CN212534992U - Combined scaffold for civil engineering - Google Patents

Combined scaffold for civil engineering Download PDF

Info

Publication number
CN212534992U
CN212534992U CN202020458541.XU CN202020458541U CN212534992U CN 212534992 U CN212534992 U CN 212534992U CN 202020458541 U CN202020458541 U CN 202020458541U CN 212534992 U CN212534992 U CN 212534992U
Authority
CN
China
Prior art keywords
scaffold
civil engineering
groove
seted
cutting ferrule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020458541.XU
Other languages
Chinese (zh)
Inventor
杨丰年
王萃萃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020458541.XU priority Critical patent/CN212534992U/en
Application granted granted Critical
Publication of CN212534992U publication Critical patent/CN212534992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a combination formula scaffold for civil engineering belongs to the civil engineering field. The utility model provides a combination formula scaffold for civil engineering, includes the lift, the lift top is equipped with the scaffold body, the inside movable groove of having seted up of scaffold body, both ends are symmetrical structure and have seted up two slag notch around the movable groove bottom surface, two standing grooves have been seted up to both ends inner wall below symmetry around the movable groove, be equipped with the cleaning brush in the standing groove, the draw-in groove has been seted up to standing groove bottom surface right-hand member, scaffold body bottom surface four corners department all welds the reference column, lift top surface four corners department all welds the support column. Through the cooperation relation of the ka tai on the reference column that sets up and the cutting ferrule to and the spring that sets up, can strengthen the cooperation relation between them, make the structure more stable, completion that can be fine is to the fixed stay of scaffold body, also is convenient for dismantle and install through the joint cooperation relation of the ka tai that sets up and cutting ferrule simultaneously.

Description

Combined scaffold for civil engineering
Technical Field
The utility model relates to a civil engineering field, more specifically say, relate to a civil engineering is with combination formula scaffold.
Background
In the civil engineering construction process, all use the scaffold, the scaffold is construction tool in one commonly used, and the scaffold can assist the staff to the eminence and carry out the construction. Present combination formula scaffold still has some problems, for example, patent number is CN209924400U combination formula scaffold for civil engineering, telescopic link and workstation lug connection's mode through setting up, inconvenient dismantlement, telescopic link and workstation coupling part are inefficacy easily after long-time use, there is certain potential safety hazard, when advancing construction operation simultaneously, the construction waste that the construction produced often can scatter to the scaffold on, long-time unclean can lead to surpassing its bearing capacity, lead to the engineering accident easily. In view of this, we propose a combined scaffold for civil engineering. In view of this, we propose a combined scaffold for civil engineering.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
An object of the utility model is to provide a civil engineering is with combination formula scaffold to solve the problem that proposes in the above-mentioned background art.
2. Technical scheme
The utility model provides a combination formula scaffold for civil engineering, includes the lift, the lift top is equipped with the scaffold body, the inside movable groove of having seted up of scaffold body, both ends are symmetrical structure and have seted up two slag notch around the movable groove bottom surface, two standing grooves have been seted up to both ends inner wall below symmetry around the movable groove, be equipped with the cleaning brush in the standing groove, the draw-in groove has been seted up to standing groove bottom surface right-hand member, scaffold body right-hand member is equipped with the staircase, scaffold body bottom surface four corners department has all welded the reference column, the reference column lower extreme outside is equipped with the ka tai, lift top surface four corners department has all welded the support column.
Preferably, two slide bars are fixedly arranged between the two placing grooves in a bilateral symmetry structure.
Preferably, two through holes are symmetrically formed in the left side and the right side above the cleaning brush, the sliding rod is limited in the through holes and is in sliding fit with the through holes, a flexible brush is fixedly arranged below the middle of the cleaning brush, and the lower end of the flexible brush is in friction contact with the bottom surface of the placing groove.
Preferably, the staircase is L type structure, staircase upper end left side has set firmly the dop, the dop cooperates with the draw-in groove joint.
Preferably, the lower end of the positioning column is further provided with a cylindrical boss, the inner side of the clamping table is fixedly connected with the outer side of the positioning column, and the upper end of the clamping table is further provided with an arc-shaped groove.
Preferably, the circular slot has been seted up at support column top surface middle part, the circular slot cooperates with cylinder boss grafting, the cutting ferrule has set firmly in the support column upper end outside, cutting ferrule upper end middle part is equipped with the spring, the spring bottom is connected fixedly with the cutting ferrule upper end, spring top and ka tai bottom elastic contact, be equipped with the hasp on the cutting ferrule, hasp one end is connected with cutting ferrule both sides face rotation, the hasp other end and arc wall inner wall sliding fit.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
1. the utility model discloses a sliding fit relation of the cylinder boss that sets up and circular slot to and the cooperation relation of ka tai and cutting ferrule on the reference column of setting, simultaneously through the spring that sets up, can strengthen the cooperation relation between them, make the structure more stable, completion that can be fine is to the fixed stay of scaffold body, and the joint cooperation relation through ka tai and cutting ferrule that sets up is also convenient for dismantle and install simultaneously.
2. The utility model discloses a standing groove and the brush of clearing knot in the inslot that sets up can accomplish accomodating the cleaning brush, save space, and the slide bar through setting up simultaneously can accomplish and clear up construction rubbish with the sliding fit relation of through-hole, simultaneously through setting up the slag notch in standing groove bottom surface both sides, can conveniently clear up rubbish, reduces the atress of scaffold, and then improves the safety in utilization of scaffold.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the scaffold body of the present invention;
FIG. 3 is a schematic view of the connection structure of the chuck table and the chuck sleeve of the present invention;
FIG. 4 is a schematic view of the overall structure of the support post of the present invention;
fig. 5 is a schematic view of the overall structure of the escalator of the present invention;
FIG. 6 is a schematic view of the overall structure of the cleaning brush of the present invention;
the reference numbers in the figures illustrate: 1. a scaffold body; 2. a movable groove; 201. a slag notch; 202. a placement groove; 203. a card slot; 204. a slide bar; 3. a cleaning brush; 301. a through hole; 302. a flexible brush; 4. an escalator; 401. clamping a head; 5. a positioning column; 501. clamping a platform; 502. an arc-shaped slot; 503. a cylindrical boss; 6. a support pillar; 601. a circular groove; 602. a card sleeve; 603. a spring; 604. a hasp; 7. an elevator.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-6, the present invention provides a technical solution:
the utility model provides a combination formula scaffold for civil engineering, including lift 7, 7 tops of lift are equipped with scaffold body 1, 1 inside movable groove 2 of having seted up of scaffold body, both ends are symmetrical structure around the 2 bottom surfaces of movable groove and have seted up two slag notch 201, two standing grooves 202 have been seted up to 2 preceding and back both ends inner wall belows symmetries of movable groove, be equipped with cleaning brush 3 in the standing groove 202, draw-in groove 203 has been seted up to standing groove 202 bottom surface right-hand member, 1 right-hand member of scaffold body is equipped with staircase 4, 1 bottom surface four corners department of scaffold body has all welded reference column 5, the 5 lower extreme outsides of reference column are equipped with ka 501, 7 top surface four.
Furthermore, two sliding rods 204 are fixedly arranged between the two placing grooves 202 in a bilateral symmetry structure, and the moving track of the cleaning brush 3 can be fixed through the arranged sliding rods 204, so that the stability of the device is improved.
Further, two through-holes 301 have been seted up to the bilateral symmetry in cleaning brush 3 top, slide bar 204 is spacing in through-hole 301 and rather than sliding fit, 3 middle part below of cleaning brush has set firmly flexible brush 302, flexible brush 302 lower extreme and standing groove 202 bottom surface frictional contact, standing groove 202 and the cleaning brush 3 of inslot that set up, can accomplish accomodating cleaning brush 3, save space, slide bar 204 through setting up and through-hole 301's sliding fit relation simultaneously, can accomplish to clear up construction waste, simultaneously through setting up the groove 201 of slagging tap in standing groove 202 bottom surface both sides, can conveniently clear up rubbish, reduce the atress of scaffold, and then improve the safety in utilization of scaffold.
Further, staircase 4 is L type structure, and 4 upper ends left sides of staircase have set firmly dop 401, and dop 401 and draw-in groove 203 joint cooperation through the dop 401 and the draw-in groove 203 joint cooperation relation that set up, can conveniently dismantle and install on the one hand, also can improve the security of staircase 4 when using simultaneously.
Further, the lower end of the positioning column 5 is further provided with a cylindrical boss 503, the inner side of the clamping table 501 is fixedly connected with the outer side of the positioning column 5, and the upper end of the clamping table 501 is further provided with an arc-shaped groove 502. Through the sliding fit relation of the cylindrical boss 503 and the circular groove 601, the stability of the structure can be further improved when the installation is completed, and the use safety of the scaffold is further improved.
Furthermore, a circular groove 601 is arranged in the middle of the top surface of the support pillar 6, the circular groove 601 is matched with the cylindrical boss 503 in an inserting manner, a cutting sleeve 602 is fixedly arranged on the outer side of the upper end of the support pillar 6, a spring 603 is arranged in the middle of the upper end of the cutting sleeve 602, the bottom end of the spring 603 is fixedly connected with the upper end of the cutting sleeve 602, the top end of the spring 603 is elastically contacted with the bottom end of the clamping table 501, a buckle 604 is arranged on the cutting sleeve 602, one end of the buckle 604 is rotatably connected with two side surfaces of the cutting sleeve 602, the other end of the buckle 604 is matched with the inner wall of the arc-shaped groove 502 in an inserting manner, meanwhile, the matching relation between the springs 603 can be strengthened through the arrangement of the springs 603, so that the structure is more stable, the fixed support of the scaffold body 1 can be well completed, meanwhile, the clamping matching relationship between the clamping table 501 and the clamping sleeve 602 is convenient to disassemble and assemble.
The working principle is as follows: when the utility model is used, firstly, the elevator 7 is stably placed on the ground, meanwhile, the cylindrical boss 503 arranged at the lower end of the positioning column 5 is inserted into the circular groove 601 arranged at the top surface of the supporting column 6 to be matched with each other, at the moment, the clamping platform 501 arranged at the front end of the positioning column 5 compresses the spring 603 arranged on the clamping sleeve 602, at the moment, the handheld hasp 604 rotates upwards around the clamping sleeve 602, when one end of the hasp 604 is matched with the arc-shaped groove 502 arranged at the upper end of the clamping platform 501 in a sliding way, the installation of the scaffold body 1 is completed, the installation of the escalator 4 is completed by matching the clamping head 401 arranged on the escalator 4 with the clamping groove 203 arranged at the right end of the bottom surface of the placing groove 202 in a clamping way, meanwhile, the external power supply is switched on through the elevator 7 arranged, so that the scaffold body 1 is lifted, when one-time construction is completed, the cleaning is, the construction rubbish that can effectually clear up out is discharged through the slag notch 201 that sets up.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A combined scaffold for civil engineering, includes lift (7), its characterized in that: lifter (7) top is equipped with scaffold body (1), movable groove (2) have been seted up to scaffold body (1) inside, both ends are symmetrical structure and have seted up two slag notch (201) around movable groove (2) bottom surface, two standing grooves (202) have been seted up to both ends inner wall below symmetry around movable groove (2), one of them be equipped with cleaning brush (3) in standing groove (202), draw-in groove (203) have been seted up to movable groove (2) bottom surface right-hand member, scaffold body (1) right-hand member is equipped with staircase (4), reference column (5) have all been welded to scaffold body (1) bottom surface four corners department, reference column (5) lower extreme outside is equipped with ka tai (501), all welded in lifter (7) top surface four corners department has support column (6).
2. The combined scaffold for civil engineering as claimed in claim 1, wherein: two sliding rods (204) are fixedly arranged between the two placing grooves (202) in a bilateral symmetry structure.
3. The combined scaffold for civil engineering as claimed in claim 2, wherein: two through holes (301) are symmetrically formed in the left side and the right side above the cleaning brush (3), the sliding rod (204) is limited in the through holes (301) and is in sliding fit with the through holes, a flexible brush (302) is fixedly arranged below the middle of the cleaning brush (3), and the lower end of the flexible brush (302) is in friction contact with the bottom surface of the placing groove (202).
4. The combined scaffold for civil engineering as claimed in claim 1, wherein: staircase (4) are L type structure, staircase (4) upper end left side has set firmly dop (401), dop (401) and draw-in groove (203) joint cooperation.
5. The combined scaffold for civil engineering as claimed in claim 1, wherein: the lower end of the positioning column (5) is further provided with a cylindrical boss (503), the inner side of the clamping table (501) is fixedly connected with the outer side of the positioning column (5), and the upper end of the clamping table (501) is further provided with an arc-shaped groove (502).
6. The combined scaffold for civil engineering as claimed in claim 5, wherein: circular slot (601) have been seted up at support column (6) top surface middle part, circular slot (601) and cylinder boss (503) cooperation of pegging graft, cutting ferrule (602) have set firmly in support column (6) upper end outside, cutting ferrule (602) upper end middle part is equipped with spring (603), spring (603) bottom and cutting ferrule (602) upper end are connected fixedly, spring (603) top and ka tai (501) bottom elastic contact, be equipped with hasp (604) on cutting ferrule (602), hasp (604) one end is connected with cutting ferrule (602) outer wall rotation, hasp (604) other end and arc wall (502) inner wall joint cooperation.
CN202020458541.XU 2020-04-01 2020-04-01 Combined scaffold for civil engineering Expired - Fee Related CN212534992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020458541.XU CN212534992U (en) 2020-04-01 2020-04-01 Combined scaffold for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020458541.XU CN212534992U (en) 2020-04-01 2020-04-01 Combined scaffold for civil engineering

Publications (1)

Publication Number Publication Date
CN212534992U true CN212534992U (en) 2021-02-12

Family

ID=74523864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020458541.XU Expired - Fee Related CN212534992U (en) 2020-04-01 2020-04-01 Combined scaffold for civil engineering

Country Status (1)

Country Link
CN (1) CN212534992U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152869A (en) * 2021-02-26 2021-07-23 舒朝辉 Building platform for outdoor building and indoor decoration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152869A (en) * 2021-02-26 2021-07-23 舒朝辉 Building platform for outdoor building and indoor decoration

Similar Documents

Publication Publication Date Title
CN212534992U (en) Combined scaffold for civil engineering
CN210413289U (en) Platform upset welding frock
CN211034417U (en) Novel building fragment of brick hacking machine
CN212763252U (en) Multifunctional magnetic sleeve
CN212553819U (en) Observation window mounting hole positioning device
CN212613610U (en) Combined steel structure component
CN210548761U (en) Electric arc stud welding gun suitable for automatic welding
CN211323983U (en) Double-cross-bar detachable high-strength alloy steel bed
CN213279644U (en) Hand-held wireless communication equipment
CN209833160U (en) Lifting seat of numerical control engraving machine
CN213613632U (en) Reaming head convenient to detach for reaming machine
CN216382167U (en) Anchoring device
CN208918403U (en) A kind of construction of the highway enclosing
CN215747445U (en) Elevator chassis welding frock with prevent skew structure
CN212411761U (en) Current type mutual inductor capable of penetrating through wall or cabinet body
CN220908275U (en) Assembling structure for grab rail of snowplow
CN213425134U (en) Campus patrol robot battery replacement mechanism
CN216428786U (en) House building steel constructs roof beam with buffer function
CN218579497U (en) Electric hoist bridge crane
CN214498573U (en) Opening bottom flange for prestressed electric pole
CN213626545U (en) Building construction management is with portable convenient steel construction scaffold frame of dismantling
CN219528636U (en) Assembled guardrail for construction
CN212367745U (en) Exchange cabinet
CN212551848U (en) PCB drilling equipment
CN214501014U (en) Novel ultra-thin energy-conserving LED panel light of concatenation formula

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212