CN212536925U - Fixing device of water conservancy buried pipe - Google Patents

Fixing device of water conservancy buried pipe Download PDF

Info

Publication number
CN212536925U
CN212536925U CN202020900974.6U CN202020900974U CN212536925U CN 212536925 U CN212536925 U CN 212536925U CN 202020900974 U CN202020900974 U CN 202020900974U CN 212536925 U CN212536925 U CN 212536925U
Authority
CN
China
Prior art keywords
pipeline
plate
support
water conservancy
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020900974.6U
Other languages
Chinese (zh)
Inventor
陈留新
付修智
胡文凤
王丽
郭栋英
张明明
李盈
芦付灵
赵芮
张殿臣
牛馨伟
程东彩
姚霜青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangqiu Water Conservancy Construction Survey Design Institute
Original Assignee
Shangqiu Water Conservancy Construction Survey Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangqiu Water Conservancy Construction Survey Design Institute filed Critical Shangqiu Water Conservancy Construction Survey Design Institute
Priority to CN202020900974.6U priority Critical patent/CN212536925U/en
Application granted granted Critical
Publication of CN212536925U publication Critical patent/CN212536925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a fixing device of water conservancy buried pipe in water conservancy pipeline construction equipment field, including first pipeline and second pipeline, first pipeline is located the second pipeline below, be provided with supporting component on the first pipeline, supporting component includes just to the left subassembly and the right subassembly that set up, a left side subassembly with all be provided with the base on the right subassembly, the base orientation first pipeline one side is just being provided with first screw rod, be provided with the limiting plate on the first screw rod, the scalable setting of limiting plate, the limiting plate top is provided with first support, the support with first screw rod threaded connection, first support dorsad first pipeline one side is provided with the second screw rod, be provided with the second support on the second screw rod, the scalable setting of second support perpendicular to second pipeline direction. The utility model discloses have the effect according to pipeline diameter regulation size.

Description

Fixing device of water conservancy buried pipe
Technical Field
The utility model relates to a water conservancy pipeline construction equipment field especially relates to a fixing device of water conservancy pipe laying.
Background
In hydraulic engineering, can often be because factors such as topography, can cause vertically and horizontally staggered between the water conservancy pipeline, if the water conservancy pipeline with vertically and horizontally staggered separately carries out the pipe laying, need the staff to excavate the pre-buried groove of two kinds of depths in grades, for convenient operation the staff mostly adopts equipment such as excavators to excavate pre-buried groove once only, if vertically and horizontally staggered's water conservancy pipeline direct contact this moment, cause mutual extrusion damage easily, consequently it is necessary to adopt plus fixing device separately fixed with vertically and horizontally staggered's water conservancy pipeline, so that the better pipe laying work that carries on of staff.
To the above-mentioned problem, chinese patent that publication number is CN209130294U discloses a fixing device for water conservancy buried pipe, including setting up stationary blade and the connecting device at the buried tub of external wall in advance, be provided with the fixed block on the stationary blade, be used for bearing fixed buried pipe, be provided with the connection piece between two stationary blades, form fixed monomer, be provided with connecting device between the upper and lower fixed monomer, form the pipeline fixing device of dislocation from top to bottom, the fixed monomeric position is adjusted to accessible connecting device, the fixed mode of dislocation from top to bottom, the crisscross laying mode of pipeline of can being convenient for, construction efficiency has been promoted.
When the pipeline fixing device is installed and used, the diameters of the pipelines on the site are not always the same, and the situation that the pipelines cannot be completely fastened due to the fact that the diameter of the fixing device is too large or the pipelines cannot be fastened due to the fact that the diameter of the fixing device is too small occurs during use, so that the pipelines cannot be fixed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a fixing device of water conservancy buried pipe through setting up the supporting component of adjustable size, has realized having strengthened fixed stability to the fixed of different diameter pipelines, has avoided because the pipeline diameter is unmatched the fixed unstable condition emergence that causes with pipeline fixing device.
The utility model aims at realizing through the following technical scheme:
the utility model provides a fixing device of water conservancy buried pipe, includes first pipeline and second pipeline, first pipeline is located the second pipeline below, be provided with supporting component on the first pipeline, supporting component includes just to left subassembly and the right subassembly of setting, a left side subassembly with all be provided with the base on the right subassembly, the base orientation first pipeline one side is just being provided with first screw rod, be provided with the limiting plate on the first screw rod, the scalable setting of limiting plate, the limiting plate top is provided with first support, first support with first screw rod threaded connection, and the scalable setting of first support, first support is kept away from first pipeline one side is provided with the second screw rod, be provided with the second support on the second screw rod, the scalable setting of second support perpendicular to second pipeline direction.
Through adopting above-mentioned technical scheme, the supporting component is used for carrying out the layering with first pipeline and second pipeline, divide into the supporting component and do to build and right subassembly has realized the most basic separation state of supporting component for the supporting component can tentatively realize adjusting according to the size of pipeline diameter. The setting of base can make things convenient for left side subassembly and right side subassembly to place fixedly, and the base of left side subassembly and right side subassembly simultaneously can realize spacing to the pipeline towards the one side of first pipeline. The setting of first screw rod can provide the mode that removes for the limiting plate, and the limiting plate can make spacingly to first pipeline along the ascending removal of first screw rod axial, prevents that first pipeline from going out along the axial motion of first screw rod. The setting of first support can realize bearing the weight of second pipeline, and the setting of first second screw rod and second support can realize bearing the weight of second pipeline with first support cooperation simultaneously, and the scalable setting of second support can be realized adjusting the length that second support is perpendicular and second pipeline axial direction according to second pipeline diameter. Thereby realizing that the support component is adjusted according to the diameter of the first pipeline and the diameter of the second pipeline.
The utility model discloses further set up to, be provided with the fixed orifices on the base, be provided with the inflation screw in the fixed orifices.
Through adopting above-mentioned technical scheme, the setting of fixed orifices and inflation screw can make things convenient for the staff to the fixed of base.
The utility model discloses further set up to: the base orientation first pipeline side and the limiting plate orientation first pipeline side all is provided with the blotter.
Through adopting above-mentioned technical scheme, the setting up of blotter can prevent on the one hand that base and limiting plate from leading to the fact the collision to first pipeline in the installation, and on the other hand blotter can laminate the pipeline surface more owing to the gentle characteristic of self, makes base and limiting plate spacing fixed more firm to first pipeline.
The utility model discloses further set up to: and the limiting plate, the first support and the second support are all provided with adjusting nuts, the adjusting nuts are in threaded connection with the first screw rod, and the limiting plate is in rotary connection with the adjusting nuts.
Through adopting above-mentioned technical scheme, adjusting nut's setting can provide the mode of reciprocating motion regulation for limiting plate and first support on first screw rod, can provide the mode of reciprocating motion for the second support simultaneously on the second screw rod. When the limiting plate moves to the corresponding height, the adjusting nut can fix the position of the limiting plate, and the limiting plate is prevented from being attached to the first pipeline in a limiting mode.
The utility model discloses further set up to: the limiting plate comprises a left plate and a right plate, the left plate faces the first pipeline side face and is matched with the right plate to extend downwards to form a sliding groove, and the right plate can be inserted into the sliding groove.
Through adopting above-mentioned technical scheme, divide into the limiting plate into left board and right board for the limiting plate can realize the extension, and the setting up of spout can make left board and right board can not use first screw rod to rotate as the axle center.
The utility model discloses further set up to: a limiting groove is formed in the side wall of the sliding groove in the direction perpendicular to the first pipeline, and a limiting block is arranged on the right plate and matched with the limiting groove.
Through adopting above-mentioned technical scheme, the setting up of spacing groove and stopper makes left plate and right board can't break away from each other, prevents that left plate and right board from breaking away from each other in adjustment process, causes the limiting plate to can't carry out spacing condition emergence to first pipeline.
The utility model discloses further set up to: the second support comprises a supporting plate, a left moving plate and a right moving plate, the supporting plate is in threaded connection with the second screw, a moving groove for the left moving plate and the right moving plate to stretch is formed in the supporting plate, and the left moving plate and the right moving plate are matched with each other and are provided with moving clamping blocks.
Through adopting above-mentioned technical scheme, divide into backup pad, left moving plate and right moving plate with the second support, the backup pad can realize the main bearing effect to the second pipeline, and left moving plate and right moving plate can realize removing the second support perpendicular with the axial length of second pipeline, and the shifting chute and the removal fixture block that set up simultaneously can prevent that left moving plate and right moving plate from breaking away from the backup pad.
The utility model discloses further set up to: first support divide into left branch board and right branch board, also be provided with the spout on the branch board of a left side, the board can be inserted in the spout is divided to the right side.
Through adopting above-mentioned technical scheme, flexible removal can be realized to first support, can carry out the ascending length adjustment of perpendicular and first pipeline axial according to the distance between left side subassembly and the right side subassembly.
To sum up, the utility model discloses a beneficial technological effect does:
the supporting assembly with the adjustable size is arranged, the pipelines with different diameters are fixed, the fixing stability is enhanced, and the situation that the pipeline diameter is not matched with the pipeline fixing device to cause the fixation instability is avoided.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural view of a second support of the present invention.
In the figure, 1, a first pipeline; 2. a second conduit; 3. a support assembly; 31. a left component; 32. a right component; 33. a base; 34. a first screw; 35. a limiting plate; 351. a left panel; 352. a right plate; 353. a chute; 354. a limiting groove; 355. a limiting block; 36. a first support; 361. a left board dividing; 362. a right board; 37. a fixing hole; 38. an expansion screw; 4. a second screw; 5. a second support; 51. a support plate; 52. a left moving plate; 53. a right moving plate; 54. a moving groove; 55. moving the fixture block; 6. a cushion pad; 7. and adjusting the nut.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a fixing device of water conservancy buried pipe, including first pipeline 1 and second pipeline 2, first pipeline 1 is located second pipeline 2 below, is provided with supporting component 3 on the first pipeline 1, and supporting component 3 is including just to left subassembly 31 and the right subassembly 32 that sets up, all is provided with base 33 on left subassembly 31 and the right subassembly 32, is provided with fixed orifices 37 on the base 33, is provided with the inflation screw 38 that is used for unable adjustment base 33 in the fixed orifices 37. Base 33 is just being provided with first screw rod 34 towards first pipeline 1 one side, is provided with limiting plate 35 on the first screw rod 34, and limiting plate 35 is scalable to be set up, and limiting plate 35 top is provided with first support 36, and first support 36 and first screw rod 34 threaded connection, first support 36 divide into left branch board 361 and right branch board 362, be provided with spout 353 on the board 361 in the left side, right branch board 362 can insert in the spout 353, first support 36 can carry out perpendicular and the ascending length adjustment of first pipeline 1 axial according to the distance between left subassembly 31 and the right subassembly 32. The base 33 and the limit plate 35 are provided with a cushion pad 6 on the sides facing the first pipeline 1 and the first pipeline 1 respectively. The first support 36 is provided with a second screw 4 on the side departing from the first pipeline 1, a second support 5 is arranged on the second screw 4, and the second support 5 is arranged in a telescopic manner in a direction perpendicular to the second pipeline 2. All be provided with adjusting nut 7 on first support 36 and the second support 5, adjusting nut 7 on first support 36 and the second support 5 sets up the surface that is located towards first pipeline 1 direction, and adjusting nut 7 all rotates with first support 36 and second support 5 to be connected. The support assembly 3 is used for layering the first pipeline 1 and the second pipeline 2, and the support assembly 3 is divided into a making structure and a right assembly 32 to realize the most basic separation state of the support assembly 3, so that the support assembly 3 can be preliminarily adjusted according to the diameter of the pipelines. The setting of base 33 can make things convenient for left subassembly 31 and right subassembly 32 to place fixedly, and the base 33 of left subassembly 31 and right subassembly 32 can realize spacing to the pipeline towards the one side of first pipeline 1 simultaneously. The arrangement of the first screw 34 can provide a moving mode for the limiting plate 35, and the limiting plate 35 can limit the movement of the first pipeline 1 in the axial direction of the first screw 34, so as to prevent the first pipeline 1 from moving in the axial direction of the first screw 34. The bearing of second pipeline 2 can be realized to the setting of first support 36, and the setting of first second screw rod 4 and second support 5 can realize bearing of second pipeline 2 with first support 36 cooperation simultaneously, and the scalable setting of second support 5 can realize adjusting the length of second support 5 perpendicular and second pipeline 2 axial direction according to second pipeline 2 diameter. Thereby enabling adjustment of the support assembly 3 according to the diameter of the first conduit 1 and the diameter of the second conduit 2.
Referring to fig. 1, in order to adjust the limiting plate 35 according to the length of the first pipeline 1, an adjusting nut 7 is disposed on the limiting plate 35, the adjusting nut 7 is in threaded connection with the first screw 34, and the limiting plate 35 is in rotational connection with the adjusting nut 7. The limiting plate 35 includes a left plate 351 and a right plate 352, the left plate 351 is provided with a sliding groove 353 extending downward toward one side of the first pipeline 1 in matching with the right plate 352, and the right plate 352 can be inserted into the sliding groove 353. A limiting groove 354 is formed in the side wall of the sliding groove 353 along the direction perpendicular to the first pipeline 1, and a limiting block 355 is arranged on the right plate 352 and matched with the limiting groove 354. The setting of adjusting nut 7 can provide the mode of reciprocating adjustment for the removal of limiting plate 35 on first screw rod 34, and when limiting plate 35 removed to corresponding height, adjusting nut 7 can play the rigidity to limiting plate 35, prevents that limiting plate 35 and the unable laminating of first pipeline 1 is spacing the condition and takes place simultaneously. The stopper plate 35 is divided into the left plate 351 and the right plate 352, so that the stopper plate 35 can be extended, and the chute 353 is provided so that the left plate 351 and the right plate 352 do not rotate about the first screw 34. Meanwhile, the arrangement of the limiting groove 354 and the limiting block 355 enables the left plate 351 and the right plate 352 not to be separated from each other, and prevents the left plate 351 and the right plate 352 from being separated from each other in the adjusting process, so that the limiting plate 35 cannot limit the first pipeline 1.
Referring to fig. 1 and 2, in order to adjust the second support 5 perpendicular to the axial direction of the second pipe 2 according to the diameter of the second pipe 2, the second support 5 is divided into a support plate 51, a left moving plate 52 and a right moving plate 53, the support plate 51 is in threaded connection with the second screw 4, a moving groove 54 for extending and retracting the left moving plate 52 and the right moving plate 53 is formed in the support plate 51, and a moving block 55 is arranged on each of the left moving plate 52 and the right moving plate 53 in cooperation with the moving groove 54. The second support 5 is divided into a support plate 51, a left moving plate 52 and a right moving plate 53, the support plate 51 can mainly bear the weight of the second pipeline 2, the left moving plate 52 and the right moving plate 53 can movably adjust the length of the second support 5 perpendicular to the axial direction of the second pipeline 2, and the moving groove 54 and the moving fixture block 55 can prevent the left moving plate 52 and the right moving plate 53 from separating from the support plate 51.
The implementation principle of the embodiment is as follows: when the staff is supporting and fixing the first pipeline 1 and the second pipeline 2, the first pipeline 1 is firstly placed into the tunnel for laying the pipeline, the adjusting nut 7 on the first screw rod 34 is adjusted according to the diameter of the first pipeline 1, the position of the limiting plate 35 is adjusted, the extension degree between the left plate 351 and the right plate 352 is adjusted, the length of the first support 36 is adjusted along with the adjustment of the length of the limiting plate 35, the adjustment is completed, the height of the first support 36 is adjusted by controlling the adjusting nut 7 on the first support 36, after the adjustment is completed, the left component 31 and the right component 32 are arranged on two sides of the first pipeline 1 in a crossing mode, and then the base 33 is installed on the bottom surface of the tunnel for laying the pipeline through collision screws. Then, the length of the second holder 5 perpendicular to the axial direction of the second pipe 2 is adjusted according to the diameter of the second pipe 2, and the left moving plate 52 and the right moving plate 53 are subjected to elongation adjustment according to the diameter of the second pipe 2 so that the second pipe 2 can be placed in the second holder 5.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. A fixing device of water conservancy buried pipe, includes first pipeline (1) and second pipeline (2), first pipeline (1) is located second pipeline (2) below, its characterized in that: the pipeline connecting device is characterized in that a supporting component (3) is arranged on the first pipeline (1), the supporting component (3) comprises a left component (31) and a right component (32) which are opposite to each other, a base (33) is arranged on the left component (31) and the right component (32), the base (33) faces towards the first pipeline (1) and is opposite to a first screw (34), a limiting plate (35) is arranged on the first screw (34), the limiting plate (35) is arranged in a telescopic mode, a first support (36) is arranged above the limiting plate (35), the first support (36) is in threaded connection with the first screw (34), the first support (36) is arranged in a telescopic mode, the first support (36) deviates from the first pipeline (1) and is provided with a second screw (4), a second support (5) is arranged on the second screw (4), the second support (5) is arranged in a telescopic mode in a direction perpendicular to the second pipeline (2).
2. A water conservancy buried pipe fixing device according to claim 1, wherein: the base (33) is provided with a fixing hole (37), and an expansion screw (38) is arranged in the fixing hole (37).
3. A water conservancy buried pipe fixing device according to claim 2, wherein: base (33) orientation first pipeline (1) a side and limiting plate (35) orientation first pipeline (1) a side all is provided with blotter (6).
4. A water conservancy buried pipe fixing device according to claim 3, wherein: all be provided with adjusting nut (7) on limiting plate (35), first support (36) and second support (5), adjusting nut (7) with first screw rod (34) threaded connection, just limiting plate (35) with adjusting nut (7) rotate and are connected.
5. A water conservancy buried pipe fixing device according to claim 4, characterized in that: the limiting plate (35) comprises a left plate (351) and a right plate (352), the left plate (351) is provided with a sliding groove (353) towards one side face of the first pipeline (1) in a matched mode, the right plate (352) extends downwards, and the right plate (352) can be inserted into the sliding groove (353).
6. A water conservancy buried pipe fixing device according to claim 5, characterized in that: a limiting groove (354) is formed in the side wall of the sliding groove (353) along the direction perpendicular to the first pipeline (1), and a limiting block (355) is arranged on the right plate (352) and matched with the limiting groove (354).
7. A water conservancy buried pipe fixing device according to claim 6, characterized in that: the second support (5) comprises a support plate (51), a left moving plate (52) and a right moving plate (53), the support plate (51) is in threaded connection with the second screw (4), a moving groove (54) for the left moving plate (52) and the right moving plate (53) to stretch is formed in the support plate (51), and the left moving plate (52) and the right moving plate (53) are matched with each other, and moving clamping blocks (55) are arranged in the moving groove (54).
8. A fixing device for a water conservancy buried pipe according to claim 7, characterized in that the first support (36) is divided into a left branch plate (361) and a right branch plate (362), the left branch plate (361) is also provided with a sliding groove (353), and the right branch plate (362) can be inserted into the sliding groove (353).
CN202020900974.6U 2020-05-25 2020-05-25 Fixing device of water conservancy buried pipe Expired - Fee Related CN212536925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020900974.6U CN212536925U (en) 2020-05-25 2020-05-25 Fixing device of water conservancy buried pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020900974.6U CN212536925U (en) 2020-05-25 2020-05-25 Fixing device of water conservancy buried pipe

Publications (1)

Publication Number Publication Date
CN212536925U true CN212536925U (en) 2021-02-12

Family

ID=74544220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020900974.6U Expired - Fee Related CN212536925U (en) 2020-05-25 2020-05-25 Fixing device of water conservancy buried pipe

Country Status (1)

Country Link
CN (1) CN212536925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113915411A (en) * 2021-08-23 2022-01-11 浙江金峨生态建设有限公司 Auxiliary structure for underwater pipe burying

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113915411A (en) * 2021-08-23 2022-01-11 浙江金峨生态建设有限公司 Auxiliary structure for underwater pipe burying

Similar Documents

Publication Publication Date Title
CN212536925U (en) Fixing device of water conservancy buried pipe
CN204546478U (en) Mould composite bevel machine table
CN209344644U (en) A kind of cable auxiliary arrangement tooling with elevating function
CN215928599U (en) Municipal administration rain sewage pipeline laying device
CN217078426U (en) Bridge cable guide pipe positioning device
CN213952673U (en) Assembled bathroom furred ceiling leveling installation device
CN213685558U (en) Pipeline fixing device is used in municipal administration plumbing construction
CN218883188U (en) Water conservancy construction pipeline supporting construction
CN206016259U (en) A kind of adjustable beam die plate reinforcing jacking device
CN221171302U (en) Pipeline supporting device for hydraulic engineering
CN218441021U (en) Pipeline positioning support
CN215215090U (en) A mounting bracket for synthesizing pipeline
CN219932049U (en) Ladder stand for engineering machinery
CN219388833U (en) Supporting seat for pipeline installation
CN220218713U (en) Novel special cutting machine of tubular product sample
CN217762356U (en) Adjustable base is used in drain pipe installation
CN218557015U (en) Support frame for water conservancy and hydropower construction
CN213930002U (en) Levelness fine-adjustment aligning device for equipment installation
CN218801936U (en) Municipal works pipeline quick connect device
CN212442694U (en) Bending device of small metal
CN218267664U (en) Height-adjustable hydraulic tunnel pipe support
CN219952557U (en) Indoor floor installation component
CN218697844U (en) Auxiliary device is used in municipal works construction piping erection
CN218062224U (en) Novel hydraulic ring geological drilling drill rod structure
CN214939825U (en) Safety device is used in hydraulic engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212