CN212582685U - High-pile wharf steel pipe pile construction positioning device - Google Patents

High-pile wharf steel pipe pile construction positioning device Download PDF

Info

Publication number
CN212582685U
CN212582685U CN202021019983.0U CN202021019983U CN212582685U CN 212582685 U CN212582685 U CN 212582685U CN 202021019983 U CN202021019983 U CN 202021019983U CN 212582685 U CN212582685 U CN 212582685U
Authority
CN
China
Prior art keywords
pile
positioning
steel pipe
leg
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021019983.0U
Other languages
Chinese (zh)
Inventor
沈克丽
刘建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbour Consultants Co Ltd
Original Assignee
CCCC First Harbour Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbour Consultants Co Ltd filed Critical CCCC First Harbour Consultants Co Ltd
Priority to CN202021019983.0U priority Critical patent/CN212582685U/en
Application granted granted Critical
Publication of CN212582685U publication Critical patent/CN212582685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a high pile pier steel-pipe pile construction positioner, include: the pile comprises pile legs, pile shoes, a horizontal support, a rotating base, a rotating arm and a positioning snap ring, wherein the pile legs are three hollow cylinders and are arranged in a regular triangle, and the bottom of each pile leg is provided with a pile shoe support and a water pump; the horizontal support is connected with the pile legs to form a transverse regular triangular frame; the rotating base is movably arranged on any one pile leg and is connected with the supporting rotating arm, and the rotating arm is connected with the positioning snap ring positioned at the center of the regular triangle frame. The utility model has the advantages that: the guide function that has accurate positioning, both can the location vertical pile, also can the location batter pile, through pile leg built-in water pump water injection and drainage realize sinking, fixed and extract, the removal of locating rack, can reduce the influence of aquatic construction environment such as wind, unrestrained, class to the operation of driving in the steel-pipe pile, improve the precision of driving in the steel-pipe pile, reduce the design drawing recalculation and adjustment that the steel-pipe pile leads to because of construction error, be favorable to the modularization construction of high pile pier.

Description

High-pile wharf steel pipe pile construction positioning device
Technical Field
The utility model relates to a port engineering technical field, concretely relates to high-pile wharf steel-pipe pile construction positioner.
Background
The steel pipe pile construction of the port engineering high-pile wharf usually adopts a pile driving boat. The piling boat is used for piling on water, the boat body is of a steel box structure, and the end part of the deck is provided with the piling frame which can bow forwards and lean backwards to meet the requirement of piling inclined piles. The piling ship is a non-self-propelled ship and is pulled in place by a tugboat. The piling ship is provided with a piling hammer, a pile frame and auxiliary equipment. The pile hammer is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted through the pile frame, and a guide frame is arranged in front of the pile frame to control the direction.
Because the guide frame of the pile driving ship is arranged on the ship, even if the positioning arrangement of the guide frame before pile driving is very accurate, the ship is always in a motion state along with the influence of sea storm flow on the ship body, and a driven pile deviates from a designed pile position to a certain extent; in addition, the pile driving boat uses a gravity type pile hammer to drive the pile, after the pile hammer is lifted to a certain height, the pile is driven by falling under the action of gravity, a certain eccentricity exists between a drop hammer point and the gravity center of the pile, and the driven pile deviates from the designed pile position to a certain degree. Due to construction errors, the actual site pile position and the bearing capacity of the pile foundation are not in accordance with the original design, and the design drawing needs to be recalculated and adjusted. And excessive construction errors can result in the generation of waste piles.
Disclosure of Invention
For solving the technical problem, the utility model aims at providing a high pile pier steel-pipe pile construction positioner, be the guider of accurate positioning, both can fix a position the vertical pile, also can fix a position the batter pile, realize sinking of locating rack through the built-in water pump water injection of spud leg and drainage, fixed and extract, remove, can reduce wind, unrestrained, the influence of the operation is squeezed into to the steel-pipe pile to the aquatic construction environment such as stream, improve the precision of squeezing into of steel-pipe pile, reduce the design recalculation and adjustment that the steel-pipe pile leads to because of construction error, be favorable to the modularization construction of high pile pier.
In order to realize the purpose, the utility model discloses a technical scheme is: the utility model provides a high pile pier steel-pipe pile construction positioner, includes: the pile comprises pile legs, pile shoes, horizontal supports, a rotating base, a rotating arm and a positioning snap ring, wherein the pile legs are three hollow cylinders and are arranged in a regular triangle, the bottom of each pile leg is provided with the pile shoe support, and a water pump is arranged inside each pile leg; three horizontal supports are arranged and are connected with the pile legs to form a transverse regular triangular frame; the rotary base is movably arranged on any one pile leg, and is connected with one end of a rotary arm facing the inside of the regular triangular frame, and the other end of the rotary arm is connected with a positioning snap ring; the positioning clamping ring is positioned in the center of the regular triangle frame and used for being inserted into a steel pipe pile to be driven into a seabed.
And a GPS positioning instrument and an inclinometer are arranged at the connecting end of the rotating arm and the positioning clamping ring, the GPS positioning instrument is used for determining the position of the pile position of the steel pipe pile to be driven into the seabed, and the inclinometer is used for determining the inclination angle of the steel pipe inclined pile to be driven into the seabed.
The pile legs, the pile shoes, the horizontal supports, the rotating base, the rotating arms and the positioning snap rings are all made of metal steel.
The diameter of the pile shoe is larger than that of the pile leg.
A plurality of intercommunicated sub-chambers are arranged inside the pile leg and used for increasing the cabin breaking stability of the triangular positioning frame.
And the water pump performs water injection and drainage operation through an opening at the upper end of the pile leg.
The rotating base is provided with a left rotating angle and a right rotating angle in the horizontal direction and drives the rotating arms to rotate together.
The positioning clamping ring is provided with an opening and closing clamping lock for fixing the steel pipe pile to be driven.
The positioning clamp vertically rotates around the central line of the rotating arm to position the inclined pile.
The utility model has the advantages that: the guide function that has accurate positioning, both can the location vertical pile, also can the location batter pile, through pile leg built-in water pump water injection and drainage realize sinking, fixed and extract, the removal of locating rack, can reduce the influence of aquatic construction environment such as wind, unrestrained, class to the operation of driving in the steel-pipe pile, improve the precision of driving in the steel-pipe pile, reduce the design drawing recalculation and adjustment that the steel-pipe pile leads to because of construction error, be favorable to the modularization construction of high pile pier.
Drawings
FIG. 1 is a schematic side view of the positioning device for steel pipe pile construction in a high-rise wharf of the present invention;
FIG. 2 is a schematic top view of the positioning device for steel pipe pile construction in a high-pile wharf;
fig. 3 is the utility model discloses a local schematic diagram of high-pile wharf steel-pipe pile construction positioner.
In the figure:
1-3 pile leg 4 pile shoe 5 horizontal support
6. Water pump 7, rotary base 8, rotary arm
9. Positioning clasp 10, GPS locator 11, inclinometer
Detailed Description
The invention will be described in further detail with reference to the following drawings and embodiments:
as shown in fig. 1, the positioning device for steel pipe pile construction in a high-pile wharf comprises a pile leg 1, a pile leg 2, a pile leg 3, a pile shoe 4, a horizontal support 5, a water pump 6, a rotating base 7, a rotating arm 8, a positioning snap ring 9, a GPS locator 10 and an inclinometer 11.
The regular triangle positioning frame is formed by connecting three cylindrical steel pile legs 1, 2, 3 and three horizontal steel horizontal braces 5. The lower ends of the pile leg 1, the pile leg 2 and the pile leg 3 are all connected with a pile shoe 4. The included angles among the pile legs 1, 2 and 3 are all 60 degrees.
The diameters of the pile leg 1, the pile leg 2 and the pile leg 3 are the same. The diameter of the pile shoe 4 is larger than the diameters of the pile leg 1, the pile leg 2 and the pile leg 3. According to the functional requirement, spud leg 1, spud leg 2, spud leg 3 are inside can set up a plurality of cabins, and this embodiment has set up 3 cabins, and the setting up of many cabins structure can increase the broken cabin stability of triangle-shaped locating rack. The lower part of each pile leg is provided with a water pump 6, and the water pump 6 carries out water injection and drainage operation through an opening at the upper end of the pile leg. After the triangular positioning frame is dragged to a designated position through the dragging wheel, water is injected into the pile leg 1, the pile leg 2 and the pile leg 3 through the water pump 6, so that the pile shoe 4 is inserted into the seabed by a certain depth under the action of gravity.
The rotating base 7 is fixed on the pile leg 1 and can rotate a certain angle left and right in the horizontal direction. The rotary base 7 is connected with a rotary arm 8, and the rotary arm 8 is rigidly connected with the rotary base 7 and can rotate in a horizontal plane along with the rotary base. The rotating arm 8 is of a truss structure and provides a supporting effect in the positioning and driving process of the steel pipe pile. The end part of the rotating arm 8 is connected with a positioning snap ring 9, and the circle center of the positioning snap ring 9 is the geometric centroid of the regular triangle positioning frame. Because the center of the steel pipe pile is consistent with the geometric centroid of the regular triangle positioning frame, the influence of eccentric acting force can be reduced in the positioning and driving process of the steel pipe pile, and the stress distribution of the three pile legs of the positioning frame is uniform. The positioning clamp ring 9 can vertically rotate around the central line of the rotating arm 8 to position the inclined pile. The steel pipe pile to be driven into the seabed is fixed through the positioning snap ring 9. The positioning snap ring 9 can be opened and closed to fix the steel pipe pile to be driven.
The positioning device for the steel pipe pile construction of the high-pile wharf can position both a straight pile and an inclined pile. The end part of the positioning snap ring 9 connected with the rotating arm 8 is provided with a GPS locator 10 and an inclinometer 11. The GPS locator 10 is used for determining the position of the steel pipe pile position, and the inclinometer 11 is used for determining the inclination angle of the steel pipe inclined pile.
After the steel pipe pile is driven into the operation, water is discharged through a water pump 6 arranged in the pile leg 1, the pile leg 2 and the pile leg 3, the pile shoe 4 of each pile leg is pulled out by means of buoyancy of the pile leg 1, the pile leg 2 and the pile leg 3, and the triangular positioning frame is moved to a new pile position.
The pile leg 1, the pile leg 2 and the pile leg 3 of the high-pile wharf steel pipe pile construction positioning device are all larger than the design elevation of the steel pipe pile after positioning and driving, the bottom elevations of the three transverse steel horizontal struts 5 are at least larger than the design elevation of the steel pipe pile after positioning and driving by more than 0.5 m, and after the steel pipe pile is driven into a seabed through the triangular positioning frame, pile cutting or pile connecting is carried out in the triangular positioning frame, so that the top elevation of the steel pipe pile meets the design elevation requirement. The pile shoe 4 is pulled out through drainage of the water pump 6, and at the moment, the bottom elevation of the transverse horizontal support 5 of the triangular positioning frame is higher than the designed top elevation of the steel pipe pile, so that the positioning frame can move smoothly.
The above-described embodiments are merely illustrative of the principles and utilities of the present application and are not intended to limit the application. Any person skilled in the art can modify or change the above-described embodiments without departing from the spirit and scope of the present application. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present disclosure be covered by the claims of the present application.

Claims (9)

1. The utility model provides a high pile pier steel-pipe pile construction positioner, characterized by includes: the pile comprises pile legs, pile shoes, horizontal supports, a rotating base, a rotating arm and a positioning snap ring, wherein the pile legs are three hollow cylinders and are arranged in a regular triangle, the bottom of each pile leg is provided with the pile shoe support, and a water pump is arranged inside each pile leg; three horizontal supports are arranged and are connected with the pile legs to form a transverse regular triangular frame; the rotary base is movably arranged on any one pile leg, and is connected with one end of a rotary arm facing the inside of the regular triangular frame, and the other end of the rotary arm is connected with a positioning snap ring; the positioning clamping ring is positioned in the center of the regular triangle frame and used for being inserted into a steel pipe pile to be driven into a seabed.
2. The device for positioning the steel pipe pile in the high-pile wharf in the construction process as claimed in claim 1, wherein a GPS (global positioning system) locator and an inclinometer are arranged at the connecting end of the rotating arm and the positioning snap ring, the GPS locator is used for determining the pile position of the steel pipe pile to be driven into the seabed, and the inclinometer is used for determining the inclination angle of the steel pipe inclined pile to be driven into the seabed.
3. The device for positioning the steel pipe pile in the construction process of the high-pile wharf as claimed in claim 1, wherein the pile legs, the pile shoes, the horizontal support, the rotating base, the rotating arms and the positioning snap rings are all made of metal steel.
4. The device for positioning the steel pipe pile in the high pile wharf in the construction process of claim 1, wherein the diameter of the pile shoe is larger than that of the pile leg.
5. The positioning device for steel pipe pile construction in the high-pile wharf according to claim 1, wherein a plurality of intercommunicated sub-chambers are arranged in the pile leg to increase the stability of the triangular positioning frame in cabin breaking.
6. The device for positioning the steel pipe pile in the high-pile wharf in the claim 1, wherein the water pump is used for water filling and draining through an opening at the upper end of the pile leg.
7. The device as claimed in claim 1, wherein the rotation base has a horizontal rotation angle, and drives the rotation arm to rotate together with the rotation base.
8. The device for positioning the steel pipe pile construction in the high-pile wharf as claimed in claim 1, wherein the positioning snap ring is provided with an opening and closing latch for fixing the steel pipe pile to be driven.
9. The device for positioning the steel pipe pile in the high-pile wharf in the construction process as claimed in claims 1 and 8, wherein the positioning clamp rotates vertically around the center line of the rotating arm to position the batter pile.
CN202021019983.0U 2020-06-06 2020-06-06 High-pile wharf steel pipe pile construction positioning device Active CN212582685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021019983.0U CN212582685U (en) 2020-06-06 2020-06-06 High-pile wharf steel pipe pile construction positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021019983.0U CN212582685U (en) 2020-06-06 2020-06-06 High-pile wharf steel pipe pile construction positioning device

Publications (1)

Publication Number Publication Date
CN212582685U true CN212582685U (en) 2021-02-23

Family

ID=74642933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021019983.0U Active CN212582685U (en) 2020-06-06 2020-06-06 High-pile wharf steel pipe pile construction positioning device

Country Status (1)

Country Link
CN (1) CN212582685U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235573A (en) * 2021-03-30 2021-08-10 深圳金信城市建设有限公司 Municipal bridge steel pipe pile construction structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235573A (en) * 2021-03-30 2021-08-10 深圳金信城市建设有限公司 Municipal bridge steel pipe pile construction structure and construction method

Similar Documents

Publication Publication Date Title
AU2012204091B2 (en) Method for providing a foundation for a mass located at height, and a positioning frame for performing the method
CN109838351A (en) Windy power generator floating is automatically to wind water wind power generating device
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
CN108674585B (en) Flat plate anchor with rotating plate arranged at bottom
CN105473791A (en) Method of installing a foundation for an offshore wind turbine and a template for use herein
CN102079365A (en) Pile driving boat
CN105464117A (en) Rotary-type overwater piling guide frame and piling process for overwater pile group foundations
CN110468833A (en) Drilled grouting piles under water constructing device and its application method for cruiseway
CN103981867A (en) Piling limiting frame for intertidal zone offshore wind power foundation pile sinking and construction method thereof
CN212582685U (en) High-pile wharf steel pipe pile construction positioning device
JP5813109B2 (en) Surface-projecting reusable underwater template for installing one or more underwater struts or piles
NL2007882C2 (en) Excavator for discharging bottom parts from a bottom floor.
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
CN202176267U (en) Novel suction pile type seabed drilling base plate
EP2913439B1 (en) Device and method for arranging foundation piles in an underwater bottom
CN219710296U (en) Shallow sea is from removing construction ship
CN218843097U (en) Deep water area underwater pile sinking positioning guide frame
CN108613662B (en) Suction type adjustable instrument frame for underwater monitoring and use method thereof
CN105401564B (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN208136938U (en) A kind of marine four floating drums-buoyancy tank combined type foundation structure
CN207295707U (en) New marine guidance piling ship
CN107724416A (en) One kind is used to build underwater foundation structure and its installation method
CN114411800A (en) Steel pipe pile construction system and technology based on floating pile-stabilizing platform
CN212582687U (en) Scalable positioning mechanical arm of high pile pier steel-pipe pile construction
CN205444193U (en) Rotating type floating pile driving guide frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant