CN212559091U - Cement pipe hoisting ring structure - Google Patents
Cement pipe hoisting ring structure Download PDFInfo
- Publication number
- CN212559091U CN212559091U CN202021355119.8U CN202021355119U CN212559091U CN 212559091 U CN212559091 U CN 212559091U CN 202021355119 U CN202021355119 U CN 202021355119U CN 212559091 U CN212559091 U CN 212559091U
- Authority
- CN
- China
- Prior art keywords
- fixed
- ring structure
- cement pipe
- cross beam
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004568 cement Substances 0.000 title claims abstract description 25
- 238000009434 installation Methods 0.000 claims abstract description 9
- 239000000725 suspension Substances 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 230000006872 improvement Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 4
- 239000011148 porous material Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a cement pipe rings structure, including rings body structure, the connecting plate structure is installed to the lower extreme of rings body structure, fixed block structure, two are all installed to the lower extreme both sides of connecting plate structure the below of fixed block structure all is connected with the lifting rope structure, the structural buffer structure that is provided with of lifting rope, the lower extreme of lifting rope structure is provided with fixed ring structure, two fixed ring structure runs through telescopic cross beam structure, the both sides of terminal surface all are provided with the installation block structure under the telescopic cross beam structure, be connected with davit structure, two on the installation block structure the davit structure opposite face all is provided with spacing ring structure, the utility model has the characteristics of maneuverability is strong and the practicality is strong, has wide market application prospect.
Description
Technical Field
The utility model relates to a technical field of cement pipe accessory, especially a cement pipe rings structure.
Background
In modern cities, underground drainage pipes are indispensable municipal facilities which can timely accumulate water on road surfaces, domestic sewage and the like
The discharge of having guaranteed the health in city, because the cement pipe has advantages such as bearing strength is big, corrosion-resistant and long service life and is used widely in various building engineering, need carry out the procedure of hoist and mount usually in the cement pipe transportation process, but because cement pipe diameter is great, it is heavier simultaneously for the process of hoist and mount is more difficult, can have certain safe risk in the operation, consequently need design a cement pipe rings structure and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cement pipe crane ring structure to the technical problem who exists among the prior art, concrete technical scheme is as follows:
the utility model provides a cement pipe rings structure, including rings body structure, the connecting plate structure is installed to the lower extreme of rings body structure, fixed block structure, two are all installed to the lower extreme both sides of connecting plate structure the below of fixed block structure all is connected with the lifting rope structure, the structural buffer structure that is provided with of lifting rope, the lower extreme of lifting rope structure is provided with fixed ring structure, two fixed ring structure runs through telescopic cross beam structure, the both sides of terminal surface all are provided with the installation block structure under the telescopic cross beam structure, be connected with davit structure, two on the installation block structure the davit structure opposite face all is provided with the spacing ring structure.
The utility model discloses a further improvement lies in: the buffer structure comprises an upper end connecting piece structure and a lower end connecting piece structure, and a buffer spring structure is arranged between the upper end connecting piece structure and the lower end connecting piece structure.
The utility model discloses a further improvement lies in: the telescopic beam structure comprises a fixed beam structure and a movable beam structure which can movably penetrate through the inside of the fixed beam structure, and the fixed beam structure and the movable beam structure are connected in a detachable mode.
The utility model discloses a further improvement lies in: the upper end face and the lower end face of the movable beam structure are equally spaced and provided with a plurality of beam limiting hole structures.
The utility model discloses a further improvement lies in: the fixed cross beam structure is provided with a fixed hole groove structure corresponding to the cross beam limiting hole structure, and a bolt and a nut penetrate through the fixed hole groove structure and the cross beam limiting hole structure and then connect the movable cross beam structure with the fixed cross beam structure.
The utility model discloses a further improvement lies in: the limiting ring structure comprises a fixed ring structure, the fixed ring structure is connected with the suspension arm structure in a welding mode, the outer side of the fixed ring structure is connected with a second buffer spring structure, one side, away from the fixed ring structure, of the second buffer spring is provided with a limiting ring structure, the limiting ring structure is connected with the second buffer spring structure in a rotatable bolt mode, and the rotatable bolt structure can rotate to enter the inside of the fixed ring structure.
The utility model discloses a further improvement lies in: the outer side of the fixed ring structure is provided with four second buffer spring structures at equal angles.
The utility model discloses a further improvement lies in: the four limiting ring structures are arranged in a surrounding mode to form a complete circular ring structure, and sealing cushion layer structures are arranged at the positions where the limiting ring structures are in contact with each other.
The utility model discloses a further improvement lies in: the suspension arm structure is L-shaped.
The utility model has the advantages that:
the utility model discloses a design makes the cement pipe more stable at the in-process of hoist and mount, reduces and rocks, and the hoist and mount process is simple and convenient, and is stable when the cement pipe hoist and mount, increases the security of hoist and mount, and such design has the characteristics that the practicality is strong and maneuverability is strong, has wide market application prospect.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of a stopper ring structure of the present invention;
description of the drawings: 1-a hanging ring body structure, 2-a connecting plate structure, 3-a fixed block structure, 4-a hanging rope structure, 5-a buffer structure, 6-a fixed ring structure, 7-a telescopic beam structure, 8-an installation block structure, 9-a hanging arm structure, 10-a limiting ring structure, 11-an upper end connecting piece structure, 12-a lower end connecting piece structure, 13-a buffer spring structure, 14-a fixed beam structure, 15-a movable beam structure, 16-a beam limiting hole structure, 17-a fixed hole groove structure, 18-a fixed ring structure, 19-a second buffer spring structure, 20-a limiting ring structure and 21-a sealing cushion structure.
Detailed Description
In order to make the technical field person understand the scheme of the present invention better, the following will combine the drawings in the embodiments of the present invention to clearly and completely describe the technical scheme in the embodiments of the present invention.
The embodiment provides a cement pipe lifting ring structure, which comprises a lifting ring body structure 1, wherein a connecting plate structure 2 is installed at the lower end of the lifting ring body structure 1, fixed block structures 3 are installed on two sides of the lower end of the connecting plate structure 2, a lifting rope structure 4 is connected below the two fixed block structures 3, a buffer structure 5 is arranged on the lifting rope structure 4, a fixed ring structure 6 is arranged at the lower end of the lifting rope structure 4, the two fixed ring structures 6 penetrate through a telescopic cross beam structure 7, installation block structures 8 are arranged on two sides of the lower end face of the telescopic cross beam structure 7, a lifting arm structure 9 is connected onto the installation block structure 8, a limiting ring structure 10 is arranged on each opposite face of the two lifting arm structures 9, the lifting arm structure 9 is L-shaped, the buffer structure 5 comprises an upper end connecting piece structure 11 and a lower end connecting piece, a buffer spring structure 13 is arranged between the upper end connecting piece structure 11 and the lower end connecting piece structure 12.
The utility model has the advantages that:
the utility model discloses a design makes the cement pipe more stable at the in-process of hoist and mount, reduces and rocks, and the hoist and mount process is simple and convenient, and is stable when the cement pipe hoist and mount, increases the security of hoist and mount, and such design has the characteristics that the practicality is strong and maneuverability is strong, has wide market application prospect.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing detailed description, or equivalent replacements may be made for some of the technical features of the embodiments. All utilize the equivalent structure that the content of the utility model discloses a specification and attached drawing was done, direct or indirect application is in other relevant technical field, all is in the same way the utility model discloses within the patent protection scope.
Claims (9)
1. The utility model provides a cement pipe rings structure which characterized in that: including rings body structure, the link plate structure is installed to rings body structure's lower extreme, fixed block structure, two are all installed to the lower extreme both sides of link plate structure the below of fixed block structure all is connected with the lifting rope structure, the lifting rope is structural to be provided with buffer structure, the lower extreme of lifting rope structure is provided with fixed ring structure, two fixed ring structure runs through telescopic cross beam structure, telescopic cross beam structure is down the both sides of terminal surface all to be provided with the installation block structure, be connected with davit structure, two on the installation block structure the davit structure opposite face all is provided with the spacing ring structure.
2. The cement pipe hoisting ring structure as claimed in claim 1, wherein: the buffer structure comprises an upper end connecting piece structure and a lower end connecting piece structure, and a buffer spring structure is arranged between the upper end connecting piece structure and the lower end connecting piece structure.
3. The cement pipe hoisting ring structure as claimed in claim 1, wherein: the telescopic beam structure comprises a fixed beam structure and a movable beam structure which can movably penetrate through the inside of the fixed beam structure, and the fixed beam structure and the movable beam structure are connected in a detachable mode.
4. The cement pipe hoisting ring structure as claimed in claim 3, wherein: the upper end face and the lower end face of the movable beam structure are equally spaced and provided with a plurality of beam limiting hole structures.
5. The cement pipe hoisting ring structure as claimed in claim 4, wherein: the fixed cross beam structure is provided with a fixed hole groove structure corresponding to the cross beam limiting hole structure, and a bolt and a nut penetrate through the fixed hole groove structure and the cross beam limiting hole structure and then connect the movable cross beam structure with the fixed cross beam structure.
6. The cement pipe hoisting ring structure as claimed in claim 1, wherein: the limiting ring structure comprises a fixed ring structure, the fixed ring structure is connected with the suspension arm structure in a welding mode, the outer side of the fixed ring structure is connected with a second buffer spring structure, one side, away from the fixed ring structure, of the second buffer spring is provided with a limiting ring structure, the limiting ring structure is connected with the second buffer spring structure in a rotatable bolt mode, and the rotatable bolt structure can rotate to enter the inside of the fixed ring structure.
7. The cement pipe hoisting ring structure as claimed in claim 6, wherein: the outer side of the fixed ring structure is provided with four second buffer spring structures at equal angles.
8. The cement pipe hoisting ring structure as claimed in claim 6, wherein: the four limiting ring structures are arranged in a surrounding mode to form a complete circular ring structure, and sealing cushion layer structures are arranged at the positions where the limiting ring structures are in contact with each other.
9. The cement pipe hoisting ring structure as claimed in claim 1, wherein: the suspension arm structure is L-shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021355119.8U CN212559091U (en) | 2020-07-12 | 2020-07-12 | Cement pipe hoisting ring structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021355119.8U CN212559091U (en) | 2020-07-12 | 2020-07-12 | Cement pipe hoisting ring structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212559091U true CN212559091U (en) | 2021-02-19 |
Family
ID=74620001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021355119.8U Expired - Fee Related CN212559091U (en) | 2020-07-12 | 2020-07-12 | Cement pipe hoisting ring structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212559091U (en) |
-
2020
- 2020-07-12 CN CN202021355119.8U patent/CN212559091U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103993728B (en) | A kind of assembling shaped steel is encorbelmented protection canopy | |
CN211423687U (en) | Air pipe single-side double-longitudinal anti-seismic support | |
CN212559091U (en) | Cement pipe hoisting ring structure | |
CN202321980U (en) | Lifting hook special for steel tube | |
CN211568803U (en) | PCCP pipeline transportation fixing device | |
CN203462396U (en) | Combined steel floating bridge | |
CN203475479U (en) | Double-layer dropping and moving prevention well lid | |
CN207419540U (en) | Damping noise reduction Cover of inspection well structure | |
CN212001279U (en) | Adjustable anti-settling nodular cast iron inspection well cover | |
CN212427167U (en) | High water level foundation | |
CN210340234U (en) | Civil engineering construction is with sewer pipe transfer device | |
CN214303128U (en) | Frost crack prevention annular concrete pole | |
CN108190758A (en) | A kind of concrete duct installs equipment | |
CN205716027U (en) | A kind of buried go out family pipeline anti-settling system | |
CN212960228U (en) | Novel civil air defense engineering poling structure | |
CN203006807U (en) | Stabilizing device for preventing instability of boom of tower crane under sudden unloading condition | |
CN215364452U (en) | Pipe gallery lifting appliance conversion frame | |
CN212957101U (en) | Connecting device for upper and lower wall bodies of steel structure building | |
CN212177595U (en) | Retractable latch device that building was used | |
CN210857219U (en) | Round pile cap structure | |
CN208346642U (en) | A kind of large-span steel trestle abutment bottom suspension device | |
CN212447834U (en) | Wear-resistant crawler frame for crane | |
CN205530375U (en) | Husky well lid of municipal administration stainless steel | |
CN214644687U (en) | Enhancement mode tubular pile steel mould | |
CN217498407U (en) | Winch balance beam hanger for hydropower station vertical shaft construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210219 |