CN212554993U - Cooling device is used in brush silk production - Google Patents

Cooling device is used in brush silk production Download PDF

Info

Publication number
CN212554993U
CN212554993U CN202021020825.7U CN202021020825U CN212554993U CN 212554993 U CN212554993 U CN 212554993U CN 202021020825 U CN202021020825 U CN 202021020825U CN 212554993 U CN212554993 U CN 212554993U
Authority
CN
China
Prior art keywords
rotating shaft
cooling
fixed
cooling box
ventilation pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021020825.7U
Other languages
Chinese (zh)
Inventor
陈斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongcheng Huaxin Special Material Packaging Co ltd
Original Assignee
Tongcheng Huaxin Special Material Packaging Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongcheng Huaxin Special Material Packaging Co ltd filed Critical Tongcheng Huaxin Special Material Packaging Co ltd
Priority to CN202021020825.7U priority Critical patent/CN212554993U/en
Application granted granted Critical
Publication of CN212554993U publication Critical patent/CN212554993U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Brushes (AREA)

Abstract

The utility model discloses a cooling device for producing brush wires, which belongs to the technical field of brush wire production equipment and comprises a cooling box filled with cooling water, wherein the left and right ends of the cooling box are provided with wire holes by the upper edge, a first rotating shaft, a second rotating shaft, a third rotating shaft and a fourth rotating shaft are sequentially and rotatably connected between the front and rear inner walls of the cooling box from left to right, the first rotating shaft and the fourth rotating shaft are at the same height, the second rotating shaft and the third rotating shaft are at the same height, the first rotating shaft is positioned at the upper side of the second rotating shaft, the centers of the circumferential surfaces of the first rotating shaft, the second rotating shaft, the third rotating shaft and the fourth rotating shaft are respectively fixed with guide rollers, the left and right parts of the upper end of the cooling box are respectively fixed with a bracket, one end of the two brackets, which is far away from each other, is respectively fixed with a cooling fan, an air outlet pipe is fixed with an air outlet pipe, one end of the air, the utility model discloses have good cooling effect, cooling efficiency is high, and the design is ingenious, and the practicality is strong.

Description

Cooling device is used in brush silk production
Technical Field
The utility model relates to a brush silk production facility technical field, more specifically say, relate to a cooling device is used in brush silk production.
Background
The existing brush wire is mostly made of plastic, the plastic is a high molecular compound which is polymerized by monomer as raw material through addition polymerization or polycondensation reaction, commonly called as plastic or resin, can freely change components and shape and form, and is composed of synthetic resin and additives such as filler, plasticizer, stabilizer, lubricant, pigment and the like, the plastic is widely used in the aspects of industry and life, and the demand is huge.
The existing brush wires are generally extruded by an extruder, then are packed up by a take-up device through natural cooling, and are cut into brush wires with different lengths by a cutting device, a large amount of time is consumed for cooling the brush wires by adopting a natural cooling mode, the cooling efficiency is low, and the cooling effect is poor.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a brush silk production is with cooling device, it has good cooling effect, and cooling efficiency is high, thinks about ingeniously, and the practicality is strong.
2. Technical scheme
In order to solve the above problem, the utility model adopts the following technical scheme:
a cooling device for brush wire production comprises a cooling box filled with cooling water, wherein wire holes are formed in the left end and the right end of the cooling box by the upper edge, a first rotating shaft, a second rotating shaft, a third rotating shaft and a fourth rotating shaft are sequentially connected between the front inner wall and the rear inner wall of the cooling box from left to right in a rotating mode, the first rotating shaft and the fourth rotating shaft are located at the same height, the second rotating shaft and the third rotating shaft are located at the same height, the first rotating shaft is located on the upper side of the second rotating shaft, guide rollers are fixed at the centers of the circumferential surfaces of the first rotating shaft, the second rotating shaft, the third rotating shaft and the fourth rotating shaft, supports are fixed on the left portion and the right portion of the upper end of the cooling box, cooling fans are fixed at the ends, far away from the two supports, air outlet pipes are fixed at the air outlets of the cooling fans, one ends of the air outlet pipes are inserted into the cooling water, and a, and the ventilation pipe and the play tuber pipe intercommunication, the lower extreme of ventilation pipe runs through the support and extends to its downside, and is a set of the lower extreme of ventilation pipe all is fixed with the shower nozzle, and shower nozzle and ventilation pipe intercommunication, have good cooling effect, and cooling efficiency is high, thinks about ingeniously, and the practicality is strong.
As a preferred scheme of the utility model, every group the ventilation pipe all is provided with a plurality ofly, and the horizontal equidistance setting of a plurality of ventilation pipes.
As a preferred scheme of the utility model, the shower nozzle is located the upside in silk hole, and the straight line distance between shower nozzle and the silk hole is 8-10 cm.
As a preferred scheme of the utility model, the front end right part lower side position department of cooler bin is fixed with the outlet, and outlet and cooler bin intercommunication, install the valve on the outlet.
As an optimized proposal of the utility model, the surface of the cooling box is wrapped with heat insulation cotton.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this scheme is at first with the cooling water add to the cooler bin in, make the cooling water cover second pivot and third pivot, and make it not cover first pivot and fourth pivot, start two cooling blower, two cooling blower produce the cooling air and get into a plurality of ventilation pipes respectively through going out the tuber pipe, finally discharge downwards through a plurality of shower nozzles, the brush silk can be cooled off through left cooling air in advance, and then the brush silk gets into the cooling water and cools off, then the cooling air that will pass through the right side cools off, accelerate drying rate simultaneously, thereby realize good cooling, because the brush silk cools off the temperature that can make the cooling water in the cooling water and rise, the cooling air still can be discharged into to the cooling water through its other end in getting into out the tuber pipe, thereby cool down the processing to it, make the cooling water keep good cooling temperature, thereby realize good cooling.
(2) This scheme can carry out good direction to the brush silk through the setting of four guide rolls.
Drawings
FIG. 1 is a first perspective view of a cooling device for producing brush wires according to the present invention;
FIG. 2 is a second perspective view of a cooling device for producing brush wires according to the present invention;
fig. 3 is a sectional view of the cooling device for producing brush wires of the present invention.
The reference numbers in the figures illustrate:
1 cooling box, 2 outlet openings, 3 cooling fans, 4 air outlet pipes, 5 supports, 6 ventilation pipes, 7 spray heads, 8 first rotating shafts, 9 second rotating shafts, 10 third rotating shafts, 11 fourth rotating shafts, 12 guide rollers and 13 wire holes.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
referring to fig. 1-3, a cooling device for producing brush filaments comprises a cooling box 1 filled with cooling water for cooling brush filaments, wherein the cooling water is used for cooling the brush filaments, the left and right ends of the cooling box 1 are respectively provided with a filament hole 13 near the upper edge, the filament hole 13 on the left side is used as a filament inlet, and the filament hole 13 on the right side is used as a filament outlet;
it is connected with first pivot 8 to rotate in proper order from the left hand right side between the front and back inner wall of cooler bin 1, second pivot 9, third pivot 10 and fourth pivot 11, first pivot 8 is located same height with fourth pivot 11, second pivot 9 and third pivot 10 are located same height, first pivot 8 is located the upside of second pivot 9, first pivot 8, second pivot 9, the circumference surface center department of third pivot 10 and fourth pivot 11 all is fixed with guide roll 12, the principle is added to the cooling water: cooling water is added into the cooling box 1, so that the cooling water covers the second rotating shaft 9 and the third rotating shaft 10 and does not cover the first rotating shaft 8 and the fourth rotating shaft 11, the first rotating shaft 8, the second rotating shaft 9, the third rotating shaft 10 and the fourth rotating shaft 11 can rotate, and therefore the four guide rollers 12 can rotate respectively, and the brush wires are guided well;
the left part and the right part of the upper end of the cooling box 1 are both fixed with the supports 5, the supports 5 play a role in installation, the cooling fans 3 are fixed at the ends, far away from the two supports 5, of the two supports 3, the cooling fans 3 are used for manufacturing cooling air, so that the cooling air is generated to cool the brush wires, the models of the cooling fans 3 can be selected according to actual needs, and therefore the description is omitted, meanwhile, the internal structure of the cooling fans 3 belongs to the common knowledge of technicians in the field, so the description is omitted, and the cooling fans 3 are also electrically connected with an external power supply to realize power supply;
an air outlet pipe 4 is fixed at an air outlet of the cooling fan 3, one end of the air outlet pipe 4 is inserted into cooling water, a group of ventilation pipes 6 are fixed on the air outlet pipe 4, the ventilation pipes 6 are communicated with the air outlet pipe 4, each group of ventilation pipes 6 is provided with a plurality of ventilation pipes 6, the ventilation pipes 6 are transversely arranged at equal intervals, the lower ends of the ventilation pipes 6 penetrate through the support 5 and extend to the lower side of the support, a spray head 7 is fixed at the lower ends of the group of ventilation pipes 6, the spray head 7 is communicated with the ventilation pipes 6, the spray head 7 is positioned on the upper side of the wire holes 13, the straight line distance between the spray head 7 and the wire holes 13 is 8-10 cm, the two cooling fans 3 are started, cooling air generated by the two cooling fans 3 enters the ventilation pipes 6 through the air outlet pipe 4 respectively and is finally discharged downwards through the spray heads 7, the wire brushing can be cooled through the left cooling air in advance, and, meanwhile, the drying speed is accelerated, so that good cooling is realized, and as the brush wires are cooled in the cooling water, the temperature of the cooling water is increased, cooling air enters the air outlet pipe 4 and is discharged into the cooling water through the other end of the air outlet pipe, so that the cooling water is cooled, and the cooling water keeps a good cooling temperature, so that good cooling is realized;
in order to discharge cooling water, a water outlet 2 is fixed at the lower side of the right part of the front end of the cooling box 1, the water outlet 2 is communicated with the cooling box 1, a valve is arranged on the water outlet 2, and the valve can be opened to discharge the cooling water through the water outlet 2;
in order to prevent external temperature from entering the cooling box 1 easily and realize good heat insulation, the surface of the cooling box 1 is wrapped with heat insulation cotton;
it should be noted that: the wire releasing device and the wire collecting device are matched with the device for use, and the wire releasing device and the wire collecting device are in the prior art, so detailed description is not repeated;
the working principle is as follows: with the brush silk according to the silk process of threading that fig. 3 shows, start two cooling blower 3, two cooling blower 3 produce the cooling air and get into a plurality of ventilation pipes 6 respectively through going out tuber pipe 4, finally discharge downwards through a plurality of shower nozzles 7, the brush silk can be cooled off through left cooling air in advance, and then the brush silk cools off in getting into the cooling water, then will cool off through the cooling air on right side, accelerate drying rate simultaneously, thereby realize good cooling, because the brush silk can make the temperature of cooling water rise in the cooling water cooling, the cooling air still can be discharged into to the cooling water through its other end in getting into out tuber pipe 4, thereby cool down the processing to it, make the cooling water keep good cooling temperature, thereby realize good cooling, the utility model discloses have good cooling effect, the cooling efficiency is high, think about ingeniously, the practicality is strong.
The above description is only the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the improvement concept of the present invention within the technical scope disclosed in the present invention.

Claims (5)

1. The utility model provides a brush silk production is with cooling device, is including filling cooler bin (1) that has cooling water, its characterized in that: the cooling box is characterized in that the left end and the right end of the cooling box (1) are provided with screw holes (13) by the upper edge, a first rotating shaft (8), a second rotating shaft (9), a third rotating shaft (10) and a fourth rotating shaft (11) are sequentially connected between the front inner wall and the rear inner wall of the cooling box (1) from left to right in a rotating mode, the first rotating shaft (8) and the fourth rotating shaft (11) are located at the same height, the second rotating shaft (9) and the third rotating shaft (10) are located at the same height, the first rotating shaft (8) is located at the upper side of the second rotating shaft (9), guide rollers (12) are fixed at the centers of the circumferential surfaces of the first rotating shaft (8), the second rotating shaft (9), the third rotating shaft (10) and the fourth rotating shaft (11), supports (5) are fixed at the left portion and the right portion of the upper end of the cooling box (1), and cooling fans (3) are fixed at the ends far away from, the air outlet of cooling fan (3) is fixed with out tuber pipe (4), and the one end that goes out tuber pipe (4) inserts in the cooling water, it is fixed with a set of ventilation pipe (6) on tuber pipe (4), and ventilation pipe (6) and play tuber pipe (4) intercommunication, the lower extreme of ventilation pipe (6) runs through support (5) and extends to its downside, and is a set of the lower extreme of ventilation pipe (6) all is fixed with shower nozzle (7), and shower nozzle (7) and ventilation pipe (6) intercommunication.
2. The cooling device for producing brush wires according to claim 1, wherein: every group ventilation pipe (6) all are provided with a plurality ofly, and a plurality of ventilation pipe (6) horizontal equidistance sets up.
3. The cooling device for producing brush wires according to claim 1, wherein: the spray head (7) is positioned on the upper side of the thread hole (13), and the linear distance between the spray head (7) and the thread hole (13) is 8-10 cm.
4. The cooling device for producing brush wires according to claim 1, wherein: a water outlet (2) is fixed at the lower side position of the right part of the front end of the cooling box (1), the water outlet (2) is communicated with the cooling box (1), and a valve is installed on the water outlet (2).
5. The cooling device for producing brush wires according to claim 1, wherein: the surface of the cooling box (1) is wrapped with heat insulation cotton.
CN202021020825.7U 2020-06-06 2020-06-06 Cooling device is used in brush silk production Expired - Fee Related CN212554993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021020825.7U CN212554993U (en) 2020-06-06 2020-06-06 Cooling device is used in brush silk production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021020825.7U CN212554993U (en) 2020-06-06 2020-06-06 Cooling device is used in brush silk production

Publications (1)

Publication Number Publication Date
CN212554993U true CN212554993U (en) 2021-02-19

Family

ID=74629974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021020825.7U Expired - Fee Related CN212554993U (en) 2020-06-06 2020-06-06 Cooling device is used in brush silk production

Country Status (1)

Country Link
CN (1) CN212554993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113057440A (en) * 2021-03-17 2021-07-02 安徽三和刷业有限公司 Brush hair integration production facility

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113057440A (en) * 2021-03-17 2021-07-02 安徽三和刷业有限公司 Brush hair integration production facility

Similar Documents

Publication Publication Date Title
CN212554993U (en) Cooling device is used in brush silk production
CN212834169U (en) Efficient production heat sink for polypropylene filament
CN109466043A (en) The extrusion after-treatment device of trunking
CN210283157U (en) Extrusion device is used in production of PVC tubular product
CN109637743B (en) Device is used in production of integration electric wire
CN113758117A (en) Rapid cooling device and cooling method for fibers for polypropylene fiber processing
CN210705904U (en) Extrusion equipment for flexible hose
CN210657737U (en) High-performance polyethylene rope twisting improvement device
CN216001393U (en) Air cooling device for preparing halogen-free low-smoke flame-retardant polyolefin cable by recycling water resources
CN209722371U (en) A kind of spinning machine
CN116288758A (en) Velvet cotton fiber production method and production equipment
CN215040127U (en) Production of plastic material is with filtering constant temperature cooling device certainly
CN214820848U (en) Air ring structure of degradable film blowing machine
CN112002468B (en) Butyronitrile compound removes flat cable for driving
CN213860637U (en) Cooling and drying device and extruder
CN211233657U (en) Drying box for new material film
CN218286661U (en) Shaping device of extruder of pipe production line
CN210026236U (en) Double-layer cooling mechanism of automatic wire wrapping machine
CN219381501U (en) Production line for realizing material modification
CN219564114U (en) Clar pipe winding forming machine
CN218115686U (en) Spinning equipment is used in production of polyester industrial yarn of environmental protection
CN213533734U (en) Plastic extrusion device capable of adjusting temperature
CN212707953U (en) Blow molding equipment for producing and processing plastic automobile water tank
CN220784868U (en) Heat shrinkage film cooling and shaping device
CN217429222U (en) Novel vermicelli cools off fast device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219

CF01 Termination of patent right due to non-payment of annual fee