CN212567400U - On-spot mapping device of building engineering cost - Google Patents

On-spot mapping device of building engineering cost Download PDF

Info

Publication number
CN212567400U
CN212567400U CN202021606643.8U CN202021606643U CN212567400U CN 212567400 U CN212567400 U CN 212567400U CN 202021606643 U CN202021606643 U CN 202021606643U CN 212567400 U CN212567400 U CN 212567400U
Authority
CN
China
Prior art keywords
mapping device
dismantled
detachably connected
box
surveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021606643.8U
Other languages
Chinese (zh)
Inventor
隋智力
孟媛
袁则循
李云青
黄艳超
董晓丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CITY UNIVERSITY
Original Assignee
BEIJING CITY UNIVERSITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CITY UNIVERSITY filed Critical BEIJING CITY UNIVERSITY
Priority to CN202021606643.8U priority Critical patent/CN212567400U/en
Application granted granted Critical
Publication of CN212567400U publication Critical patent/CN212567400U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model belongs to the technical field of surveying equipment, in particular to a construction engineering cost on-site surveying device, which comprises a bottom plate, the lower end surface of the bottom plate is detachably connected with four universal wheels which are evenly distributed, the upper end surface of the bottom plate is provided with a box body, the upper end surface of two installation blocks is provided with cylinders, the output ends of the two cylinders can be detachably connected with connecting rods, the upper end surface of a third installation plate is provided with a surveying device main body, the upper end surface of the box body is detachably connected with a cover plate, the right side of the cover plate is detachably connected with two lock catches, the cover plate is detachably connected with the box body through the two lock catches, the right side of the box body is provided with a handle, thereby achieving the effect of conveniently carrying the surveying device, avoiding the time waste caused by the detachment and carrying of the surveying device main body and a bracket, and, the work efficiency of staff is improved to convenient the removal in the survey and drawing process.

Description

On-spot mapping device of building engineering cost
Technical Field
The utility model relates to a survey and drawing technical field, concretely relates to on-spot mapping device of building engineering cost.
Background
The engineering survey and drawing is to measure various information of space and earth and draw various topographic maps, the shape, size and gravity field of the earth and other planets are used as research objects, the research and surveying objects are very wide, and mainly comprise various ground objects, landforms, underground geological structures, hydrology, mineral deposits and the like of the earth surface, such as mountains, rivers, houses, roads, vegetations and the like.
Present on-spot mapping device of building engineering cost when carrying the mapping device main part, needs to dismantle support and mapping device and carry, and then the installation leads to the fact a large amount of wastes of time with the dismantlement to adjust the inefficiency of mapping device height, reduced staff's work efficiency, and inconvenient removal among the mapping process.
Disclosure of Invention
Not enough to prior art, the utility model provides a building engineering cost is at scene mapping device has and avoids when carrying mapping device to mapping device main part and support split with carry the time waste who causes and conveniently adjust mapping device's height characteristics.
In order to achieve the above object, the utility model provides a following technical scheme: a construction engineering cost on-site surveying and mapping device comprises a bottom plate, wherein the lower end face of the bottom plate is detachably connected with four universal wheels which are uniformly distributed, a box body is installed on the upper end face of the bottom plate, the bottom end in the box body is detachably connected with two installation blocks, air cylinders are installed on the upper end faces of the two installation blocks, the output ends of the two air cylinders are detachably connected with connecting rods, the upper end faces of the two connecting rods are detachably connected with first installation plates, the upper end faces of the two first installation plates are provided with first connecting blocks, the upper end faces of the first connecting blocks are detachably connected with telescopic rods, the upper end faces of the telescopic rods are detachably connected with second connecting blocks, the upper end faces of the second connecting blocks are detachably connected with second installation plates, the upper ends of the second installation plates are provided with third installation plates, and the upper end faces of the third installation plates are provided with surveying and, the upper end face of the box body is detachably connected with a cover plate, the right side of the cover plate is detachably connected with two lock catches, the cover plate is detachably connected with the box body through the two lock catches, and a handle is installed on the right side of the box body.
Preferably, the inner chamber has been seted up to the inside of second mounting panel, the up end of second mounting panel is seted up flutedly, the diameter of recess is the same with the diameter of inner chamber, the inside of recess is provided with the stopper, the up end of stopper can be dismantled and be connected with the screw rod, the upper end of screw rod runs through the inner chamber and extends to the inside of recess, the up end of screw rod can be dismantled and be connected with the rotation axis with recess assorted, the up end of rotation axis and the lower terminal surface fixed connection of third mounting panel.
Preferably, the telescopic link includes the sleeve, three evenly distributed's regulation hole has been seted up to telescopic lateral wall, telescopic inside wall sliding connection has the inner tube, the lateral wall lower extreme of inner tube can be dismantled and be connected with and adjust the hole assorted regulation marble.
Preferably, the up end of third mounting panel can be dismantled and is connected with branch, branch is located the right side of mapping device main part, the light is installed to the up end of branch.
Preferably, the standing groove has been seted up to the up end of apron, the loose axle is installed to the inside bottom of standing groove, the left side swing joint of loose axle has the support column, the length of support column equals the total length of box and bottom plate, the lower terminal surface fixedly connected with non slipping spur of support column, the case is placed to the up end fixedly connected with of first mounting panel, it is located the left side of first connecting block to place the case, the inside swing joint who places the case has the shorthand board.
Preferably, the embedding of the up end of third mounting panel is provided with the battery, the battery is located the below of branch, be electric connection between battery and the light.
Preferably, the lower terminal surface of bottom plate can be dismantled and is connected with four evenly distributed's nut, bottom plate and box can be dismantled through four nuts and be connected.
Preferably, the front end face of the box body is sequentially provided with a first switch and a second switch from left to right, the first switch is electrically connected with the cylinder, and the second switch is electrically connected with the illuminating lamp.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in the operation process, during the survey and drawing, open the cylinder, the cylinder drives the top that the mapping device main part rose the box and surveys and draw, in the mapping process, promote the box, the universal wheel drives the box and advances towards the direction that promotes, when the survey and drawing is finished, open the cylinder, the cylinder drives the mapping device main part and resumes to the normal position, be closure state with the apron with the box after that, carry out the lock with the apron with the box through the hasp after that, carry the device to corresponding position through the pulling handle, thereby reached the effect that conveniently carries this mapping device, avoid wasting the time that causes mapping device main part and support split and carry, and conveniently adjust the height of mapping device main part, staff's work efficiency has been improved, and convenient the removal in the mapping process.
Drawings
FIG. 1 is a structural diagram of the construction engineering cost on-site surveying and mapping device of the present invention;
FIG. 2 is a cross-sectional view of the construction cost on-site surveying and mapping device of the present invention;
FIG. 3 is an opened sectional view of the construction cost on-site surveying and mapping device of the present invention;
fig. 4 is a sectional view of the main body of the surveying and mapping device of the present invention.
In the figure: 1. a base plate; 101. a box body; 102. a cover plate; 103. a placement groove; 104. a movable shaft; 105. a support pillar; 106. anti-skid blocks; 107. locking; 108. a handle; 109. a nut; 2. mounting blocks; 201. a cylinder; 202. a connecting rod; 203. a first mounting plate; 3. a telescopic rod; 301. a sleeve; 302. an adjustment hole; 303. an inner barrel; 304. adjusting the marble; 305. a first connection block; 306. a second connecting block; 4. placing a box; 401. a stenographic board; 5. a second mounting plate; 501. an inner cavity; 502. a groove; 503. a limiting block; 504. a screw; 505. a rotating shaft; 506. a third mounting plate; 507. a storage battery; 6. a surveying device body; 7. a strut; 701. an illuminating lamp; 8. a first switch; 801. a second switch; 9. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: a construction engineering cost on-site mapping device comprises a bottom plate 1, four universal wheels 9 which are uniformly distributed are detachably connected to the lower end face of the bottom plate 1, a box body 101 is installed on the upper end face of the bottom plate 1, two installation blocks 2 are detachably connected to the bottom end inside the box body 101, air cylinders 201 are installed on the upper end faces of the two installation blocks 2, connecting rods 202 are detachably connected to the output ends of the two air cylinders 201, first installation plates 203 are detachably connected to the upper end faces of the two connecting rods 202, first connection blocks 305 are installed on the upper end faces of the two first installation plates 203, telescopic rods 3 are detachably connected to the upper end faces of the first connection blocks 305, second connection blocks 306 are detachably connected to the upper end faces of the telescopic rods 3, second installation plates 5 are detachably connected to the upper end faces of the second connection blocks 306, third installation plates 506 are arranged on the upper ends of the second installation plates 5, and mapping device bodies 6 are, the upper end face of the box body 101 is detachably connected with a cover plate 102, the right side of the cover plate 102 is detachably connected with two latches 107, the cover plate 102 and the box body 101 are detachably connected through the two latches 107, and a handle 108 is installed on the right side of the box body 101.
In this embodiment: the model of cylinder 201 is SD50, during the survey and drawing, open cylinder 201, cylinder 201 drives the top that mapping device main part 6 rose box 101 and surveys, the survey and drawing in-process, promote box 101, universal wheel 9 drives box 101 and advances towards the direction that promotes, when the survey and drawing is finished, open cylinder 201, cylinder 201 drives mapping device main part 6 and resumes to the normal position, be closure state with apron 102 and box 101 after that, carry out the lock with apron 102 and box 101 through hasp 107 after that, carry the device to corresponding position through pulling handle 108, thereby reached the effect that conveniently carries this mapping device, avoid wasting the time that causes mapping device main part 6 and support split and carry, and conveniently adjust the height of mapping device main part 6, the work efficiency of staff has been improved, and convenient the removal of survey and drawing in-process.
As the utility model discloses a technical optimization scheme, inner chamber 501 has been seted up to the inside of second mounting panel 5, recess 502 is seted up to the up end of second mounting panel 5, the diameter of recess 502 is the same with inner chamber 501's diameter, the inside of recess 502 is provided with stopper 503, stopper 503's up end can be dismantled and be connected with screw rod 504, the upper end of screw rod 504 runs through inner chamber 501 and extends to the inside of recess 502, the up end of screw rod 504 can be dismantled and be connected with recess 502 assorted rotation axis 505, the up end of rotation axis 505 and the lower terminal surface fixed connection of third mounting panel 506.
In this embodiment: according to on-the-spot survey and drawing needs, when needing to adjust the angle of mapping device main part 6, pulling third mounting plate 506 is rotatory to rotatory angle, and rotatory in-process, rotation axis 505 rotates in the inside of recess 502, and stopper 503 prevents that rotation axis 505 and inner chamber 501 from droing to the convenient effect of adjusting the rotation angle of mapping device main part 6 has been reached.
As a technical optimization scheme, telescopic link 3 includes sleeve 301, and three evenly distributed's regulation hole 302 is seted up to sleeve 301's lateral wall, and sleeve 301's inside wall sliding connection has inner tube 303, and the lateral wall lower extreme of inner tube 303 can be dismantled and be connected with and adjust hole 302 assorted regulation marble 304.
In this embodiment: after surveying and mapping device main part 6 rose the top of box 101, the staff needed highly finely tuning surveying and mapping device main part 6 according to on-the-spot survey and drawing demand, during the regulation, pressed and adjusted marble 304, and then made the regulation marble 304 adjust to corresponding regulation hole 302 in to reached the effect that conveniently highly finely tunes surveying and mapping device main part 6.
As a technical optimization scheme of the utility model, the up end of third mounting panel 506 can be dismantled and be connected with branch 7, and branch 7 is located the right side of mapping device main part 6, and light 701 is installed to the up end of branch 7.
In this embodiment: when surveying and mapping on-site light is weaker, the illuminating lamp 701 is turned on to illuminate the surveying and mapping on-site, and therefore delay of construction period caused by incapability of surveying and mapping under the condition of weaker light is avoided.
As a technical optimization scheme of the utility model, standing groove 103 has been seted up to the up end of apron 102, loose axle 104 is installed to the inside bottom of standing groove 103, the left side swing joint of loose axle 104 has support column 105, the length of support column 105 equals the total length of box 101 and bottom plate 1, lower terminal surface fixedly connected with non slipping spur 106 of support column 105, the up end fixedly connected with of first mounting panel 203 places case 4, place the left side that case 4 is located first connecting block 305, the inside swing joint who places case 4 has shorthand board 401.
In this embodiment: when staff's survey and drawing in-process, open the back with apron 102, pull out support column 105 and be ninety degrees with ground and place support apron 102, support in-process, non slipping spur 106 prevents support column 105 and ground skidding, will place the inside stenography board 401 of case 4 and take out the upper end of placing apron 102 after that to reached and made things convenient for the staff to place the effect of surveying and mapping instrument and stenography board 401 in the apron 102 upper end of opening, improved staff's efficiency.
As a technical optimization scheme of the utility model, the embedding of the up end of third mounting panel 506 is provided with battery 507, and battery 507 is located the below of branch 7, is electric connection between battery 507 and the light 701.
In this embodiment: by installing the storage battery 507, the storage battery 507 supplies power to the illumination lamp 701, thereby facilitating the supply of power to the illumination lamp 701.
As a technical optimization scheme of the utility model, bottom plate 1's lower terminal surface can be dismantled and be connected with four evenly distributed's nut 109, and bottom plate 1 and box 101 can be dismantled through four nuts 109 and connect.
In this embodiment: when needing to detect and maintain cylinder 201, twist four nuts 109, dismantle bottom plate 1 and box 101 after that, detect and maintain cylinder 201 after that to the effect that conveniently detects and maintain cylinder 201 has been reached.
As a technical optimization scheme of the utility model, first switch 8 and second switch 801 are from left to right installed in proper order to the preceding terminal surface of box 101, are electric connection between first switch 8 and the cylinder 201, are electric connection between second switch 801 and the light 701.
In this embodiment: by pressing the first switch 8, the control cylinder 201 can be conveniently turned on and off, and by pressing the second switch 801, the lighting lamp 701 can be conveniently turned on and off.
When the device is used for surveying, the first switch 8 is pressed to open the cylinder 201, the cylinder 201 drives the surveying device main body 6 to ascend to the upper part of the box body 101, after the surveying device main body 6 ascends to the upper part of the box body 101, a worker needs to finely adjust the height of the surveying device main body 6 according to the surveying requirement on site, when the surveying device is adjusted, the adjusting marble 304 is pressed, the adjusting marble 304 is adjusted into the corresponding adjusting hole 302, the supporting column 105 is pulled out to place the supporting cover plate 102 at an angle of ninety degrees with the ground after the cover plate 102 is opened, the antiskid block 106 prevents the supporting column 105 from slipping with the ground during the supporting process, the stenographic plate 401 inside the placing box 4 is taken out and placed at the upper end of the cover plate 102, the worker places a surveying tool and the stenographic plate 401 at the upper end of the opened cover plate 102 conveniently, then surveying is started, the box body 101 is pushed during the surveying process, the universal wheel 9 drives the, according to the needs of on-site surveying and mapping, when the angle of the surveying and mapping device main body 6 needs to be adjusted, the third mounting plate 506 is pulled to rotate to the rotating angle, in the rotating process, the rotating shaft 505 rotates in the groove 502, the limiting block 503 prevents the rotating shaft 505 from falling off from the inner cavity 501, when the light of the surveying and mapping site is weak, the second switch 801 is pressed to turn on the illuminating lamp 701 to illuminate the surveying and mapping site, when the surveying and mapping are finished, the cylinder 201 is opened, the cylinder 201 drives the surveying and mapping device main body 6 to return to the original position, then the cover plate 102 and the box body 101 are in a closed state, then the cover plate 102 and the box body 101 are tightly locked through the lock catch 107, and the.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides an on-spot mapping device of building engineering cost, includes bottom plate (1), the lower terminal surface of bottom plate (1) can be dismantled and be connected with four evenly distributed's universal wheel (9), its characterized in that: the box body (101) is installed on the upper end face of the bottom plate (1), the two installation blocks (2) can be detachably connected to the bottom end in the box body (101), the air cylinders (201) are installed on the upper end faces of the two installation blocks (2), the output ends of the two air cylinders (201) can be detachably connected with the connecting rods (202), the upper end faces of the two connecting rods (202) can be detachably connected with the first installation plate (203), the first connecting blocks (305) are installed on the upper end faces of the two first installation plates (203), the upper end faces of the first connecting blocks (305) can be detachably connected with the telescopic rods (3), the upper end face of each telescopic rod (3) can be detachably connected with the second connecting block (306), the upper end face of each second connecting block (306) can be detachably connected with the second installation plate (5), and the third installation plate (506) is arranged on the upper end of the, surveying and mapping device main part (6) are installed to the up end of third mounting panel (506), the up end of box (101) can be dismantled and be connected with apron (102), the right side of apron (102) can be dismantled and be connected with two hasp (107), apron (102) can be dismantled through two hasp (107) with box (101) and be connected, handle (108) are installed on the right side of box (101).
2. The construction cost on-site surveying and mapping device of claim 1, wherein: inner chamber (501) have been seted up to the inside of second mounting panel (5), recess (502) have been seted up to the up end of second mounting panel (5), the diameter of recess (502) is the same with the diameter of inner chamber (501), the inside of recess (502) is provided with stopper (503), the up end of stopper (503) can be dismantled and be connected with screw rod (504), the inside of inner chamber (501) and extension to recess (502) is run through to the upper end of screw rod (504), the up end of screw rod (504) can be dismantled and be connected with recess (502) assorted rotation axis (505), the up end of rotation axis (505) and the lower terminal surface fixed connection of third mounting panel (506).
3. The construction cost on-site surveying and mapping device of claim 1, wherein: telescopic link (3) include sleeve (301), three evenly distributed's regulation hole (302) is seted up to the lateral wall of sleeve (301), the inside wall sliding connection of sleeve (301) has inner tube (303), the lateral wall lower extreme of inner tube (303) can be dismantled and be connected with and adjust hole (302) assorted regulation marble (304).
4. The construction cost on-site surveying and mapping device of claim 2, wherein: the up end of third mounting panel (506) can be dismantled and be connected with branch (7), branch (7) are located the right side of mapping device main part (6), light (701) are installed to the up end of branch (7).
5. The construction cost on-site surveying and mapping device of claim 2, wherein: the utility model discloses a safe and convenient storage box, including apron (102), storage box (102), standing groove (103), loose axle (104) are installed to the inside bottom of standing groove (103), the left side swing joint of loose axle (104) has support column (105), the length of support column (105) equals the total length of box (101) and bottom plate (1), lower terminal surface fixedly connected with non slipping spur (106) of support column (105), case (4) are placed to the up end fixedly connected with of first mounting panel (203), it is located the left side of first connecting block (305) to place case (4), the inside swing joint of placing case (4) has shorthand board (401).
6. The construction cost on-site surveying and mapping device of claim 4, wherein: the embedding of the up end of third mounting panel (506) is provided with battery (507), battery (507) are located the below of branch (7), be electric connection between battery (507) and light (701).
7. The construction cost on-site surveying and mapping device of claim 1, wherein: the lower terminal surface of bottom plate (1) can be dismantled and be connected with four evenly distributed's nut (109), bottom plate (1) and box (101) can be dismantled through four nuts (109) and be connected.
8. The construction cost on-site surveying and mapping device of claim 4, wherein: the front end face of the box body (101) is sequentially provided with a first switch (8) and a second switch (801) from left to right, the first switch (8) is electrically connected with the cylinder (201), and the second switch (801) is electrically connected with the illuminating lamp (701).
CN202021606643.8U 2020-08-05 2020-08-05 On-spot mapping device of building engineering cost Expired - Fee Related CN212567400U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021606643.8U CN212567400U (en) 2020-08-05 2020-08-05 On-spot mapping device of building engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021606643.8U CN212567400U (en) 2020-08-05 2020-08-05 On-spot mapping device of building engineering cost

Publications (1)

Publication Number Publication Date
CN212567400U true CN212567400U (en) 2021-02-19

Family

ID=74627946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021606643.8U Expired - Fee Related CN212567400U (en) 2020-08-05 2020-08-05 On-spot mapping device of building engineering cost

Country Status (1)

Country Link
CN (1) CN212567400U (en)

Similar Documents

Publication Publication Date Title
CN212586018U (en) Sampling device for geological survey
CN212567400U (en) On-spot mapping device of building engineering cost
CN205428231U (en) Interim traffic pilot lamp of municipal administration
CN111997665B (en) Umbrella-shaped point column type temporary support for coal mine tunnel
CN212901375U (en) Detachable lighting installation support
CN107152644B (en) A kind of road construction multi-functional street lamp
CN210831297U (en) Fixing device for engineering monitoring equipment
CN217055145U (en) Oil field exploitation sampling device with storage function
CN215950847U (en) Supplementary mapping device of three-dimensional topography in city
CN214893373U (en) Multifunctional measuring instrument for geological exploration
CN214743772U (en) A positioning support that arranges for municipal drainage engineering's pipeline
CN212510791U (en) Underground lamp convenient to angle regulation
CN210920724U (en) Be used for colliery to measure support device
CN112503339A (en) Building surveyor's level is measured with adjusting supporting equipment
CN211716437U (en) Lighting device for highway tunnel construction
CN216480377U (en) Multi-functional green construction is light for night
CN216050282U (en) Highway tunnel illuminance short-term test auxiliary device
CN213930734U (en) LED lighting device based on photovoltaic power generation
CN215220141U (en) Municipal works are with outdoor LED display screen
CN219933894U (en) Lighting equipment mounting structure for civil engineering construction
CN210551102U (en) Construction engineering managers specialized tool case
CN215060997U (en) Building survey and drawing apparatus is with flexible tripod
CN210771821U (en) Interim street lamp
CN215717358U (en) Connecting structure between module and civil engineering structure
CN215165888U (en) Measuring device for foundation detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219

Termination date: 20210805