CN212562492U - Preformed hole construction equipment that building engineering used - Google Patents

Preformed hole construction equipment that building engineering used Download PDF

Info

Publication number
CN212562492U
CN212562492U CN202021191094.2U CN202021191094U CN212562492U CN 212562492 U CN212562492 U CN 212562492U CN 202021191094 U CN202021191094 U CN 202021191094U CN 212562492 U CN212562492 U CN 212562492U
Authority
CN
China
Prior art keywords
pipe
screw rod
preformed hole
mold
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021191094.2U
Other languages
Chinese (zh)
Inventor
魏柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021191094.2U priority Critical patent/CN212562492U/en
Application granted granted Critical
Publication of CN212562492U publication Critical patent/CN212562492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a preformed hole construction equipment that building engineering used belongs to building construction equipment technical field. The device comprises a die pipe with a sealed bottom, a plurality of positioning frames arranged in the die pipe and a screw rod connected with each positioning frame, wherein the die pipe is made of elastic plastic materials; the positioning frame comprises a sleeve ring in threaded connection with the screw rod and a plurality of supporting rods uniformly distributed outside the sleeve ring in the circumferential direction, each supporting rod comprises a sleeve pipe hinged on the sleeve pipe, a guide rod inserted in the sleeve pipe and a compression spring connected between the sleeve pipe and the guide rod, and the outer end of the guide rod is hinged on the inner wall of the mold pipe; the lower extreme of screw rod is fixed and is provided with a kicking block, and the kicking block can support and lean on the bottom inner wall of mould pipe. The utility model has the advantages of convenient disassembly and assembly and the like.

Description

Preformed hole construction equipment that building engineering used
Technical Field
The utility model belongs to the technical field of the construction equipment, a preformed hole construction equipment that building engineering used is related to.
Background
In the building construction process, especially in the concrete pouring process, the hole is reserved the construction frequently, and the current mode all adopts the metal pipe mould, and light swift during the pouring construction, but the mould is difficult to be demolishd, even if the mantle also often can have the condition of drawing the mould difficulty, can damage the mould even.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned problem that exists to current technique, provide a preformed hole construction equipment that building engineering used, the utility model aims to solve the technical problem how to make the construction mould dismouting light.
The purpose of the utility model can be realized by the following technical proposal: a preformed hole construction device for constructional engineering is characterized by comprising a mold pipe with a sealed bottom, a plurality of positioning frames arranged in the mold pipe and a screw rod connected with each positioning frame, wherein the mold pipe is made of elastic plastic materials; the positioning frame comprises a sleeve ring in threaded connection with the screw rod and a plurality of supporting rods uniformly distributed outside the sleeve ring in the circumferential direction, each supporting rod comprises a sleeve pipe hinged on the sleeve pipe, a guide rod inserted in the sleeve pipe and a compression spring connected between the sleeve pipe and the guide rod, and the outer end of each guide rod is hinged on the inner wall of the mold pipe; the lower end of the screw rod is fixedly provided with an ejector block, and the ejector block can abut against the inner wall of the bottom of the die tube.
In the preformed hole applying device for the building engineering, the inner wall of the die tube is fixedly provided with the supporting blocks which correspond to the guide rods one by one, and the outer ends of the guide rods which correspond to the supporting blocks are hinged on the supporting blocks.
In the preformed hole constructing device for the building engineering, a holding rod perpendicular to the screw rod is fixedly arranged at the upper end of the screw rod.
In the preformed hole applying device for the building engineering, the number of the positioning frames is two, and the two positioning frames are distributed in the middle of the mold pipe at intervals.
The construction process is as follows: the sleeve is pre-embedded at the position of the reserved hole, concrete is poured outside the sleeve to be below the top opening of the mold pipe, the screw rod is rotated to the top block to abut against the bottom of the mold pipe, at the moment, the inner end of the support rod is in a downward inclination state, the inner end of the support rod is enabled to be upward inclined to have larger resistance, further, the inside of the mold pipe is enabled to have larger supporting force from inside to outside, after the concrete is solidified, the screw rod is rotated reversely, on the premise that the compression spring is compressed, the inner end of the support rod is enabled to be upward inclined, the rotating screw rod is mechanically repaired, when the pressing force of the compression spring on the guide rod is smaller, the pressing force between the mold pipe and the inner wall.
This scheme is suitable for the construction in great aperture preformed hole, the mould pipe is the plastics material, receiving under great bracing piece tension, certain deformation can take place, make the mould pipe under the prerequisite that keeps basic outline, by a small amount of external stay extension of support position, the position that is propped when making to take out the mould pipe restores and breaks away from with muddy earth, and then can be great reduction mould pipe take out the in-process and the adhesive force that mixes earth, this scheme need not carry out mantle and fat liquoring to the outer wall of mould pipe and handles. The holding rod is used for reducing external force required by rotation of the screw rod and facilitating pulling out of the die tube.
Drawings
Fig. 1 is a schematic structural view of the preformed hole construction device when concrete is poured.
FIG. 2 is a schematic view of the construction apparatus for a preformed hole after demolding.
Fig. 3 is a plan view of the preformed hole constructing apparatus.
In the figure, 1, a mould tube; 2. a positioning frame; 21. a sleeve; 22. a guide bar; 23. a compression spring; 24. a support block; 25. a collar; 3. a screw; 31. a top block; 32. the rod is held.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1, 2 and 3, the mold comprises a mold tube 1 with a sealed bottom, a plurality of positioning frames 2 arranged in the mold tube 1, and a screw 3 connected with each positioning frame 2, wherein the mold tube 1 is made of elastic plastic material; the positioning frame 2 comprises a lantern ring 25 in threaded connection with the screw rod 3 and a plurality of support rods which are uniformly distributed outside the lantern ring 25 in the circumferential direction, each support rod comprises a sleeve 21 hinged on the sleeve 21, a guide rod 22 inserted in the sleeve 21 and a compression spring 23 connected between the sleeve 21 and the guide rod 22, and the outer end of the guide rod 22 is hinged on the inner wall of the mold tube 1; the lower end of the screw rod 3 is fixedly provided with an ejector block 31, and the ejector block 31 can abut against the inner wall of the bottom of the die tube 1.
The inner wall of the die tube 1 is fixedly provided with supporting blocks 24 corresponding to the guide rods 22 one by one, and the outer ends of the guide rods 22 corresponding to the supporting blocks 24 are hinged on the supporting blocks 24. A holding rod 32 perpendicular to the screw 3 is fixedly arranged at the upper end of the screw 3.
The number of the positioning frames 2 is two, and the two positioning frames 2 are distributed at the middle part of the mould pipe 1 at intervals.
The construction process is as follows: the sleeve 21 is pre-embedded at the position of the reserved hole, concrete is poured outside the sleeve to be below the top opening of the mold pipe 1, the screw rod 3 is rotated to the top block 31 to abut against the bottom of the mold pipe 1, at the moment, the inner end of the support rod is in a downward tilting state, the inner end of the support rod tilts upwards to have large resistance, further, the inner part of the mold pipe 1 has large supporting force from inside to outside, after the concrete is solidified, the screw rod 3 is rotated reversely, on the premise that the compression spring 23 is compressed, the inner end of the support rod tilts upwards, the rotary screw rod 3 is mechanically repaired, when the pressing force of the compression spring 23 on the guide rod 22 is small, the pressing force between the mold pipe 1 and the inner wall of the reserved hole on the outer side is reduced.
This scheme is suitable for the construction in great aperture preformed hole, mould pipe 1 is the plastics material, receiving under great bracing piece tension, certain deformation can take place, make mould pipe 1 under the prerequisite that keeps basic outline, by a small amount of external stay extension of support position, the position that makes when taking out mould pipe 1 and propped outward recovers and breaks away from with muddy earth, and then can be great reduction mould pipe 1 take out the in-process and mix the adhesive force of earth, this scheme need not carry out mantle and fat liquoring to the outer wall of mould pipe 1 and handles. The holding rod 32 is used to reduce the external force required for rotating the screw 3 and to facilitate the extraction of the mold tube 1.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (4)

1. The preformed hole construction device for the building engineering is characterized by comprising a mold pipe (1) with a sealed bottom, a plurality of positioning frames (2) arranged in the mold pipe (1) and a screw (3) connected with the positioning frames (2), wherein the mold pipe (1) is made of elastic plastic materials; the positioning frame (2) comprises a sleeve ring (25) in threaded connection with the screw rod (3) and a plurality of supporting rods which are uniformly distributed outside the sleeve ring (25) in the circumferential direction, the supporting rods comprise sleeves (21) hinged on the sleeves (21), guide rods (22) inserted in the sleeves (21) and compression springs (23) connected between the sleeves (21) and the guide rods (22), and the outer ends of the guide rods (22) are hinged on the inner wall of the mold tube (1); the lower end of the screw rod (3) is fixedly provided with an ejector block (31), and the ejector block (31) can abut against the inner wall of the bottom of the die tube (1).
2. The preformed hole construction device for the construction engineering according to claim 1, wherein the inner wall of the mold tube (1) is fixedly provided with support blocks (24) corresponding to the guide rods (22) one by one, and the outer ends of the guide rods (22) corresponding to the support blocks (24) are hinged on the support blocks (24).
3. The preformed hole construction device for constructional engineering as claimed in claim 2, wherein a holding rod (32) perpendicular to the screw rod (3) is fixedly arranged at the upper end of the screw rod (3).
4. A preformed hole construction device for building engineering according to claim 1, 2 or 3, characterized in that the positioning frames (2) are two, and the two positioning frames (2) are distributed at intervals in the middle of the mould pipe (1).
CN202021191094.2U 2020-06-24 2020-06-24 Preformed hole construction equipment that building engineering used Expired - Fee Related CN212562492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021191094.2U CN212562492U (en) 2020-06-24 2020-06-24 Preformed hole construction equipment that building engineering used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021191094.2U CN212562492U (en) 2020-06-24 2020-06-24 Preformed hole construction equipment that building engineering used

Publications (1)

Publication Number Publication Date
CN212562492U true CN212562492U (en) 2021-02-19

Family

ID=74612162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021191094.2U Expired - Fee Related CN212562492U (en) 2020-06-24 2020-06-24 Preformed hole construction equipment that building engineering used

Country Status (1)

Country Link
CN (1) CN212562492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982263A (en) * 2021-10-09 2022-01-28 甘肃省建设投资(控股)集团有限公司 Diameter-adjustable wall penetrating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982263A (en) * 2021-10-09 2022-01-28 甘肃省建设投资(控股)集团有限公司 Diameter-adjustable wall penetrating device

Similar Documents

Publication Publication Date Title
CN208529365U (en) A kind of shrinkable internal model having bottom plate
CN112976295B (en) Manufacturing method of high-strength prestressed concrete precast tubular pile
CN212562492U (en) Preformed hole construction equipment that building engineering used
CN208513606U (en) A kind of magnesium iron pump case casting die
CN213390464U (en) Gutter inlet forming tool
CN210458951U (en) Bridge reinforced concrete guardrail template fixing device
CN210261022U (en) Municipal administration well lid moves device
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN201133078Y (en) Electric hoisting barrel type formwork
CN110700581A (en) Reinforced concrete thin-wall cylindrical well template system and method for pouring thin-wall cylindrical well by using same
CN205969435U (en) Piping lane mould is assembled in horizontal many storehouses
CN218715127U (en) Be used for concrete building one-time to pour fashioned aluminium template mounting structure
CN107558734B (en) Building pouring device and pouring method
CN208105089U (en) A kind of culvert building wall device
CN207405978U (en) A kind of plastic building template
CN211682701U (en) Hydraulic system mould for building component
CN106166790B (en) A kind of horizontal multiple-chamber assembly piping lane mold
CN2205444Y (en) Well shaft working device
CN101691811A (en) Recyclable wall conduit
CN218713286U (en) Piping lane hydraulic mould
CN210239128U (en) Mold hanging tool for plugging of post-pouring reserved hole
CN221112539U (en) Demoulding device of electric smelting elbow
CN204920195U (en) Revenue and expenditure mould mechanism, interior tube formwork and lift well formwork device
CN214562288U (en) Demoulding mechanism of plastic suction foaming mould for refrigerator liner
CN212642122U (en) Longitudinal assembling combined building mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219