CN212543326U - Support frame suitable for electric power capital construction job site interim cable supports - Google Patents
Support frame suitable for electric power capital construction job site interim cable supports Download PDFInfo
- Publication number
- CN212543326U CN212543326U CN202021530285.7U CN202021530285U CN212543326U CN 212543326 U CN212543326 U CN 212543326U CN 202021530285 U CN202021530285 U CN 202021530285U CN 212543326 U CN212543326 U CN 212543326U
- Authority
- CN
- China
- Prior art keywords
- support
- support frame
- frame suitable
- sleeve
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 11
- 238000009440 infrastructure construction Methods 0.000 claims abstract description 7
- 230000014759 maintenance of location Effects 0.000 claims abstract description 7
- 230000000694 effects Effects 0.000 abstract description 17
- 238000000034 method Methods 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a support frame suitable for temporary cable support in electric power infrastructure construction sites, which comprises a support rod, wherein the bottom of the support rod is conical, a telescopic device which can prevent the overhead line vertical arc from being too close to the ground and is convenient for storage and combination is arranged on the support rod, the telescopic device comprises a support sleeve which is movably sleeved outside the support rod and can adjust the height of the device, the outer side of the support sleeve is in threaded connection with a retention bolt, the support frame suitable for temporary cable support in electric power infrastructure construction sites realizes the functions of preventing the overhead line vertical arc from being too close to the ground and being convenient for storage and combination through the telescopic device, realizes the function of adjusting the height of the device through the sleeve connection of the support sleeve and the support rod, realizes the function of supporting and limiting the support cable through an adjustable limiting device, and realizes the function of folding and storage of folding a folding sleeve through the storage sleeve, the effect of being convenient for to accomodate has been played.
Description
Technical Field
The utility model relates to an electric wire, cable support equipment technical field specifically are a support frame suitable for electric power capital construction job site interim cable supports.
Background
Along with the development of construction technology in recent years, various small and medium-sized hand-held electric tools are more and more applied to the building construction process, the labor work efficiency is greatly improved, and the dependence on labor force is effectively reduced. However, most of various devices on the construction site of the construction site have the characteristics of temporality, mobility, large operation area and the like, so that the devices frequently move, the phenomena of cable mopping, criss-cross and the like are easily caused, and if water is accumulated in a certain place, the cable is soaked, so that great potential safety hazards are brought to the construction process.
The problem that the overhead line vertical arc is too close to the ground is caused by increasing the length between supports for solving the cable looseness, the existing temporary cable support frame is mostly supported by arranging cable grooves on the supports, but the existing cable grooves are fixed in length, more cable grooves can be increased when the cable length is prolonged, the variable use scene cannot be adapted, great inconvenience is brought to transportation, storage and installation work, and therefore the support frame suitable for supporting the temporary cable in the electric power infrastructure construction site is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a support frame suitable for electric power capital construction job site interim cable supports to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a support frame suitable for interim cable support of electric power capital construction job site, includes the bracing piece, the bracing piece bottom is the toper, be equipped with on the bracing piece and prevent that overhead line arc of hanging down is too close ground and the telescoping device of the combination of being convenient for to accomodate, realized preventing that overhead line arc of hanging down is too close ground and the effect of the combination of being convenient for to accomodate through the telescoping device.
Preferably, the telescoping device includes that the activity cup joints the support cover that can carry out height control to the device in the bracing piece outside, support cover outside threaded connection has the maintenance bolt, maintenance bolt and bracing piece butt, support cover top fixedly connected with is used for supporting spacing adjustable stop device to interim cable conductor, has realized carrying out height control's effect to the device through cup jointing of support cover and bracing piece, has realized supporting spacing effect to a cable through adjustable stop device.
Preferably, adjustable stop device includes and supports the cover for fixed connection's the cover of accomodating, it is equipped with folding sleeve pipe to accomodate the cover inboard, the folding sleeve pipe outside is equipped with a plurality of rings of hanging, the both ends in accomodating the cover outside are the symmetry respectively and are equipped with two fixed blocks, four through two liang of rotations of round pin axle between the fixed block are connected with the couple, and a couple and the ring joint of hanging that is close to folding sleeve pipe, have realized folding the effect of accomodating to folding sleeve pipe through accomodating the cover, have played the effect of being convenient for accomodate, have realized adjusting folding sleeve pipe length as required through the couple with the joint of hanging the ring.
Preferably, the outer side of the supporting rod is fixedly connected with a plurality of angle fixing rods for preventing the supporting rod from inclining, and the effect of keeping the verticality of the device is achieved through the angle adjusting rods.
Preferably, a plurality of fixed plates are arranged at the bottoms of the angle fixing rods, fixing bolts are connected to the fixed plates in a threaded mode, and the effect of preventing the angle adjusting rod from moving upwards is achieved through the fixing bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, realized preventing that overhead line vertical arc from too being close ground and being convenient for accomodate the effect of combination through the telescoping device, realized carrying out the effect of altitude mixture control to the device through cup jointing of supporting cover and bracing piece, realized supporting spacing effect to a cable through adjustable stop device, realized folding the effect of accomodating to the folding sleeve pipe through accomodating the cover, the effect of being convenient for to accomodate has been played, realized adjusting the effect of folding sleeve pipe length as required through the couple with the joint of hanging the circle, realized the effect of keeping device straightness that hangs down through the angle adjusting lever, realized preventing the effect of angle adjusting lever rebound through fixing bolt.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the adjustable position-limiting device of the present invention;
fig. 3 is a schematic view of the combination state of the present invention.
In the figure: 1-a support bar; 2-a telescopic device; 3-supporting the sleeve; 4-a retention bolt; 5-adjustable limiting device; 6-a storage sleeve; 7-folding the sleeve; 8-hanging a ring; 9-fixing block; 10-hanging hooks; 11-angle fixing rod; 12-a fixing plate; 13-fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a support frame suitable for interim cable support of electric power capital construction job site, includes bracing piece 1, 1 bottoms of bracing piece are the toper, be equipped with on the bracing piece 1 and prevent that overhead line vertical arc is too close ground and be convenient for accomodate the telescoping device 2 of combination.
The telescopic device 2 comprises a support sleeve 3 which is movably sleeved on the outer side of the support rod 1 and can adjust the height of the device, a retention bolt 4 is connected to the outer side of the support sleeve 3 in a threaded manner, the retention bolt 4 is abutted against the support rod 1, and an adjustable limiting device 5 which is used for supporting and limiting the temporary cable is fixedly connected to the top of the support sleeve 3.
Adjustable stop device 5 includes and supports cover 3 and give fixed connection's the cover 6 of accomodating, it is equipped with folding sleeve pipe 7 to accomodate 6 inboards of cover, the folding sleeve pipe 7 outside is equipped with a plurality of rings 8 of hanging, the both ends in accomodating 6 outsides are symmetrical respectively and are equipped with two fixed blocks 9, four be connected with couple 10 through two liang of rotations of round pin axle between the fixed block 9, and be close to a couple 10 and the 8 joints of ring of hanging of folding sleeve pipe 7.
The outer side of the supporting rod 1 is fixedly connected with a plurality of angle fixing rods 11 for preventing the supporting rod 1 from inclining.
The bottom of the angle fixing rods 11 is provided with a fixing plate 12, and the fixing plate 12 is in threaded connection with a fixing bolt 13.
The working principle is as follows: set up a plurality of devices according to cable length, end to end connection in proper order between every device, insert a plurality of bracing pieces 1 respectively in the soil, it is fixed in ground with fixed plate 12 to rotate fixing bolt 13, it is fixed with angle dead lever 11, tensile support cover 3 to required height, it is fixed to rotate retention bolt 4 and will support cover 3, stretch out folding sleeve 7 and accomodate the cover 6 outside, one end with folding sleeve 7 is stretched to the cover 6 one end of accomodating that corresponds another support frame, confirm length and hang circle 8 with couple 10 joint, hang circle 8 and the couple 10 joint of another device one end of keeping away from device one end, pass folding sleeve 7 with the cable.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a support frame suitable for electric power capital construction job site interim cable supports, includes bracing piece (1), bracing piece (1) bottom is the toper, its characterized in that: the support rod (1) is provided with a telescopic device (2) which prevents the overhead line from being too close to the ground and is convenient to store and combine.
2. The support frame suitable for supporting the temporary cable on the power infrastructure construction site as claimed in claim 1, wherein: the telescopic device (2) comprises a support sleeve (3) which is movably sleeved on the outer side of the support rod (1) and can be used for adjusting the height of the device, a retention bolt (4) is connected to the outer side of the support sleeve (3) in a threaded manner, the retention bolt (4) is abutted against the support rod (1), and an adjustable limiting device (5) used for limiting the support of the temporary cable is fixedly connected to the top of the support sleeve (3).
3. The support frame suitable for supporting the temporary cable on the power infrastructure construction site as claimed in claim 2, wherein: adjustable stop device (5) include with support cover (3) give fixed connection accomodate cover (6), it is equipped with folding sleeve pipe (7) to accomodate cover (6) inboard, folding sleeve pipe (7) outside is equipped with a plurality of rings (8) of hanging, the both ends of accomodating the cover (6) outside symmetry respectively are equipped with two fixed blocks (9), four be connected with couple (10) through two liang of rotations of round pin axle between fixed block (9), and be close to couple (10) and the ring (8) joint of hanging of folding sleeve pipe (7).
4. The support frame suitable for supporting the temporary cable on the power infrastructure construction site as claimed in claim 1, wherein: the outer side of the supporting rod (1) is fixedly connected with a plurality of angle fixing rods (11) for preventing the supporting rod (1) from inclining.
5. The support frame suitable for supporting the temporary cable on the power infrastructure construction site as claimed in claim 4, wherein: the bottom of the angle fixing rods (11) is provided with a fixing plate (12), and the fixing plate (12) is in threaded connection with a fixing bolt (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021530285.7U CN212543326U (en) | 2020-07-29 | 2020-07-29 | Support frame suitable for electric power capital construction job site interim cable supports |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021530285.7U CN212543326U (en) | 2020-07-29 | 2020-07-29 | Support frame suitable for electric power capital construction job site interim cable supports |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212543326U true CN212543326U (en) | 2021-02-12 |
Family
ID=74517788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021530285.7U Active CN212543326U (en) | 2020-07-29 | 2020-07-29 | Support frame suitable for electric power capital construction job site interim cable supports |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212543326U (en) |
-
2020
- 2020-07-29 CN CN202021530285.7U patent/CN212543326U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106025957B (en) | Cable support device | |
CN105024310A (en) | Adjustable slewing bearing device for laying cable bridge | |
CN212639884U (en) | Building telescopic platform with adjustable | |
CN212129843U (en) | Construction equipment scaffold | |
CN211647581U (en) | Electric power construction that makes things convenient for interim use is with protection rail | |
CN212543326U (en) | Support frame suitable for electric power capital construction job site interim cable supports | |
CN211018109U (en) | Communication engineering cable erection device | |
CN211229798U (en) | River course protection network for hydraulic engineering | |
CN214089503U (en) | Highway bridge construction support bracket | |
CN210316487U (en) | Stabilize effectual joint formula scaffold frame base | |
CN211596310U (en) | Temporary construction platform for surface finishing in garden road construction process | |
CN209760978U (en) | Insulating rail convenient to remove | |
CN217535396U (en) | Portable simple and easy lifting device of height-adjustable | |
CN113027228B (en) | A enclose and keep off reinforcing apparatus for wall body | |
CN213341444U (en) | Cable erecting device convenient for cable tightening | |
CN211046336U (en) | Cable transmission support | |
CN220267161U (en) | Movable scaffold with stable supporting structure | |
CN216393564U (en) | Special orchard stool | |
CN210316462U (en) | Adjustable usable floor area's hanging flower basket for building engineering | |
CN210767570U (en) | Security protection guardrail structure suitable for unsmooth highway section | |
CN218643935U (en) | Safety protection device for electric power engineering construction | |
CN217104803U (en) | Road warning roadblock for highway engineering | |
CN204081429U (en) | Overhead welding and hoisted in position job platform | |
CN210074677U (en) | Movable cable tray | |
CN214145018U (en) | Protector for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231009 Address after: No.7 Taiye Lane, Jinzhu Street, Rongcheng Town, Rongxian County, Yulin City, Guangxi Zhuang Autonomous Region, 537500 Patentee after: Guangxi Rongxian Construction Engineering Co. Address before: No.82 Fumin Third Road, Wuzhou City, Guangxi Zhuang Autonomous Region Patentee before: WUZHOU University |