CN212564745U - Steel structure support for mineral equipment collecting pipeline - Google Patents

Steel structure support for mineral equipment collecting pipeline Download PDF

Info

Publication number
CN212564745U
CN212564745U CN202021184379.3U CN202021184379U CN212564745U CN 212564745 U CN212564745 U CN 212564745U CN 202021184379 U CN202021184379 U CN 202021184379U CN 212564745 U CN212564745 U CN 212564745U
Authority
CN
China
Prior art keywords
screw
welded
rods
mineral equipment
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021184379.3U
Other languages
Chinese (zh)
Inventor
常丽
马灿青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Aogou Mining Technology Co ltd
Original Assignee
Jiangsu Aogou Mining Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Aogou Mining Technology Co Ltd filed Critical Jiangsu Aogou Mining Technology Co Ltd
Priority to CN202021184379.3U priority Critical patent/CN212564745U/en
Application granted granted Critical
Publication of CN212564745U publication Critical patent/CN212564745U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a steel structure support for mineral equipment collecting pipe, including the mounting panel, the installation piece has all been welded to both sides around the mounting panel, the support body has all been welded to the left and right sides of mounting panel, the below of mounting panel is provided with three bull sticks of group, the left and right sides of bull stick all is provided with a storehouse, the left and right sides of bull stick all runs through a storehouse and extends to inside a storehouse, first screw rod has all been welded to the left and right sides of bull stick, one side that the storehouse is close to the support body all is provided with the movable block, and the bottom of movable block all runs through there is the third screw rod, all seted up the slide on the inner wall of support body, and the slide one side of keeping away from the movable block has all evenly seted up the fixed slot, the one end that the third screw rod is. The utility model discloses can make somebody a mere figurehead to the pipeline of different bores and lay, can carry out the altitude mixture control to the pipeline according to user's actual conditions moreover.

Description

Steel structure support for mineral equipment collecting pipeline
Technical Field
The utility model relates to a steel structure support technical field specifically is a be used for mineral equipment to gather steel structure support for pipeline.
Background
In the international market, mineral is a raw material with large amount and low price, and the deposit is always far away from the market, so in the price of mineral, the transportation cost usually accounts for a large proportion, therefore, the transportation is an important link in mineral processing, the transportation mode of mineral mainly comprises railway, water transportation, road and pipeline transportation, wherein the pipeline transportation has the advantages of large transportation amount, continuity, rapidness, economy, safety, reliability, stability, less investment, less occupied area, low cost and the like, the caliber of the pipeline in China is gradually increased, the transportation distance is gradually increased, the development prospect of pipeline transportation is large, steel structure supports are often used for aerial laying of pipelines in the pipeline transportation, but with the gradual change of the caliber of the pipeline, the pipeline support with a single caliber can not meet the requirements of users, and the users need to additionally purchase pipeline supports with other calibers, time and labor are wasted, and unnecessary economic loss is brought to users.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for mineral equipment to gather steel structure support for pipeline to solve present pipe support bore singleness that proposes in the above-mentioned background art, the pipeline of the different bores of unable effective fixation has brought trouble and economic loss's problem for the user.
In order to achieve the above object, the utility model provides a following technical scheme: a steel structure bracket for a mineral equipment collecting pipeline comprises a mounting plate, mounting pieces are welded on the front side and the rear side of the mounting plate, the left side and the right side of the mounting plate are both welded with frame bodies, three groups of rotating rods are arranged below the mounting plate, the middle part of the rotating rod is welded with a handle, the left side and the right side of the rotating rod are provided with rack bins, the left side and the right side of the rotating rod penetrate through the rack bins and extend to the interior of the rack bins, the left side and the right side of the rotating rod are both welded with first screw rods, and the outer sides of the first screw rods are both sleeved with two groups of nuts, the top ends of the nuts are all welded with clamping blocks, one side of the rack bin close to the rack body is all provided with moving blocks, the bottom ends of the moving blocks are all penetrated with third screw rods, the inner wall of the frame body is all provided with slideways, and one side of the slideway far away from the moving block is uniformly provided with a fixed groove, and one end of the third screw rod close to the fixed groove is inserted into the fixed groove.
Preferably, the thread directions of the external threads at the two ends of the first screw rod are opposite, and the nuts are connected with the first screw rod through thread structures.
Preferably, two groups of second screws penetrate through the top ends of the moving blocks, and the bottom ends of the second screws are inserted into the rack bin.
Preferably, all be provided with the internal thread with second screw rod matched with on the inner wall that puts up storehouse and second screw rod and laminate mutually, put up the storehouse and all be connected through helicitic texture with the second screw rod.
Preferably, the inner wall of the fixing groove is provided with an internal thread matched with the third screw rod, and the fixing groove and the third screw rod are connected through a thread structure.
Preferably, the inner walls of the clamping blocks are all arc-shaped, and rubber pads are glued on the inner walls of the clamping blocks.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model can lay the pipelines with different calibers in an overhead way, and can adjust the height of the pipelines according to the actual conditions of users;
1. the clamping block is arranged, a user can drive the clamping block to clamp and fix the pipeline by rotating the handle, the clamping block has a good fixing effect on pipelines with various calibers, the user does not need to additionally purchase a bracket with other calibers, the economic pressure of the user is reduced, the trouble is reduced for the user, meanwhile, the user can very easily finish the fixing work, other tools are not required to be additionally used for operation, and great convenience is brought to the user;
2. be provided with the fixed slot, the user can adjust the level of movable block after unscrewing the third screw rod to adjust the level of clamp splice, make the device can make somebody a mere figurehead fixedly to the pipeline of various co-altitude, make the device all have good suitability to various different use sight, application scope is nimble extensive, and simple structure has very strong practicality.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
fig. 2 is a partially enlarged schematic view of a portion a in fig. 1 according to the present invention;
FIG. 3 is a schematic side view of the structure of the present invention;
fig. 4 is a schematic view of the front view of the structure of the present invention.
In the figure: 1. mounting a plate; 2. mounting a sheet; 3. a frame body; 4. a rotating rod; 5. a handle; 6. a rack bin; 7. a first screw; 8. a nut; 9. a clamping block; 10. a moving block; 11. a second screw; 12. a third screw; 13. a slideway; 14. fixing grooves; 15. and (7) a rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment:
a steel structure support for a mineral equipment collecting pipeline comprises a mounting plate 1, mounting plates 2 are welded on the front side and the rear side of the mounting plate 1, frame bodies 3 are welded on the left side and the right side of the mounting plate 1, three groups of rotating rods 4 are arranged below the mounting plate 1, handles 5 are welded in the middle of the rotating rods 4, frame bins 6 are arranged on the left side and the right side of the rotating rods 4, the left side and the right side of each rotating rod 4 penetrate through the frame bins 6 and extend into the frame bins 6, first screw rods 7 are welded on the left side and the right side of each rotating rod 4, two groups of nuts 8 are sleeved on the outer sides of the first screw rods 7, clamping blocks 9 are welded on the top ends of the nuts 8, moving blocks 10 are arranged on one sides of the frame bins 6 close to the frame bodies 3, two groups of second screw rods 11 penetrate through the top ends of the moving blocks 10, the bottom ends of the second screw rods 11 are inserted into the frame bins 6, internal threads matched with the second screw rods 11, the rack bin 6 and the second screw rod 11 are connected through a threaded structure, a user rotates the second screw rod 11 to drive the second screw rod 11 to move upwards, the rack bin 6 can be dismounted by the user after the second screw rod 11 is separated from the moving block 10, when the number of pipelines which need to be laid in an overhead mode by the user is small, the user can dismount redundant rack bins 6 through the operation, the redundant rack bins 6 are mounted on other devices to work, waste of resources is avoided, and the practicability is high;
the bottom end of the moving block 10 is provided with a third screw 12, the inner wall of the frame body 3 is provided with a slideway 13, one side of the slideway 13 far away from the moving block 10 is uniformly provided with a fixed groove 14, one end of the third screw 12 close to the fixed groove 14 is inserted in the fixed groove 14, the inner wall of the fixed groove 14 is provided with an internal thread matched with the third screw 12, the fixed groove 14 and the third screw 12 are connected through a thread structure, when a user needs to adjust the horizontal height of a pipeline according to the user demand, the third screw 12 is rotated to drive the third screw 12 to move, and the third screw 12 is separated from the fixed groove 14, the user can slide the moving block 10 up and down, so as to drive the clamping block 9 to move up and down, so that the clamping block 9 can aerial-mount pipelines with different heights according to different use conditions, the thread directions of the external threads at two ends of the first, nut 8 all is connected through helicitic texture with first screw rod 7, the user rotates handle 5 and drives bull stick 4 and rotate, bull stick 4 drives first screw rod 7 and rotates, first screw rod 7 can drive nut 8 and be close to each other or keep away from each other, nut 8 drives clamp splice 9 and is close to each other or keep away from each other, can carry out the centre gripping to the pipeline when clamp splice 9 is close to each other fixed, the inner wall of clamp splice 9 all is the arc, all there is rubber pad 15 on the inner wall of clamp splice 9, the arc inner wall can be better laminate mutually with the outside of pipeline, rubber pad 15 has increased the frictional force between clamp splice 9 and the pipeline simultaneously, make clamp splice 9 more firm with the pipeline centre gripping, be difficult for producing the obscission because of external force factor.
The working principle is as follows: firstly, a user screws a fixing bolt into the middle of the mounting piece 2 so as to mount the device at a fixed point, then the user places a pipeline to be laid in an overhead manner between the clamping blocks 9, holds the handle 5 to drive the rotating rod 4 to rotate, simultaneously drives the first screw 7 to rotate, drives the nuts 8 to mutually approach by the first screw 7 so as to drive the clamping blocks 9 to mutually approach, clamps and fixes the pipeline, and then the user clamps and fixes a plurality of groups of pipelines through the steps;
when the user needs to adjust the height of the pipeline according to actual use conditions, the user firstly rotates the third screw 12 to drive the third screw 12 to move close to the handle 5, after the third screw 12 is separated from the fixed groove 14, the user can adjust the horizontal height of the movable block 10 up and down, so as to adjust the horizontal height of the clamping block 9, after the user adjusts the clamping block 9 to the height required by the user, the user screws the third screw 12 into the fixed groove 14 again, and the position of the clamping block 9 can be fixed through the movable block 10, so as to complete the whole height adjustment work.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a be used for mineral equipment to gather steel structure support for pipeline, includes mounting panel (1), its characterized in that: the mounting plate is characterized in that mounting pieces (2) are welded on the front side and the rear side of the mounting plate (1), frame bodies (3) are welded on the left side and the right side of the mounting plate (1), three groups of rotating rods (4) are arranged below the mounting plate (1), handles (5) are welded at the middle parts of the rotating rods (4), frame bins (6) are arranged on the left side and the right side of the rotating rods (4), the left side and the right side of each rotating rod (4) penetrate through the frame bins (6) and extend into the frame bins (6), first screw rods (7) are welded on the left side and the right side of each rotating rod (4), two groups of nuts (8) are sleeved on the outer sides of the first screw rods (7), clamping blocks (9) are welded on the top ends of the nuts (8), moving blocks (10) are arranged on one side, close to the frame bins (6), of the moving blocks (10) are penetrated through the bottom ends of the third screw rods, the inner wall of the frame body (3) is provided with a slide way (13), one side, far away from the moving block (10), of the slide way (13) is provided with a fixing groove (14) uniformly, and one end, close to the fixing groove (14), of the third screw (12) is inserted into the fixing groove (14).
2. The steel structural support for the mineral equipment collecting pipe according to claim 1, wherein: the thread directions of the external threads at the two ends of the first screw rod (7) are opposite, and the nuts (8) are connected with the first screw rod (7) through thread structures.
3. The steel structural support for the mineral equipment collecting pipe according to claim 1, wherein: two groups of second screw rods (11) penetrate through the top ends of the moving blocks (10), and the bottom ends of the second screw rods (11) are inserted into the rack bin (6).
4. A steel structural support for a mineral equipment gathering pipe as defined in claim 3, wherein: the inner walls of the rack bin (6) and the second screw (11) which are attached to each other are provided with internal threads matched with the second screw (11), and the rack bin (6) and the second screw (11) are connected through thread structures.
5. The steel structural support for the mineral equipment collecting pipe according to claim 1, wherein: the inner wall of the fixing groove (14) is provided with internal threads matched with the third screw (12), and the fixing groove (14) and the third screw (12) are connected through thread structures.
6. The steel structural support for the mineral equipment collecting pipe according to claim 1, wherein: the inner walls of the clamping blocks (9) are arc-shaped, and rubber pads (15) are glued on the inner walls of the clamping blocks (9).
CN202021184379.3U 2020-06-24 2020-06-24 Steel structure support for mineral equipment collecting pipeline Active CN212564745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021184379.3U CN212564745U (en) 2020-06-24 2020-06-24 Steel structure support for mineral equipment collecting pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021184379.3U CN212564745U (en) 2020-06-24 2020-06-24 Steel structure support for mineral equipment collecting pipeline

Publications (1)

Publication Number Publication Date
CN212564745U true CN212564745U (en) 2021-02-19

Family

ID=74613676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021184379.3U Active CN212564745U (en) 2020-06-24 2020-06-24 Steel structure support for mineral equipment collecting pipeline

Country Status (1)

Country Link
CN (1) CN212564745U (en)

Similar Documents

Publication Publication Date Title
CN209766826U (en) Auxiliary device for crimping of ground wire of power transmission line
CN212564745U (en) Steel structure support for mineral equipment collecting pipeline
CN111389861B (en) Steel construction building solid waste recovery processing equipment
CN211715917U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN208744649U (en) A kind of GRP pipe docking facilities
CN213929723U (en) Novel petroleum pipeline supports device
CN208913426U (en) Defense equipment door frame welding device
CN208845979U (en) The express delivery cabinet being easily installed
CN209309480U (en) A kind of combined anti-seismic suspension and support
CN208580225U (en) A kind of Pipe installing structure of optical cable welding
CN206756896U (en) A kind of embedded energy consumption measure cumulative timer
CN221257945U (en) Anti-loosening and falling pipeline supporting frame
CN212082594U (en) Bracket structure of PMT probe
CN219658350U (en) Billboard mounting bracket
CN219637562U (en) Grid belt cutting machine
CN214621814U (en) Deep soil body drilling device for geological engineering investigation
CN219903882U (en) Office supplies receiver convenient to adjust
CN220960964U (en) Assembled concrete semi-rigid finished product detection device
CN219311222U (en) Aluminum frame clamping support with strong stability
CN221612526U (en) Detection equipment with protection effect
CN216151111U (en) Machine tool spindle box supporting seat
CN213236355U (en) Screw type air pipe side longitudinal anti-seismic support
CN216327902U (en) Wear-free clamp for aluminum bar machining
CN218935755U (en) Electric power energy storage equipment installs fixing base
CN208520682U (en) A kind of carbon fiber reinforced concrete mechanical property monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 8, Zhenxing West Road, Dongxing Town, Jingjiang City, Taizhou City, Jiangsu Province, 214500

Patentee after: Jiangsu Aogou Mining Technology Co.,Ltd.

Address before: 214500 No.1 Kangqiao Road, Xingang Park, Jingjiang Economic Development Zone, Taizhou City, Jiangsu Province

Patentee before: Jiangsu aogou Mining Technology Co.,Ltd.

CP03 Change of name, title or address