CN212561484U - Mounting structure of concrete tubular pile end plate - Google Patents

Mounting structure of concrete tubular pile end plate Download PDF

Info

Publication number
CN212561484U
CN212561484U CN202021119422.8U CN202021119422U CN212561484U CN 212561484 U CN212561484 U CN 212561484U CN 202021119422 U CN202021119422 U CN 202021119422U CN 212561484 U CN212561484 U CN 212561484U
Authority
CN
China
Prior art keywords
end plate
pipe pile
concrete pipe
mounting structure
connecting holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021119422.8U
Other languages
Chinese (zh)
Inventor
陈福根
胡晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Haihong Cement Products Co ltd
Original Assignee
Suzhou Haihong Cement Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Haihong Cement Products Co ltd filed Critical Suzhou Haihong Cement Products Co ltd
Priority to CN202021119422.8U priority Critical patent/CN212561484U/en
Application granted granted Critical
Publication of CN212561484U publication Critical patent/CN212561484U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of the technique of concrete pipe pile production and specifically relates to a mounting structure of concrete pipe pile end plate is related to, it includes the end plate and runs through a plurality of connecting holes on the end plate, and is a plurality of the connecting hole sets up along the even interval in end plate edge, the guide way has been seted up on the end plate, guide way and connecting hole intercommunication, the guide way extends to the edge of end plate. The utility model discloses aim at solving the end plate and can not fix a position the problem that leads to end plate installation effectiveness low fast. The utility model discloses have from taking guide structure, save the calibration process during the installation, promote the effect of installation effectiveness.

Description

Mounting structure of concrete tubular pile end plate
Technical Field
The utility model belongs to the technical field of the technique of concrete pipe pile production and specifically relates to a mounting structure of concrete pipe pile end plate is related to.
Background
The tubular pile end plate is a disc-shaped part and is formed at two ends of the tubular pile in the length direction and used for being connected with equipment, so that the connection strength and the durability of the equipment are improved.
At present, chinese patent with publication number CN210086234U discloses a tubular pile end plate for prestressed concrete tubular pile, which comprises an end plate, wherein a fixing ring is connected to one side edge of the end plate, a plurality of connecting holes are formed in the middle of one side of the end plate, the fixing ring is fixedly connected to the end plate, an expansion screw tube is arranged right above the connecting holes, a fixing screw is arranged above one side of the expansion screw tube far from the end plate, the firmness of the connection between the end plate and the tubular pile can be increased by arranging the expansion screw tube, the end plate is primarily fixed to the tubular pile through the connecting holes of the end plate by the expansion screw tube, the end plate is further fixed by using the fixing screw, the side wall is extruded by the fixing screw, and barbs are fixedly connected to the side wall, so that the expansion screw tube can be firmly connected to the tubular pile through the fixing screw, and the end; through the one end at the end plate through the solid fixed ring of fixed connection, will fix the solid fixed ring cover on the tubular pile when the end plate is connected, rotate the runner again, through the runner through linkage post drive rotatory screw rod.
The defect of the prior art is that after the framework of the concrete pipe pile is woven by steel bars, end plates are arranged at two ends of the framework, and a certain amount of time is spent for calibration during installation of the end plates so as to ensure that the expansion sleeve can be quickly and accurately inserted into a connecting hole in the end plate and the installation efficiency of the end plates is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a mounting structure of concrete tubular pile end plate. Its advantage is equipped with guide structure on the end plate, saves the calibration process during the installation, promotes the installation effectiveness.
The above utility model discloses an above-mentioned utility model's purpose can be realized through following technical scheme:
the utility model provides a mounting structure of concrete pipe pile end plate, includes the end plate and runs through a plurality of connecting holes on the end plate, and is a plurality of the connecting hole sets up along end plate edge interval, the guide way has been seted up on the end plate, guide way and connecting hole intercommunication, the guide way extends to the edge of end plate.
Through adopting above-mentioned technical scheme, the connecting hole is used for inserting of end plate and concrete pipe pile skeleton, and the guide way is used for leading to the end plate. The skeleton of concrete pipe pile slides in the guide way, and the skeleton slides to the guide way bottom, rotates the end plate along the axis of the skeleton that inserts in the guide way, and other connecting holes and skeleton connection on the quick adjustment end plate promote the installation effectiveness of end plate.
The present invention may be further configured in a preferred embodiment as: the guide groove is provided with many corresponding to the connecting hole, many the guide groove length direction parallels.
Through adopting above-mentioned technical scheme, many reinforcing bars on the skeleton slide simultaneously and get into the guide way in, many reinforcing bars carry out certain injecing to the position of end plate, slide the end plate along the length direction of guide way and adjust the end plate, the location installation of end plate can be accomplished to the position of adjustment skeleton in the guide way, has saved the process that the end plate rotated to carry out the location along the reinforcing bar, further promotes the installation effectiveness of end plate.
The present invention may be further configured in a preferred embodiment as: the end plate is provided with a plurality of positioning holes in a penetrating mode, the positioning holes correspond to the connecting holes, the end plate is provided with a sliding groove, two ends of the sliding groove in the length direction are respectively communicated with the positioning holes and the connecting holes, and the sliding groove is provided with a plurality of connecting holes.
Through adopting above-mentioned technical scheme, the skeleton rotates the end plate after sliding into the spread groove along the guide way for the reinforcing bar passes from the spread groove in, rotates the end plate, and in the spout slip entering locating hole was followed to the skeleton, the reinforcing bar joint in the skeleton realized the location of end plate and skeleton in the locating hole, had saved the process of fixing a position the end plate, had promoted the installation effectiveness of end plate greatly.
The present invention may be further configured in a preferred embodiment as: and fastening bolts are connected in the connecting holes in a threaded manner.
Through adopting above-mentioned technical scheme, with fastening bolt screw in connecting hole, fastening bolt prevents that the skeleton from having slight deformation to lead to the skeleton to follow the spread groove of spout slip-in the locating hole and take off, promotes the stability that end plate and skeleton are connected.
The present invention may be further configured in a preferred embodiment as: and the end plate is provided with anchoring rods, and a plurality of anchoring rods are arranged at intervals along the edge of the inner ring of the end plate.
Through adopting above-mentioned technical scheme, the shaping of concrete pipe pile is accomplished the back, and the anchor pole shaping is in concrete pipe pile, and when the end plate received tensile, the friction of anchor pole and concrete pipe pile prevented that the end plate from taking off along the axial of tubular pile, promoted the joint strength of end plate and tubular pile, and the anchor pole promotes concrete pipe pile's joint strength.
The present invention may be further configured in a preferred embodiment as: and one ends of the anchoring rods, which are far away from the end plate, are provided with anti-loosening blocks.
Through adopting above-mentioned technical scheme, concrete tubular pile pours the completion back, and locking piece shaping is in concrete tubular pile, and when the end plate received the effort along tubular pile axis direction, the stock conducted the effort to locking piece, and the concrete tubular pile butt of locking piece absorbs the effort, promotes the tensile strength of stock, further promotes the joint strength of end plate and tubular pile.
The present invention may be further configured in a preferred embodiment as: the width of the guide groove is gradually increased along the direction far away from the connecting hole.
Through adopting above-mentioned technical scheme, the width increase of guide way, the skeleton more inserts the guide way in, makes things convenient for the skeleton to be connected with the guide way, further promotes the installation effectiveness of end plate.
The present invention may be further configured in a preferred embodiment as: the end plate is provided with a reinforcing sleeve, and the side wall of the end plate is provided with a connecting groove for connecting the reinforcing sleeve.
Through adopting above-mentioned technical scheme, the uide bushing is impressed through extrusion deformation in the spread groove, and the uide bushing protects concrete pipe pile, prevents that concrete pipe pile from taking place to explode the stake when receiving pressure, promotes concrete pipe pile's intensity.
The present invention may be further configured in a preferred embodiment as: the diameter of the end plate decreases in the direction of the assembly adjacent to the reinforcing sleeve.
Through adopting above-mentioned technical scheme, the diameter of end plate reduces gradually, and the reinforcement sleeve slides to the diameter main-end along the less end of end plate lateral wall diameter, makes things convenient for the end plate to insert fast in the reinforcement sleeve and will strengthen the cover extrusion on the end plate, promotes the connection efficiency to end plate and reinforcement sleeve, and then promotes the installation effectiveness of end plate.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the end plate is provided with a plurality of guide grooves communicated with the connecting holes, and the guide grooves and the framework of the concrete pipe pile realize quick positioning, so that the quick positioning and installation of the end plate are realized, and the installation efficiency of the end plate is improved;
2. the connecting hole is communicated with a sliding groove, one end of the sliding groove, which is far away from the connecting hole, is communicated with a positioning hole, the framework slides into the connecting hole through the guide groove, and the framework slides into the positioning hole along the sliding groove when the end plate is rotated, so that the quick positioning of the end plate is realized, and the installation efficiency of the end plate is further improved;
3. be equipped with the reinforcement sleeve on the end plate, the reinforcement sleeve prevents that concrete pipe pile from exploding the stake when receiving pressure, promotes the intensity of tubular pile, is equipped with the anchor rod on the end plate, and the anchor rod is kept away from end plate one end and is equipped with anti-loosening block, and anchor rod and anti-loosening block promote the joint strength of end plate and tubular pile.
Drawings
FIG. 1 is a schematic view of a concrete pipe pile skeletal structure;
FIG. 2 is a schematic view of the overall structure;
fig. 3 is a schematic structural view showing the connection relationship of the end plates.
In the figure, 1, end plate; 2. a framework; 3. a guide groove; 4. fastening a bolt; 5. positioning holes; 6. a chute; 7. a reinforcing sleeve; 8. an anchoring rod; 9. anti-loosening blocks; 10. connecting holes; 11. and connecting the grooves.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a mounting structure of concrete tubular pile end plate, including end plate 1 and a plurality of connecting holes 10 that run through on end plate 1, the axis of a plurality of connecting holes 10 all is perpendicular with the face of end plate 1, and the circumferencial direction interval distribution of end plate 1 is followed to a plurality of connecting holes 10. Offer the guide way 3 that is used for leading to concrete pipe pile's skeleton 2 on the end plate 1, 3 length direction one ends of guide way and connecting hole 10 intercommunication, the width of guide way 3 is along keeping away from connecting hole 10 direction crescent, and the other end extends to the edge of end plate 1, and 3 corresponding connecting holes 10 of guide way are provided with many, and the length direction central line of many guide ways 3 parallels. 2 length direction both ends of concrete pipe pile skeleton can carry out the upset forging, the connecting rod one end diameter of keeping away from of guide way 3 is great, make things convenient for in the guide way 3 that inserts of skeleton 2, skeleton 2 slides along guide way 3 and gets into connecting hole 10 in, many guide ways 3 conveniently carry out preliminary location to end plate 1, slide end plate 1 along 3 length direction central lines of guide way and carry out further location, save the time of carrying out the calibration to end plate 1, promote the installation effectiveness of end plate 1.
Referring to fig. 1 and 3, a plurality of positioning holes 5 are formed in the end plate 1 in a penetrating manner, the diameter of each positioning hole 5 is smaller than that of the end portion of the framework 2, the positioning holes 5 correspond to the connecting holes 10, the positioning holes 5 are arranged at intervals in the circumferential direction of the end plate 1, and the positioning holes 5 are parallel to the axis of the connecting holes 10. The end plate 1 is provided with a sliding groove 6, the width of the sliding groove 6 is smaller than the diameter of the end part of the framework 2, one end of the sliding groove 6 in the length direction is communicated with the connecting hole 10, the other end of the sliding groove 6 is communicated with the positioning hole 5, and the positioning hole 5 and the axis of the connecting hole 10 are arranged on one side, close to the inner ring of the end plate 1, of the central line of the sliding groove 6. After the framework 2 enters the connecting hole 10, the end plate 1 is dragged along the length direction of the sliding groove 6, the framework 2 slides along the sliding groove 6 to enter the positioning hole 5, the positioning and installation of the framework 2 and the end plate 1 are completed, the process of further calibration after the framework 2 is inserted into the connecting hole 10 is omitted, and the installation efficiency of the end plate 1 is improved.
Referring to fig. 1 and 3, a fastening bolt 4 is threadedly coupled in each coupling hole 10. After the framework 2 slides into the positioning hole 5, the fastening bolt 4 is screwed into the connecting hole 10, the fastening bolt 4 plugs the outlet of the framework 2, the framework 2 is prevented from loosening from the positioning hole 5, and the stability of connection of the end plate 1 and the framework 2 is improved.
Referring to fig. 1 and 3, an anchoring rod 8 is horizontally welded on the end plate 1, the length direction of the anchoring rod 8 is parallel to the axial direction of the connecting hole 10, and an anti-loosening block 9 is welded at one end, far away from the end plate 1, of the anchoring rod 8. The baffle is connected with skeleton 2, accomplishes the back of pouring of concrete pipe pile, and anchor 8 and locking piece 9 shaping are in concrete pipe pile, and anchor 8 and locking piece 9 absorb the power of end plate 1 along concrete pipe pile axis direction, promote the installation intensity of end plate 1 and concrete pipe pile.
Referring to fig. 1 and 3, the diameter of the end plate 1 is gradually reduced along the direction close to the anchoring rod 8, the connecting groove 11 is formed in the side wall of the end plate 1, the reinforcing sleeve 7 is arranged on the end plate 1, the reinforcing sleeve 7 is extruded, and the reinforcing sleeve 7 deforms under the action of pressure to enter the connecting groove 11. The end plate 1 is in a round table shape, so that the reinforcing sleeve 7 is sleeved on the end plate 1, and then the reinforcing sleeve 7 is extruded to enable the sleeve to be erected and connected with the end plate 1 stably. After the concrete tubular pile is poured, the reinforcing sleeve 7 is formed on the outer side wall of the concrete tubular pile, and when the concrete tubular pile is pressurized, the reinforcing sleeve 7 promotes the lightness of the concrete tubular pile to prevent the pile from being exploded.
The implementation principle of the embodiment is as follows: the reinforcing sleeve 7 is pressed into the connecting groove 11 of the end plate 1, and the anchor rod 8 is welded on the end plate 1. The framework 2 slides into the connecting hole 10 along the guide groove 3, the end plate 1 is pulled, the framework 2 slides into the positioning hole 5 along the sliding groove 6 to complete positioning and installation of the short plate, and the fastening bolt 4 is screwed into the connecting hole 10 to prevent the framework 2 from being separated from the positioning hole 5. An anchoring rod 8 and a locking block 9 are formed in the concrete tubular pile, the anchoring rod 8 and the locking block 9 absorb acting force along the length direction of the concrete tubular pile, and the connection strength of the end plate 1 and the concrete tubular pile is improved.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. The utility model provides a mounting structure of concrete pipe pile end plate, includes end plate (1) and runs through a plurality of connecting holes (10) on end plate (1), and is a plurality of connecting hole (10) are followed end plate (1) edge interval and are set up its characterized in that: the end plate is characterized in that a guide groove (3) is formed in the end plate (1), the guide groove (3) is communicated with the connecting hole (10), and the guide groove (3) extends to the edge of the end plate (1).
2. A mounting structure of a concrete pipe pile end plate according to claim 1, wherein: the guide grooves (3) are provided with a plurality of corresponding connecting holes (10), and the length directions of the guide grooves (3) are parallel.
3. A mounting structure of a concrete pipe pile end plate according to claim 1, wherein: the end plate is characterized in that a positioning hole (5) penetrates through the end plate (1), a plurality of positioning holes (5) are formed in the corresponding connecting holes (10), a sliding groove (6) is formed in the end plate (1), the two ends of the length direction of the sliding groove (6) are respectively communicated with the positioning hole (5) and the connecting hole (10), and a plurality of positioning holes (5) and connecting holes (10) are formed in the corresponding connecting holes (6).
4. A mounting structure of a concrete pipe pile end plate according to claim 3, wherein: and fastening bolts (4) are connected in the connecting holes (10) in a threaded manner.
5. A mounting structure of a concrete pipe pile end plate according to claim 1, wherein: the anchor rod (8) is arranged on the end plate (1), and a plurality of anchor rods (8) are arranged at intervals along the edge of the inner ring of the end plate (1).
6. A concrete pipe pile end plate mounting structure according to claim 5, wherein: many anchor rod (8) are kept away from end plate (1) one end and are equipped with anti-loosening block (9).
7. A mounting structure of a concrete pipe pile end plate according to claim 1, wherein: the width of the guide groove (3) is gradually increased along the direction far away from the connecting hole (10).
8. A mounting structure of a concrete pipe pile end plate according to claim 1, wherein: be equipped with on end plate (1) reinforcement cover (7), be equipped with on end plate (1) lateral wall and be used for spread groove (11) that reinforcement cover (7) are connected.
9. A mounting structure of a concrete pipe pile end plate according to claim 8, wherein: the diameter of the end plate (1) decreases along the direction close to the reinforcing sleeve (7).
CN202021119422.8U 2020-06-17 2020-06-17 Mounting structure of concrete tubular pile end plate Expired - Fee Related CN212561484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021119422.8U CN212561484U (en) 2020-06-17 2020-06-17 Mounting structure of concrete tubular pile end plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021119422.8U CN212561484U (en) 2020-06-17 2020-06-17 Mounting structure of concrete tubular pile end plate

Publications (1)

Publication Number Publication Date
CN212561484U true CN212561484U (en) 2021-02-19

Family

ID=74634923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021119422.8U Expired - Fee Related CN212561484U (en) 2020-06-17 2020-06-17 Mounting structure of concrete tubular pile end plate

Country Status (1)

Country Link
CN (1) CN212561484U (en)

Similar Documents

Publication Publication Date Title
CN205600149U (en) A supporting member for preventing warp in steel reinforcement cage course of working
CN102182197B (en) Bundled grouting anchor rope reinforcing method for road rock slope
CN101424100A (en) Connecting apparatus of reinforced concrete precast member
CN108643671B (en) Four-steel-pipe constraint type buckling-restrained brace with replaceable cross-shaped inner core
CN203510449U (en) Novel tension device for pipe pile production
CN205421238U (en) Prefabricated pile body
CN211666259U (en) Wall post aluminum mould board assembling structure
CN105666688B (en) A kind of prefabricated pile, pile body and production method
CN212561484U (en) Mounting structure of concrete tubular pile end plate
CN211143495U (en) Connecting and fixing device for concrete filled steel tube column
CN204626393U (en) For the pile extension assembly of concrete pile
CN210316632U (en) Adherence formula circular member resistance to compression reinforcing apparatus that hugs closely
CN106948339B (en) Steel reinforcement cage pipe penetrating guide and steel reinforcement cage pipe penetrating method
CN110700676A (en) Sectional type prestressed high-strength reinforced concrete pole
CN211080240U (en) Circular triangular support assembly for cylindrical reinforcement cage
CN212561485U (en) End plate of concrete pipe pile
CN106762441B (en) Transition connecting piece and wind power tower
CN201343786Y (en) Reinforced concrete preformed unit connecting device
CN102587364A (en) Connecting method between piles and simple mechanical connection structure between piles
CN203452066U (en) Non-prestressed high-strength centrifugal concrete square pile
CN202899173U (en) Tubular pile uplift-resistance test device
CN202482854U (en) Pure mechanical connection structure between piles
CN208169271U (en) A kind of jointing device and prestressing force prefabricated component
CN113152449A (en) End plate sheet, precast pile, tensioning structure and method, pile splicing structure and method
CN212054988U (en) Concrete tower structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219