CN212562521U - Telescopic operation layer pedestrian passageway - Google Patents

Telescopic operation layer pedestrian passageway Download PDF

Info

Publication number
CN212562521U
CN212562521U CN202020834221.XU CN202020834221U CN212562521U CN 212562521 U CN212562521 U CN 212562521U CN 202020834221 U CN202020834221 U CN 202020834221U CN 212562521 U CN212562521 U CN 212562521U
Authority
CN
China
Prior art keywords
module
square steel
telescopic
steel main
manway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020834221.XU
Other languages
Chinese (zh)
Inventor
刘超
林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Luyi Construction Engineering Co ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202020834221.XU priority Critical patent/CN212562521U/en
Application granted granted Critical
Publication of CN212562521U publication Critical patent/CN212562521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a telescopic operation layer manway comprises end tail module, middle part module, end module and plank platform, end tail module can insert in the middle part module, the middle part module can insert in the end module, and insert length is adjustable, plank platform lay in the frame top that three module constitutes telescopic manway jointly. The utility model discloses utilize simple and easy device to assemble telescopic operation layer manway and avoid direct contact floor reinforcing bar in making the operation personnel construction, effectively protect upper reinforcing bar, guaranteed concrete steel bar protective layer thickness, strengthened the engineering quality, improved work efficiency.

Description

Telescopic operation layer pedestrian passageway
Technical Field
The utility model relates to an operation layer pedestrian passageway closes technical field, especially relates to a telescopic operation layer pedestrian passageway.
Background
In the engineering construction process, when carrying out floor structure reinforcement construction and concrete placement, construction unit does not have special measure to the walking of operation layer constructor on the floor reinforcing bar face of just tying, the operation personnel walk at will on the operation layer, lead to partial region reinforcing bar protective layer thickness unsatisfied requirement, also make constructor walk on the floor reinforcing bar of tying when carrying out the concrete placement operation simultaneously and bring inconvenience, set up carelessly and can also harm constructor ankle, make concrete placement work efficiency low, the event needs a telescopic operation layer manway, make the operation personnel walk on the passageway, and do not destroy the reinforcing bar of tying and also improved work efficiency.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a telescopic operation layer pedestrian passageway, simple structure, the installation procedure is simple and easy, easy operation.
The utility model discloses a concrete technical scheme does: the utility model provides a telescopic operation layer manway comprises end tail module, middle part module, end module and plank platform, the end tail module can insert in the middle part module, the middle part module can insert in the end module, and each module inserts length adjustable, the plank platform lay and constitute telescopic manway's frame top jointly at three module.
Further, the end tail module constitute by first party steel main joist, first party steel support and first square steel secondary joist, the middle part module constitute by second square steel main joist and second square steel secondary joist, the end module constitute by third party steel main joist, third party steel support and third square steel secondary joist, first, second, third party steel main joist set up the square steel for two levels, first, second, third square steel secondary joist as supporting, set up respectively between first, second, third party steel main joist, first, second square steel support as the landing leg, vertical setting is at end tail module afterbody, end module end respectively.
Furthermore, the first square steel main keel is inserted into the second square steel main keel, and the second square steel main keel is inserted into the third square steel main keel.
Compared with the prior art, the utility model has the advantages that: the utility model discloses utilize simple and easy device to assemble telescopic operation layer pedestrian passageway and avoid direct contact floor reinforcing bar in making the operation personnel construction, effectively protect upper reinforcing bar, guaranteed concrete steel bar protective layer thickness, strengthened the engineering quality, improved work efficiency, simultaneously the utility model discloses a pedestrian passageway can be according to on-the-spot actual need adjustment channel length, utilizes flexible characteristics to make the device more portable nimble.
Drawings
FIG. 1 is a schematic structural view of a pedestrian passageway of a telescopic working floor;
FIG. 2 is a schematic illustration of a plank platform;
FIG. 3 is a schematic end-to-end module;
FIG. 4 is a schematic view of a middle module;
FIG. 5 is a schematic view of a tip module;
in the figure: 1. end-to-end module, 2, middle part module, 3, end module, 4, plank platform, 101 first party steel main joist, 102 first party steel support, 103 first square steel secondary joist, 201 second square steel main joist, 202 second square steel secondary joist, 301 third party steel main joist, 302 third party steel support, 303 third square steel secondary joist.
Detailed Description
The invention is further described with reference to the accompanying drawings.
As shown in fig. 1-5, a retractable working floor pedestrian passageway is composed of an end-to-end module 1, a middle module 2, an end module 3 and a plank platform 4. The end-to-end module 1 can be inserted into the middle module 2, the middle module 2 can be inserted into the end module 3, the insertion length can be adjusted, and the thick wood board platform 4 is laid above a frame of the telescopic pedestrian passageway formed by the three modules.
The end-to-end module 1 consists of a first square steel main keel 101, a first square steel bracket 102 and a first square steel secondary keel 103. The middle module 2 is composed of a second square steel main keel 201 and a second square steel secondary keel 202. The end module comprises third party steel main joist 301, third party steel support 302 and third party steel secondary joist 303. The first, second and third steel main keels are two pieces of horizontally arranged square steel; the first, second and third square steel secondary keels are used as supports and are respectively arranged among the first, second and third square steel main keels; the first square steel support and the second square steel support are used as supporting legs and are respectively vertically arranged at the tail part of the end tail module and the end of the end module.
In foretell first side steel main joist 101 inserted second side steel main joist 201, during second side steel main joist 201 inserted third side steel main joist 301, can adjust whole length according to the on-the-spot demand during the use.
When in use, the first step: after the binding of the reinforcing steel bars at the lower part of the floor slab is finished, the retractable working layer pedestrian passageway is transported to a working surface;
step two: stretching out a pedestrian passageway of an operation layer according to the actual required length on site, wherein supporting legs of the passageway are required to be placed on a template, so that direct contact with floor slab reinforcing steel bars is avoided;
step three: a scaffold board or a wood board is laid on the channel cross bar, so that the walking of personnel is facilitated;
step four: and after the concrete pouring of the floor slab is finished, the pedestrian passageway is retracted and moved to the next working surface.
The present invention and its embodiments have been described above schematically, and the description is not limited thereto, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without departing from the inventive spirit of the present invention, the person skilled in the art should also design the similar structural modes and embodiments without creativity to the technical solution, and all shall fall within the protection scope of the present invention.

Claims (3)

1. The utility model provides a telescopic operation layer manway, characterized by comprises end tail module (1), middle part module (2), end module (3) and plank platform (4), end tail module (1) can insert in middle part module (2), middle part module (2) can insert in end module (3), and each module inserts length is adjustable, plank platform (4) lay and constitute telescopic manway's frame top jointly at three module.
2. The telescopic working floor walkway of claim 1, wherein the end-to-end module (1) consists of a first square steel main keel (101), a first square steel bracket (102) and a first square steel secondary keel (103), the middle module (2) is composed of a second square steel main keel (201) and a second square steel secondary keel (202), the end head module (3) consists of a third-party steel main keel (301), a third-party steel bracket (302) and a third-party steel secondary keel (303), the first, second and third square steel main keels are two horizontally arranged square steels, the first, second and third square steel secondary keels are used as supports and are respectively arranged among the first, second and third square steel main keels, the first square steel support and the second square steel support are used as supporting legs and are respectively vertically arranged at the tail part of the end tail module and the end of the end head module.
3. A telescopic workfloor walkway according to claim 2, wherein the first square steel main runner (101) is inserted into a second square steel main runner (201) and the second square steel main runner (201) is inserted into a third square steel main runner (301).
CN202020834221.XU 2020-05-19 2020-05-19 Telescopic operation layer pedestrian passageway Active CN212562521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020834221.XU CN212562521U (en) 2020-05-19 2020-05-19 Telescopic operation layer pedestrian passageway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020834221.XU CN212562521U (en) 2020-05-19 2020-05-19 Telescopic operation layer pedestrian passageway

Publications (1)

Publication Number Publication Date
CN212562521U true CN212562521U (en) 2021-02-19

Family

ID=74624124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020834221.XU Active CN212562521U (en) 2020-05-19 2020-05-19 Telescopic operation layer pedestrian passageway

Country Status (1)

Country Link
CN (1) CN212562521U (en)

Similar Documents

Publication Publication Date Title
CN106522997B (en) A kind of construction trolley and construction method of tunnels and underground engineering middle arch rack
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN205444887U (en) Slope roofing template system
CN107227814B (en) A kind of large cantilever concrete structure section construction method
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN212562521U (en) Telescopic operation layer pedestrian passageway
CN109944447B (en) Multi-slope roof concrete pouring method
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN207553597U (en) Side template support device
CN206646817U (en) The form bracing system of the cast-in-place decorative panel of staged Arc Stand
CN202220439U (en) Combined steel template of integral stair plate
CN212406040U (en) Stretchable elevator shaft operating platform device
CN212836701U (en) Concrete floor entrance to a cave shutoff mould lifting tool
CN211974467U (en) Supporting device
CN111519895A (en) Pouring construction method for integral steel formwork of staircase and wall
CN206128636U (en) Detachable stair formwork of flier
CN207553449U (en) Floor and plate tendon protective layer thickness Comprehensive Control part
CN206971589U (en) A kind of hanging board device for being used to control cast-in-situ stair bench plate thickness
CN215520053U (en) Adjust pole that counts by skin
CN212836620U (en) Concrete pouring platform
CN216112499U (en) Portable console mode pipeline support
CN216922008U (en) Simple ladder stand suitable for construction of T-beam hogging moment prestressed steel beam
CN214362935U (en) High mound rollover construction reinforcement ligature protection frame
CN220247397U (en) Combined cushion block for controlling thickness of reinforcement protection layer and floor slab
CN214884357U (en) Assembled building frame construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230816

Address after: Shop 21, Building B9, Wanjiang Market, Liyang Town, He County, Ma'anshan City, Anhui Province, 238201

Patentee after: Anhui Luyi Construction Engineering Co.,Ltd.

Address before: 243061 Anhui province Ma'anshan mountain rain Yushan Road No. 88

Patentee before: CHINA MCC17 GROUP Co.,Ltd.