CN212562652U - Quick mounting and connecting structure for prefabricated house - Google Patents

Quick mounting and connecting structure for prefabricated house Download PDF

Info

Publication number
CN212562652U
CN212562652U CN202020851348.2U CN202020851348U CN212562652U CN 212562652 U CN212562652 U CN 212562652U CN 202020851348 U CN202020851348 U CN 202020851348U CN 212562652 U CN212562652 U CN 212562652U
Authority
CN
China
Prior art keywords
wallboard
latch
sliding shaft
vice
fixing stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020851348.2U
Other languages
Chinese (zh)
Inventor
李�柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Changyun Technology Co ltd
Original Assignee
Chengdu Changyun Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Changyun Technology Co ltd filed Critical Chengdu Changyun Technology Co ltd
Priority to CN202020851348.2U priority Critical patent/CN212562652U/en
Application granted granted Critical
Publication of CN212562652U publication Critical patent/CN212562652U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a quick erection joint structure of activity board room, includes main wallboard, vice wallboard and fixing stud, the main wallboard all be provided with the latch with the vice wallboard outside to through latch fixed connection, this latch inboard is provided with the screw hole, the screw hole inboard connect fixing stud, vice wallboard one end be provided with the sliding shaft, the top cap is connected to this sliding shaft.

Description

Quick mounting and connecting structure for prefabricated house
Technical Field
The utility model relates to a prefabricated house connection structure especially relates to a quick erection joint structure of prefabricated house.
Background
Among present building technology, the board house adopts especially extensively, and the board house is a simple and fast building of placing, can conveniently solve people's temporary housing and place of placing object article, but the board house all needs screw and support to assemble in the past, leads to the installation time loss too much, causes certain trouble.
SUMMERY OF THE UTILITY MODEL
The utility model discloses it is not enough to above-mentioned technique, provide a quick erection joint structure of prefabricated house.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
the utility model provides a quick erection joint structure of activity board room, includes main wallboard, vice wallboard and fixing stud, the main wallboard all be provided with the latch with the vice wallboard outside to through latch fixed connection, this latch inboard is provided with the screw hole, the screw hole inboard connect fixing stud, vice wallboard one end be provided with the sliding shaft, the top cap is connected to this sliding shaft.
The latch that main wallboard and vice wallboard set up be the staggered connection, the screw hole symmetric connection that this main wallboard and vice wallboard outside set up.
One end of the fixing stud is provided with a conical head and penetrates through one side of the main wallboard and one side of the auxiliary wallboard, and the other end of the fixing stud is provided with a nut and is connected with the other end of the main wallboard and the other end of the auxiliary wallboard. The sliding shaft is fixedly connected with one side of the auxiliary wallboard through a screw and is arranged in a T shape.
The top cap be the arc setting, this top cap outside both ends all are provided with the recess, recess connection sliding shaft.
This novel board of building has been fixed to crisscross latch of having adopted, the latch of cross connection can be less the screw use of having supported, can conveniently install the board room fast, the screw hole that the latch inboard set up can be fixed rather than spacing through the screw, it is uneven to place tetragonal board room and appear, thereby lead to rocking, this fixing stud one end sets up to the cone, can install and insert the ground inboard, play the fixed action in board room, the slide shaft that this novel opposite side set up passes through the setting of T type, can fix the position of top cap, and the top cap can insert the installation through the slide shaft.
Drawings
Fig. 1 is a schematic view showing the assembly of a quick-install coupling structure for a portable housing.
Fig. 2 is a front view of a quick-install coupling structure for a portable housing.
Fig. 3 is a main wall panel of a quick-install coupling structure of a prefabricated house.
Fig. 4 is a secondary wall panel of a quick-install connection structure for a portable house.
In the figure: the wall comprises a main wall plate 1, an auxiliary wall plate 2, a fixing stud 3, a sliding shaft 4, a latch 5, a top cover 6, a screw hole 51 and a groove 61.
Detailed Description
The following describes in detail a quick-mounting and connecting structure for portable housing according to the present invention with reference to the accompanying drawings.
A quick erection joint structure of portable house who combines fig. 1 to 4, including main wallboard 1, vice wallboard 2 and fixing stud 3, its characterized in that: the outer sides of the main wallboard 1 and the auxiliary wallboard 2 are both provided with latch 5 and fixedly connected through the latch 5, the inner side of the latch 5 is provided with screw holes 51, the inner sides of the screw holes 51 are connected with fixing studs 3, one end of the auxiliary wallboard 2 is provided with a sliding shaft 4, the sliding shaft 4 is connected with a top cover 6, the latch 5 arranged on the main wallboard 1 and the auxiliary wallboard 2 are in staggered connection, the main wallboard 1 and the screw holes 51 arranged on the outer sides of the auxiliary wallboard 2 are symmetrically connected, one end of each fixing stud 3 is provided with a conical head and penetrates through one sides of the main wallboard 1 and the auxiliary wallboard 2, the other end of each fixing stud 3 is provided with a nut and is connected with the other ends of the main wallboard 1 and the auxiliary wallboard 2, the sliding shaft 4 is fixedly connected with one side of the auxiliary wallboard 2 through screws, the sliding shaft 4 is arranged in a T shape, the top cover 6 is arranged in an arc shape, and both ends of the outer side of, the groove 61 is connected with the sliding shaft 4.
This novel board of building has been fixed to crisscross latch of having adopted, the latch of cross connection can be less the screw use of having supported, can conveniently install the board room fast, the screw hole that the latch inboard set up can be fixed rather than spacing through the screw, it is uneven to place tetragonal board room and appear, thereby lead to rocking, this fixing stud one end sets up to the cone, can install and insert the ground inboard, play the fixed action in board room, the slide shaft that this novel opposite side set up passes through the setting of T type, can fix the position of top cap, and the top cap can insert the installation through the slide shaft.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a quick erection joint structure of activity board room, includes main wallboard (1), vice wallboard (2) and fixing stud (3), its characterized in that: main wallboard (1) and vice wallboard (2) outside all be provided with latch (5) to through latch (5) fixed connection, this latch (5) inboard is provided with screw hole (51), screw hole (51) inboard connect fixing stud (3), vice wallboard (2) one end be provided with sliding shaft (4), top cap (6) is connected in this sliding shaft (4).
2. The portable housing quick mount connection structure of claim 1, wherein: main wallboard (1) be staggered connection with latch (5) that vice wallboard (2) set up, screw hole (51) symmetric connection that this main wallboard (1) and vice wallboard (2) outside set up.
3. The portable housing quick mount connection structure of claim 1, wherein: and one end of the fixing stud (3) is provided with a conical head and penetrates through one side of the main wallboard (1) and one side of the auxiliary wallboard (2), and the other end of the fixing stud (3) is provided with a nut and is connected with the other end of the main wallboard (1) and the other end of the auxiliary wallboard (2).
4. The portable housing quick mount connection structure of claim 1, wherein: the sliding shaft (4) is fixedly connected with one side of the auxiliary wallboard (2) through a screw, and the sliding shaft (4) is arranged in a T shape.
5. The portable housing quick mount connection structure of claim 1, wherein: top cap (6) be the arc setting, this top cap (6) outside both ends all are provided with recess (61), recess (61) connect sliding shaft (4).
CN202020851348.2U 2020-05-20 2020-05-20 Quick mounting and connecting structure for prefabricated house Expired - Fee Related CN212562652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020851348.2U CN212562652U (en) 2020-05-20 2020-05-20 Quick mounting and connecting structure for prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020851348.2U CN212562652U (en) 2020-05-20 2020-05-20 Quick mounting and connecting structure for prefabricated house

Publications (1)

Publication Number Publication Date
CN212562652U true CN212562652U (en) 2021-02-19

Family

ID=74623960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020851348.2U Expired - Fee Related CN212562652U (en) 2020-05-20 2020-05-20 Quick mounting and connecting structure for prefabricated house

Country Status (1)

Country Link
CN (1) CN212562652U (en)

Similar Documents

Publication Publication Date Title
CN108487464B (en) Clamping groove connecting piece and assembled building
CN109779142B (en) Be applied to assembly type structure's wallboard of dismantling
CN215630608U (en) Assembly type building fixing device for constructional engineering
CN212562652U (en) Quick mounting and connecting structure for prefabricated house
CN214220092U (en) Reliably-connected assembled indoor wall
CN216304963U (en) Assembled wall body for assembly type building with location complementary unit
CN214368841U (en) Scene aggregate unit in wisdom exhibition room
CN212897263U (en) Assembled decoration panel convenient to installation
CN212001736U (en) Steel construction assembled wallboard
CN109511243B (en) Machine room cabinet frame structure
CN210377762U (en) Smoke alarm is used to intelligence house convenient to installation
CN220848164U (en) Assembled wall corner coupling mechanism
CN210621943U (en) Fixing device is connected to assembly type structure
CN112095844A (en) Assembled module wallboard convenient to change
CN2632268Y (en) Right angle connecting structure of aluminium alloy door frame
CN218622614U (en) Categorised building structure of assembled building design
CN216587099U (en) Building sound insulation building board
CN216042079U (en) Fixing support for building ceiling
CN212358638U (en) Assembled building connecting component
CN213776595U (en) Machine room pipeline modularization installing support
CN218148899U (en) Temporary living is with small-size house of assembled
CN215054531U (en) Environment-friendly building board
CN219732406U (en) Assembled unit fossil fragments partition wall device
CN212026927U (en) Wallboard mounting system
CN217630681U (en) Assembled steel construction building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219