pull type flat-top wind and snow resistance flame-retardant sunshade tent
CN220336381U (en) Adjustable scaffold
CN2574223Y (en) Single-post overhead solar battery installation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220830

Address after: 2nd Floor, Building 13, No. 27, Xinjinqiao Road, China (Shanghai) Pilot Free Trade Zone, Pudong New Area, Shanghai, 200137

Patentee after: Shanghai Yuanyao Construction Engineering Co.,Ltd.

Address before: 518000 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee before: Shenzhen Lanfeng Technology Co.,Ltd.

TR01 Transfer of patent right